Interrogatory responses

Answers to questions 2 thru 20

Files10

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf

Extracted from the file · 16 pages · 28,745 characters

Words on different pages
  1. Page 18 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E that Stratification considers peaking costs based on natural gas combustion turbines as the base for cost comparison, while the reality of today’s system is that peaking resources can include a broader range of resources, including battery storage and demand response. Additionally, Public Service contends, while Stratification is based on the idea that the capacity portion of generating resources providing 100 percent firm capacity, this does not hold true for intermittent resources such as wind, solar, and battery storage. 39 The Company also notes that Stratification classifies fixed production plant into energy-related and capacity-related components, which are further allocated to classes using separate allocators for energy and for demand. Public Service concludes the record in this case does not have sufficient data to accomplish an appropriate allocation. 40 50. CEC objects to Stratification, arguing that the classification as energy-related of all fixed generation costs greater than the cost of peaking capacity assumes that all investment in plant greater than peaking capacity is done solely to reduce energy costs. CEC contends this shifts significant costs to higher-load factor classes, violating the stability principle of regulation. Additionally, CEC maintains, if the Commission selects Stratification as the cost allocation methodology, it must also direct Public Service to reallocate its fuel costs to reflect the lower fuel costs of baseload generation. 41 d. 51. Summary of Allocated Revenue Requirements The following tables show the allocation percentages and revenue requirement responsibilities under each methodology, based on the approved revenue requirement for Public Service in the Phase I rate case and prior to Public Service’s filing of its Rebuttal case. 42 Hrng. Exh. 109 Klingeman Rebuttal Testimony at 27:3-15. Public Service SOP at 20. 41 CEC SOP at 20. 42 Tables do not add to 100 percent because “Street and Area Lighting” and “Traffic Signal Lighting” classes have been excluded. Those rate classes account for about two percent of cost responsibility. 39 40 18
  2. Page 19 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E Revenue Allocation Factor POD-PH 43 44.5% 5.0% 36.6% 8.3% 3.6% Residential Small Commercial C&I Secondary C&I Primary C&I Transmission POD 44 39.5% 4.9% 38.6% 10.2% 4.9% Stratification 45 43.4% 5.0% 37.5% 8.7% 3.3% 4CP-AED 46 45.3% 5.0% 36.6% 7.9% 3.0% Base Rate Revenue Requirement POD-PH42 $984,895,983 110,245,609 810,198,350 184,674,137 79,284,699 Residential Small Commercial C&I Secondary C&I Primary C&I Transmission e. 52. POD43 $874,338,024 108,477,211 848,880,934 225,615,118 107,450,084 Stratification44 $961,015,793 111,665,883 829,221,030 192,834,911 73,864,992 4CP-AED45 $1,002,232,556 112,556,695 811,240,429 174,285,586 67,241,682 Commission Findings and Conclusions We recognize there is no simple answer to the choice of cost allocation methodologies, especially given the continued evolution of Public Service’s system, the movement toward beneficial electrification, and concerns for rate stability across rate classes. However, considering the evidence and argument in this case, we find it appropriate to adopt for the rate design in this Phase II rate case, use of a POD-PH methodology with 1,000 peak hours. 53. We find that the POD-PH methodology as proposed by the Company is a measured step in the right direction as we adjust to an increasingly dynamic system of resource planning and cost causation. For now, on this record, POD-PH offers both a way to allocate costs based on a greater number of peak hours relative to the 4CP-AED methodology and acknowledges that peak hours are likely to migrate from only summer to some eventual higher usage times in winter with electrification. While we appreciate the arguments for using POD without a peak hour modifier, Hrng. Exh. 106 Knighten Supplemental Testimony at 11, Table JRK-S-2. Hrng. Exh. 300 Peterson Answer Testimony, Att. DEP-3. 45 Hrng. Exh. 300 Peterson Answer Testimony, Att. DEP-12. 46 Hrng. Exh. 300 Peterson Answer Testimony, Att. DEP-2. 43 44 19
  3. Page 20 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E we find that use of the POD-PH is a step in the right direction to reflect a focus on both a greater number of peak hours and the hours we are most concerned about in terms of cost causation, acknowledging the dynamic nature of how the system is planned and how resources are dispatched. 54. We also find merit in the Stratification methodology because it can be structured to use the detailed results from the Company’s Electric Resource Plan (ERP) filings as a basis for cost allocation but note limits in this record that restrict its use at this time. Going forward, we would expect to see a broader analysis that links customer class cost allocation to drivers of cost causation as determined in the Company’s most recent ERP. Specifically, we direct the Company in its next Phase II rate case, to include Stratification as a possible cost allocation methodology, using the Effective Load Carrying Capability (ELCC) data in the ERP to determine the proportion of demand-related costs for different resource types, including wind, solar, and storage. Regarding coal replacement cost assumptions, we would request that the Company explore making its analysis more consistent with the assumptions in either the Regulatory Assistance Project cost allocation report described in the Table above or with the values used by the Company in South Dakota, 47 instead of the speculative approach to coal plant replacement presented in this Proceeding. 3. Other Contested Cost Allocations (1) 55. Transmission and Distribution Substation Allocation As explained above, Public Service proposed to continue its practice of using the same allocator for production plant for transmission and distribution substation costs. Therefore, in its Direct case, the Company proposed to use the POD-PH allocator that resulted in the spread of revenue requirements shown in the preceding table. 47 See Hrng. Exh. 300 Peterson Answer Testimony, Att. DEP-9 at 14, Table 2. 20
  4. Page 21 of 45

