Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 2 thru 20

Files10

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf

Extracted from the file · 16 pages · 28,745 characters

Text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf

Extracted from the file · 45 pages · 89,290 characters

Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf

Read by machine from a scan · 4 pages · may contain errors, especially in numbers

Words on different pages
  1. Page 21 of 31

    HYDRO ONE NETWORKS INC. RATES FOR RETAIL DISTRIBUTION SERVICE Effective Date: January 1, 2013 This schedule supersedes and replaces all previously approved schedules of Rates, Charges and Loss Factors Distributed Generation [DGen] Monthly Rates and Charges - Electricity Component Rate Rider for 2012 Global Adjustment Sub-Account Disposition – Non – RPP Customers (expires December 31, 2014) $ / kWh (0.00050) $ $ / kW 41.64 5.939 $ / kW (0.048) $ / kW $ / kW $ / kW $ / kW $ / kW 0.071 0.059 (0.006) 0.35 0.23 $ / kWh $ / kWh $ 0.0052 0.0011 0.25 Monthly Rates and Charges - Delivery Component Service Charge (includes Smart Meter Funding Adder - $3.92) Distribution Volumetric Rate Volumetric Rate Rider #9 - Deferral/Variance Account Disposition 2012 (expires December 31, 2014) Volumetric Rate Rider #10 - Incremental Capital Costs (expires December 31, 2014 or when new 2015 rates come into effect) Volumetric Rate Rider #11 - Smart Grid Costs (expires December 31, 2013) Volumetric Rate Rider #12 - Shared Tax Savings (expires December 31, 2013) Retail Transmission Rate - Network Service Rate (4) Retail Transmission Rate - Line and Transformation Connection Service Rate (5) Monthly Rates and Charges - Regulatory Component Wholesale Market Service Rate (7) (13) Rural or Remote Rate Protection Rate (7) (13) Standard Supply Service - Administration Charge (if applicable) Page 18 of 28
  2. Page 22 of 31

    HYDRO ONE NETWORKS INC. RATES FOR RETAIL DISTRIBUTION SERVICE Effective Date: January 1, 2013 This schedule supersedes and replaces all previously approved schedules of Rates, Charges and Loss Factors Street Lights Monthly Rates and Charges - Electricity Component Rate Rider for 2012 Global Adjustment Sub-Account Disposition – Non – RPP Customers (expires December 31, 2014) $ / kWh (0.00050) $ $ / kWh 1.45 0.07209 $ / kWh (0.00102) $ / kWh $ / kWh $ / kWh $ / kWh $ / kWh 0.00059 0.00049 (0.00005) 0.00435 0.00303 $ / kWh $ / kWh $ 0.0052 0.0011 0.25 Monthly Rates and Charges - Delivery Component Service Charge Distribution Volumetric Rate Volumetric Rate Rider #9 - Deferral/Variance Account Disposition 2012 (expires December 31, 2014) Volumetric Rate Rider #10 - Incremental Capital Costs (expires December 31, 2014 or when new 2015 rates come into effect) Volumetric Rate Rider #11 - Smart Grid Costs (expires December 31, 2013) Volumetric Rate Rider #12 - Shared Tax Savings (expires December 31, 2013) Retail Transmission Rate - Network Service Rate (4) Retail Transmission Rate - Line and Transformation Connection Service Rate (5) Monthly Rates and Charges - Regulatory Component Wholesale Market Service Rate (7) (13) Rural or Remote Rate Protection Rate (7) (13) Standard Supply Service - Administration Charge (if applicable) Page 19 of 28
  3. Page 23 of 31

