Interrogatory responses

Answers to questions 2 thru 20

Files10

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf

Extracted from the file · 16 pages · 28,745 characters

Words on different pages
  1. Page 14 of 45

    Decision No. C24-0117 37. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E Like WRA, EOC suggests that rate impact mitigation can be accomplished outside of the cost allocation methodology. EOC opposes use of the 4CP-AED methodology for allocating transmission and substation costs. 26 (3) 38. Objections to POD-PH or POD Methodologies Climax, CEC, FEA, and Walmart object to the POD-PH methodology and advocate for continued use of 4CP-AED. 39. Climax faults POD-PH as untested and flawed because it does not correctly allocate demand related costs and it does not consider cost causation because it uses a 100 percent energy allocator for all generation assets. 27 Should the Commission authorize the POD-PH, Climax recommends using 500 peak hours rather than 1,000. 40. CEC similarly offers a modification of the peak hours should the POD-PH be approved: the hours in which retail demand is at least 90 percent of peak demand, about 83 hours of the 2022 test year, with the top retail demand hours corresponding to the hours used to determine production cost in the POD-PH allocation factor calculation. 28 41. FEA objects to the POD-PH methodology, arguing it does not sufficiently weight peak demands that drive investment in production resource capacity and does not align with critical peak hour demands impacting service reliability and conservation-related critical peak pricing objectives. FEA faults POD-PH as an energy allocation methodology, claiming it gives minimal weighting to peak hour demands that drive investment, and disputes whether it accurately reflects Hrng. Exh. 601 Chernick Answer Testimony at 17-19. Hrng. Exh. 1500 Baron Answer Testimony at 14:14-18. 28 Hrng. Exh. 401 Higgins Cross-Answer Testimony at 6:18-23. 26 27 14
  2. Page 15 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E cost causation, creating a shift in cost responsibility across rate classes to the detriment of customers. 29 42. Walmart objects to the POD-PH methodology, arguing that the choice of 1,000 peak hours is arbitrary and could result in rate classes with TOU components paying for peak hour costs that do not align with the TOU structure. 30 If the Commission approves a POD-PH methodology, Walmart recommends choosing a peak-hour modifier of fewer than 100 hours. Walmart argues the Company did not provide evidence that the 4CP-AED methodology is less stable than POD-PH. b. 43. Support for 4CP-AED Methodology CEC, Climax, FEA, and Walmart support continued use of the 4CP-AED methodology. This methodology allocates costs based on contribution to four peak load hours in June, July, August, and September (4CP). The AED component is calculated by subtracting class annual Average Demand from the Excess Demand (the class 4CP). The AED is allocated to each class using the ratio of each class’s Excess Demand to total retail Excess Demand. 44. CEC supports use of 4CP-AED for the allocation of production plant because it has long been used by this Commission and because it recognizes peak demand as an important part of generation investment. CEC contends 4CP-AED appropriately meets the Commission’s order to identify a cost allocation methodology that is consistent across all electric generation and storage assets, concluding that wind plant can be included in the 4CP-AED with simultaneous allocation of production tax credit benefits using the 4CP-AED. 31 Should the Commission reject 4CP-AED, FEA SOP at 4. Hrng. Exh. 1000 Teague Answer Testimony at 11:16-19. 31 CEC SOP at 9. 29 30 15
  3. Page 16 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E CEC recommends use of POD-PH with peak hours as those in which demand is at least 90 percent of system peak, which is 83 hours in the 2022 test year. 45. Climax maintains that the 4CP-AED methodology appropriately allocates fixed, demand-related capacity costs on a combination of class demands at four peaks, along with average and excess class demand for the year. 32 46. FEA contends the 4CP-AED methodology considers both peak hour coincident demands and production capacity to serve base hourly energy demands. 33 Additionally, FEA argues that fixed costs are more accurately classified as both customer- and demand-related costs and that classifying them as only demand ignores customer impacts on the distribution costs. 34 FEA concludes, if the Commission wants to mitigate the rate impact for the Residential class, it can do so with 4CP-AED, with gradual movement toward cost of service. 35 c. 47. Discussion of Stratification Methodology Stratification is an Equivalent Peaker Method discussed by UCA’s witness Peterson, although he ultimately recommends using the POD methodology. Under Stratification, peaking units are considered pure capacity units, because of their low installed costs per kW and high fuel-related costs per kWH, relative to baseload and intermediate generating units. Costs associated with baseload and intermediate units are divided into demand and energy components, with the demand component defined in terms of an equivalent peaking unit. Hrng. Exh. 1500 Baron Answer Testimony at 18:1–16:2. Hrng. Exh. 900 Gorman Answer Testimony at 8:4-11. 34 Hrng. Exh. 900 Gorman Answer Testimony at 10:3-7. 35 Hrng. Exh. 900 Gorman Answer Testimony at 10:11-17. 32 33 16
  4. Page 17 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E The following example, drawn from the Regulatory Assistance Project’s “Electric Cost Allocation for a New Era” shows how costs would be allocated: 36 Generating Unit Peaking unit (e.g., combustion turbine) Intermediate unit (e.g., combined cycle) Baseload unit (e.g., coal-fired) 48. Capital Cost $/kW $ 770 $1,020 $1,976 Capacity-Related Share of Cost 100.0% 75.4% 39.0% Energy-Related Share of Cost 0.0% 24.6% 61.0% Despite describing Stratification in his Answer testimony, UCA witness Peterson does not recommend using Stratification in this Proceeding, stating it is a methodology for classifying demand and energy rather than an allocation method and the production costs classified to demand are allocated on a 4CP basis. 37 In his written testimony, UCA witness Peterson cites to Minnesota, South Dakota, and North Dakota as states approving the Stratification methodology for Public Service’s affiliate, Northern States Power Company, 38 but during cross examination he noted that, in South Dakota, each of the four electric utilities use different allocators, including 4CP-AED and 12CP-AED. 49. Public Service contends that Stratification is an inappropriate methodology for modern resource planning for several reasons. First, that it is based on an incorrect assumption that Public Service plans its generation system based solely on using the least expensive source of generation. Public Service contends that Stratification’s division of costs simply based on demand and energy is outdated and cannot be applied to a generation portfolio that includes renewable resources that provide attributes above capacity and energy. Additionally, Public Service objects Hrng. Exh. 601 Sinton Answer Testimony, Att. PC-2 at 116. Hrng. Exh. 300 Peterson Answer Testimony at 24:12-20; Dec. 15, 2023 Hrng. Trans. at 175:11-16. 38 Although Mr. Peterson states the Commission found the Stratification methodology reasonable in Public Service’s 2020 Phase II case, citing the Commission’s approval of a $7.5 million downward adjustment to the Residential class’s cost responsibility, the allocation methodology used in that proceeding was 4CP-AED and the Residential class adjustment was done afterward for rate mitigation purposes. 36 37 17