    Decision No. C24-0117 56. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E In its Rebuttal case, Public Service revised its allocation methodology for transmission and distribution substations, some $355 million, from POD-PH to 4CP-AED, stating these costs are caused by coincident peak demand during the summer months, making 4CP-AED a more appropriate cost allocation methodology. Public Service notes it has traditionally used one cost allocation methodology for production plant, transmission, and distribution substation costs, but that 4CP-AED better reflects the cause-causation of transmission and distribution assets. With this modification, Public Service acknowledges that the Commission could direct the Company to use one methodology for all assets and require additional analysis in a future Phase II proceeding. 48 57. EOC objects to use of 4CP-AED for transmission and substations, contending the costs of these assets are not necessarily driven by summer peak demand and noting the Company provides no evidence to support the change in methodology. EOC recommends the Commission direct Public Service to conduct studies before the next Phase II rate case, using AMI meter data, to develop appropriate allocators. In this proceeding, EOC recommends using a POD/POD-PH allocator for transmission costs, which EOC contends are driven by system constraints at or near generation and by the distance between generation and load, not just peak demand, and a POD-PH allocator for substation costs, which EOC notes the Company acknowledges fall between system demand and individual customer demands. 49 58. For cost allocation of transmission and distribution substations the Commission approves the POD-PH cost allocation methodology, rejecting the Company’s proposal to use 4CP-AED. We do not find evidence in this record to support use of a cost allocation methodology 48 49 Hrng. Exh. 108 Knighten Rebuttal Testimony at 25:14–26-5. EOC SOP at 24-25. 21
  5. Page 22 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E for transmission and distribution substations that is different from that used for production assets, particularly with regard to the peaking hours associated with distribution substations. We also find merit in continuing to apply one cost allocation methodology for the demand-related costs of production, transmission, and distribution substations, absent compelling evidence that another approach is more accurate. (2) 59. Production Tax Credit Public Service agreed with CEC that production tax credit benefits associated with wind should be allocated in the same manner as production plant costs and stated it would modify its Electric Commodity Adjustment (ECA) accordingly. 50 60. We agree that production tax credit benefits should be allocated in the ECA in the same manner as production plant costs and direct the Company to do so in its next ECA filing. (3) 61. Advanced Meter Costs EOC questions Public Service’s allocation of AMI costs as 83 percent customer-related, arguing that, because AMI benefits the system overall, only 23 percent of AMI costs should be allocated as customer-related, with the remaining 77 percent functionalized and allocated as primary distribution, generation, and transmission. 51 62. SWEEP proposes a 50/50 AMI cost allocation between metering and distribution in order to minimize the increase in the residential Service and Facilities (S&F) charge. SWEEP observes, in the same manner as EOC, that the benefits of AMI extend beyond traditional metering and concludes that a 50/50 split is consistent with state policy goals because “lower customer charges can support equity and promote decarbonization.” 52 Hrng. Exh. 108 Knighten Rebuttal Testimony at 26:6-17. EOC SOP at 14. 52 Hrng. Exh. 1200 Brant Answer Testimony at 14:21-23. 50 51 22
  6. Page 23 of 45

