Interrogatory responses
Answers to questions 2 thru 20
Files10
OCC Response to CIEC Second Set of Requests.pdf
PDF · 571 KB · 25 pagesText searchable
Download OCC Response to CIEC Second Set of Requests.pdfRead the text of OCC Response to CIEC Second Set of Requests.pdf
Response to CIEC-2 (a) Classification of AMI-related costs.xlsx
Excel · 16 KBText searchable
Download Response to CIEC-2 (a) Classification of AMI-related costs.xlsxRead the text of Response to CIEC-2 (a) Classification of AMI-related costs.xlsx
Response to CIEC-8 (b) Allocation of AMI meter costs.xlsx
Excel · 16 KBText searchable
Download Response to CIEC-8 (b) Allocation of AMI meter costs.xlsxRead the text of Response to CIEC-8 (b) Allocation of AMI meter costs.xlsx
CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf
PDF · 177 KB · 16 pagesText searchable
Download CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdfRead the text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf
CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf
PDF · 476 KB · 45 pagesText searchable
Download CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdfRead the text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf
CIEC-12 Attachment - Bonbright Excerpt.pdf
PDF · 136 KB · 4 pagesText read by machine from a scan; may contain errors, especially in numbers
Download CIEC-12 Attachment - Bonbright Excerpt.pdfScanned pages and text of CIEC-12 Attachment - Bonbright Excerpt.pdf
CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf
PDF · 245 KB · 31 pagesText searchable
Download CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdfRead the text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf
CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf
PDF · 3.3 MB · 99 pagesText searchable
Download CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdfRead the text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf
CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdfRead the text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf
CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf
PDF · 198 KB · 3 pagesText searchable
Download CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdfRead the text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf
Page 1 of 25
CIEC-2 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 3 Date Submitted: November 11, 2026 CIEC-2 Please refer to Whited Direct Testimony at page 11, lines 3-15, and page 12, line 1 (Table 1) and line 2. Please provide the following regarding Table 1: a. All workpapers supporting Table 1 in Excel format with formulas intact, to the extent not otherwise provided in response to CIEC-1. b. The source note to Table 1 cites “Exhibit CLP-AMI-3, Figure 7.” Please identify the specific page and figure of Exhibit CLP-AMI-3 from which each net present value (“NPV”) benefit amount in Table 1 was taken. c. Explain the basis for splitting the $163.80 million VVO benefit into $106.2 million energyrelated and $57.6 million demand-related, and provide the supporting calculation. d. For each benefit category in Table 1, explain specifically why the classification assigned reflects the cause of the cost of AMI meters, as opposed to the type of benefit Ms. Whited believes AMI provides. Response: a. See Attachment “Response to CIEC-2 (a) Classification of AMI-related costs.xlsx” b. All values were taken from “Figure 7 – Annual Nominal Costs and Benefits Over 20 Years” on pages 17-18 of Exhibit CLP-AMI-3. These values are reproduced below:Page 2 of 25
c. No calculations were performed. This value is taken from the portion of the table shown at the top of Exhibit CLP-AMI-3, page 43 for the 20-year NPV. This portion of the table is reproduced below.Page 3 of 25
d. As stated in the NARUC Manual on page 34, “Cost classification identifies the utility operation-- demand, energy, customer-- for which functionalized dollars are spent.” The reason that the Company has proposed to install more costly AMI meters as opposed to less costly traditional meters is to avoid certain types of customer, energy, and demandrelated costs. Page 11 of Ms. Whited’s testimony states “AMI meter costs should be classified in proportion to the net present value of the benefits the Company has quantified, with each benefit assigned according to what drives the cost it avoids. I recommend that benefits from metering, billing, and customer account functions be classified as customerrelated, benefits from voltage optimization and reduced line losses as energy-related, and benefits from peak reduction, avoided VVO line sensors, and improved outage restoration as demand-related.” If there were no energy- or demand-related costs on the system, there would be no need to install more advanced meters. Thus, energy- and demand-related costs drive the decision to install AMI.Page 4 of 25
CIEC-3 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-3 Please refer to Whited Direct Testimony at page 4, lines 11-15; page 11, lines 4-9; and page 12, line 1 (Table 1). a. Please confirm that Ms. Whited’s proposed 38% customer / 47% demand / 15% energy classification would apply only to AMI meter plant (FERC Account 370). If it would apply to any other AMI-related costs (e.g., the customer information system, meter data management system, communications network or VVO enablement), identify each such cost and the classification proposed for it. b. Please state whether the benefits in Table 1 are, in Ms. Whited’s understanding, attributable to the AMI meters alone or to the Company’s AMI program as a whole (including the customer information system, meter data management system, communications network and VVO enablement). If the latter, explain why they are an appropriate basis for classifying the cost of the meters alone. Response: a. Confirmed. b. It is Ms. Whited’s understanding that the benefits in Table 1 are enabled by the AMI meters themselves, rather than by the meter data management system, customer information system, communications network, etc. Of course, the benefits of the meters themselves are only realized when the meters are installed in conjunction with the rest of the AMI investments. Nevertheless, it was Ms. Whited’s intent to separate out the benefits unlocked by the meters themselves, rather than primarily attributable to other AMI components.Page 5 of 25
