Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 2 thru 20

Files10

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf

Extracted from the file · 16 pages · 28,745 characters

Text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf

Extracted from the file · 45 pages · 89,290 characters

Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf

Read by machine from a scan · 4 pages · may contain errors, especially in numbers

Text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf

Extracted from the file · 31 pages · 41,898 characters

Text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf

Extracted from the file · 99 pages · 204,526 characters

Words on different pages
  1. Page 4 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61081-E 60661-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE 3. RATES: Sheet 4 Total bundled service charges are calculated using the total rates shown below. Direct Access (DA) and Community Choice Aggregation (CCA) charges shall be calculated in accordance with the paragraph in this rate schedule titled Billing. TOTAL BUNDLED TIME-OF-USE RATES Secondary Voltage Primary Voltage Transmission Voltage $107.36636 (R) $110.32836 (R) $331.86645 (R) $41.35 (R) $9.27 (R) $39.08 (R) $43.88 (R) $9.45 (R) $34.28 (R) $22.28 $5.31 $17.19 (R) $2.32 $39.08 (R) $2.34 $34.28 (R) $2.97 $17.19 (R) $0.17702 (I) $0.14227 (I) $0.11482 (I) $0.17322 (I) $0.13597 (I) $0.10998 (I) $0.15702 (I) $0.13245 (I) $0.10504 (I) $0.15632 (I) $0.11460 (I) $0.05872 (I) $0.14951 (I) $0.11005 (I) $0.05406 (I) $0.15043 (I) $0.10085 (I) $0.05134 (I) $0.00005 $0.00005 $0.00005 PDP Rates PDP Charges ($ per kWh) All Usage During PDP Event $0.90 $0.90 $0.90 PDP Credits Demand ($ per kW) Peak Summer Part-Peak Summer ($7.21) ($1.05) ($8.24) ($1.13) ($6.56) ($1.56) Energy ($ per kWh) Peak Summer Part-Peak Summer $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 Total Customer Charge Rates Customer Charge Mandatory B-20 ($ per meter per day) Total Demand Rates ($ per kW) Maximum Peak Demand Summer Maximum Part-Peak Demand Summer Maximum Demand Summer Maximum Peak Demand Winter Maximum Demand Winter Total Energy Rates ($ per kWh) Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Power Factor Adjustment Rate ($/kWh/%) (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  2. Page 5 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61082-E 60662-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 5 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. PDP charges and credits are all generation and are not included below. UNBUNDLING OF TOTAL RATES Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Demand Rates by Components ($ per kW) Secondary Voltage Primary Voltage Transmission Voltage Generation: Maximum Peak Demand Summer Maximum Part-Peak Demand Summer Maximum Demand Summer $18.25 $2.65 $0.00 $20.36 $2.80 $0.00 $22.28 $5.31 $0.00 $2.32 $2.34 $2.97 Maximum Peak Demand Winter Maximum Demand Winter Distribution**: Maximum Peak Demand Summer Maximum Part-Peak Demand Summer Maximum Demand Summer $23.10 $6.62 $28.02 (R) (R) (R) $23.52 (R) $6.65 (R) $23.22 (R) $0.00 $0.00 $6.13 (R) Maximum Peak Demand Winter Maximum Demand Winter $0.00 $28.02 (R) $0.00 $23.22 (R) $0.00 $6.13 (R) Transmission Maximum Demand* Reliability Services Maximum Demand* $11.03 $0.03 $11.03 $0.03 $11.03 $0.03 * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  3. Page 6 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61083-E 60663-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 6 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. PDP charges and credits are all generation and are not included below. UNBUNDLING OF TOTAL RATES Customer Charge Rates: Customer charge rates provided in the Total Rate section above are assigned entirely to the unbundled distribution component. Energy Charges by Components ($ per kWh) Secondary Voltage Generation: Peak Summer Part-Peak Summer Off-Peak Summer $0.14803 $0.11328 $0.08583 $0.14447 $0.10722 $0.08123 $0.13032 $0.10575 $0.07834 $0.12733 $0.08561 $0.02973 $0.12076 $0.08130 $0.02531 $0.12373 $0.07415 $0.02464 Peak Winter Off-Peak Winter Super Off-Peak Winter Distribution**: Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Transmission Rate Adjustments* (all usage) Public Purpose Programs (all usage) Nuclear Decommissioning (all usage) Competition Transition Charge (all usage) Energy Cost Recovery Amount (all usage) Wildfire Fund Charge (all usage) New System Generation Charge (all usage)** Wildfire Hardening Charge (all usage) Recovery Bond Charge (all usage) Recovery Bond Credit (all usage) Bundled Power Charge Indifference Adjustment (all usage)*** * ** *** Primary Voltage Transmission Voltage ($0.00264) ($0.00264) ($0.00264) (R) (R) (R) ($0.00247) (R) ($0.00247) (R) ($0.00247) (R) ($0.00171) (R) ($0.00171) (R) ($0.00171) (R) ($0.00264) ($0.00264) ($0.00264) (R) (R) (R) ($0.00247) (R) ($0.00247) (R) ($0.00247) (R) ($0.00171) (R) ($0.00171) (R) ($0.00171) (R) $0.00474 $0.02337 ($0.00002) $0.00025 $0.00002 $0.00591 $0.00395 $0.00264 $0.00857 ($0.00857) ($0.00923) (I) (I) $0.00474 $0.02280 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00247 $0.00857 ($0.00857) ($0.00889) $0.00474 $0.02082 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00171 $0.00857 ($0.00857) ($0.00896) (I) (I) (R) (I) (I) (I) (I) (R) (I) (I) (I) (R) Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. Distribution and New System Generation Charges are combined for presentation on customer bills. Direct Access, Community Choice Aggregation and Transitional Bundled Service Customers pay the applicable Vintaged Power Charge Indifference Adjustment. Generation and Bundled PCIA are combined for presentation on bundled customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  4. Page 7 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61084-E 60664-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 7 3. Rates: (Cont’d.) Total bundled service charges are calculated using the total rates shown below. DA and CCA charges shall be calculated in accordance with the paragraph in this rate schedule titled Billing. TOTAL BUNDLED TIME-OF-USE RATES FOR OPTION R (for qualifying solar customers as set forth in Section 16) Total Customer Charge Rates Customer Charge Mandatory B-20 ($ per meter per day) Total Demand Rates ($ per kW) Maximum Peak Demand Summer Maximum Part-Peak Demand Summer Maximum Demand Summer Maximum Peak Demand Winter Maximum Demand Winter Total Energy Rates ($ per kWh) Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Power Factor Adjustment Rate ($/kWh/%) Secondary Voltage Primary Voltage Transmission Voltage $107.36636 (R) $110.32836 (R) $331.86645 (R) $5.62 (R) $1.61 (R) $38.23 (R) $5.69 (R) $1.61 (R) $33.49 (R) $0.00 $0.00 $16.40 (R) $0.00 $38.23 (R) $0.00 $33.49 (R) $0.00 $16.40 (R) $0.40620 (R) $0.22337 (R) $0.16434 (R) $0.38216 (R) $0.21100 (R) $0.15843 (R) $0.29050 (I) $0.17188 (I) $0.12163 (I) $0.17396 (I) $0.13023 (I) $0.09448 (I) $0.16540 (I) $0.12533 (I) $0.08958 (I) $0.17172 (I) $0.11871 (I) $0.08591 (I) $0.00005 $0.00005 $0.00005 (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  5. Page 8 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61085-E 60665-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 8 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. UNBUNDLING OF TOTAL RATES FOR OPTION R (Cont’d) (for qualifying solar customers as set forth in Section 16) Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Demand Rates by Components ($ per kW) Distribution**: Maximum Peak Demand Summer Maximum Part-Peak Demand Summer Maximum Demand Summer Maximum Peak Demand Winter Maximum Demand Winter Transmission Maximum Demand* Reliability Services Maximum Demand* Secondary Voltage Primary Voltage Transmission Voltage $5.62 (R) $1.61 (R) $27.17 (R) $5.69 (R) $1.61 (R) $22.43 (R) $0.00 $0.00 $5.34 (R) $0.00 $27.17 (R) $0.00 $22.43 (R) $0.00 $5.34 (R) $11.03 $0.03 $11.03 $0.03 $11.03 $0.03 * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  6. Page 9 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61086-E 60666-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 9 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. UNBUNDLING OF TOTAL RATES FOR OPTION R (Cont’d.) (for qualifying solar customers as set forth in Section 16) Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Energy Charges by Components ($ per kWh) Secondary Voltage Primary Voltage Transmission Voltage Generation: Peak Summer Part-Peak Summer Off-Peak Summer $0.26894 $0.13619 $0.09873 $0.25766 $0.12876 $0.09406 $0.26209 $0.14347 $0.09322 $0.14233 $0.09860 $0.06285 $0.13418 $0.09411 $0.05836 $0.14331 $0.09030 $0.05750 $0.10563 (R) $0.05555 (R) $0.03398 (R) $0.09328 (R) $0.05102 (R) $0.03315 (R) $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 Peak Winter Off-Peak Winter Super Off-Peak Winter Distribution**: Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Transmission Rate Adjustments* (all usage) Public Purpose Programs (all usage) Nuclear Decommissioning (all usage) Competition Transition Charge (all usage) Energy Cost Recovery Amount (all usage) Wildfire Fund Charge (all usage) New System Generation Charge (all usage)** Wildfire Hardening Charge (all usage) Recovery Bond Charge (all usage) Recovery Bond Credit (all usage) Bundled Power Charge Indifference Adjustment (all usage)*** $0.00474 $0.02337 ($0.00002) $0.00025 $0.00002 $0.00591 $0.00395 $0.00264 $0.00857 ($0.00857) ($0.00923) (I) (I) (I) (I) (R) $0.00474 $0.02280 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00247 $0.00857 ($0.00857) ($0.00889) (I) (I) (I) (I) (R) $0.00474 $0.02082 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00171 $0.00857 ($0.00857) ($0.00896) (I) (I) (I) (R) * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. *** Direct Access, Community Choice Aggregation and Transitional Bundled Service Customers pay the applicable Vintaged Power Charge Indifference