Text of CIEC-9 (d) Attachment A C17-0556_16A-0588E.pdf

Extracted from the file · 16 pages · 28,745 characters

Text of CIEC-9 (d) Attachment B 2023-CO-Phase-II-Electric-Rate-Review-Decision.pdf

Extracted from the file · 45 pages · 89,290 characters

Scanned pages of CIEC-12 Attachment - Bonbright Excerpt.pdf

Read by machine from a scan · 4 pages · may contain errors, especially in numbers

Text of CIEC-13 (a) Attachment - rate_order_Hydro One DX 2013_20121220.pdf

Extracted from the file · 31 pages · 41,898 characters

Text of CIEC-13 (d) - Hydro One Density Study HONI_APPL_Exhibit D_20120615.pdf

Extracted from the file · 99 pages · 204,526 characters

Words on different pages
  1. Page 9 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61086-E 60666-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 9 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. UNBUNDLING OF TOTAL RATES FOR OPTION R (Cont’d.) (for qualifying solar customers as set forth in Section 16) Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Energy Charges by Components ($ per kWh) Secondary Voltage Primary Voltage Transmission Voltage Generation: Peak Summer Part-Peak Summer Off-Peak Summer $0.26894 $0.13619 $0.09873 $0.25766 $0.12876 $0.09406 $0.26209 $0.14347 $0.09322 $0.14233 $0.09860 $0.06285 $0.13418 $0.09411 $0.05836 $0.14331 $0.09030 $0.05750 $0.10563 (R) $0.05555 (R) $0.03398 (R) $0.09328 (R) $0.05102 (R) $0.03315 (R) $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 Peak Winter Off-Peak Winter Super Off-Peak Winter Distribution**: Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Transmission Rate Adjustments* (all usage) Public Purpose Programs (all usage) Nuclear Decommissioning (all usage) Competition Transition Charge (all usage) Energy Cost Recovery Amount (all usage) Wildfire Fund Charge (all usage) New System Generation Charge (all usage)** Wildfire Hardening Charge (all usage) Recovery Bond Charge (all usage) Recovery Bond Credit (all usage) Bundled Power Charge Indifference Adjustment (all usage)*** $0.00474 $0.02337 ($0.00002) $0.00025 $0.00002 $0.00591 $0.00395 $0.00264 $0.00857 ($0.00857) ($0.00923) (I) (I) (I) (I) (R) $0.00474 $0.02280 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00247 $0.00857 ($0.00857) ($0.00889) (I) (I) (I) (I) (R) $0.00474 $0.02082 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00171 $0.00857 ($0.00857) ($0.00896) (I) (I) (I) (R) * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. *** Direct Access, Community Choice Aggregation and Transitional Bundled Service Customers pay the applicable Vintaged Power Charge Indifference Adjustment. Generation and Bundled PCIA are combined for presentation on bundled customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  2. Page 10 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61087-E 60667-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 10 3. Rates: (Cont’d.) Total bundled service charges are calculated using the total rates shown below. DA and CCA charges shall be calculated in accordance with the paragraph in this rate schedule titled Billing. TOTAL BUNDLED TIME-OF-USE RATES FOR OPTION S (for qualifying storage customers as set forth in Section 18) Total Customer Charge Rates Customer Charge Mandatory B-20 ($ per meter per day) Total Demand Rates ($ per kW) Maximum Peak Demand Summer (per day) Maximum Part-Peak Demand Summer (per day) Maximum Demand Summer (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Summer (per monthly billing) Maximum Peak Demand Winter (per day) Maximum Demand Winter (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Winter (per billing month) Total Energy Rates ($ per kWh) Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Power Factor Adjustment Rate ($/kWh/%) Secondary Voltage Primary Voltage Transmission Voltage $107.36636 (R) $110.32836 (R) $331.86645 (R) $1.30 (R) $1.09 (R) $0.18 (R) $0.07 $0.07 $5.56 (R) $4.57 (R) $1.07 (R) $11.06 $11.06 $11.06 $1.02 (R) $0.82 (R) $0.18 (R) $5.56 (R) $4.57 (R) $1.07 (R) $11.06 $11.06 $11.06 $0.40620 (R) $0.22337 (R) $0.16434 (R) $0.38216 (R) $0.21100 (R) $0.15843 (R) $0.29050 (I) $0.17188 (I) $0.12163 (I) $0.17396 (I) $0.13023 (I) $0.09448 (I) $0.16540 (I) $0.12533 (I) $0.08958 (I) $0.17172 (I) $0.11871 (I) $0.08591 (I) $0.00005 $0.00005 $0.00005 (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  3. Page 11 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61088-E 60668-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 11 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. UNBUNDLING OF TOTAL RATES FOR OPTION S (Cont’d) (for qualifying storage customers as set forth in Section 18) Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Demand Rates by Components ($ per kW) Distribution**: Maximum Peak Demand Summer (per day) Maximum Part-Peak Demand Summer (per day) Maximum Demand Summer (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Summer (per monthly billing) Secondary Voltage $1.30 (R) $0.07 $5.56 Primary Voltage $1.09 Transmission Voltage (R) $0.18 (R) (R) $1.07 (R) $0.07 (R) $0.00 $4.57 $0.00 $0.00 Maximum Peak Demand Winter (per day) $1.02 (R) $0.82 (R) $0.18 (R) Maximum Demand Winter (per monthly billing, all hours except 9 am to 2 pm) Maximum Demand Winter (per billing month) $5.56 (R) $4.57 (R) $1.07 (R) Transmission Maximum Demand* Reliability Services Maximum Demand* $0.00 $0.00 $0.00 $11.03 $0.03 $11.03 $0.03 $11.03 $0.03 * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  4. Page 12 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 61089-E 60669-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 12 3. Rates: (Cont’d.) Total bundled service charges shown on customers’ bills are unbundled according to the component rates shown below. UNBUNDLING OF TOTAL RATES FOR OPTION S (Cont’d.) (for qualifying storage customers as set forth in Section 18) Customer Charge Rates: Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component. Energy Charges by Components ($ per kWh) Generation: Peak Summer Part-Peak Summer Off-Peak Summer Peak Winter Off-Peak Winter Super Off-Peak Winter Distribution**: Peak Summer Part-Peak Summer Off-Peak Summer Secondary Voltage Primary Voltage $0.26894 $0.13619 $0.09873 $0.25766 $0.12876 $0.09406 $0.26209 $0.14347 $0.09322 $0.14233 $0.09860 $0.06285 $0.13418 $0.09411 $0.05836 $0.14331 $0.09030 $0.05750 $0.10563 $0.05555 $0.03398 (R) (R) (R) $0.00000 $0.00000 $0.00000 Peak Winter Off-Peak Winter Super Off-Peak Winter Transmission Rate Adjustments* (all usage) Public Purpose Programs (all usage) Nuclear Decommissioning (all usage) Competition Transition Charge (all usage) Energy Cost Recovery Amount (all usage) Wildfire Fund Charge (all usage) New System Generation Charge (all usage)** Wildfire Hardening Charge (all usage) Recovery Bond Charge (all usage) Recovery Bond Credit (all usage) Bundled Power Charge Indifference Adjustment (all usage)*** Transmission Voltage $0.00474 $0.02337 ($0.00002) $0.00025 $0.00002 $0.00591 $0.00395 $0.00264 $0.00857 ($0.00857) ($0.00923) $0.09328 $0.05102 $0.03315 (R) (R) (R) $0.00000 $0.00000 $0.00000 (I) (I) (I) (I) (R) $0.00474 $0.02280 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00247 $0.00857 ($0.00857) ($0.00889) $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 (I) (I) (I) (I) (R) $0.00474 $0.02082 ($0.00002) $0.00024 $0.00002 $0.00591 $0.00395 $0.00171 $0.00857 ($0.00857) ($0.00896) (I) (I) (I) (R) * Transmission, Transmission Rate Adjustments, and Reliability Service charges are combined for presentation on customer bills. ** Distribution and New System Generation Charges are combined for presentation on customer bills. *** Direct Access, Community Choice Aggregation and Transitional Bundled Service Customers pay the applicable Vintaged Power Charge Indifference Adjustment. Generation and Bundled PCIA are combined for presentation on bundled customer bills. (Continued) Advice Decision 7846-E Issued by Shilpa Ramaiya Vice President Regulatory and Rates Submitted Effective Resolution February 27, 2026 March 1, 2026
  5. Page 13 of 24

