Text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf

Extracted from the file · 16 pages · 28,745 characters

Text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf

Extracted from the file · 45 pages · 89,290 characters

Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf

Read by machine from a scan · 4 pages · may contain errors, especially in numbers

Text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf

Extracted from the file · 31 pages · 41,898 characters

Text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf

Extracted from the file · 99 pages · 204,526 characters

Words on different pages
  1. Page 2 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 53911-E 49033-E San Francisco, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 2 1. APPLICABILITY: Definition of Maximum Demand: Demand will be averaged over 15-minute intervals. (Cont’d.) “Maximum demand” will be the highest of all the 15-minute averages for the billing month. If the customer’s use of electricity is intermittent or subject to severe fluctuations, a 5-minute interval may be used. If the customer has any welding machines, the diversified resistance welder load, calculated in accordance with Section J of Rule 2, will be considered the maximum demand if it exceeds the maximum demand that results from averaging the demand over 15-minute intervals. The customer’s maximum-peak-period demand will be the highest of all the 15-minute averages for the peak period during the billing month. (See Section 6 for a definition of “Peak-Period.”) Standby Demand: For customers under this rate schedule and for whom Schedule SB— Standby Service Special Conditions 1 through 6 apply, standby demand is the portion of a customer’s maximum demand in any month caused by nonoperation of the customer’s alternate source of power, and for which a demand charge is paid under the regular service schedule. If the customer imposes standby demand in any month, then the regular service maximum demand charge will be reduced by the applicable reservation capacity charge (see Schedule SB Special Condition 1). To qualify for the above reduction in the maximum demand charge, the customer must, within 30 days of the regular meter read date, demonstrate to the satisfaction of PG&E the amount of standby demand in any month. This may be done by submitting to PG&E a completed Electric Standby Service Long Sheet (Form 79-726). Option R for Standalone Storage: The Option R rate is available to qualifying Bundled, DA and CCA B-20 customers. Eligible customers system must have a minimum discharge capacity equal to or greater than 20 percent of the customer’s annual peak demand, as recorded over the previous 12 months to be eligible for Option R. Discharge capacity for Option R will be calculated using the same method as that used for Option S. For additional Option R details and program specifics, including the participation cap, see Sections 3 and 16. (T) I I I I I (T) Option R for Renewable Distributed Generation Technologies: The Option R rate is available to qualifying customers taking Bundled, DA or CCA service under Schedule B-20. Eligible customers system with solar, wind, fuel cells or other eligible onsite renewable distributed generation technologies as defined by the California Solar Initiative program (CSI) or Self Generation Incentive Program (SGIP), customers with behind-the-meter storage paired with such renewable distributed generation, and Permanent Load Shifting (PLS) technologies. Eligible renewable generation systems and PLS systems must have a net renewable generating capacity or load shift capacity equal to or greater than 15 percent of the customer’s annual peak demand, as recorded over the previous 12 months. For additional Option R details and program specifics, including the participation cap, see Sections 3 and 16. (N) I I I I I I I I I (N) (L) (L) (Continued) Advice Decision 6676-E 21-11-016 Issued by Meredith Allen Vice President, Regulatory Affairs Submitted Effective Resolution August 15, 2022 September 1, 2022
