Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 2 thru 20

Files10

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf

Extracted from the file · 16 pages · 28,745 characters

Text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf

Extracted from the file · 45 pages · 89,290 characters

Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf

Read by machine from a scan · 4 pages · may contain errors, especially in numbers

Text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf

Extracted from the file · 31 pages · 41,898 characters

Words on different pages
  1. Page 66 of 99

    Customer Density and Distribution Service Costs serves, establishing a separate rate class even for half of them is neither realistic nor prudent. Hence, “like” municipalities will need to be grouped into a common rate class. Whether this grouping is done on a regional, density, or size basis would have to be examined through further analysis. There is likely a trade-off between simplicity, i.e. the number of rate classes, and the allocative efficiency of the rate design, i.e. the apparent level of cross-subsidies. One approach that could be considered is to make the groupings appear similar to existing HONI rate classes. In other words, the population or density of a municipality can be used to delineate the classes. For instance, if the municipal population (or the number of customer served within the municipality) is greater than 3,000 and the density (again population or customer density) within the municipality is greater than 60 customers per line kilometre, then all customers within the municipality may be classified as UR. If the municipal population is less than 3,000 and the customer density within the municipality is greater than 15 customers per line kilometre but less than 60 customers per line kilometre, then all customers within the municipality may be classified as R1. This approach could also potentially minimize the implications of any changes that would have to be considered in respect of the application of the Rural or Remote Rate Protection (“RRRP”) program. Another issue that arises in the context of municipal boundary considerations is the extent to which the same rate design principles are extended to the other LDCs. While some LDCs only serve customers in a single municipality, many serve multiple municipalities, which can range in terms of size, density, etc. Moving HONI to a rate design which utilizes municipal boundaries, if explored, should be done on a province-wide basis taking into account other LDCs as well. The Elenchus Research Associate report correctly points out that in “defining customer classes, it is desirable to minimize boundary issues that arise when the criteria for defining classes result in very similar customers falling on different sides of the break point between classes”. Incorporating well-defined municipal boundaries into HONI’s existing rate class design may help customers to better recognize and understand the delineation between classes, as the boundary would be much more explicit. However, it is still possible that “similar”, proximate, customers will fall on different sides and thus be subject to different rates. 6.1.3 Regional Rates Another alternative design that could be considered is one based on regional postage-stamp distribution rates. Regional distribution rates could be established by pooling the revenue requirements of all the LDCs serving customers in a given region. The combined revenue requirement would then be allocated to customer classes to establish a single series of rates for the region. The combined revenues would then be divided amongst the LDCs based on the proportion of the revenue requirement attributable to an individual LDC (or alternatively, based on electricity consumption within their service territories). Today a precedent exists for this approach in the form of the provincial transmission rates which are based on the revenue London Economics International LLC Benjamin Grunfeld/Steven Kim [phone removed] [email removed] 45 PowerNex Associates Inc. Mark Vainberg/Gary Ford/Andrew Poray [phone removed] [email removed]
  2. Page 67 of 99

    Customer Density and Distribution Service Costs requirement and customer demands served by the four transmission companies.35 This methodology has been successfully applied since the opening of the electricity market in 2002. Figure 32: Summary of a Regional Rate Mechanism Individual Revenue Requirement Rate Classes Individual Revenue Received LDC 1 Residential LDC 1 Urban LDC 2 Combined Revenue Requirement LDC 3 Rural General Service Urban Rural Other Combined Revenue LDC 2 LDC 3 Based on percent of total revenue requirement attributed to individual utility The rate classes could also be established to maintain differences between urban and rural (high- and low-density) customers. Again a precedent exists in the electricity transmission sector where there are separate rates for connection, transformation, and network services. As an example, there are seven LDCs, including HONI that currently serve customers in the Niagara region. Hence, residential customers in this relatively small geographic region could have one of nine different rates (three possible rates for HONI customers and one each for customers in the other six utility’s service territories. Harmonizing the rates would be a simplification for consumers. It may also promote further rationalization in terms of the number of LDCs that exist within the province. 35 OEB. “In the matter of an application by: Hydro One Networks, Inc. 2011 and 2012 Transmission Revenue Requirement and Rates”. (EB-2010-0002). Toronto: December 23, 2010. London Economics International LLC Benjamin Grunfeld/Steven Kim [phone removed] [email removed] 46 PowerNex Associates Inc. Mark Vainberg/Gary Ford/Andrew Poray [phone removed] [email removed]
  3. Page 68 of 99