    Cancelling U 39 Revised Original Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. San Francisco, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE 3. 49044-E 45609-E RATES: (Cont’d.) a. Sheet 13 TYPES OF CHARGES: The customer’s monthly charge for service under Schedule B-20 is the sum of a customer charge, demand charges, and energy charges: The customer charge is a flat monthly fee. 4. METERING REQUIREMENTS: – Schedule B-20 has three demand charges, a maximum-peak-period-demand charge, a maximum-part-peak-period demand charge, and a maximum-demand charge. The maximum-peak-period-demand charge per kilowatt applies to the maximum demand during the month’s peak hours, the maximum-part-peakdemand charge per kilowatt applies to the maximum demand during the month’s part-peak hours, and the maximum-demand charge per kilowatt applies to the maximum demand at any time during the month. The bill will include all of these demand charges. Option S includes variations of these basic demand charge types assessed on a (1) daily basis by time period and (2) maximum monthly basis applied to all hours except 9 am to 2 pm. (Time periods are defined in Section 6.) – The energy charge is the sum of the energy charges from the peak, partialpeak, and off-peak periods. The customer pays for energy by the kilowatt-hour (kWh), and rates are differentiated according to time of day and time of year. – The monthly charges may be increased or decreased based upon the power factor. (See Section 7.) – As shown on the rate chart, which set of customer, demand, and energy charges is paid depends on the voltage at which service is taken. Service voltages are defined in Section 5 below. An interval data meter that measures and registers the amount of electricity a customer uses and can be read remotely by PG&E is required for all customers on this schedule. For customers taking service under the provisions of Direct Access, see Electric Rule 22 for metering requirements. (L) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | (L) (Continued) Advice Decision 6090-E-A Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution February 26, 2021 March 1, 2021
  6. Page 14 of 24

    Cancelling U 39 Revised Original Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. San Francisco, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE 5. 6. 49045-E 45610-E DEFINITION OF SERVICE VOLTAGE: DEFINITION OF TIME PERIODS: Sheet 14 The following defines the three voltage classes of Schedule B-20 rates. Standard Service Voltages are listed in Rule 2. a. Secondary: This is the voltage class if the service voltage is less than 2,400 volts or if the definitions of “primary” and “transmission” do not apply to the service. b. Primary: This is the voltage class if the customer is served from a “single customer substation” or without transformation from PG&E’s serving distribution system at one of the standard primary voltages specified in PG&E’s Electric Rule 2, Section B.1. c. Transmission: This is the voltage class if the customer is served without transformation at one of the standard transmission voltages specified in PG&E’s Electric Rule 2, Section B.1. Times of the year and times of the day are defined as follows: SUMMER - Service from June 1 through September 30: Peak: 4:00 p.m. to 9:00 p.m. Every day, including weekends and holidays Partial-peak: 2:00 p.m. to 4:00 pm AND 9:00 p.m. to 11:00 p.m. Every day, including weekends and holidays Off-peak: All other Hours. WINTER - Service from October 1 through May 31: Peak: 4:00 p.m. to 9:00 p.m. Every day, including weekends and holidays Super Off-Peak 9:00 a.m. to 2:00 p.m. Every day in March, April and May, including weekends and holidays Off-peak: All other Hours. CHANGE FROM SUMMER TO WINTER OR WINTER TO SUMMER: When a billing month includes both summer and winter days, PG&E will calculate demand charges as follows. It will consider the applicable maximum demands for the summer and winter portions of the billing month separately, calculate a demand charge for each, and then apply the two according to the number of billing days each represents. (L) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | (L) (Continued) Advice Decision 6090-E-A Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution February 26, 2021 March 1, 2021
  7. Page 15 of 24

