Interrogatory responses
Answers to questions 2 thru 20
Files10
OCC Response to CIEC Second Set of Requests.pdf
PDF · 571 KB · 25 pagesText searchable
Download OCC Response to CIEC Second Set of Requests.pdfRead the text of OCC Response to CIEC Second Set of Requests.pdf
Response to CIEC-2 (a) Classification of AMI-related costs.xlsx
Excel · 16 KBText searchable
Download Response to CIEC-2 (a) Classification of AMI-related costs.xlsxRead the text of Response to CIEC-2 (a) Classification of AMI-related costs.xlsx
Response to CIEC-8 (b) Allocation of AMI meter costs.xlsx
Excel · 16 KBText searchable
Download Response to CIEC-8 (b) Allocation of AMI meter costs.xlsxRead the text of Response to CIEC-8 (b) Allocation of AMI meter costs.xlsx
CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf
PDF · 177 KB · 16 pagesText searchable
Download CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdfRead the text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf
CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf
PDF · 476 KB · 45 pagesText searchable
Download CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdfRead the text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf
CIEC-12 Attachment - Bonbright Excerpt.pdf
PDF · 136 KB · 4 pagesText read by machine from a scan; may contain errors, especially in numbers
Download CIEC-12 Attachment - Bonbright Excerpt.pdfScanned pages and text of CIEC-12 Attachment - Bonbright Excerpt.pdf
CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf
PDF · 245 KB · 31 pagesText searchable
Download CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdfRead the text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf
CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf
PDF · 3.3 MB · 99 pagesText searchable
Download CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdfRead the text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf
CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf
PDF · 1.9 MB · 24 pagesText searchable
Download CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdfRead the text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf
CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf
PDF · 198 KB · 3 pagesText searchable
Download CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdfRead the text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf
Page 6 of 25
CIEC-5 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-5 Please refer to Whited Direct Testimony at page 11, lines 8-9, and page 12, line 1 (Table 1, row “Improved Restoration – Significant Storms”). a. Please explain specifically how the cost of storm restoration, or the value of reduced customer outage time during significant storms, varies with class peak demand, and provide any study or analysis supporting the classification of this $162.4 million benefit as demand-related. b. Please identify any regulatory decision or cost allocation authority that classifies storm restoration costs as demand-related. Response: a. Avoided storm restoration expense relates to reduced operation and maintenance (O&M) expense such as repairing or replacing poles, conductors, and line transformers on the distribution system. Such O&M expense is classified on the same basis as the plant it maintains or restores. This plant is primarily classified as demand-related in the Company’s cost of service study. Under the basic customer method I recommend, distribution poles, conductors, and line transformers (FERC Accounts 364–368) are classified as 100 percent demand-related. The expense of restoring that plant is therefore demand-related as well. b. Ms. Whited is not aware of how other jurisdictions classify storm-related costs; however her understanding is that these costs may be allocated using allocators associated with distribution or transmission plant, and that such allocators are typically based on various measures of demand. For example: a. In dockets E-7, SUB 1243 and E-2, SUB 1262, the North Carolina Utilities Commission approved Duke’s storm recovery cost allocation as follows: the distribution-related costs are allocated based on a composite distribution plant allocator and the transmission-related costs are allocated based on a transmission demand factor, both from the 2019 Rate Cases. b. Texas law requires that “system restoration costs shall be functionalized and allocated to customers in the same manner as the corresponding facilities and related expenses are functionalized and allocated in the electric utility's current base rates.” 2025 Texas Statutes, Utilities Code, Section 36.403(g).Page 7 of 25
CIEC-6 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-6 Please refer to Whited Direct Testimony at page 4, lines 13-15, and page 11, lines 4-5 and 12-15. a. Please explain how a classification proportional to projected benefits reflects the causes of the costs being classified, particularly where the projected benefits of the AMI program are less than its projected costs (see Exhibit CLP-AMI-3 at 17-18, Figure 7). b. If the Company’s benefit estimates are revised in a future proceeding, or actual benefits differ from those projected, would Ms. Whited’s proposed classification of AMI meter costs change accordingly? Please explain the answer in detail. Response: a. Please see the response to CIEC-2 (d). As noted in that response, the additional cost of AMI is incurred to obtain capabilities beyond billing, such as enablement of time-varying rates, outage detection, and voltage optimization. Classifying costs in proportion to the quantified benefits therefore assigns them according to the functions the investment is designed to serve. This is the same principle that underlies classification generally: costs are classified according to the purpose for which they are incurred. The fact that projected benefits are less than projected costs does not change this conclusion. b. Yes, if the estimated or actual benefits were to change, it would be appropriate to update the classification of the AMI meters.Page 8 of 25
