Text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf

Extracted from the file · 16 pages · 28,745 characters

Words on different pages
  1. Page 35 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E determine if there is any actual behavioral change associated with their transition to or from the demand-rate. 95. The Commission is also concerned that Public Service has not fully complied with the requirements of the directive in the 2020 Phase II rate case regarding customer notice as to the option to take service under Schedule C or C-TOU and the deployment of a rate comparison tool, which the Commission anticipated would be accomplished by the end of 2022 based on information previously provided by the Company. We therefore direct Public Service to make its commercial rate comparison tool available to customers by March 31, 2024, and have a process in place through with customers will be able to speak directly to a single point of contact to clarify their rate schedule and make any appropriate changes. When the rate comparison tool and process are available, the Company shall file a notice to the Commission in this Proceeding. 96. The Company shall also contact all customers on Schedule SG who would be eligible to take service under Schedule C or C-TOU within 30 days of the availability of the rate comparison tool to notify them that moving to a different rate schedule could be beneficial and to provide them with a link and information regarding how to access the rate comparison tool, as well as a customer service phone number at which the switch to a new tariff could be completed in one interaction. The Company shall again file a notice in this Proceeding when that communication has been completed and shall include the number of customers contacted and a copy of the communication sent to them. 35
  2. Page 36 of 45

    Decision No. C24-0117 8. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E Secondary General (Schedules SG & SG-CPP) Time Differentiated G&T Charge (1) 97. Public Service Proposal In its Statement of Position, Public Service explains that Schedule SG is the Company’s largest rate schedule by sales volume. Its monthly customer charge (i.e., the Service and Facilities Charge (or S&F charge)) collects approximately 6 percent of total Schedule SG revenue. The distribution demand charge accounts for approximately 38 percent of total, while a seasonally differentiated generation and transmission (G&T) demand charge accounts for approximately 44 percent of revenue. The rate’s energy charge collects approximately 12 percent of Schedule SG revenue. 98. In order to encourage Schedule SG customers to shift usage out of peak hours and to flatten their load patterns, Public Service proposes modifying Schedule SG and Schedule SG-CPP to include time-differentiated G&T demand charges. Public Service initially requested that the period for time-differentiated demand charges be set as 2:00 p.m. to 7:00 p.m. on non-holiday weekdays but modified this in its Rebuttal case to 3:00 p.m. to 7:00 p.m. on non-holiday weekdays. Under this proposal, customers who receive an Advanced Meter by December 31, 2024, will transition to the time-differentiated demand charge beginning on April 1, 2025, while those receiving Advanced Meters after January 1, 2025, will be transitioned on April 1 of the year following the installation of their Advanced Meter. (2) 99. Intervenors’ Positions COSSA/SEIA recommends modifying the Schedule SG rate design to shift much of the allocated revenue requirement from demand charges to energy charges in order to send price signals 72 and making the Company’s pilot SG-TOU rate a permanent service offering. 72 Hrng. Exh. 800 Lucas Answer Testimony at 44:4–46:7. 36
  3. Page 37 of 45

    Decision No. C24-0117 100. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E Public Service opposes COSSA/SEIA’s recommendation to move Schedule SG into an energy-based rate because there are no results from the Schedule SG-TOU pilot that support an energy-based rate. Public Service further argues that COSSA/SEIA’s proposal would move $130 million from time-differentiated G&T demand charge into a non-time differentiated energy charge and $30 million of costs from the distribution demand charge into a non-time differentiated energy charge and should be rejected. 73 101. Kroger recommends rejecting the time-differentiated demand rates and revisiting them in the next rate case or requiring the Company to modify the periods to be consistent with the Company’s projected load net of renewables for 2025, which indicate highest peak load between 7:00 p.m. and 9:00 p.m. 74 102. Public Service disagrees with Kroger’s proposal that the time-differentiated demand charges not be implemented until all Advanced Meters are deployed. The Company also rejects Kroger’s alternative proposal as it would undermine the goal of sending price signals to Schedule SG customers. 75 (3) 103. Commission Findings and Conclusions We support Public Service in modifying Schedules SG and SG-CPP to move to a time-differentiated demand component, but we further direct the Company to include the proposed time-differentiated demand charge for Schedules SG and SG-CPP in the advice letter we have directed to be filed by September 3, 2024, for an effective date of May 1, 2025, consistent with the discussion above addressing the RE-TOU and C-TOU rates. We expect the Company to use the Public Service SOP at 26. Kroger SOP at 5. 75 Hrng. Exh. 108 Knighten Rebuttal Testimony at 56:12-18. 73 74 37
  4. Page 38 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E most appropriate load data available when determining the hours for the time-differentiated demand charge. 9. 104. Secondary General Low-Load Factor (Schedule SGL) Schedule SGL, with some 500 customers, is available to customers with load factors of 11 percent or less. COSSA/SEIA recommends increasing the breakeven monthly load factor to 30 percent to attract customers who do not qualify for Schedules SG-TOU or SG-CPP. 105. Public Service and Kroger both oppose this proposal. Kroger faults COSSA/SEIA for failing to provide evidence that the proposal aligns with cost causation or will send effective price signals. Kroger also notes the Schedule C-TOU option is available to customers on Schedule SG, providing a rate option with energy-based charges. Kroger suggests these changes should be considered in the next Phase II rate case, where Public Service could provide a cost allocation base on a separate rate class. 76 106. Public Service states that 60 percent of Schedule SG customer have access to Schedules C and C-TOU and that those rates are beneficial for customers with load factors less than 45.5 percent, thus COSSA/SEIA’s proposal is unnecessary. The Company also contends that COSSA/SEIA’s proposal would result in unwarranted bill reductions for existing Schedule SGL customers, because there would be a 59 percent reduction to energy charges, and that the rates would not recover the authorized revenue requirement. 77 107. We will not adopt COSSA/SEIA’s proposal. The Company has demonstrated there are sufficient alternative for customers with load factors of 30 percent or less. 76 77 Kroger SOP at 18. Public Service SOP at 36. 38
  5. Page 39 of 45