  5. Page 18 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E that Stratification considers peaking costs based on natural gas combustion turbines as the base for cost comparison, while the reality of today’s system is that peaking resources can include a broader range of resources, including battery storage and demand response. Additionally, Public Service contends, while Stratification is based on the idea that the capacity portion of generating resources providing 100 percent firm capacity, this does not hold true for intermittent resources such as wind, solar, and battery storage. 39 The Company also notes that Stratification classifies fixed production plant into energy-related and capacity-related components, which are further allocated to classes using separate allocators for energy and for demand. Public Service concludes the record in this case does not have sufficient data to accomplish an appropriate allocation. 40 50. CEC objects to Stratification, arguing that the classification as energy-related of all fixed generation costs greater than the cost of peaking capacity assumes that all investment in plant greater than peaking capacity is done solely to reduce energy costs. CEC contends this shifts significant costs to higher-load factor classes, violating the stability principle of regulation. Additionally, CEC maintains, if the Commission selects Stratification as the cost allocation methodology, it must also direct Public Service to reallocate its fuel costs to reflect the lower fuel costs of baseload generation. 41 d. 51. Summary of Allocated Revenue Requirements The following tables show the allocation percentages and revenue requirement responsibilities under each methodology, based on the approved revenue requirement for Public Service in the Phase I rate case and prior to Public Service’s filing of its Rebuttal case. 42 Hrng. Exh. 109 Klingeman Rebuttal Testimony at 27:3-15. Public Service SOP at 20. 41 CEC SOP at 20. 42 Tables do not add to 100 percent because “Street and Area Lighting” and “Traffic Signal Lighting” classes have been excluded. Those rate classes account for about two percent of cost responsibility. 39 40 18
  6. Page 19 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E Revenue Allocation Factor POD-PH 43 44.5% 5.0% 36.6% 8.3% 3.6% Residential Small Commercial C&I Secondary C&I Primary C&I Transmission POD 44 39.5% 4.9% 38.6% 10.2% 4.9% Stratification 45 43.4% 5.0% 37.5% 8.7% 3.3% 4CP-AED 46 45.3% 5.0% 36.6% 7.9% 3.0% Base Rate Revenue Requirement POD-PH42 $984,895,983 110,245,609 810,198,350 184,674,137 79,284,699 Residential Small Commercial C&I Secondary C&I Primary C&I Transmission e. 52. POD43 $874,338,024 108,477,211 848,880,934 225,615,118 107,450,084 Stratification44 $961,015,793 111,665,883 829,221,030 192,834,911 73,864,992 4CP-AED45 $1,002,232,556 112,556,695 811,240,429 174,285,586 67,241,682 Commission Findings and Conclusions We recognize there is no simple answer to the choice of cost allocation methodologies, especially given the continued evolution of Public Service’s system, the movement toward beneficial electrification, and concerns for rate stability across rate classes. However, considering the evidence and argument in this case, we find it appropriate to adopt for the rate design in this Phase II rate case, use of a POD-PH methodology with 1,000 peak hours. 53. We find that the POD-PH methodology as proposed by the Company is a measured step in the right direction as we adjust to an increasingly dynamic system of resource planning and cost causation. For now, on this record, POD-PH offers both a way to allocate costs based on a greater number of peak hours relative to the 4CP-AED methodology and acknowledges that peak hours are likely to migrate from only summer to some eventual higher usage times in winter with electrification. While we appreciate the arguments for using POD without a peak hour modifier, Hrng. Exh. 106 Knighten Supplemental Testimony at 11, Table JRK-S-2. Hrng. Exh. 300 Peterson Answer Testimony, Att. DEP-3. 45 Hrng. Exh. 300 Peterson Answer Testimony, Att. DEP-12. 46 Hrng. Exh. 300 Peterson Answer Testimony, Att. DEP-2. 43 44 19
  7. Page 20 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E we find that use of the POD-PH is a step in the right direction to reflect a focus on both a greater number of peak hours and the hours we are most concerned about in terms of cost causation, acknowledging the dynamic nature of how the system is planned and how resources are dispatched. 54. We also find merit in the Stratification methodology because it can be structured to use the detailed results from the Company’s Electric Resource Plan (ERP) filings as a basis for cost allocation but note limits in this record that restrict its use at this time. Going forward, we would expect to see a broader analysis that links customer class cost allocation to drivers of cost causation as determined in the Company’s most recent ERP. Specifically, we direct the Company in its next Phase II rate case, to include Stratification as a possible cost allocation methodology, using the Effective Load Carrying Capability (ELCC) data in the ERP to determine the proportion of demand-related costs for different resource types, including wind, solar, and storage. Regarding coal replacement cost assumptions, we would request that the Company explore making its analysis more consistent with the assumptions in either the Regulatory Assistance Project cost allocation report described in the Table above or with the values used by the Company in South Dakota, 47 instead of the speculative approach to coal plant replacement presented in this Proceeding. 3. Other Contested Cost Allocations (1) 55. Transmission and Distribution Substation Allocation As explained above, Public Service proposed to continue its practice of using the same allocator for production plant for transmission and distribution substation costs. Therefore, in its Direct case, the Company proposed to use the POD-PH allocator that resulted in the spread of revenue requirements shown in the preceding table. 47 See Hrng. Exh. 300 Peterson Answer Testimony, Att. DEP-9 at 14, Table 2. 20
  8. Page 21 of 45

