Interrogatory responses
Answers to questions 2 thru 20
Files10
OCC Response to CIEC Second Set of Requests.pdf
PDF · 571 KB · 25 pagesText searchable
Download OCC Response to CIEC Second Set of Requests.pdfRead the text of OCC Response to CIEC Second Set of Requests.pdf
Response to CIEC-2 (a) Classification of AMI-related costs.xlsx
Excel · 16 KBText searchable
Download Response to CIEC-2 (a) Classification of AMI-related costs.xlsxRead the text of Response to CIEC-2 (a) Classification of AMI-related costs.xlsx
Response to CIEC-8 (b) Allocation of AMI meter costs.xlsx
Excel · 16 KBText searchable
Download Response to CIEC-8 (b) Allocation of AMI meter costs.xlsxRead the text of Response to CIEC-8 (b) Allocation of AMI meter costs.xlsx
CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf
PDF · 177 KB · 16 pagesText searchable
Download CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdfRead the text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf
CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf
PDF · 476 KB · 45 pagesText searchable
Download CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdfRead the text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf
CIEC-12 Attachment - Bonbright Excerpt.pdf
PDF · 136 KB · 4 pagesText read by machine from a scan; may contain errors, especially in numbers
Download CIEC-12 Attachment - Bonbright Excerpt.pdfScanned pages and text of CIEC-12 Attachment - Bonbright Excerpt.pdf
CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf
PDF · 245 KB · 31 pagesText searchable
Download CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdfRead the text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf
CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf
PDF · 3.3 MB · 99 pagesText searchable
Download CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdfRead the text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf
CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdfRead the text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf
CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf
PDF · 198 KB · 3 pagesText searchable
Download CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdfRead the text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf
Page 16 of 25
CIEC-13 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-13 Please refer to Whited Direct Testimony at page 4, lines 3-6; page 16, lines 3-11; and page 18, lines 15-21. a. Please provide a copy of any Ontario Energy Board decision or order (as distinct from the Board Staff Discussion Paper cited in footnote 27) that approved the density-based classification method Ms. Whited describes. b. Please identify each U.S. state regulatory commission of which Ms. Whited is aware that has adopted a customer density-based classification of distribution plant, and provide a copy of each relevant decision. c. Please confirm that, under the density-based approach Ms. Whited describes, a portion of distribution plant in each density category would still be classified as customer-related. d. Please identify the data the Company would need to develop the proposed density-based approach and whether, to Ms. Whited’s knowledge, the Company currently maintains those data. Response: a. Please refer to the attachment. b. Ms. Whited is not aware of any US jurisdiction that has approved a customer-density based classification of distribution plant. c. Confirmed. d. Please see the attachment for a description of the data and methods used to perform the density study for Hydro One in Ontario, including an overview of the customer, asset, and geographic data used on page 4. Note that the Company could conduct a Connecticut-based density study without strictly adhering to Hydro One’s methodology. Ms. Whited does not know whether similar data is currently maintained by the Company.Page 17 of 25
CIEC-14 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-14 Please refer to Whited Direct Testimony at page 16, line 12, through page 17, line 15, and page 19, lines 1-7. a. Please identify the specific per-customer load-carrying capacity values, by equipment type (e.g., primary and secondary poles, overhead and underground conductors, line transformers), that Ms. Whited recommends be used for CL&P, and provide all supporting workpapers. b. Please confirm that in the 24-10-04 Decision (at 197-199), the Authority adopted loadcarrying capacity values based on UI’s own minimum-sized equipment rather than the generic per-customer values of 0.4 kW and 1.5 kW that OCC presented, and found that omitting classes whose demands can “generally” be met by the minimum system “is too imprecise to be a reasonable approach.” c. Does Ms. Whited agree that any load-carrying capacity adjustment for CL&P should be calculated from the load-carrying capability of the specific minimum-sized facilities in the Company’s MDS study? If not, explain why not. d. Please explain how the proposed adjustment would be applied to classes, such as Rate 39, that take service at primary voltage and are not allocated the costs of secondary facilities. e. Please provide any quantification Ms. Whited has performed of the effect of her proposed adjustment on class rates of