CIEC-7 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-7 Please refer to Whited Direct Testimony at page 9, lines 13-18. a. Please identify each AMI capability referenced at lines 14-16 that Ms. Whited contends is not currently available to customers served under Rate 39 and Rate 57 through their existing metering. b. Has Ms. Whited reviewed the number, type or cost of the meters currently serving Rate 39 and Rate 57 customers? If so, provide the information reviewed. Response: a. Ms. Whited has not conducted a review of the specific metering capabilities for customers on Rates 39 or 57. b. Ms. Whited has not conducted this review.Page 9 of 25
CIEC-8 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-8 Please refer to Whited Direct Testimony at page 4, lines 11-15, and page 12, lines 3-4. a. Please identify the allocation factors Ms. Whited would use to allocate the demand-related and energy-related portions of AMI meter costs to rate classes. b. Please provide, by rate class (including Rate 39 and Rate 57), the allocation of an illustrative $1 million AMI meter revenue requirement under (i) Ms. Whited’s proposed classification and (ii) the weighted meter cost allocator used for Account 370 in the Company’s ACOSS (Exhibit CLP-ACOS-2 at 16-20). Provide workpapers for the foregoing in Excel format. c. If Ms. Whited has not performed such an analysis, please explain why not. Response: a. As described in her testimony on pages 20-22, Ms. Whited recommends that the Company develop equipment-level allocators for its next base rate case. However, until such allocators are available, she recommends that AMI demand-related costs should be allocated on the same basis as other demand-related distribution costs. It is Ms. Whited’s understanding that most of the distribution system benefits would relate to the primary system, and thus primary demand would likely be the appropriate allocator. However, it could also be reasonable to develop a blended allocator if it can be demonstrated that a portion of benefits would also accrue to the secondary system and line transformers, which have different allocators. For energy-related AMI costs, Ms. Whited proposes to use kilowatt-hour sales as the allocator. For customer-related AMI costs, Ms. Whited proposes to use the weighted cost of meters. b. See attachment “Response to CIEC-8 (b) Allocation of AMI meter costs.xlsx” c. N/APage 10 of 25
CIEC-9 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 2 Date Submitted: November 11, 2026 CIEC-9 Please refer to Whited Direct Testimony at page 12, line 5, through page 13, line 5. a. Please confirm that in the 24-10-04 Decision (at 197-198), OCC recommended that AMI costs be classified according to benefits in the customer, demand and energy categories, and the Authority “affirm[ed] the Company’s proposed classification of AMI meters as 100% customer-related, which is consistent with cost causation principles.” b. Please explain why Ms. Whited’s testimony does not address that determination. c. Please identify each fact specific to CL&P that Ms. Whited contends warrants a different classification of AMI meter costs than the Authority approved for UI. d. Other than the Maryland decision cited at page 12, line 6 through page 13, line 5, please identify every regulatory decision of which Ms. Whited is aware that adopted or rejected a benefits-based classification of AMI meter costs, and provide a copy of each. e. Please identify each proceeding in which Ms. Whited or Synapse Energy Economics, Inc. has recommended a benefits-based classification of AMI or smart meter costs, and state the outcome in each. Response: a. Confirmed. b. The Authority decides each proceeding on the evidence before it. In docket 24-10-04, OCC’s recommendation was not based on estimates of quantified benefits, as these were not available at the time because the Authority found UI’s benefit-cost analysis was deficient. In this proceeding, CL&P has provided quantifiable estimates of AMI benefits upon which one can develop more precise allocation factors. OCC believes that these values provide the Authority with additional information to support the classification that OCC has proposed. c. See response to (b). d. Ms. Whited is aware of two other cases in which a similar approach was adopted. a. The Colorado Public Utilities Commission has adopted a benefits-based classification of AMI meter costs. This approach was initially approved in 2017. The current 83 percent customer-related and 17 percent demand-related split will be reexamined in PSCo’s upcoming rate case, as per the 2023 rate case order (attached). b. In 2023, the Minnesota Public Utilities Commission stated that “the new meters would primarily serve to help reduce demand and energy for the class of customers receiving the new meters. But the purpose of the meters is to benefit the utility’sPage 11 of 25
entire system, and society at large; accordingly, it may well make sense to allocate AMI costs to all utility customers—including wholesale customers.” Thus, the commission stated that it would no longer give preference to the traditional method of treating customer costs as customer-related and instead “Minnesota Power will have to analyze how AMI meters are associated with customer costs as well as energy costs and demand costs—or, in the alternative, conduct its class cost-ofservice study using the premise that AMI costs are allocated equally to customer, demand, and energy factors.” See: Minnesota Power’s 2021 rate case order in Docket E015/GR-21-335, Feb. 28, 2023, at 61.) e. Ben Havumaki of Synapse proposed such a classification in Consumers Energy’s most recent rate case (U-22070). The outcome of this case has not yet been decided.Page 12 of 25