    Customer Density and Distribution Service Costs Figure 33: LDCs in the Niagara Region Niagara Peninsula Energy Inc. Horizon Utilities Corp. Niagara-on-the Lake Hydro Inc. Welland Hydro-Electric System Corp. Grimsby Power Inc. Hydro One Networks Inc. Canadian Niagara Power Co. Ltd. Source: IESO As in most instances of rate re-design, administrative simplicity comes at the cost of allocative efficiency. In the case of a move from LDC-specific to regional distribution rates, customers that were historically in the lower-cost LDCs’ service territories could end up subsidizing customers in the higher-cost LDCs’ service territories. This may make it more difficult to achieve consensus amongst LDCs with respect to support for a move towards regional distribution tariffs. London Economics International LLC Benjamin Grunfeld/Steven Kim [phone removed] [email removed] 47 PowerNex Associates Inc. Mark Vainberg/Gary Ford/Andrew Poray [phone removed] [email removed]
  4. Page 69 of 99

    Customer Density and Distribution Service Costs 7 Conclusions and Recommendations As outlined in Section 1.1, the objectives of this study were to (i) evaluate the relationship between customer density and distribution service costs, (ii) assess whether HONI’s existing density based rate classes and density weighting factors appropriately reflect this relationship, and (iii) consider, qualitatively, the appropriateness and feasibility of establishing alternate customer class definitions. Both the econometric analysis and the direct cost assignment analysis establish that there is a statistically significant inverse relationship between customer density and distribution service costs across HONI’s service territory. In both studies, distribution service costs were shown to decrease as the customer density of an operating area and/or a sample area increased. The comparison of the output from the HONI CAM with the results of the direct cost assignment analysis suggests that HONI’s existing density based rate classes and density weighting factors reflect this relationship, although the density weighting factors may understate the actual difference between the cost to serve high-, medium-, and low-density customers. Based on the results of this analysis, LEI and PNXA would not recommend wholesale changes to HONI’s existing rate class definitions. However, adjustments to the weighting factors used in HONI’s CAM could be justified to better capture the differences between the cost to serve high-, medium-, and low-density customers. In doing so, care will need to be taken to ensure that customers do not experience a sense of “rate shock”. If the resulting change in rates is significant, a transition period over which the modification is gradually introduced may be required. Other rate class definitions were also considered (i.e., municipal boundaries or regional rates), however, the move to such a design is a long-term decision that LEI and PNXA recommend be made in the context of a broader provincial dialogue. London Economics International LLC Benjamin Grunfeld/Steven Kim [phone removed] [email removed] 48 PowerNex Associates Inc. Mark Vainberg/Gary Ford/Andrew Poray [phone removed] [email removed]
  5. Page 70 of 99

