Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 38, 42, 43, 44, 45, 46, 47, 48, 49, 50, 52

Files12

Search terms highlighted
Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CIEC-043_Final.pdf

Extracted from the file · 1 page · 1,715 characters

Words on different pagesRead the text of CIEC-043_Final.pdf

Text of CIEC-044_Final.pdf

Extracted from the file · 1 page · 979 characters

Words on different pagesRead the text of CIEC-044_Final.pdf
Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-045 Page 1 of 1 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to the Rates Panel Testimony at page 30, lines 6-12. a. Please identify each non-distribution component of the rates applicable to large commercial and industrial customers that the Company considers time-varying and that, as stated at lines 6-8, “provide additional incentive and opportunity for customer benefit through efficient utilization of electric service.” b. Please state the Company’s position on a requirement that EDR participants take service under a new TOU rate with time-differentiated distribution, transmission and generation charges that has not yet been designed or approved, and explain the basis for that position. c. Please state whether the Company’s billing system can currently bill an EDR participant’s incremental load under a different rate structure than the participant’s pre-existing load. Response: a. The transmission, non-bypassable FMCC, CTA and energy supply components of service are all priced on a time-varying (time-of-day) basis. While supply rates depend on whether a customer takes Last Resort Service or competitive supply, these time varying structures are mandatory for larger customers who would take service under the EDR (e.g., Rate 55Rate 58). b. To the extent such rate is a general service rate and is the only option compared with existing offerings (that would continue to be available or applicable in the future), it would seem, hypothetically, it would be inevitable that a future EDR participant would be on a time-differentiated rate offering, one way or another (noting, the context of the question contemplates distribution as a time-varying rate, which currently applies for only intermediate, large and MHD EV TOU rate customers). c. Billing capabilities are currently limited in this regard. The Company performs special handling (i.e., manual) billing for Rate 39 customers, where load is bifurcated, analyzed in detail, and billed under two different rate structures.

Text of CIEC-046_Final.pdf

Extracted from the file · 1 page · 2,520 characters

Words on different pagesRead the text of CIEC-046_Final.pdf

Text of CIEC-047_Final.pdf

Extracted from the file · 2 pages · 2,745 characters

Words on different pagesRead the text of CIEC-047_Final.pdf

Text of CIEC-048_Final.pdf

Extracted from the file · 3 pages · 4,409 characters

Text of CIEC-049_Final.pdf

Extracted from the file · 2 pages · 5,446 characters

Words on different pagesRead the text of CIEC-049_Final.pdf

Text of CIEC-050_Final.pdf

Extracted from the file · 2 pages · 2,003 characters

Text of CIEC-052_Final.pdf

Extracted from the file · 3 pages · 6,788 characters

Words on different pagesRead the text of CIEC-052_Final.pdf

As listed on the current system

Question(s) Answered 38, 42, 43, 44, 45, 46, 47, 48, 49, 50, 52 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/12/2026

This filing on the current system (opens in a new tab)