return, including for Rate 39 and Rate 57. Response: a. Ms. Whited requested that the Company provide these values in OCC-738 (b), but the Company stated that it has not performed such analysis and calculations. However, the Company provided the capacity of the minimum size equipment in response to OCC-728 (b). b. Confirmed. c. Ideally, the load-carrying capacity adjustment for CL&P should be calculated from the load-carrying capability of the specific minimum-sized facilities in the Company’s MDS study. Absent this data, it would be reasonable to adopt values from other utilities (such as those adopted in 24-10-04) until CL&P values can be developed. d. A class would receive a load-carrying credit for a component only if it is allocated the customer-related minimum system cost of that same component. e. Ms. Whited has not performed such analysis.Page 18 of 25
CIEC-15 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-15 Please refer to Whited Direct Testimony at page 19, lines 8-13, and page 20, line 1 (Table 3). a. Please identify the data request response or other document that is the source of Table 3 and provide a copy, including any Excel workpapers. b. Please provide, by rate class, the change in revenue requirement at equalized rates of return that would result from replacing the MDS method with the basic customer method. Response: a. Please refer to the response to OCC-729 (a). b. Please refer to the response to OCC-729 (a).Page 19 of 25
CIEC-16 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-16 Please refer to Whited Direct Testimony at page 4, lines 16-22, and page 21, line 11, through page 22, line 10. a. Please confirm that Ms. Whited proposes that the equipment-level allocation study be filed alongside, and not in place of, the Company’s conventional class cost of service study in its next rate case, and that she is not recommending that the Authority adopt the equipmentlevel method in this proceeding. b. Please confirm that, under Ms. Whited’s proposal, the loads of customers taking service at primary or transmission voltage would be excluded from the allocation of facilities at lower voltage levels that they do not use, consistent with the NARUC Manual at 97. c. Please confirm that Ms. Whited would preserve the Company’s current exclusion of customers served from customer-owned transformers from the allocation of Account 368 line transformer costs (Exhibit CLP-ACOS-1 at 6, lines 8-10). d. Please confirm that in the 24-10-04 Decision (at 200-201), UI reported that its alternative substation and feeder allocators were “very similar” to its NCP and 1CP allocators, and that the Authority retained NCP allocators, adjusted for load-carrying capacity, for poles, conductors and line transformers. e. Please provide any estimate Ms. Whited has made of the cost to the Company of retaining, aggregating and analyzing hourly AMI data at the substation, feeder and line transformer level. f. Please explain how the proposed study would allocate the costs of substations or feeders dedicated to serving a single customer. Response: a. b. c. d. e. f. Confirmed. Confirmed. Confirmed. Confirmed. Ms. Whited has not developed such an estimate. These would be directly allocated to the customer.Page 20 of 25
CIEC-17 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-17 Please refer to Whited Direct Testimony at page 5, line 6, and page 39, lines 18-20. a. Please provide the precise tariff definition of “data center loads” that Ms. Whited proposes for the EDR exclusion. b. Please state whether the proposed exclusion would include a minimum size threshold and, if so, what that threshold would be. c. Please state whether the exclusion would apply to a manufacturing facility with significant on-site computing, automation or process control load, and explain how such a facility would be distinguished from a data center. d. Please state whether the exclusion would apply to incremental load resulting from the electrification of industrial processes, such as process heating. e. Please explain how the exclusion would apply to a facility that combines data center and non-data center operations. Response: a. The exclusion from the EDR should apply to facilities that classified under the North American Industry Classification System (NAICS) code 518210 (Data Processing, Hosting, and Related Services). b. The minimum size threshold should be temporarily set at 50 MW, before a permanent threshold can be determined in a dedicated proceeding on data center tariffs. c. See answer to subpart (a) above. d. No. The exclusion would not apply to incremental load resulting from the electrification of industrial processes such as process heating. e. See answer to subpart (a) above.Page 21 of 25