  2. Page 3 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 53912-E 49034-E San Francisco, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 3 1. APPLICABILITY: Fuel Cell Generation Demand Adjustment: A customer who installs a fuel cell electric generation facility may be eligible to receive a Generation Demand Adjustment. A customer will qualify for a Generation Demand Adjustment if both of the following conditions are met: (1) the customer’s fuel cell electric generation facility was installed (and approved for interconnection by PG&E); and (2) the electric generation facility reduces the customer’s maximum demand to the point that the customer would no longer be eligible for service under this schedule. The Generation Demand Adjustment will be the fixed reduction in demand as determined by PG&E from the customer’s interconnection agreement, and will be added to the customer’s maximum demand for the sole purpose of determining the customer’s eligibility for Schedule B-20. (Cont’d.) The Generation Demand Adjustment does not specifically guarantee the customer’s continued eligibility for service under this schedule nor will it be applied to the customer’s maximum demand for purposes of calculating the monthly maximum demand charge. Option S for Storage: The Option S rate for storage is available to qualifying Bundled, DA and CCA service under Schedule B-20 customers with storage systems with a rated capacity in watts which is at least 10% of the customer’s peak demand over the previous 12 months. Option S is available subject to an enrollment cap. For additional Option S details and program specifics, sett Sections 3 and 18. (L) I I I I I I I I I I I I I I I I I I I (L) Peak Day Pricing Default Rates: Peak Day Pricing (PDP) rates provide customers the opportunity to manage their electric costs by reducing load during high cost periods or shifting load from high cost periods to lower cost periods. Decision 10-02-032 ordered that beginning May 1, 2010, eligible large Commercial and Industrial (C&I) customers default to PDP rates. A customer is eligible for default when 1) it has at least twelve (12) months of hourly usage data available, and 2) it has measured demands equal to or exceeding 200 kW for three (3) consecutive months during the past 12 months. All eligible customers will be placed on PDP rates unless they opt-out to a TOU rate. Decision 10-02-032, as modified by Decision 11-11-008, ordered that beginning November 1, 2014, eligible small and medium C&I customers (those with demands that are not equal to or greater than 200 kW for three consecutive months) default to PDP rates. A customer is eligible for default when it has at least twelve (12) billing months of hourly usage data available and two years of experience on TOU rates. All eligible customers will be placed on PDP rates unless they opt-out to a TOU rate. Customers with a SmartMeterTM system, or interval meter, installed that can be remotely read by PG&E may also voluntarily elect to enroll on PDP rates. Bundled service customers are eligible for PDP. Direct Access (DA) and Community Choice Aggregation (CCA) service customers are not eligible, including those DA customers on transitional bundled service (TBS). Customers on standby service (Schedule SB) whose premises are regularly supplied in full by electric energy from a nonutility source of supply, net-energy metering Schedules NEMFC, NEMBIO, NEMCCSF, or NEMA, or an energy payment demand response program are not eligible for PDP. Customers that take standby service whose premises are regularly supplied in part (but not in full) by electric energy from a nonutility source of supply are eligible for PDP on the non-standby portion of their service. In addition, master-metered customers are not eligible, except for commercial buildings with submetering as stated in PG&E Rule 1 and Rule 18. For additional details and program specifics, see the Peak Day Pricing Details section below. 2. TERRITORY: Schedule B-20 applies everywhere PG&E provides electric service. (Continued) Advice Decision 6676-E 21-11-016 Issued by Meredith Allen Vice President, Regulatory Affairs Submitted Effective Resolution August 15, 2022 September 1, 2022