    Decision No. C24-0117 56. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E In its Rebuttal case, Public Service revised its allocation methodology for transmission and distribution substations, some $355 million, from POD-PH to 4CP-AED, stating these costs are caused by coincident peak demand during the summer months, making 4CP-AED a more appropriate cost allocation methodology. Public Service notes it has traditionally used one cost allocation methodology for production plant, transmission, and distribution substation costs, but that 4CP-AED better reflects the cause-causation of transmission and distribution assets. With this modification, Public Service acknowledges that the Commission could direct the Company to use one methodology for all assets and require additional analysis in a future Phase II proceeding. 48 57. EOC objects to use of 4CP-AED for transmission and substations, contending the costs of these assets are not necessarily driven by summer peak demand and noting the Company provides no evidence to support the change in methodology. EOC recommends the Commission direct Public Service to conduct studies before the next Phase II rate case, using AMI meter data, to develop appropriate allocators. In this proceeding, EOC recommends using a POD/POD-PH allocator for transmission costs, which EOC contends are driven by system constraints at or near generation and by the distance between generation and load, not just peak demand, and a POD-PH allocator for substation costs, which EOC notes the Company acknowledges fall between system demand and individual customer demands. 49 58. For cost allocation of transmission and distribution substations the Commission approves the POD-PH cost allocation methodology, rejecting the Company’s proposal to use 4CP-AED. We do not find evidence in this record to support use of a cost allocation methodology 48 49 Hrng. Exh. 108 Knighten Rebuttal Testimony at 25:14–26-5. EOC SOP at 24-25. 21
  9. Page 22 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E for transmission and distribution substations that is different from that used for production assets, particularly with regard to the peaking hours associated with distribution substations. We also find merit in continuing to apply one cost allocation methodology for the demand-related costs of production, transmission, and distribution substations, absent compelling evidence that another approach is more accurate. (2) 59. Production Tax Credit Public Service agreed with CEC that production tax credit benefits associated with wind should be allocated in the same manner as production plant costs and stated it would modify its Electric Commodity Adjustment (ECA) accordingly. 50 60. We agree that production tax credit benefits should be allocated in the ECA in the same manner as production plant costs and direct the Company to do so in its next ECA filing. (3) 61. Advanced Meter Costs EOC questions Public Service’s allocation of AMI costs as 83 percent customer-related, arguing that, because AMI benefits the system overall, only 23 percent of AMI costs should be allocated as customer-related, with the remaining 77 percent functionalized and allocated as primary distribution, generation, and transmission. 51 62. SWEEP proposes a 50/50 AMI cost allocation between metering and distribution in order to minimize the increase in the residential Service and Facilities (S&F) charge. SWEEP observes, in the same manner as EOC, that the benefits of AMI extend beyond traditional metering and concludes that a 50/50 split is consistent with state policy goals because “lower customer charges can support equity and promote decarbonization.” 52 Hrng. Exh. 108 Knighten Rebuttal Testimony at 26:6-17. EOC SOP at 14. 52 Hrng. Exh. 1200 Brant Answer Testimony at 14:21-23. 50 51 22
  10. Page 23 of 45