CIEC-10 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 2 Date Submitted: November 11, 2026 CIEC-10 Please refer to Whited Direct Testimony at page 4, lines 7-10, and page 18, lines 8-21. a. Please confirm that in the 24-10-04 Decision (at 198), in response to OCC’s recommendation of the basic customer method, the Authority stated that “it is not clear that the basic customer method is a superior alternative” and found that “[t]he MSS approach is a just and reasonable approach to cost classification.” b. Please confirm that in the 22-08-08 Decision (at 227-228), the Authority found the minimum system methodology “generally acceptable” and accepted its use. c. Please explain why Ms. Whited’s testimony cites the 24-10-04 Decision for the loadcarrying capacity adjustment (page 17, lines 11-15) but does not address the Authority’s rejection of the basic customer method in that same decision. d. Please identify any facts, data or analysis specific to CL&P, or developed since the 24-1004 Decision, that Ms. Whited contends warrant a different result in this proceeding. Response: a. Confirmed. b. Confirmed. c. While the Authority did not accept the basic customer approach in docket 24-10-04, the Authority also did not provide blanket acceptance of the minimum system approach. Rather, the Authority acknowledged OCC’s concerns with the minimum system approach and stated that it accepted the MSS approach “in this proceeding.” Further, the Authority stated that the MSS approach was an imperfect proxy for geographic dispersion and, on page 200 of its decision, directed UI to “explore the use of proxies that align more closely with geographic dispersion as a cost driver, rather than defaulting to MSS…” My testimony in this proceeding responds directly to these concerns and recommends the basic customer method be implemented only until a customer density analysis can be performed. d. Because CL&P has not conducted a customer density analysis, the Authority must choose between two imperfect cost allocation methods in the interim: the minimum system approach and the basic customer method. While the Authority accepted the minimum system approach in docket 24-10-04, it limited its acceptance to that particular proceeding. The adoption of the basic customer method in this proceeding would be reasonable given the magnitude of the Company’s proposed rate increase and the affordability concerns that this raises, particularly for lower-income customers, since the basic customer methodPage 13 of 25
would reduce the costs allocated to the residential class (as shown on Table 3 of Ms. Whited’s testimony.)Page 14 of 25
CIEC-11 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-11 Please refer to Whited Direct Testimony at page 15, lines 6-16. a. Please confirm that the “additional distribution system poles and wires” that a new rural customer “may require” in order “to extend service to the customer’s residence” (lines 1214) would be required even if that customer’s demand were negligible, and are therefore not caused by that customer’s peak demand. b. Under the basic customer method Ms. Whited recommends, would the cost of those poles and wires be classified as demand-related and allocated to rate classes based on class NCP demand? If so, explain how that result is consistent with cost causation. c. Please confirm that the costs of the poles and wires required to connect customers vary with the number and geographic dispersion of customers rather than with their peak demand. Response: a. Confirmed. b. Yes, under the basic customer method, the costs of poles and wires are classified as demand-related and allocated based on class NCP. Please see the response to CIEC-10 (c)(d). Ms. Whited acknowledges that both the minimum system method and the basic customer method are imperfect proxies for geographic dispersion. For this reason, Ms. Whited recommends that the basic customer method be implemented only until a better allocator is developed. c. Confirmed.Page 15 of 25
CIEC-12 The Office of Consumer Counsel Witness: Melissa Whited Docket No. 26-05-10 Page 1 of 1 Date Submitted: November 11, 2026 CIEC-12 Please refer to Whited Direct Testimony at page 15, line 17, through page 16, line 2. a. Please confirm that, as described at page 15, lines 19-20, Professor Bonbright argued that the costs of the minimum system “should be excluded from demand-related costs.” b. Please explain how Ms. Whited’s recommendation to classify all costs in FERC Accounts 364-368 as demand-related (page 19, lines 8-9) is consistent with that view. c. Please provide a copy of pages 347-348 of Principles of Public Utility Rates (1961) as relied upon. Response: a. Confirmed. Bonbright argues that these costs cannot be classified as either customerrelated or demand-related. b. As noted above, both the minimum system method and the basic customer method are imperfect proxies for geographic dispersion, and neither is consistent with Bonbright’s observation that these costs should not be classified as either demand-related or customerrelated. However, CL&P has not yet conducted a customer density study, and thus a better allocator is not readily available. For this reason, Ms. Whited recommends that the basic customer method be implemented only until a better allocator is developed. c. Please see the attachment.
Text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf
Extracted from the file · 45 pages · 89,290 characters
Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf
Read by machine from a scan · 4 pages · may contain errors, especially in numbers
Text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf
Extracted from the file · 31 pages · 41,898 characters
Text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf
Extracted from the file · 99 pages · 204,526 characters
Text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf
Extracted from the file · 24 pages · 63,774 characters
Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf
Extracted from the file · 3 pages · 7,608 characters
As listed on the current system
Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026