  3. Page 4 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61081-E 60661-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE 3. RATES: Sheet 4 Total bundled service charges are calculated using the total rates shown below. Direct Access (DA) and Community Choice Aggregation (CCA) charges shall be calculated in accordance with the paragraph in this rate schedule titled Billing. TOTAL BUNDLED TIME-OF-USE RATES Secondary Voltage Primary Voltage Transmission Voltage $107.36636 (R) $110.32836 (R) $331.86645 (R) $41.35 (R) $9.27 (R) $39.08 (R) $43.88 (R) $9.45 (R) $34.28 (R) $22.28 $5.31 $17.19 (R) $2.32 $39.08 (R) $2.34 $34.28 (R) $2.97 $17.19 (R) $0.17702 (I) $0.14227 (I) $0.11482 (I) $0.17322 (I) $0.13597 (I) $0.10998 (I) $0.15702 (I) $0.13245 (I) $0.10504 (I) $0.15632 (I) $0.11460 (I) $0.05872 (I) $0.14951 (I) $0.11005 (I) $0.05406 (I) $0.15043 (I) $0.10085 (I) $0.05134 (I) $0.00005 $0.00005 $0.00005 PDP Rates PDP Charges ($ per kWh) All Usage During PDP Event $0.90 $0.90 $0.90 PDP Credits Demand ($ per kW) Peak Summer Part-Peak Summer ($7.21) ($1.05) ($8.24) ($1.13) ($6.56) ($1.56) Energy ($ per kWh) Peak Summer Part-Peak Summer $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 Total Customer Charge Rates Customer Charge Mandatory B-20 ($ per meter per day) Total Demand Rates ($ per kW) Maximum Peak Demand Summer Maximum Part-Peak Demand Summer Maximum Demand Summer Maximum Peak Demand Winter Maximum Demand Winter Total Energy Rates ($ per kWh) Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Power Factor Adjustment Rate ($/kWh/%) (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  4. Page 5 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61082-E 60662-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 5 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. PDP charges and credits are all generation and are not included below. UNBUNDLING OF TOTAL RATES Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Demand Rates by Components ($ per kW) Secondary Voltage Primary Voltage Transmission Voltage Generation: Maximum Peak Demand Summer Maximum Part-Peak Demand Summer Maximum Demand Summer $18.25 $2.65 $0.00 $20.36 $2.80 $0.00 $22.28 $5.31 $0.00 $2.32 $2.34 $2.97 Maximum Peak Demand Winter Maximum Demand Winter Distribution**: Maximum Peak Demand Summer Maximum Part-Peak Demand Summer Maximum Demand Summer $23.10 $6.62 $28.02 (R) (R) (R) $23.52 (R) $6.65 (R) $23.22 (R) $0.00 $0.00 $6.13 (R) Maximum Peak Demand Winter Maximum Demand Winter $0.00 $28.02 (R) $0.00 $23.22 (R) $0.00 $6.13 (R) Transmission Maximum Demand* Reliability Services Maximum Demand* $11.03 $0.03 $11.03 $0.03 $11.03 $0.03 * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  5. Page 6 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61083-E 60663-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 6 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. PDP charges and credits are all generation and are not included below. UNBUNDLING OF TOTAL RATES Customer Charge Rates: Customer charge rates provided in the Total Rate section above are assigned entirely to the unbundled distribution component. Energy Charges by Components ($ per kWh) Secondary Voltage Generation: Peak Summer Part-Peak Summer Off-Peak Summer $0.14803 $0.11328 $0.08583 $0.14447 $0.10722 $0.08123 $0.13032 $0.10575 $0.07834 $0.12733 $0.08561 $0.02973 $0.12076 $0.08130 $0.02531 $0.12373 $0.07415 $0.02464 Peak Winter Off-Peak Winter Super Off-Peak Winter Distribution**: Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Transmission Rate Adjustments* (all usage) Public Purpose Programs (all usage) Nuclear Decommissioning (all usage) Competition Transition Charge (all usage) Energy Cost Recovery Amount (all usage) Wildfire Fund Charge (all usage) New System Generation Charge (all usage)** Wildfire Hardening Charge (all usage) Recovery Bond Charge (all usage) Recovery Bond Credit (all usage) Bundled Power Charge Indifference Adjustment (all usage)*** * ** *** Primary Voltage Transmission Voltage ($0.00264) ($0.00264) ($0.00264) (R) (R) (R) ($0.00247) (R) ($0.00247) (R) ($0.00247) (R) ($0.00171) (R) ($0.00171) (R) ($0.00171) (R) ($0.00264) ($0.00264) ($0.00264) (R) (R) (R) ($0.00247) (R) ($0.00247) (R) ($0.00247) (R) ($0.00171) (R) ($0.00171) (R) ($0.00171) (R) $0.00474 $0.02337 ($0.00002) $0.00025 $0.00002 $0.00591 $0.00395 $0.00264 $0.00857 ($0.00857) ($0.00923) (I) (I) $0.00474 $0.02280 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00247 $0.00857 ($0.00857) ($0.00889) $0.00474 $0.02082 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00171 $0.00857 ($0.00857) ($0.00896) (I) (I) (R) (I) (I) (I) (I) (R) (I) (I) (I) (R) Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. Distribution and New System Generation Charges are combined for presentation on customer bills. Direct Access, Community Choice Aggregation and Transitional Bundled Service Customers pay the applicable Vintaged Power Charge Indifference Adjustment. Generation and Bundled PCIA are combined for presentation on bundled customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  6. Page 7 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61084-E 60664-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 7 3. Rates: (Cont’d.) Total bundled service charges are calculated using the total rates shown below. DA and CCA charges shall be calculated in accordance with the paragraph in this rate schedule titled Billing. TOTAL BUNDLED TIME-OF-USE RATES FOR OPTION R (for qualifying solar customers as set forth in Section 16) Total Customer Charge Rates Customer Charge Mandatory B-20 ($ per meter per day) Total Demand Rates ($ per kW) Maximum Peak Demand Summer Maximum Part-Peak Demand Summer Maximum Demand Summer Maximum Peak Demand Winter Maximum Demand Winter Total Energy Rates ($ per kWh) Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Power Factor Adjustment Rate ($/kWh/%) Secondary Voltage Primary Voltage Transmission Voltage $107.36636 (R) $110.32836 (R) $331.86645 (R) $5.62 (R) $1.61 (R) $38.23 (R) $5.69 (R) $1.61 (R) $33.49 (R) $0.00 $0.00 $16.40 (R) $0.00 $38.23 (R) $0.00 $33.49 (R) $0.00 $16.40 (R) $0.40620 (R) $0.22337 (R) $0.16434 (R) $0.38216 (R) $0.21100 (R) $0.15843 (R) $0.29050 (I) $0.17188 (I) $0.12163 (I) $0.17396 (I) $0.13023 (I) $0.09448 (I) $0.16540 (I) $0.12533 (I) $0.08958 (I) $0.17172 (I) $0.11871 (I) $0.08591 (I) $0.00005 $0.00005 $0.00005 (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  7. Page 8 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61085-E 60665-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 8 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. UNBUNDLING OF TOTAL RATES FOR OPTION R (Cont’d) (for qualifying solar customers as set forth in Section 16) Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Demand Rates by Components ($ per kW) Distribution**: Maximum Peak Demand Summer Maximum Part-Peak Demand Summer Maximum Demand Summer Maximum Peak Demand Winter Maximum Demand Winter Transmission Maximum Demand* Reliability Services Maximum Demand* Secondary Voltage Primary Voltage Transmission Voltage $5.62 (R) $1.61 (R) $27.17 (R) $5.69 (R) $1.61 (R) $22.43 (R) $0.00 $0.00 $5.34 (R) $0.00 $27.17 (R) $0.00 $22.43 (R) $0.00 $5.34 (R) $11.03 $0.03 $11.03 $0.03 $11.03 $0.03 * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  8. Page 9 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61086-E 60666-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 9 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. UNBUNDLING OF TOTAL RATES FOR OPTION R (Cont’d.) (for qualifying solar customers as set forth in Section 16) Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Energy Charges by Components ($ per kWh) Secondary Voltage Primary Voltage Transmission Voltage Generation: Peak Summer Part-Peak Summer Off-Peak Summer $0.26894 $0.13619 $0.09873 $0.25766 $0.12876 $0.09406 $0.26209 $0.14347 $0.09322 $0.14233 $0.09860 $0.06285 $0.13418 $0.09411 $0.05836 $0.14331 $0.09030 $0.05750 $0.10563 (R) $0.05555 (R) $0.03398 (R) $0.09328 (R) $0.05102 (R) $0.03315 (R) $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 Peak Winter Off-Peak Winter Super Off-Peak Winter