    Decision No. C24-0117 10. 108. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E Production and Load Meter Charges COSSA/SEIA suggests that the costs of AMI production meters for systems under 10 kW should be recovered from all customers because the Company utilizes the AMI production meters at for general solar forecasting purposes, so the meters benefit the entire system. COSSA/SEIA also recommends the Commission deny the Company’s proposal to replace all non-AMI production meters with AMI production meters. 109. Public Service responds that there is no proposal to replace non-AMI production meters, although some replacements have been made in order to continue billing some Solar*Rewards customers. The Company also contends that because of contractual obligations to Solar*Regards customers, it cannot unilaterally uninstall existing production meters. 78 110. We deny COSSA/SEIA’s request to spread the cost of AMI production meters across rate base. We find the record is not developed sufficiently on this issue to determine the impact on the S&F charge nor to determine if the resulting rates would be just and reasonable. However, based on this Phase II rate case record, we question the Company’s decision-making that has led to continued expenditures on production meter costs for small systems without proper examination of need and benefits of such meters, and therefore we expect this will be a prudency issue carefully reviewed in Public Service’s next Phase I rate case, as it is our understanding that the majority of production meter replacements may have occurred after the test year utilized in this Proceeding. Similar to the issues in this Proceeding surrounding the allocation of advanced meter costs, the treatment of production meter costs may be another reason for the Company to file a combined Phase I and Phase II case for its next rate case. 78 Public Service SOP at 40. 39
  6. Page 40 of 45

    Decision No. C24-0117 11. 111. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E Secondary Photovoltaic TOU (Schedule SPVTOU) Schedule SPVTOU is intended to make solar net metering more financially viable for C&I Secondary customers and currently is limited to customers with service loads between 25 and 500 kW, with a photovoltaic system of at least 10 kW, and who participate in Solar*Rewards. A fourth requirement is a 15 MW annual installation cap for new photovoltaic installations. 112. In response to COSSA/SEIA, Public Service agreed to remove the Solar*Rewards participation requirement and is proposing to modify the service load requirement to 25 to 1,000 kW (rather than 500 kW) and lower the PV system capacity to 8 kW. The Company contends these modifications address COSSA/SEIA’s concerns regarding customer use of renewable energy credits and the programs availability to a wider range of customers, within the bounds of the settlement reached in Proceeding No. 21A-0625EG. 113. We find good cause to approve the modifications made to Schedule SPVTOU. 12. 114. Electric Heating Rate Pilot SWEEP proposes the development of an Electric Heating Rate Pilot, available to residential customers with existing electric heating and an AMI meter, with a focus on income-qualified customers and customers in disproportionately impacted communities. SWEEP suggests that a stakeholder group would develop the rate design, as well as monitoring and reporting metrics. The pilot would be filed by June 1, 2024, and run for at least four heating seasons. 115. WRA supports SWEEP’s proposed Electric Heating Rate Pilot, suggesting the formation of a stakeholder group to collaboratively design a pilot and that Public Service be directed to file a proposal for an Electric Heating Rate Pilot within six months of a Commission decision in this Proceeding. 40
  7. Page 41 of 45

    Decision No. C24-0117 116. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E Staff and Public Service object to the Residential Heating Rate Pilot as premature, noting it is not clear that such rate is necessary to encourage electric heating nor that a rate design solution would be fair, because it would be paid for by other customers. Public Service also objects to the timeline proposed by SWEEP as unduly aggressive. 79 117. We will deny the proposed Electric Heating Rate Pilot as premature but suggest that such a pilot could be warranted in the coming years as Colorado increasingly moves toward beneficial electrification. Although we do not approve this proposal, we do commend SWEEP for its creative thinking on this issue and for bringing this forward for our consideration. One issue for further consideration is whether this could be pursued as a voluntary high-differential time-of-use rate that could send a much more aggressive voluntary price signal to move load off the peak period. This could be a viable option for customers who are willing and able to move load off of that peak time, which is likely to include many customers with beneficial electrification, but by not being exclusive to them could address issues of verification and fairness that may be difficult to tackle. 13. 118. Outreach to Income-Qualified Customers EOC witness Nussbaumer presented data and analysis describing the number of income-qualified customers in Public Service’s service territory, the characteristics of incomequalified households’ electricity use, rate affordability, energy burden, and appropriate TOU period. Notably, he shows that the number of energy burdened households is much larger than Public Service estimates. 80 79 80 Public Service SOP at 39. Hrng. Exh. 602 Nussbaumer Answer Testimony at 6:5–10:14. 41
  8. Page 42 of 45