    Customer Density and Distribution Service Costs Appendix A –Econometric Analysis Details Introduction to Econometric Analysis If one hypothesized that distribution service costs were linearly influenced by the number of customers and customer density, Equation 3 below would be the functional form. The parameter (or coefficient) “A” is the intercept term. The presence of a positive value for the “A” intercept means that there is a cost of doing business, regardless of the number of customers. The coefficient “B” represents the incremental cost of one additional customer. The coefficient “C” represents the incremental cost associated with one incremental unit of customer density. Equation 3 Equation 3 is a simplification. However, it illustrates one of the advantages of econometric analysis, in the sense that the impact of individual factors (i.e., the number of customers or customer density) on distribution service costs can be simultaneously yet independently analyzed. The coefficients A, B, and C are estimated by collecting real-world data on distribution service costs, the number of customers served, and the customer density, and utilizing one of many possible regression estimation techniques. Sample Operating Area Data Figure 34: Operating Area 2010 Customer Density (per square kilometre) Density (customers per km2 ) 40 2010 35 30 25 20 15 10 - Newmarket Dundas Bowmanville Essex Winchester Kingston Orangeville Penetangui… Fenelon Falls Brockville Orillia Picton Vankleek Hill Barrie Owen Sound Peterborough Lincoln Perth Aylmer Alliston Lambton Arnprior Tweed Beachville Listowel Clinton Strathroy Bracebridge Bancroft Kent Minden Walkerton Guelph Sudbury Simcoe Parry Sound Huntsville Cobden Manitoulin Algoma New Liskeard Nipissing Kirkland… Timmins Kenora Kapuskasing Thunder Bay Dryden 5 Source: HONI; LEI and PNXA analysis London Economics International LLC Benjamin Grunfeld/Steven Kim [phone removed] [email removed] 49 PowerNex Associates Inc. Mark Vainberg/Gary Ford/Andrew Poray [phone removed] [email removed]
  6. Page 71 of 99

    Tweed Peterborough Perth Owen Sound Winchester Thunder Bay Cobden Newmarket Kingston Bancroft Barrie Fenelon Falls Huntsville Essex Bracebridge Sudbury Beachville Orangeville Brockville Nipissing Parry Sound Dundas Vankleek Hill Minden Walkerton Kenora Arnprior Kent Picton Clinton Penetanguishene Bowmanville Simcoe Orillia Strathroy Timmins Dryden Lambton Guelph Aylmer Lincoln New Liskeard Kapuskasing Alliston Manitoulin Algoma Listowel Kirkland Lake Dundas Newmarket Lincoln Bowmanville Timmins Vankleek Hill Kingston Winchester Brockville Orillia Arnprior Sudbury Picton Essex Fenelon Falls Penetanguis… Barrie Owen Sound Tweed Algoma Bracebridge Peterborough Perth Kirkland Lake Minden Simcoe Orangeville Cobden Nipissing Guelph Lambton Alliston Huntsville Bancroft Listowel Kapuskasing Aylmer Parry Sound Clinton Thunder Bay Walkerton New Liskeard Beachville Manitoulin Strathroy Kent Kenora Dryden Customer Density and Distribution Service Costs Figure 35: Operating Area 2010 Customer Density (per circuit kilometre) Density (customers per line-km) 30 London Economics International LLC Benjamin Grunfeld/Steven Kim [phone removed] [email removed] 2010 25 20 15 10 5 Source: HONI; LEI and PNXA analysis Figure 36: Operating Area 2010 OM&A Cost Total Operating Area OM&A Cost (millions $) 10 50 2010 9 8 7 6 5 4 3 2 1 - Source: HONI; LEI and PNXA analysis PowerNex Associates Inc. Mark Vainberg/Gary Ford/Andrew Poray [phone removed] [email removed]
  7. Page 72 of 99

    Winchester Tweed Peterborough Newmarket Barrie Perth Owen Sound Kingston Fenelon Falls Orangeville Essex Thunder Bay Cobden Bancroft Huntsville Vankleek Hill Bracebridge Sudbury Walkerton Kenora Timmins Parry Sound Minden Nipissing Brockville Bowmanville Dundas Arnprior Guelph Beachville Alliston Strathroy Simcoe Kent Clinton Picton Dryden Penetanguishene Lambton Orillia Manitoulin Lincoln Aylmer New Liskeard Algoma Kirkland Lake Kapuskasing Listowel Customer Density and Distribution Service Costs Figure 37: Operating Area 2010 Capital Proxy Total Operating Area Capital Cost (millions $) 18 London Economics International LLC Benjamin Grunfeld/Steven Kim [phone removed] [email removed] 2010 16 14 12 10 8 6 4 2 - Source: HONI; LEI and PNXA analysis 51 PowerNex Associates Inc. Mark Vainberg/Gary Ford/Andrew Poray [phone removed] [email removed]
  8. Page 73 of 99