CIEC-4 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-4 Please refer to Whited Direct Testimony at page 11, lines 6-9, and page 12, line 1 (Table 1, rows “VVO” and “Asset Optimization”). a. Please state and explain in detail whether the VVO and Asset Optimization benefits shown in Table 1 would be realized if the Company installed AMI meters but did not make the VVO enablement investment included in its AMI cost estimates. b. To the extent those benefits depend on the VVO enablement investment, please explain why they are an appropriate basis for classifying the cost of AMI meters. Response: a. No. Other investments such as line devices such as voltage regulators, capacitors, and LTC controllers at substations must also be installed to unlock these benefits. b. The benefits associated with the VVO enablement investment also depend on the installation of AMI meters, as shown in Figure 16 on page 198 of Exhibit CLP-AMI-3. Because the benefits arise from multiple investments (i.e., in the meters themselves as well as other VVO enablement investments), it would be reasonable to only attribute a portion of these benefits to the meters themselves. However, to Ms. Whited’s knowledge, the benefits have not been divided across the various investments, so it is unclear what proportion should be attributed to the meters themselves. The benefits of Asset Optimization are more clearly attributable to the meters themselves, as AMI enables the Company to avoid the cost associated with line sensors. As explained on page 40 of Exhibit CLP-AMI-3, “Asset Optimization details the benefits of avoided cellular charges and avoided line-sensor capital associated with the AMI supported VVO program.”Page 6 of 25
CIEC-5 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-5 Please refer to Whited Direct Testimony at page 11, lines 8-9, and page 12, line 1 (Table 1, row “Improved Restoration – Significant Storms”). a. Please explain specifically how the cost of storm restoration, or the value of reduced customer outage time during significant storms, varies with class peak demand, and provide any study or analysis supporting the classification of this $162.4 million benefit as demand-related. b. Please identify any regulatory decision or cost allocation authority that classifies storm restoration costs as demand-related. Response: a. Avoided storm restoration expense relates to reduced operation and maintenance (O&M) expense such as repairing or replacing poles, conductors, and line transformers on the distribution system. Such O&M expense is classified on the same basis as the plant it maintains or restores. This plant is primarily classified as demand-related in the Company’s cost of service study. Under the basic customer method I recommend, distribution poles, conductors, and line transformers (FERC Accounts 364–368) are classified as 100 percent demand-related. The expense of restoring that plant is therefore demand-related as well. b. Ms. Whited is not aware of how other jurisdictions classify storm-related costs; however her understanding is that these costs may be allocated using allocators associated with distribution or transmission plant, and that such allocators are typically based on various measures of demand. For example: a. In dockets E-7, SUB 1243 and E-2, SUB 1262, the North Carolina Utilities Commission approved Duke’s storm recovery cost allocation as follows: the distribution-related costs are allocated based on a composite distribution plant allocator and the transmission-related costs are allocated based on a transmission demand factor, both from the 2019 Rate Cases. b. Texas law requires that “system restoration costs shall be functionalized and allocated to customers in the same manner as the corresponding facilities and related expenses are functionalized and allocated in the electric utility's current base rates.” 2025 Texas Statutes, Utilities Code, Section 36.403(g).Page 7 of 25
CIEC-6 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-6 Please refer to Whited Direct Testimony at page 4, lines 13-15, and page 11, lines 4-5 and 12-15. a. Please explain how a classification proportional to projected benefits reflects the causes of the costs being classified, particularly where the projected benefits of the AMI program are less than its projected costs (see Exhibit CLP-AMI-3 at 17-18, Figure 7). b. If the Company’s benefit estimates are revised in a future proceeding, or actual benefits differ from those projected, would Ms. Whited’s proposed classification of AMI meter costs change accordingly? Please explain the answer in detail. Response: a. Please see the response to CIEC-2 (d). As noted in that response, the additional cost of AMI is incurred to obtain capabilities beyond billing, such as enablement of time-varying rates, outage detection, and voltage optimization. Classifying costs in proportion to the quantified benefits therefore assigns them according to the functions the investment is designed to serve. This is the same principle that underlies classification generally: costs are classified according to the purpose for which they are incurred. The fact that projected benefits are less than projected costs does not change this conclusion. b. Yes, if the estimated or actual benefits were to change, it would be appropriate to update the classification of the AMI meters.Page 8 of 25