CIEC-18 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-18 Please refer to Whited Direct Testimony at page 38, lines 3-19, and page 39, lines 3-10. a. Please confirm that the EDR approved for UI in the 22-08-08 Decision (at 252) is “available to all C&I customers, without any cap on participation,” subject only to an exception for C&I customers directly participating in local commerce, and does not exclude data center loads. b. Please identify any generation or transmission cost that Ms. Whited contends would be borne by other customers as a result of a discount applied only to the distribution charges of a data center customer. c. Please provide any Connecticut-specific evidence that the siting decisions of data center developers are insensitive to the level of distribution rates. Response: a. Confirmed. b. Ms. Whited has not identified any generation or transmission cost that would be borne by other customers as a result of a distribution charge discount. c. Ms. Whited is not aware of Connecticut-specific evidence that data center siting decisions are insensitive to utility rates. The statement indicates that data center developments tend to prioritize speed over cost reflects national trends. See: • “For data center developers, speed-to-power far outweighs other factors like the price of power or access to land.” Center for Strategic & International Studies. 2025. The Electricity Supply Bottleneck on U.S. AI Dominance. https://www.csis.org/analysis/electricity-supply-bottleneck-us-ai-dominance • “While 24/7 power availability is a central goal for data centers and hyperscalers, the top priority remains speed to market.” Ascend Analytics. 2026. Data Centers and Power: Speed, Reliability, and Tradeoffs. https://www.ascendanalytics.com/blog/data-centers-energy-tradeoffs-speedreliability • “Power, not location or cost, will be the primary site selection criteria due to multiyear wait times for a grid connection.” JLL. 2026. 2026 Global Data Center Market Outlook. https://www.jll.com/en-us/insights/market-outlook/data-centeroutlookPage 22 of 25
CIEC-19 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-19 Please refer to Whited Direct Testimony at page 40, lines 7-22. a. Please identify each transmission or supply cost that Ms. Whited contends incremental EDR load would impose on other customers and that would not be recovered from the EDR customer through its undiscounted transmission charges and its supply arrangements. b. Please confirm that new load whose revenue exceeds its marginal cost to serve places downward pressure on rates for other customers regardless of whether that load is concentrated in off-peak hours. c. Please provide any quantification Ms. Whited has performed of the transmission or supply cost impacts referenced at lines 10-16. Response: a. There are two ways that increases in CL&P’s peak demand can increase costs to all customers. First, higher peak demand can lead to an increase in generation capacity requirements and higher energy prices, resulting in higher market clearing prices as demand intersects the supply curve higher than before. This would be reflected in higher market clearing prices for all load. Second, increases in peak demand can trigger the need for additional transmission investments. To the extent that the cost of the additional transmission capacity necessary to serve the new load is greater than the system average transmission costs, transmission rates will increase for all customers. b. Confirmed, as long as the comparison between revenue and marginal cost to serve incorporates all components of the system (generation, transmission, and distribution). c. Ms. Whited has not performed such analysis.Page 23 of 25
CIEC-20 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-20 Please refer to Whited Direct Testimony at page 41, lines 15-20, and page 5, lines 7-9. a. Please state whether the proposed TOU requirement would apply only to the EDR customer’s incremental load or to the customer’s entire facility, including its pre-existing load. b. Please state whether the EDR would be unavailable to customers until the proposed industrial TOU rates are filed and approved by the Authority. c. Please state whether Ms. Whited proposes that the new industrial TOU rates be mandatory, optional or unavailable for Rate 57 and Rate 58 customers that do not participate in the EDR. d. Please identify each jurisdiction of which Ms. Whited is aware that requires customers to take service under a TOU rate as a condition of eligibility for an economic development rate, and provide the relevant tariff or decision. e. Please confirm that the EDR approved for UI in the 22-08-08 Decision does not require participants to take service under a TOU rate. f. Please provide any analysis Ms. Whited has performed of the load profiles, load factors or load flexibility of Rate 57 and Rate 58 customers. Response: a. If the incremental load is separately metered, the proposed TOU requirement would apply only to the EDR customer’s incremental load. If the incremental load is not separately metered, the proposed TOU requirement would apply to the EDR customer’s entire load. b. The EDR would be unavailable to customers until industrial TOU rates are approved by the Authority. c. The new industrial TOU rates would be optional for Rate 57 and 58 customers not participating in the EDR. d. Ms. Whited is not aware of other jurisdictions that require economic development rate customers to take service under a TOU rate. However, many jurisdictions that offer economic development rates also have standard industrial rates that are time-varying. For example, see the attachments for Pacific Gas & Electric’s and Public Service Company of Colorado’s standard industrial tariffs. e. Confirmed. f. Ms. Whited has not performed an analysis on the load profiles, load factors, or load flexibility of Rate 57 and Rate 58 customers.Page 24 of 25