Distribution**: Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Transmission Rate Adjustments* (all usage) Public Purpose Programs (all usage) Nuclear Decommissioning (all usage) Competition Transition Charge (all usage) Energy Cost Recovery Amount (all usage) Wildfire Fund Charge (all usage) New System Generation Charge (all usage)** Wildfire Hardening Charge (all usage) Recovery Bond Charge (all usage) Recovery Bond Credit (all usage) Bundled Power Charge Indifference Adjustment (all usage)*** $0.00474 $0.02337 ($0.00002) $0.00025 $0.00002 $0.00591 $0.00395 $0.00264 $0.00857 ($0.00857) ($0.00923) (I) (I) (I) (I) (R) $0.00474 $0.02280 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00247 $0.00857 ($0.00857) ($0.00889) (I) (I) (I) (I) (R) $0.00474 $0.02082 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00171 $0.00857 ($0.00857) ($0.00896) (I) (I) (I) (R) * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. *** Direct Access, Community Choice Aggregation and Transitional Bundled Service Customers pay the applicable Vintaged Power Charge Indifference Adjustment. Generation and Bundled PCIA are combined for presentation on bundled customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  9. Page 10 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61087-E 60667-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 10 3. Rates: (Cont’d.) Total bundled service charges are calculated using the total rates shown below. DA and CCA charges shall be calculated in accordance with the paragraph in this rate schedule titled Billing. TOTAL BUNDLED TIME-OF-USE RATES FOR OPTION S (for qualifying storage customers as set forth in Section 18) Total Customer Charge Rates Customer Charge Mandatory B-20 ($ per meter per day) Total Demand Rates ($ per kW) Maximum Peak Demand Summer (per day) Maximum Part-Peak Demand Summer (per day) Maximum Demand Summer (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Summer (per monthly billing) Maximum Peak Demand Winter (per day) Maximum Demand Winter (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Winter (per billing month) Total Energy Rates ($ per kWh) Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Power Factor Adjustment Rate ($/kWh/%) Secondary Voltage Primary Voltage Transmission Voltage $107.36636 (R) $110.32836 (R) $331.86645 (R) $1.30 (R) $1.09 (R) $0.18 (R) $0.07 $0.07 $5.56 (R) $4.57 (R) $1.07 (R) $11.06 $11.06 $11.06 $1.02 (R) $0.82 (R) $0.18 (R) $5.56 (R) $4.57 (R) $1.07 (R) $11.06 $11.06 $11.06 $0.40620 (R) $0.22337 (R) $0.16434 (R) $0.38216 (R) $0.21100 (R) $0.15843 (R) $0.29050 (I) $0.17188 (I) $0.12163 (I) $0.17396 (I) $0.13023 (I) $0.09448 (I) $0.16540 (I) $0.12533 (I) $0.08958 (I) $0.17172 (I) $0.11871 (I) $0.08591 (I) $0.00005 $0.00005 $0.00005 (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  10. Page 11 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61088-E 60668-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 11 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. UNBUNDLING OF TOTAL RATES FOR OPTION S (Cont’d) (for qualifying storage customers as set forth in Section 18) Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Demand Rates by Components ($ per kW) Distribution**: Maximum Peak Demand Summer (per day) Maximum Part-Peak Demand Summer (per day) Maximum Demand Summer (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Summer (per monthly billing) Secondary Voltage $1.30 (R) $0.07 $5.56 Primary Voltage $1.09 Transmission Voltage (R) $0.18 (R) (R) $1.07 (R) $0.07 (R) $0.00 $4.57 $0.00 $0.00 Maximum Peak Demand Winter (per day) $1.02 (R) $0.82 (R) $0.18 (R) Maximum Demand Winter (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Winter (per billing month) $5.56 (R) $4.57 (R) $1.07 (R) Transmission Maximum Demand* Reliability Services Maximum Demand* $0.00 $0.00 $0.00 $11.03 $0.03 $11.03 $0.03 $11.03 $0.03 * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026

Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf

Extracted from the file · 3 pages · 7,608 characters

As listed on the current system

Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026