    Decision No. C24-0117 63. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E Public Service responds that EOC’s proposal is invalid because it is based on functionalizing a portion of Advanced Meter costs as generation and transmission, a process that is part of a Phase I revenue requirement determination. 53 Additionally, Public Service argues that the Unopposed Comprehensive Settlement Agreement (AGIS CPCN Settlement) in Proceeding No. 16A-0588E only contemplates functionalizing Advanced Meter costs within the distribution system. 54 Public Service rejects SWEEPs proposal as well because it is not based on data or evidence in this Proceeding. Public Service states any discussion of revisiting the functionalization of AMI costs is premature until the full AMI rollout is complete, and the full costs are known. 64. The Commission finds that the record in the Proceeding on this issue is inadequate to order changes to the allocation of AMI costs but also finds that there are system-wide benefits of AMI that should be better reflected in the allocation. Therefore, the Commission directs the Company to maintain allocation of AMI costs as 83 percent customer-related for this Proceeding but directs the Company to provide a more robust analysis of these costs and identification of the scale and proper allocation of benefits associated with AMI when it files its next Phase II rate case. 53 The record in this Phase II rate case calls into question Public Service’s assertion that the “functionalization of costs” is a process exclusive to a Phase I rate case. The impacts of the cost allocators used in a CCOSS strongly relate to the functionalization and categorization of costs and are likely expected to be legitimate factors for review by the parties and the Commission in a Phase II rate case. Moreover, because one of the principal outputs of a Phase I rate case is generally understood to be an overall measure of the Company’s revenue requirement for collections through base rates, it is possible that potential intervenors would not recognize that a Phase I rate case is where disputes over cost functionalization and categorization would be addressed and fixed for later application in a Phase II proceeding. It is further reasonable to anticipate potential deficiencies in case records if cost functionalization and categorization is kept separate from CCOSS considerations, rate design, and the mitigation of bill impacts across customer classes. 54 Public Service SOP at 22. 23
  7. Page 24 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E (4) 65. Service Laterals EOC recommends requiring Public Service to modify its service lateral allocation to account for the diversity of load for multifamily buildings. EOC contends this modification could reduce service lateral costs to the Residential class by 15 percent, or some $3.7 million. 55 66. Public Service agrees that a service lateral allocation should be more thoroughly analyzed in its next Phase II rate case, but rejects a cost allocation in this Proceeding, arguing that EOC’s proposal does not have quantitative support and that EOC does not show that making the adjustment results in just and reasonable rates. 56 67. The Commission agrees that there is insufficient evidence in this record to make the modification to the service lateral costs recommended by EOC and thus rejects EOC’s recommendation. However, we direct Public Service to provide sufficient analysis in the next Phase II rate case so that we can more fully review the costs of service laterals to multifamily buildings and make any appropriate adjustments in that case to cost allocation. 4. 68. Residential Customer Charge (Monthly S&F Charge) Although Public Service had initially proposed an increase in Residential S&F charges from $6.29 to $8.00 per month, inclusive of the Electric Affordability Program (EAP) charge, with the changes made to the CCOSS in its Rebuttal case the Company proposes an S&F charge of $7.90. 69. EOC recommends rejecting the proposed increase and suggests that an increase to $7.10 would be more appropriate. SWEEP also rejects the proposed S&F increase, offering that $6.90 would be more appropriate. Both SWEEP and EOC argue that the increase to $7.90 stems 55 56 EOC SOP at 26. Public Service SOP at 23. 24
  8. Page 25 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E from inappropriately allocating some 83 percent of AMI costs as customer related. Both intervenors express concern for income qualified customers. 70. Public Service maintains the S&F charge proposals from both EOC and SWEEP are not cost-based and suggests that energy affordability is more appropriately addressed by the Energy Insecurity Working Group created as a result of Decision No. C23-0592 in Proceeding No. 22AL-0530E. 71. We find good cause to set the Residential S&F charge at $7.10. The Commission is concerned with the increasing S&F charge from its current level, but as Public Service points out, the proposed S&F charge is based in costs, and the increase represents the necessary gradualism in adjusting rates accordingly. We are further confident that, going forward, the Energy Insecurity Working Group will provide workable proposals for assisting income qualified customers. 5. 72. Medical Exemption Program (MEP) Rates Staff contends that Public Service’s proposed MEP rates in this Proceeding are moot because the Commission authorized new rates on September 1, 2023, in Proceeding No. 23AL-0393E. 73. Public Service counters that Proceeding No. 23AL-0393E authorized a new methodology for calculating MEP rates, moving from a calculation of MEP energy rates equal to the annual average energy rate for Schedules R and RE-TOU to setting the MEP rate equal to the off-peak energy rate for Schedule RE-TOU. The new methodology was approved after Public Service filed its Direct case in this Proceeding, so the Company used the new methodology to calculate MEP rates when it filed its Rebuttal case and asserts these are the rates that should be approved in this Proceeding. 25
  9. Page 26 of 45