    HYDRO ONE NETWORKS INC. RATES FOR RETAIL DISTRIBUTION SERVICE Effective Date: January 1, 2013 This schedule supersedes and replaces all previously approved schedules of Rates, Charges and Loss Factors Sentinel Lights Monthly Rates and Charges - Electricity Component Rate Rider for 2012 Global Adjustment Sub-Account Disposition – Non – RPP Customers (expires December 31, 2014) $ / kWh (0.00050) $ $ / kWh 1.48 0.09877 $ / kWh (0.00100) $ / kWh $ / kWh $ / kWh $ / kWh $ / kWh 0.00103 0.00085 (0.00009) 0.00435 0.00303 $ / kWh $ / kWh $ 0.0052 0.0011 0.25 Monthly Rates and Charges - Delivery Component Service Charge Distribution Volumetric Rate Volumetric Rate Rider #9 - Deferral/Variance Account Disposition 2012 (expires December 31, 2014) Volumetric Rate Rider #10 - Incremental Capital Costs (expires December 31, 2014 or when new 2015 rates come into effect) Volumetric Rate Rider #11 - Smart Grid Costs (expires December 31, 2013) Volumetric Rate Rider #12 - Shared Tax Savings (expires December 31, 2013) Retail Transmission Rate - Network Service Rate (4) Retail Transmission Rate - Line and Transformation Connection Service Rate (5) Monthly Rates and Charges - Regulatory Component Wholesale Market Service Rate (7) (13) Rural or Remote Rate Protection Rate (7) (13) Standard Supply Service - Administration Charge (if applicable) MicroFIT Generator Service Charge $ Page 20 of 28 5.40
  4. Page 24 of 31

    HYDRO ONE NETWORKS INC. RATES FOR RETAIL DISTRIBUTION SERVICE Effective Date: January 1, 2013 This schedule supersedes and replaces all previously approved schedules of Rates, Charges and Loss Factors Sub Transmission [ST] Monthly Rates and Charges - Electricity Component Rate Rider for 2012 Global Adjustment Sub-Account Disposition – Non – RPP Customers (expires December 31, 2014) (14) $ / kWh (0.00050) $ $ 295.68 471.17 $/kW (1) (15) 0.675 $/km (2) $/km (2) 640.12 496.09 $/kW (1) (15) 1.614 $/kW (1) (15) 3.579 $/kW (3) (15) 1.965 $/kW (1) (15) 0.275 $/kW (1) (15) (0.627) $/kW (1) (15) 0.010 $/kW (1) (15) $/kW (1) (15) 0.008 (0.001) $/kW $/kW $/kW 3.18 0.70 1.63 $/kWh $/kWh $ 0.0052 0.0011 0.25 Monthly Rates and Charges - Delivery Component Service Charge (includes Smart Meter Funding Adder - $3.92) Meter Charge (for Hydro One ownership) (12) Facility charge for connection to Common ST Lines (44 kV to 13.8 kV) (9) Facility charge for connection to Specific ST Lines (44 kV to 13.8 kV) Facility charge for connection to Specific Primary Lines (12.5 kV to 4.16 kV) Facility charge for connection to high-voltage (> 13.8 kV secondary) delivery High Voltage Dist’n Station Facility charge for connection to low-voltage (< 13.8 kV secondary) delivery High Voltage Dist’n Station Facility charge for connection to low voltage (< 13.8 kV secondary) Low Voltage Dist’n Station Volumetric Rate Rider #9A (General) - Deferral/Variance Account Disposition 2012 (expires December 31, 2014) (10) Volumetric Rate Rider #9B (Wholesale Market Service Rate) Deferral/Variance Account Disposition 2012 (expires December 31, 2014) (11) Volumetric Rate Rider #10 - Incremental Capital Costs (expires December 31, 2014 or when new 2015 rates come into effect) Volumetric Rate Rider #11 - Smart Grid Costs (expires December 31, 2013) Volumetric Rate Rider #12 - Shared Tax Savings (expires December 31, 2013) Retail Transmission Service Rates (6)(7)(8): Retail Transmission Rate - Network Service Rate (4) Retail Transmission Rate - Line Connection Service Rate (5) Retail Transmission Rate - Transformation Connection Service Rate (5) Monthly Rates and Charges - Regulatory Component Wholesale Market Service Rate (7) (13) Rural or Remote Rate Protection Rate (7) (13) Standard Supply Service - Administration Charge (if applicable) Notes: Page 21 of 28
  5. Page 25 of 31