CIEC-7 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-7 Please refer to Whited Direct Testimony at page 9, lines 13-18. a. Please identify each AMI capability referenced at lines 14-16 that Ms. Whited contends is not currently available to customers served under Rate 39 and Rate 57 through their existing metering. b. Has Ms. Whited reviewed the number, type or cost of the meters currently serving Rate 39 and Rate 57 customers? If so, provide the information reviewed. Response: a. Ms. Whited has not conducted a review of the specific metering capabilities for customers on Rates 39 or 57. b. Ms. Whited has not conducted this review.Page 9 of 25
CIEC-8 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-8 Please refer to Whited Direct Testimony at page 4, lines 11-15, and page 12, lines 3-4. a. Please identify the allocation factors Ms. Whited would use to allocate the demand-related and energy-related portions of AMI meter costs to rate classes. b. Please provide, by rate class (including Rate 39 and Rate 57), the allocation of an illustrative $1 million AMI meter revenue requirement under (i) Ms. Whited’s proposed classification and (ii) the weighted meter cost allocator used for Account 370 in the Company’s ACOSS (Exhibit CLP-ACOS-2 at 16-20). Provide workpapers for the foregoing in Excel format. c. If Ms. Whited has not performed such an analysis, please explain why not. Response: a. As described in her testimony on pages 20-22, Ms. Whited recommends that the Company develop equipment-level allocators for its next base rate case. However, until such allocators are available, she recommends that AMI demand-related costs should be allocated on the same basis as other demand-related distribution costs. It is Ms. Whited’s understanding that most of the distribution system benefits would relate to the primary system, and thus primary demand would likely be the appropriate allocator. However, it could also be reasonable to develop a blended allocator if it can be demonstrated that a portion of benefits would also accrue to the secondary system and line transformers, which have different allocators. For energy-related AMI costs, Ms. Whited proposes to use kilowatt-hour sales as the allocator. For customer-related AMI costs, Ms. Whited proposes to use the weighted cost of meters. b. See attachment “Response to CIEC-8 (b) Allocation of AMI meter costs.xlsx” c. N/APage 10 of 25
CIEC-9 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 2 Date Submitted: November 11, 2026 CIEC-9 Please refer to Whited Direct Testimony at page 12, line 5, through page 13, line 5. a. Please confirm that in the 24-10-04 Decision (at 197-198), OCC recommended that AMI costs be classified according to benefits in the customer, demand and energy categories, and the Authority “affirm[ed] the Company’s proposed classification of AMI meters as 100% customer-related, which is consistent with cost causation principles.” b. Please explain why Ms. Whited’s testimony does not address that determination. c. Please identify each fact specific to CL&P that Ms. Whited contends warrants a different classification of AMI meter costs than the Authority approved for UI. d. Other than the Maryland decision cited at page 12, line 6 through page 13, line 5, please identify every regulatory decision of which Ms. Whited is aware that adopted or rejected a benefits-based classification of AMI meter costs, and provide a copy of each. e. Please identify each proceeding in which Ms. Whited or Synapse Energy Economics, Inc. has recommended a benefits-based classification of AMI or smart meter costs, and state the outcome in each. Response: a. Confirmed. b. The Authority decides each proceeding on the evidence before it. In docket 24-10-04, OCC’s recommendation was not based on estimates of quantified benefits, as these were not available at the time because the Authority found UI’s benefit-cost analysis was deficient. In this proceeding, CL&P has provided quantifiable estimates of AMI benefits upon which one can develop more precise allocation factors. OCC believes that these values provide the Authority with additional information to support the classification that OCC has proposed. c. See response to (b). d. Ms. Whited is aware of two other cases in which a similar approach was adopted. a. The Colorado Public Utilities Commission has adopted a benefits-based classification of AMI meter costs. This approach was initially approved in 2017. The current 83 percent customer-related and 17 percent demand-related split will be reexamined in PSCo’s upcoming rate case, as per the 2023 rate case order (attached). b. In 2023, the Minnesota Public Utilities Commission stated that “the new meters would primarily serve to help reduce demand and energy for the class of customers receiving the new meters. But the purpose of the meters is to benefit the utility’s
Text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf
Extracted from the file · 45 pages · 89,290 characters
Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf
Read by machine from a scan · 4 pages · may contain errors, especially in numbers
Text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf
Extracted from the file · 31 pages · 41,898 characters
Text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf
Extracted from the file · 99 pages · 204,526 characters
Text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf
Extracted from the file · 24 pages · 63,774 characters
Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf
Extracted from the file · 3 pages · 7,608 characters
As listed on the current system
Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026