    Decision No. C24-0117 74. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E The Commission approves the MEP rates as proposed by the Company consistent with the CCOSS set forth in the Company’s Rebuttal case and any modification made by the Commission to the CCOSS in this Decision. 6. Time of Use Periods (RE-TOU and C-TOU) (1) 75. Public Service Proposal In Proceeding No. 19AL-0687E, the settling parties agreed that time of use (TOU) periods will remain unchanged until Public Service files an advice letter on April 1, 2025. Based on this, Public Service proposes no change to the TOU periods in this Proceeding; Staff, COSSA/SEIA, EOC, and SWEEP agree. WRA agrees to leaving the periods unchanged but in its closing Statement of Position encourages the Commission to move up the date for review of the TOU periods. 76. As ordered in this Proceeding, Public Service provided Supplemental Direct testimony showing load net of renewables for each year from 2024 through 2030, looking at the top 100 hours for each of the years, concluding that shifting on-peak pricing periods to later in the day would be appropriate in the future. Additionally, Public Service determined that winter morning hours could become important with increased electrification, noting the possibility of an on-peak period of 5:00 a.m. to 8:00 a.m. The Company proposes a year 2030 timeframe for re-visiting TOU periods because all resources identified in the Clean Energy Plan portfolio of the Company’s 2021 ERP and Clean Energy Plan should be in place by then. 77. Public Service objects to changing the TOU periods now because doing so would require a modified customer educational program, which the Company claims could lead to customer confusion and dissatisfaction. 57 The Company offers that the opt-out rate has been only 57 Hrng. Exh. 104 Knighten Supplemental Direct Testimony at 8:16–11:10. 26
  10. Page 27 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E 1.1 percent and that customers are modifying their behaviors and cautions against changes that could alter this. Additionally, Public Service argues that adding a new TOU period would require additional analysis. 58 (2) 78. Intervenors’ Positions Staff recommends the Commission approve Public Service’s proposal to maintain the existing TOU periods for all rate schedules until a comprehensive re-evaluation in 2025. Staff argues the Company’s existing RE-TOU periods comply with prior Commission decisions with the aim to minimize changes to RE-TOU while customers move to the new rate “to avoid disruption of the transition process and ratepayers’ adaptation to the new TOU rates.” 59 Staff explains, while the prior settlement principally prohibits the Company from filing an advice letter to change the RE-TOU rate before April 1, 2025, the settlement did not prohibit intervening parties in this Proceeding who joined that settlement from advocating for a change to TOU periods before the 2025 Advice Letter is filed. Staff further argues that, while Public Service’s forecasts suggest loads may shift in the future, the Commission should not be overly hasty to change TOU hours while advanced meters are still being rolled out and the transition to RE-TOU is incomplete. Staff warns a premature change to RE-TOU in this Proceeding will complicate Company messaging, confuse customers, and muddle the price signals. According to Staff, implementing a change before the TOU rollout has concluded will also fundamentally alter the structure and intent of previous Commission decisions. 79. Although WRA does not support changing TOU periods in this Proceeding, 60 it encourages beginning customer education about the changes now so that customers will be Public Service SOP at 9. Staff SOP at 5 (citing Decision No. R20-0642 at ¶ 163). 60 WRA SOP at 9. 58 59 27

Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf

Read by machine from a scan · 4 pages · may contain errors, especially in numbers

Text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf

Extracted from the file · 31 pages · 41,898 characters

Text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf

Extracted from the file · 99 pages · 204,526 characters

Text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf

Extracted from the file · 24 pages · 63,774 characters

Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf

Extracted from the file · 3 pages · 7,608 characters

As listed on the current system

Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026