    Note (1): The basis of the charge is the customer’s monthly maximum demand. For a customer with multiple delivery points served from the same Transformer Station or High Voltage Distribution Station, the aggregated demand will be the applicable billing determinant. Demand is not aggregated between stations. Note (2): The basis of the charge is kilometers of line, within the supplied LDC's service area, supplying solely that LDC. Note (3): These rates are based on the “non-coincident demand” at each delivery point of the customer supplied by the station. This is measured as the kW demand at the delivery point at the time in the month of maximum load on the delivery point. For a customer connected through two or more distribution stations, the total charge for the connection to the shared distribution stations is the sum of the relevant charges for each of the distribution stations. Note (4): The monthly billing determinant for the RTSR Network Service rate is: - for energy-only metered customers: the customer’s metered energy consumption adjusted by the total loss factor as approved by the Board. - for interval-metered customers: the peak demand from 7 AM to 7 PM (local time) on IESO business days in the billing period. The rates shown are to be adjusted by the total loss factor as approved by the Board. - for non-interval-metered demand billed customers: the non-coincident peak demand in the billing period. The rates shown are to be adjusted by the total loss factor as approved by the Board. Note (5): (a) The monthly billing determinant for the RTSR Line and Transformation Connection Service rates is - for energy-only metered customers: the customer’s metered energy consumption adjusted by the total loss factor as approved by the Board. - for all demand billed customers: the non-coincident peak demand in the billing period. The rates shown are to be adjusted by the total loss factor as approved by the Board. Page 22 of 28
  6. Page 26 of 31

    (b) For customers with load displacement generation above 1 MW, or 2 MW for renewable generation, installed after October 1998, RTSR connection is billed at the gross demand level. Note (6): Delivery point with respect to RTSR is defined as the low side of the Transformer Station that steps down voltage from above 50 kV to below 50 kV. For a customer's multiple intervalmetered delivery points served from the same Transformer Station, the aggregated demand at the said delivery points on the low side of the Transformer Station will be the applicable billing determinant. Note (7): These rates pertain to the IESO’s defined point of sale; consequently, appropriate loss factors as approved by the Board and set out in Hydro One Distribution’s loss factors must be applied to the metered load of energy-metered customers. Similarly, appropriate loss factors as approved by the Board and set out as Hydro One Distribution’s loss factors must be applied to the applicable tariffs of demand-billed customers. Note (8): The loss factors, and which connection service rates are applied, are determined based on the point at which the distribution utility or customer is metered for its connection to Hydro One Distribution’s system. Hydro One Distribution’s connection agreements with these distribution utilities and customers will establish the appropriate loss factors and connection rates to apply from Hydro One Distribution’s tariff schedules. Note (9): The Common ST Lines rate also applies to the supply to Distributors which use lines in the 12.5 kV to 4.16 kV range from HVDSs or LVDSs. Note (10): "Rider 9A (General)" is charged based on appropriate billing kW. Note (11): "Rider 9B (Wholesale Market Service Charge)" applies to those customers who were charged Wholesale Market Service Charges by Hydro One Distribution. Note (12): The Meter charge is applied to delivery points for which Hydro One owns the metering. Page 23 of 28
  7. Page 27 of 31

    Note (13): The Wholesale Market Service Rate and the Rural or Remote Rate Protection Rate are charged solely to non-Wholesale-Market-Participants. Note (14): The Global Adjustment rider applies to the non-LDC and non-RPP ST customers that were charged Wholesale Market Service Charges by Hydro One Distribution. Note (15): For customers with load displacement generation above 1MW, or 2 MW for renewable generation, installed after October1998, the ST volumetric charges are billed at the gross demand level. Customer-Supplied Transformation Allowance Applicable to customers providing their own transformers: Primary Voltage under 50 kV (per kW) Demand Billed Energy Billed $ / kW cents / kWh Page 24 of 28 0.60 0.14
  8. Page 28 of 31