    Decision No. C24-0117 63. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E Public Service responds that EOC’s proposal is invalid because it is based on functionalizing a portion of Advanced Meter costs as generation and transmission, a process that is part of a Phase I revenue requirement determination. 53 Additionally, Public Service argues that the Unopposed Comprehensive Settlement Agreement (AGIS CPCN Settlement) in Proceeding No. 16A-0588E only contemplates functionalizing Advanced Meter costs within the distribution system. 54 Public Service rejects SWEEPs proposal as well because it is not based on data or evidence in this Proceeding. Public Service states any discussion of revisiting the functionalization of AMI costs is premature until the full AMI rollout is complete, and the full costs are known. 64. The Commission finds that the record in the Proceeding on this issue is inadequate to order changes to the allocation of AMI costs but also finds that there are system-wide benefits of AMI that should be better reflected in the allocation. Therefore, the Commission directs the Company to maintain allocation of AMI costs as 83 percent customer-related for this Proceeding but directs the Company to provide a more robust analysis of these costs and identification of the scale and proper allocation of benefits associated with AMI when it files its next Phase II rate case. 53 The record in this Phase II rate case calls into question Public Service’s assertion that the “functionalization of costs” is a process exclusive to a Phase I rate case. The impacts of the cost allocators used in a CCOSS strongly relate to the functionalization and categorization of costs and are likely expected to be legitimate factors for review by the parties and the Commission in a Phase II rate case. Moreover, because one of the principal outputs of a Phase I rate case is generally understood to be an overall measure of the Company’s revenue requirement for collections through base rates, it is possible that potential intervenors would not recognize that a Phase I rate case is where disputes over cost functionalization and categorization would be addressed and fixed for later application in a Phase II proceeding. It is further reasonable to anticipate potential deficiencies in case records if cost functionalization and categorization is kept separate from CCOSS considerations, rate design, and the mitigation of bill impacts across customer classes. 54 Public Service SOP at 22. 23

Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf

Read by machine from a scan · 4 pages · may contain errors, especially in numbers

Text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf

Extracted from the file · 31 pages · 41,898 characters

Text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf

Extracted from the file · 99 pages · 204,526 characters

Text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf

Extracted from the file · 24 pages · 63,774 characters

Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf

Extracted from the file · 3 pages · 7,608 characters

As listed on the current system

Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026