    Customer Density and Distribution Service Costs Appendix B – Background Information on Distribution Systems Distribution System Topology and Equipment Electricity is typically generated at relatively low voltages, in the range of 20 to 25 kilovolts (“kV”) in major generating stations and immediately transformed up to higher voltages (115 kV, 230 kV and 500 kV) for transmission to load centres. Figure 38: Simplified Generation/Transmission/Distribution Model Source: PNXA Transmission substations transform the voltage back down to typically 44 kV for bulk distribution of power via what are called sub-transmission or “M Class” feeders that supply distribution stations. Distribution stations further transform the voltage down to typically 8 kV for distribution feeder circuits that are used to supply customers. A simplified generation, transmission, and distribution system model is illustrated in Figure 38. The transformation process then continues one further step down to the 600, 230 or 115 volt (“V”) level used in customers’ homes and businesses. This last transformation is done by poletop or pad-mounted transformers located relatively close to the customers, as illustrated in Figure 39. London Economics International LLC Benjamin Grunfeld/Steven Kim [phone removed] [email removed] 52 PowerNex Associates Inc. Mark Vainberg/Gary Ford/Andrew Poray [phone removed] [email removed]
  9. Page 74 of 99

    Customer Density and Distribution Service Costs Figure 39: Typical Single Phase Pole-Top Transformer Source: PNXA files The primary elements that make up a distribution system are the distribution feeders (lines or cables), distribution stations, and metering and control systems. However, each of these elements is comprised of many types of components. Overhead distribution lines, as illustrated in Figure 39, include aluminum primary conductors, porcelain or polymeric line insulators, fuses and fuse holders, pole-top transformers, secondary wiring, poles and pole hardware. Underground and submarine cables are used sparingly because they are significantly more costly than overhead lines. They include insulated primary cable, and pre-moulded terminations and splices. Distribution stations vary in design and complexity depending on their location and the number of feeders connected by them. Figure 40 illustrates a typical open air distribution station. London Economics International LLC Benjamin Grunfeld/Steven Kim [phone removed] [email removed] 53 PowerNex Associates Inc. Mark Vainberg/Gary Ford/Andrew Poray [phone removed] [email removed]
  10. Page 75 of 99

    Customer Density and Distribution Service Costs Figure 40: Typical Open Air Distribution Station Source: PNXA files Stations of this type include transformers, circuit breakers and/or re-closers, disconnect switches, grounding switches, bus conductors, protection, control and metering equipment, station cables to facilitate line entrances and exits, and structural elements. In built-up areas distribution stations may be enclosed in buildings or surrounded by improved appearance walls and other aesthetic treatments. Power quality standards require that the voltage and frequency be maintained within prescribed limits. The frequency is controlled at the bulk transmission system level, however, voltage control is a concern on distribution systems. Current flowing on long distribution feeders causes a voltage drop along the feeder that is a function of loading. As well, loads with lagging power factors (inductive loads for example, motors, air conditioners, etc.) require reactive compensation in the form of capacitor banks which need to be switched in or out as required. Voltage regulators, such as the single phase unit illustrated in Figure 41, are in common use on long feeders to provide controlled voltage support when loads are high and series inductors to limit voltage levels when loads are low. London Economics International LLC Benjamin Grunfeld/Steven Kim [phone removed] [email removed] 54 PowerNex Associates Inc. Mark Vainberg/Gary Ford/Andrew Poray [phone removed] [email removed]

Text of CIEC-20 (d) Attachment 1 - PG&E Rate B-20.pdf

Extracted from the file · 24 pages · 63,774 characters

Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf

Extracted from the file · 3 pages · 7,608 characters

As listed on the current system

Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026

This filing on the current system (opens in a new tab)