Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 38, 42, 43, 44, 45, 46, 47, 48, 49, 50, 52

Files12

Search terms highlighted
Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CIEC-043_Final.pdf

Extracted from the file · 1 page · 1,715 characters

Words on different pagesRead the text of CIEC-043_Final.pdf

Text of CIEC-044_Final.pdf

Extracted from the file · 1 page · 979 characters

Words on different pagesRead the text of CIEC-044_Final.pdf

Text of CIEC-045_Final.pdf

Extracted from the file · 1 page · 2,237 characters

Words on different pagesRead the text of CIEC-045_Final.pdf

Text of CIEC-046_Final.pdf

Extracted from the file · 1 page · 2,520 characters

Words on different pagesRead the text of CIEC-046_Final.pdf

Text of CIEC-047_Final.pdf

Extracted from the file · 2 pages · 2,745 characters

Words on different pagesRead the text of CIEC-047_Final.pdf

Text of CIEC-048_Final.pdf

Extracted from the file · 3 pages · 4,409 characters

Text of CIEC-049_Final.pdf

Extracted from the file · 2 pages · 5,446 characters

Words on different pagesRead the text of CIEC-049_Final.pdf
2 pages match
  1. Page 1Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-050 Page 1 of 2 Date Filed: November 12, 2026 Witness: Edward A. Davis and Kimberly R. Parsons Request from: Connecticut Industrial Energy Consumers Question: Please refer to Exhibit CLP-RATES-3 at page 186 (Transmission Adjustment Clause), which refers to “the transmission costs of acquiring such services.” a. Please identify the billing determinants ISO-NE uses to assess Regional Network Service and Local Network Service charges to the Company, including whether those charges are based on the Company’s network load at the time of the monthly peak. b. Please provide the Company’s monthly network load used to determine Regional Network Service charges for each month from January 2023 through the most recent month available. c. Please provide the Company’s estimate of the change in its annual Regional Network Service charges that would result from a 1 MW increase in its network load at the time of the monthly peak in each of the months of November through March. Response: a. CL&P's monthly regional network load reported to ISO-NE is derived from its network load at the time of the monthly transmission peak. Both the Regional Network Service (RNS) and Local Network Service (LNS) charges use this peak-load billing determinant multiplied by the applicable RNS and LNS rates applied to calculate the respective charges each month. b. The following table provides the monthly network load used to determine Regional Network Service charges for January 2023 to September 2026.
  2. Page 2Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set CIEC-09 Date Issued October 29, 2026 CIEC-050 Page 2 of 2 c. Based on the annual RNS rate, a 1 MW increase in CL&P’s monthly network load would increase the RNS charges as follows: • 2023: $11,804 per month. • 2024: $12,863 per month. • 2025: $15,440 per month. • 2026: $14,802 per month.

Text of CIEC-052_Final.pdf

Extracted from the file · 3 pages · 6,788 characters

Words on different pagesRead the text of CIEC-052_Final.pdf

As listed on the current system

Question(s) Answered 38, 42, 43, 44, 45, 46, 47, 48, 49, 50, 52 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/12/2026

This filing on the current system (opens in a new tab)