    Decision No. C24-0117 119. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E EOC witness Bennett further explains that income-qualified customers face high energy burdens such that they face unwelcome choices between paying certain bills and foregoing other life-necessities. 81 He also concludes that there is a significantly underserved population of energy-burdened customers and that the disparity between those in need and those who are provided energy assistance exists for a number of reasons, including but not limited to limits on funding, eligibility requirements, and barriers in enrollment. 82 120. Accordingly, we look for solutions to address the gap between the needs of income-qualified customers and the resources available to help them, including improved identification of customers most at risk of permanent disconnection and finding ways, through propensity-to-pay or other customer-specific data, of identifying these customers earlier in the process especially before they are multiple months in arrears. 14. 121. Uncontested Requests The Commission enters findings approving the following items that Public Service describes as uncontested: (1) 122. 2022 Test Year Data The Commission finds Public Service’s use of the 2022 data and the associated revisions to the POD-PH allocator are reasonable. (2) 123. IVVO Lost Revenue The Commission finds that by using the 2022 Test Year data, it is not necessary to continue IVVO-related lost revenue recovery through the Public Service’s Electric Commodity Adjustment. 81 82 Hrng. Exh. 600 Bennett Answer Testimony at 11:15–12:3. Hrng. Exh. 600 Bennett Answer Testimony at 14:5–10. 42
  9. Page 43 of 45

    Decision No. C24-0117 Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E (3) 124. Meter Weighting Factors The Commission finds Public Service’s revisions to the meter weighting factors used in the CCOSS as set forth in its Rebuttal case are reasonable. (4) 125. Re-Functionalization of Distribution Costs The Commission finds the re-functionalization of certain distribution costs from secondary to primary in the CCOSS is reasonable. (5) 126. EVRAZ Treatment The Commission finds that Public Service correctly accounted for EVRAZ in the CCOSS in accordance with Decision No. C18-0889 in Proceeding No. 18A-0569E. (6) 127. Schedule P-EV / P-EV-CPP The Commission approves Public Service’s proposed Schedules P-EV and P-EV-CPP. (7) 128. Schedule PG-CPP G&T Window Consistent with our finding for the Schedule SG, we approve the Schedule PG-CPP time-differentiated demand charges be based on demand measured between 3:00 p.m. and 7:00 p.m. on non-holiday weekdays to align with the Company’s other C&I Primary time-differentiated demand calculations. (8) 129. Schedule SPVTOU-B G&T Window Likewise, we approve the Schedule SPVTOU Section B time-differentiated demand charges be based on demand measured between 3:00 p.m. and 7:00 p.m. on non-holiday weekdays to align with Public Service’s other C&I Secondary time-differentiated demand calculations. 43
  10. Page 44 of 45

    Decision No. C24-0117 II. Before the Public Utilities Commission of the State of Colorado PROCEEDING NO. 23AL-0243E ORDER A. The Commission Orders That: 1. The tariff sheets filed by Public Service Company of Colorado (Public Service) on May 15, 2023, with Advice Letter No. 1923-Electric are permanently suspended and shall not be further amended. 2. Public Service shall file an advice letter compliance filing to modify the tariff sheets in its Colorado P.U.C. No. 8 - Electric Tariff consistent with the findings, conclusions, and directives in this Decision. Public Service shall file the compliance tariff sheets in a separate proceeding and on not less than two business days’ notice. The advice letter and tariff sheets shall be filed as a new advice letter proceeding and shall comply with all applicable rules. In calculating the proposed effective date, the date the filing is received at the Commission is not included in the notice period and the entire notice period must expire prior to the effective date. The advice letter and tariff must comply in all substantive respects to this Decision in order to be filed as a compliance filing on shortened notice. 3. The 20-day period provided for in § 40-6-114, C.R.S., within which to file applications for rehearing, reargument, or reconsideration, begins on the first day following the effective date of this Decision. 4. This Decision is effective on its Mailed Date. 44

Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf

Read by machine from a scan · 4 pages · may contain errors, especially in numbers

Text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf

Extracted from the file · 31 pages · 41,898 characters

Text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf

Extracted from the file · 99 pages · 204,526 characters

Text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf

Extracted from the file · 24 pages · 63,774 characters

Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf

Extracted from the file · 3 pages · 7,608 characters

As listed on the current system

Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026