    Cancelling U 39 Revised Original Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. San Francisco, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE 7. 49046-E 45611-E POWER FACTOR ADJUSTMENTS: Sheet 15 The bill will be adjusted based upon the power factor. The power factor is computed from the cosine of the arctangent of the ratio of lagging reactive kilovolt-ampere-hours to the kilowatt-hours consumed in the month. Power factors are rounded to the nearest whole percent. The rates in this rate schedule are based on a power factor of 85 percent. If the average power factor is greater than 85 percent, the total monthly bill will be reduced by the product of the power factor rate and the kilowatt-hour usage for each percentage point above 85 percent. If the average power factor is below 85 percent, the total monthly bill will be increased by the product of the power factor rate and the kilowatt-hour usage for each percentage point below 85 percent. Power factor adjustments will be assigned to distribution for billing purposes. 8. CHARGES The demand and energy meter readings used in determining the charges will be adjusted to FOR correct for transformation and line losses in accordance with Section B.4 of Rule 2. TRANSFORM ER AND LINE LOSSES: 9. STANDARD SERVICE FACILITIES: If PG&E must install any new or additional facilities to provide the customer with service under Schedule B-20, the customer may have to pay some of the cost. Any advance necessary and any monthly charge for the facilities will be specified in a line extension agreement. See Rules 2, 15, and 16 for details. Facilities installed to serve the customer may be removed when service is discontinued. The customer will then have to repay PG&E for all or some of its investment in the facilities. Terms and conditions for repayment will be set forth in the line extension agreement. 10. SPECIAL FACILITIES: PG&E will normally install only those standard facilities it deems necessary to provide service under Schedule B-20. If the customer requests any additional facilities, those facilities will be treated as “special facilities” in accordance with Section I of Rule 2. (L) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | (L) (Continued) Advice Decision 6090-E-A Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution February 26, 2021 March 1, 2021
  8. Page 16 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 60670-E 59077-E Oakland, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE 11. BILLING: Sheet 16 A customer’s bill is calculated based on the option applicable to the customer. Bundled Service Customers receive generation and delivery services solely from PG&E. The customer’s bill is based on the Unbundling of Total Rates and Conditions set forth in this schedule. Transitional Bundled Service (TBS) Customers take TBS as prescribed in Rules 22.1 and 23.1, or take PG&E bundled service prior to the end of the six (6) month advance notice period required to elect PG&E bundled service as prescribed in Rules 22.1 and 23.1. TBS customers shall pay all charges shown in the Unbundling of Total Rates except for the Bundled Power Charge Indifference Adjustment and the generation charge. TBS customers shall also pay for their applicable Vintaged Power Charge Indifference Adjustment provided in the table below, and the short-term commodity prices as set forth in Schedule TBCC. Direct Access (DA) and Community Choice Aggregation (CCA) Generation Service Customers purchase energy from their non-utility provider and continue receiving delivery services from PG&E. These customers shall pay all charges shown in the Unbundling of Total Rates except for the Bundled Power Charge Indifference Adjustment and the generation charge. These customers shall also pay for their applicable Vintaged Power Charge Indifference Adjustment provided in the table below, the franchise fee surcharge provided in Schedule E-FFS, and the Generation Service from their non-utility provider. Exemptions to charges for DA and CCA customers are set forth in Schedules DA CRS and CCA CRS. Secondary Voltage Primary Voltage Vintaged Power Charge Indifference Adjustment (per kWh) 2009 Vintage $0.02717 (I) $0.02617 (I) 2010 Vintage $0.03075 (I) $0.02962 (I) 2011 Vintage $0.03190 (I) $0.03074 (I) 2012 Vintage $0.03358 (I) $0.03235 (I) 2013 Vintage $0.03387 (I) $0.03263 (I) 2014 Vintage $0.03368 (I) $0.03245 (I) 2015 Vintage $0.03362 (I) $0.03239 (I) 2016 Vintage $0.03368 (I) $0.03245 (I) 2017 Vintage $0.03344 (I) $0.03222 (I) 2018 Vintage $0.03361 (I) $0.03238 (I) 2019 Vintage $0.03403 (I) $0.03279 (I) 2020 Vintage $0.03318 (I) $0.03197 (I) 2021 Vintage $0.04809 (I) $0.04633 (I) 2022 Vintage $0.04816 (I) $0.04640 (I) 2023 Vintage $0.04915 (I) $0.04735 (I) 2024 Vintage $0.04628 (I) $0.04459 (I) 2025 Vintage ($0.00923) (I) ($0.00889) (I) 2026 Vintage ($0.00923) (N) ($0.00889) (N) Transmission Voltage $0.02637 (I) $0.02985 (I) $0.03097 (I) $0.03260 (I) $0.03288 (I) $0.03269 (I) $0.03264 (I) $0.03270 (I) $0.03247 (I) $0.03263 (I) $0.03304 (I) $0.03221 (I) $0.04668 (I) $0.04675 (I) $0.04772 (I) $0.04493 (I) ($0.00896) (I) ($0.00896) (N) (Continued) Advice Decision 7797-E Issued by Shilpa Ramaiya Vice President Regulatory Proceedings and Rates Submitted Effective Resolution December 30, 2025 January 1, 2026
  9. Page 17 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 53413-E 49048-E San Francisco, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE Sheet 17 12. CARE DISCOUNT FOR NONPROFIT GROUPLIVING AND SPECIAL EMPLOYEE HOUSING FACILITIES: Facilities which meet the eligibility criteria in Rule 19.2 or 19.3 are eligible for a California Alternate Rates for Energy discount under Schedule E-CARE. CARE customers are exempt from paying the Wildfire Fund Charge, Recovery Bond Charge, Recovery Bond Credit, and the CARE surcharge portion of the public purpose program charge. 13. ELECTRIC EMERGENCY PLAN ROTATING BLOCK OUTAGES: See Electric Rule 14. 14. STANDBY APPLICABILITY: SOLAR GENERATION FACILITIES EXEMPTION: Customers who utilize solar generating facilities which are less than or equal to one megawatt to serve load and who do not sell power or make more than incidental export of power into PG&E’s power grid and who have not elected service under Schedule NEM, will be exempt from paying the otherwise applicable standby reservation charges. (T) | (T) DISTRIBUTED ENERGY RESOURCES EXEMPTION: Any customer under a time-of-use (TOU) rate schedule using electric generation technology that meets the criteria as defined in Electric Rule 1 for Distributed Energy Resources is exempt from the otherwise applicable standby reservation charges. Customers qualifying for this exemption shall be subject to the following requirements. Customers qualifying for an exemption from standby charges under Public Utilities (PU) Code Sections 353.1 and 353.3, as described above, must take service on a TOU schedule in order to receive this exemption until a real-time pricing program, as described in PU Code 353.3, is made available. Once available, customers qualifying for the standby charge exemption must participate in the real-time program referred to above. Qualification for and receipt of this distributed energy resources exemption does not exempt the customer from metering charges applicable to TOU and real-time pricing, or exempt the customer from reasonable interconnection charges, non-bypassable charges as required in Preliminary Statement BB - Competition Transition Charge Responsibility for All Customers and CTC Procurement, or obligations determined by the Commission to result from participation in the purchase of power through the California Department of Water Resources, as provided in PU Code Section 353.7. 15. WILDFIRE FUND CHARGE The Wildfire Fund Charge was imposed by California Public Utilities Commission Decisions 19-10-056, 20-07-014, 20-09-005, and 20-09-023 and is property of Department of Water Resources (DWR) for all purposes under California law. The Charge became effective October 1, 2020, and applies to all retail sales, excluding CARE and Medical Baseline sales. The Wildfire Fund Charge (where applicable) is included in customers’ total billed amounts. The Wildfire Fund Charge replaces the DWR Bond Charge imposed by California Public Utilities Commission Decisions 02-10-063 and 02-12-082. (Continued) Advice Decision 6603-E-A Issued by Robert S. Kenney Vice President, Regulatory Affairs Submitted Effective Resolution May 31, 2022 June 1, 2022
  10. Page 18 of 24