CIEC-21 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-21 Please refer to Whited Direct Testimony at page 41, lines 3-14. a. Please provide all studies, data or other support for the statement at lines 9-11 that an eighthour on-peak period “can make it difficult for customers to manage around.” b. Please identify the on-peak period Ms. Whited would recommend for the industrial TOU rates she proposes, and provide all supporting analysis. c. Please identify any analysis Ms. Whited has performed of the bill impacts of her proposed industrial TOU rates on Rate 57 and Rate 58 customers. d. The reference at line 12 to “Section V.29C” appears to be a typographical error. Please identify the section of Whited Direct Testimony intended. Response: a. This statement is based on the duration of common commercially-deployed battery storage systems. As stated by Enel, “Most commercially deployed battery energy storage systems have storage durations of two to four hours, used for short-duration applications like ancillary services and shaving demand peaks.” https://www.enelnorthamerica.com/insights/blogs/battery-storage-101-everything-youneed-to-know b. Ms. Whited is not recommending a specific on-peak period for the industrial TOU rates at this time. The selection of the appropriate on-peak period should consider the hours with highest system load, probability of peak, distribution marginal costs, and wholesale energy prices. c. An analysis on the bill impacts of potential industrial TOU rates on Rate 57 and Rate 58 customers has not been performed. d. The correct reference should be to Section V.C, which begins on page 29 of the testimony.Page 25 of 25
CIEC-22 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-22 Please refer to Whited Direct Testimony at page 5, lines 10-13; page 43, lines 13-15; and page 44, lines 7-12. a. Whited Direct Testimony describes the proposed discount cap as “50 percent of the net present value of incremental revenues” (page 5, lines 12-13), as “50 percent of the total incremental distribution revenue from the incremental load” (page 43, lines 13-14, describing the UI EDR) and as “50 percent of the net present value of the incremental distribution revenues, accounting for the cost of connecting the customer and any other electric infrastructure investments made to serve the incremental load” (page 44, lines 1012). Please reconcile these descriptions and state precisely how the cap would be calculated. b. Please confirm that Ms. Whited intends the cap and associated hurdle rate analysis to replicate those the Authority approved for UI in the 22-08-08 Decision (at 249-251). If not, identify each difference and explain why it is warranted. c. Please state whether “the cost of connecting the customer and any other electric infrastructure investments” would include costs that the EDR customer pays directly to the Company through a contribution in aid of construction or otherwise under the Company’s new business policies (CL&P Response to OCC-932(a)). d. Please provide a numerical example illustrating the calculation of the proposed cap. Response: a. The cap would be calculated as 50 percent of the net present value of incremental distribution revenues from the EDR customer. The net present value would be equal to the revenues expected from the customer minus the marginal costs to serve that customer, including the payments made by the customer and costs incurred by the Company to connect the customer to the grid under the Company’s new business policies. b. The recommended cap and associated rate hurdle analysis is meant to replicate those approved by the Authority for UI in the 22-08-08 Decision. c. See response to subpart (a). d. Assume expected distribution revenues of $10,000,000 from an EDR customer (inclusive of any contribution in aid of construction under Eversource’s new business policies), and incremental distribution costs of $6,000,000 to serve that customer (inclusive of the costs to connect the customer to the system). The net present value of the incremental distribution revenues is $10,000,000 - $6,000,000 = $4,000,000. The cap on the total discount for this customer would be 50% x $4,000,000 = $2,000,000.
Text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf
Extracted from the file · 45 pages · 89,290 characters
Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf
Read by machine from a scan · 4 pages · may contain errors, especially in numbers
Text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf
Extracted from the file · 31 pages · 41,898 characters
Text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf
Extracted from the file · 99 pages · 204,526 characters
Text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf
Extracted from the file · 24 pages · 63,774 characters
Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf
Extracted from the file · 3 pages · 7,608 characters
As listed on the current system
Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026