Adjustment. Generation and Bundled PCIA are combined for presentation on bundled customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  7. Page 10 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61087-E 60667-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 10 3. Rates: (Cont’d.) Total bundled service charges are calculated using the total rates shown below. DA and CCA charges shall be calculated in accordance with the paragraph in this rate schedule titled Billing. TOTAL BUNDLED TIME-OF-USE RATES FOR OPTION S (for qualifying storage customers as set forth in Section 18) Total Customer Charge Rates Customer Charge Mandatory B-20 ($ per meter per day) Total Demand Rates ($ per kW) Maximum Peak Demand Summer (per day) Maximum Part-Peak Demand Summer (per day) Maximum Demand Summer (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Summer (per monthly billing) Maximum Peak Demand Winter (per day) Maximum Demand Winter (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Winter (per billing month) Total Energy Rates ($ per kWh) Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Power Factor Adjustment Rate ($/kWh/%) Secondary Voltage Primary Voltage Transmission Voltage $107.36636 (R) $110.32836 (R) $331.86645 (R) $1.30 (R) $1.09 (R) $0.18 (R) $0.07 $0.07 $5.56 (R) $4.57 (R) $1.07 (R) $11.06 $11.06 $11.06 $1.02 (R) $0.82 (R) $0.18 (R) $5.56 (R) $4.57 (R) $1.07 (R) $11.06 $11.06 $11.06 $0.40620 (R) $0.22337 (R) $0.16434 (R) $0.38216 (R) $0.21100 (R) $0.15843 (R) $0.29050 (I) $0.17188 (I) $0.12163 (I) $0.17396 (I) $0.13023 (I) $0.09448 (I) $0.16540 (I) $0.12533 (I) $0.08958 (I) $0.17172 (I) $0.11871 (I) $0.08591 (I) $0.00005 $0.00005 $0.00005 (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  8. Page 11 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61088-E 60668-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 11 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. UNBUNDLING OF TOTAL RATES FOR OPTION S (Cont’d) (for qualifying storage customers as set forth in Section 18) Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Demand Rates by Components ($ per kW) Distribution**: Maximum Peak Demand Summer (per day) Maximum Part-Peak Demand Summer (per day) Maximum Demand Summer (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Summer (per monthly billing) Secondary Voltage $1.30 (R) $0.07 $5.56 Primary Voltage $1.09 Transmission Voltage (R) $0.18 (R) (R) $1.07 (R) $0.07 (R) $0.00 $4.57 $0.00 $0.00 Maximum Peak Demand Winter (per day) $1.02 (R) $0.82 (R) $0.18 (R) Maximum Demand Winter (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Winter (per billing month) $5.56 (R) $4.57 (R) $1.07 (R) Transmission Maximum Demand* Reliability Services Maximum Demand* $0.00 $0.00 $0.00 $11.03 $0.03 $11.03 $0.03 $11.03 $0.03 * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  9. Page 12 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61089-E 60669-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 12 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. UNBUNDLING OF TOTAL RATES FOR OPTION S (Cont’d.) (for qualifying storage customers as set forth in Section 18) Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Energy Charges by Components ($ per kWh) Generation: Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Distribution**: Peak Summer Part-Peak Summer Off-Peak Summer Secondary Voltage Primary Voltage $0.26894 $0.13619 $0.09873 $0.25766 $0.12876 $0.09406 $0.26209 $0.14347 $0.09322 $0.14233 $0.09860 $0.06285 $0.13418 $0.09411 $0.05836 $0.14331 $0.09030 $0.05750 $0.10563 $0.05555 $0.03398 (R) (R) (R) $0.00000 $0.00000 $0.00000 Peak Winter Off-Peak Winter Super Off-Peak Winter Transmission Rate Adjustments* (all usage) Public Purpose Programs (all usage) Nuclear Decommissioning (all usage) Competition Transition Charge (all usage) Energy Cost Recovery Amount (all usage) Wildfire Fund Charge (all usage) New System Generation Charge (all usage)** Wildfire Hardening Charge (all usage) Recovery Bond Charge (all usage) Recovery Bond Credit (all usage) Bundled Power Charge Indifference Adjustment (all usage)*** Transmission Voltage $0.00474 $0.02337 ($0.00002) $0.00025 $0.00002 $0.00591 $0.00395 $0.00264 $0.00857 ($0.00857) ($0.00923) $0.09328 $0.05102 $0.03315 (R) (R) (R) $0.00000 $0.00000 $0.00000 (I) (I) (I) (I) (R) $0.00474 $0.02280 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00247 $0.00857 ($0.00857) ($0.00889) $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 (I) (I) (I) (I) (R) $0.00474 $0.02082 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00171 $0.00857 ($0.00857) ($0.00896) (I) (I) (I) (R) * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. *** Direct Access, Community Choice Aggregation and Transitional Bundled Service Customers pay the applicable Vintaged Power Charge Indifference Adjustment. Generation and Bundled PCIA are combined for presentation on bundled customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  10. Page 13 of 24