    Transformer Loss Allowance • Applicable to non-ST customers requiring a billing adjustment for transformer losses as the result of being metered on the primary side of a transformer. The following uniform values shall be applied to measured demand and energy to calculate transformer losses for voltages up to and including 50 kV (as metered on the primary side): a) 1.5% for transformer installations up to an individual bank capacity of 400 kVA, b) 1.0% for bank capacities over 400 kVA. And; • Applicable to ST customers requiring a billing adjustment for transformer losses as the result of being metered on the secondary side of a transformer. The following uniform value shall be added to measured demand and energy (as metered on the secondary side) to adjust for transformer losses: a) 1.0% • Alternatively, transformer losses may be determined from transformer test data, and measured demand and energy adjusted accordingly. • For services which are not demand metered, an assumed demand of 50% of the transformer capacity will be used to calculate the loss allowance. Where several transformers are involved, the bank capacity is assumed to be the arithmetic sum of all transformer capacities. Page 25 of 28
  9. Page 29 of 31

    Loss Factors Rate Class Factor Residential UR R1 R2 Seasonal 1.078 1.085 1.092 1.092 General Service GSe GSd UGe UGd DGen 1.092 1.061 1.092 1.061 1.061 Lights Street Sentinel 1.092 1.092 Sub Transmission Distribution Loss Factors Embedded Delivery Points (metering at station) Embedded Delivery Points (metering away from station) Total Loss Factors Embedded Delivery Points (metering at station) Embedded Delivery Points (metering away from station) Page 26 of 28 1.000 1.028 1.006 1.034
  10. Page 30 of 31

    HYDRO ONE NETWORKS INC. RATES FOR RETAIL DISTRIBUTION SERVICE Effective Date: January 1, 2013 This schedule supersedes and replaces all previously approved schedules of Rates, Charges and Loss Factors SPECIFIC SERVICE CHARGES Standard Amounts Rate Code Specific Service Charge - Standard Name Calculation Method 2006 Rate Handbook Standard Other Formula Formula 1 Temporary Service 2 3 Dispute Meter Test $30 plus Measurement Canada fees Collection of account – no disconnection/load $30 limiter Collection/Disconnect/load limiter/reconnect $65 (at meter) trip – regular hours Collection/Disconnect/load limiter/reconnect $185 (at meter) trip – after regular hours Collection/Disconnect/load limiter/reconnect $185 (at pole) trip – regular hours Collection/Disconnect/load limiter/reconnect $415 (at pole) trip – after regular hours Account Set-up Charge $30 Arrears Certificate $15 NSF Cheque Charge (Plus bank charges) $15 Easement Charge for Unregistered Rights $15 Late Payment Charge 1.5%/month Retailer Services – Establishing Service $100/agreement/Retailer Agreements (refer to Handbook for all +$20/month/Retailer charges) +$0.50/month/customer + other Retailer Services – Other (includes Bill $0.30/month/customer + $0.25/request Ready for Retailers and Service Transactions for request fee + $0.50/request for Requests) as per the Handbook, Chapter 12 process fee Special Meter Reads $30 Service Layout Fee – Basic Service Layout Fee – Complex Crossing Application – Pipeline Crossing Application – Water Crossing Application – Railroad Line Staking – per meter Central Metering – New service < 45 kW Conversion to Central Metering < 45 kW Conversion to Central Metering > 45 kW Tingle Voltage Test – In Excess of 4 Hours (per hour – average 2 additional hours) Standby Administration Charge per month 4 5 6 7 8 9 10 11 12 13a 13b 14 15 16 17 18 19 20 21 22 23 24 25 $500 Page 27 of 28 $562 $750 $2,600 $2,960 $3,100 $3.75 $115 $935 $815 $125 $480 Time and Materials

Text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf

Extracted from the file · 99 pages · 204,526 characters

Text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf

Extracted from the file · 24 pages · 63,774 characters

Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf

Extracted from the file · 3 pages · 7,608 characters

As listed on the current system

Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026

This filing on the current system (opens in a new tab)