Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 10, 11, 12, 13, 14, 15, 16, 17

Files11

Search terms highlighted
Eversource rate increase is on 2 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CIEC-11c_file_list.xlsx

Sheet names, column headings and text cells; numbers left out

Text of CT PURA 26-05-10 CLF Response CIEC-2-012.pdf

Extracted from the file · 2 pages · 5,588 characters

Text of CT PURA 26-05-10 CLF Response CIEC-2-013.pdf

Extracted from the file · 3 pages · 9,208 characters

Text of CT PURA 26-05-10 CLF Response CIEC-2-014.pdf

Extracted from the file · 2 pages · 6,675 characters

Text of CT PURA 26-05-10 CLF Response CIEC-2-015.pdf

Extracted from the file · 2 pages · 3,989 characters

Words on different pages

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: README] CIEC-15(a) workpaper: the $121.49 Rate 1 customer charge Docket No. 26-05-10. Witness: Juan-Pablo Velez. Request from Connecticut Industrial Energy Consumers. This workbook derives the monthly Rate 1 customer charge that would eliminate the representative fossil fuel-heated home's overpayment after it installs a heat pump while holding Rate 1's revenue constant (Velez Direct at 97:11-13 and n.85; Ex. JPV-2, Section 6). It is a redesign of Rate 1 for every customer, not Rate HP. Yellow cells are inputs; every other number is a formula. Inputs Monthly kWh: the representative fossil fuel-heated home before and after heat pump installation, the same home as in Ex. JPV-2, Section 2, and Ex. JPV-4, sheet monthly. Rates: proposed Rate 1 customer charge, Distribution Energy Charge and transmission rate, and the filed delivery riders (Ex. CLP-RATES-2; Ex. CLP-RATES-3 at 243-244). Generation is CL&P's 2025 standard service rate, as in Ex. JPV-2 at 2 and Ex. JPV-4; it does not affect the result. Marginal T&D cost: the home's annual marginal distribution, sub-transmission and bulk transmission cost before and after installation (Ex. JPV-3, sheet hourly_marginal_cost, cells N4 and O4). Rate 1 billing determinants: Rate Year billing months (annual bills) and billed sales (Ex. CLP-RATES-2.4, Rate Year Workpapers, page 3 of 75). Sheets representative_home_consumption: monthly kWh before and after, and the change. rate_1: proposed Rate 1 by month. Each distribution rider is in its own column, and the distribution total includes them. representative_home_bills: the home's annual charges before and after. Cell D8 is the scaling factor: the home's incremental marginal T&D cost divided by its increase in distribution and transmission charges. class: Rate 1 customers, billed sales, and distribution and transmission revenue at filed rates. modified_rate_1: the revenue given up by scaling distribution and transmission rates to the scaling factor, spread across Rate 1's customers as a customer charge increase (cell B6), and the redesigned customer charge (cell B8). Cells B16 and B20 check that class revenue is unchanged and that the home's overpayment is zero. [Sheet: representative_home_consumption] Month | Before | After | Change Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual [Sheet: rate_1] Month | Customer charge | Generation supply | Distribution | Transmission Customer charge ($/month) | Generation supply ($/kWh) | Distribution energy ($/kWh) | Electric system improvements ($/kWh) | Revenue decoupling ($/kWh) | Competitive transition assessment ($/kWh) | FMCC delivery ($/kWh) | Conservation adjustment ($/kWh) | Clean energy fund ($/kWh) | System benefits ($/kWh) | Total ($/kWh) | Transmission ($/kWh) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec [Sheet: representative_home_bills] Component | Before | After | Change Customer charge Generation supply Distribution Transmission Distribution and transmission Marginal T&D cost Scaling factor [Sheet: class] Determinant | Value Annual bills (Rate Year billing months) Billed sales (MWh) Rate 1 customers (average per month) Annual kWh Monthly kWh Distribution and transmission revenue at filed rates ($/year) [Sheet: modified_rate_1] Step | Value Scaling factor Distribution and transmission revenue Distribution and transmission revenue given up ($/year) Rate 1 customers Customer charge increase ($/month) Proposed customer charge ($/month) Redesigned customer charge ($/month) Redesigned customer charge, rounded to the cent Customer charge increase, rounded to the cent Distribution and transmission revenue per customer at filed rates ($/year) Rate 1 revenue at filed rates: customer charge, distribution and transmission ($/year) Rate 1 revenue at redesigned rates ($/year) Check: redesigned minus filed revenue (zero) Home's increase in distribution and transmission charges at redesigned rates Home's incremental marginal T&D cost Check: home's overpayment at redesigned rates (zero)

Text of CT PURA 26-05-10 CLF Response CIEC-2-016.pdf

Extracted from the file · 1 page · 925 characters

Text of CT PURA 26-05-10 CLF Response CIEC-2-017.pdf

Extracted from the file · 1 page · 1,256 characters

As listed on the current system

Question(s) Answered 10, 11, 12, 13, 14, 15, 16, 17 (Conservation Law Foundation) Date Filed: 11/17/2026

This filing on the current system (opens in a new tab)