    Cancelling U 39 Revised Original Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. San Francisco, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE 3. 49044-E 45609-E RATES: (Cont’d.) a. Sheet 13 TYPES OF CHARGES: The customer’s monthly charge for service under Schedule B-20 is the sum of a customer charge, demand charges, and energy charges: The customer charge is a flat monthly fee. 4. METERING REQUIREMENTS: – Schedule B-20 has three demand charges, a maximum-peak-period-demand charge, a maximum-part-peak-period demand charge, and a maximum-demand charge. The maximum-peak-period-demand charge per kilowatt applies to the maximum demand during the month’s peak hours, the maximum-part-peakdemand charge per kilowatt applies to the maximum demand during the month’s part-peak hours, and the maximum-demand charge per kilowatt applies to the maximum demand at any time during the month. The bill will include all of these demand charges. Option S includes variations of these basic demand charge types assessed on a (1) daily basis by time period and (2) maximum monthly basis applied to all hours except 9 am to 2 pm. (Time periods are defined in Section 6.) – The energy charge is the sum of the energy charges from the peak, partialpeak, and off-peak periods. The customer pays for energy by the kilowatt-hour (kWh), and rates are differentiated according to time of day and time of year. – The monthly charges may be increased or decreased based upon the power factor. (See Section 7.) – As shown on the rate chart, which set of customer, demand, and energy charges is paid depends on the voltage at which service is taken. Service voltages are defined in Section 5 below. An interval data meter that measures and registers the amount of electricity a customer uses and can be read remotely by PG&E is required for all customers on this schedule. For customers taking service under the provisions of Direct Access, see Electric Rule 22 for metering requirements. (L) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | (L) (Continued) Advice Decision 6090-E-A Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution February 26, 2021 March 1, 2021

Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf

Extracted from the file · 3 pages · 7,608 characters

As listed on the current system

Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026

This filing on the current system (opens in a new tab)