    Cancelling U 39 Revised Revised Cal. P.U.C. Sheet No. Cal. P.U.C. Sheet No. 53913-E 49049-E San Francisco, California ELECTRIC SCHEDULE B-20 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE 16. Option R Sheet 18 The Option R rate is available to qualifying customers with eligible technologies as described in the applicability section of this tariff. Across all applicable rate schedules, Option R participation is capped at 600 MW of generating or storage discharge capacity. Eligible Permanent Load Shift (PLS) technologies are not subject to this cap. (T) I I I (T) For eligible stand-alone storage, the qualifying capacity counted towards the Option R cap is the discharge capacity of the storage system or systems, calculating using the same method as is used for Option S. (N) I I I I I I I I I I I I I I I (N) For eligible renewable technologies, the qualifying capacity counted towards the Option R participation cap is based on net renewable generating capacity (i.e., the amount of power actually delivered by the generator or generators net of any losses such as auxiliary loads, thermal management loads, etc.). For paired storage systems, the qualifying capacity counted towards the Option R cap is the larger of the system’s California Energy Commission (CEC) alternating current (AC) solar capacity or the discharge capacity of the storage system calculated using the same method as that used for Option S (but not both). No Benefitting* or Aggregated* account is eligible for Option R unless there is an eligible technology interconnected at that account that independently meets the Option R minimum size requirements relative to peak load, as described in the applicability section of this tariff. (D) I I I I I I I I I (D) * Benefiting and Aggregated accounts are defined in rate schedules that allows for such accounts for example, NEM2, RES-BCT and other tariffs. 1 (D) | | | | | | | | | | | | (D) (Continued) Advice Decision 6676-E 21-11-016 Issued by Meredith Allen Vice President, Regulatory Affairs Submitted Effective Resolution August 15, 2022 September 1, 2022

Text of CIEC-20 (d) Attachment 2 - PSCo Schedule PG.pdf

Extracted from the file · 3 pages · 7,608 characters

As listed on the current system

Question(s) Answered 2 thru 20 (OCC) Date Filed: 11/12/2026

This filing on the current system (opens in a new tab)