Interrogatory responses

Answers to questions 1 thru 9

Files22

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: 17 Sum Accrual Adj] Figure Plant | Plant | Current Parameters | Company Proposed | OCC Proposed | OCC Adjustment | Plant | Plant | Current Parameters | Company Proposed | OCC Proposed | OCC Adjustment Function | Rate | Accrual | Rate | Accrual | Rate | Accrual | Rate | Adjustment | Function | Rate | Accrual | Rate | Accrual | Rate | Accrual | Rate | Adjustment Distribution Plant | Distribution Plant General Plant | General Plant Reserve Adjustment | Reserve Adjustment Total Depreciable Plant | Total Depreciable Plant [Sheet: 18 Parameter Comp] Figure Current Parameters | Company Position | OCC Position | Net Salvage Adjustment Calculation | Current Parameters | Company Position | OCC Position Account | Iowa | Salvage | Depr | Annual | Iowa | Salvage | Depr | Annual | Iowa | Salvage | Depr | Annual | Proposed | Adjusted | Account | Iowa | Salvage | Depr | Annual | Iowa | Salvage | Depr | Annual | Iowa | Salvage | Depr | Annual No. | Description | Curve | Rate | Rate | Accrual | Curve | Rate | Rate | Accrual | Curve | Rate | Rate | Accrual | NS Increase | Limit | NS | No. | Description | Curve | Rate | Rate | Accrual | Curve | Rate | Rate | Accrual | Curve | Rate | Rate | Accrual DISTRIBUTION PLANT | DISTRIBUTION PLANT STATION EQUIPMENT | S0 | R1 | R1 | STATION EQUIPMENT | S0 | R1 | R1 POLES, TOWERS AND FIXTURES | R0.5 | R0.5 | L0 | POLES, TOWERS AND FIXTURES | R0.5 | R0.5 | L0 OVERHEAD CONDUCTORS AND DEVICES | R0.5 | R0.5 | R0.5 | OVERHEAD CONDUCTORS AND DEVICES | R0.5 | R0.5 | R0.5 UNDERGROUND CONDUIT | R2 | R1.5 | R1.5 | UNDERGROUND CONDUIT | R2 | R1.5 | R1.5 UNDERGROUND CONDUCTORS AND DEVICES | R0.5 | R0.5 | L0 | UNDERGROUND CONDUCTORS AND DEVICES | R0.5 | R0.5 | L0 LINE TRANSFORMERS | R0.5 | R0.5 | R0.5 | LINE TRANSFORMERS | R0.5 | R0.5 | R0.5 SERVICES | R1.5 | R1.5 | R1.5 | SERVICES | R1.5 | R1.5 | R1.5 METERS | METERS AMR | L1 | S0 | S0 | AMR | L1 | S0 | S0 BRIDGE | L1 | S2 | S2 | BRIDGE | L1 | S2 | S2 DEMAND METER | L1 | S0 | S0 | DEMAND METER | L1 | S0 | S0 NET METER | L1 | S0 | S0 | NET METER | L1 | S0 | S0 TIME OF USE METER | L1 | S0 | S0 | TIME OF USE METER | L1 | S0 | S0 INSTALLATIONS ON CUSTOMERS' PREMISES | L0 | L0 | L0 | INSTALLATIONS ON CUSTOMERS' PREMISES | L0 | L0 | L0 STREET LIGHTING AND SIGNAL SYSTEMS | L0 | L0 | O3 | STREET LIGHTING AND SIGNAL SYSTEMS | L0 | L0 | O3 GENERAL PLANT | GENERAL PLANT STRUCTURES AND IMPROVEMENTS | R1.5 | R1.5 | R1.5 | STRUCTURES AND IMPROVEMENTS | R1.5 | R1.5 | R1.5 TRANS EQUIP - CLASS 1 (CARS) | L2.5 | L3 | L3 | TRANS EQUIP - CLASS 1 (CARS) | L2.5 | L3 | L3 TRANS EQUIP - CLASS 2 (LIGHT TRUCKS) | S2 | S2 | S2 | TRANS EQUIP - CLASS 2 (LIGHT TRUCKS) | S2 | S2 | S2 TRANS EQUIP - CLASS 3 (MEDIUM TRUCKS) | S2 | S2.5 | S2.5 | TRANS EQUIP - CLASS 3 (MEDIUM TRUCKS) | S2 | S2.5 | S2.5 TRANS EQUIP - CLASS 4 (HEAVY TRUCKS) | S1.5 | S0.5 | S0.5 | TRANS EQUIP - CLASS 4 (HEAVY TRUCKS) | S1.5 | S0.5 | S0.5 [Sheet: 19 Detail Rate Comp] [1] | [2] | [3] | [4] | [5] Current | Company | OCC | OCC Parameters | Proposal | Proposal | Adjustment Account | Original Cost | Annual | Annual | Annual | Annual No. | Description | Rate | Accrual | Rate | Accrual | Rate | Accrual | Rate | Accrual DISTRIBUTION PLANT LAND RIGHTS STRUCTURES AND IMPROVEMENTS STATION EQUIPMENT COMPUTER HARDWARE - PCs COMPUTER HARDWARE FULLY ACCRUED AMORTIZED TOTAL COMPUTER SOFTWARE - 3 YEAR COMPUTER SOFTWARE - 10 YEAR COMPUTER SOFTWARE - 5 YEAR COMPUTER SOFTWARE - 15 YEAR COMMUNICATION EQUIPMENT COMMUNICATION EQUIPMENT - MICROWAVE POLES, TOWERS AND FIXTURES OVERHEAD CONDUCTORS AND DEVICES UNDERGROUND CONDUIT UNDERGROUND CONDUCTORS AND DEVICES LINE TRANSFORMERS SERVICES METER EQUIPMENT METERS AMR BRIDGE DEMAND METER NET METER TIME OF USE METER ELECTRIC VEHICLE CHARGING STATION INSTALLATIONS ON CUSTOMERS' PREMISES STREET LIGHTING AND SIGNAL SYSTEMS TOTAL DISTRIBUTION PLANT GENERAL PLANT OFFICE FURNITURE AND EQUIPMENT OFFICE FURNITURE AND EQUIPMENT - IT TRANSPORTATION EQUIPMENT - CLASS 1 (CARS)
  2. Part 2

    TRANSPORTATION EQUIPMENT - CLASS 2 (LIGHT TRUCKS) TRANSPORTATION EQUIPMENT - CLASS 3 (MEDIUM TRUCKS) TRANSPORTATION EQUIPMENT - CLASS 4 (HEAVY TRUCKS) TRANSPORTATION EQUIPMENT - CLASS 5 (ROLLING EQUIPMENT) TRANSPORTATION EQUIPMENT - CLASS 6 (TRAILERS) TRANSPORTATION EQUIPMENT - OTHER STORES EQUIPMENT TOOLS, SHOP AND GARAGE EQUIPMENT LABORATORY EQUIPMENT POWER OPERATED EQUIPMENT COMMUNICATION EQUIPMENT - OTHER MISCELLANEOUS EQUIPMENT TOTAL GENERAL PLANT RESERVE ADJUSTMENT FOR AMORTIZATION TOTAL RESERVE ADJUSTMENT FOR AMORTIZATION TOTAL DEPRECIABLE PLANT [1], [2], [3] From Company depreciation study [4] From Exhibit DJG-20 [4] = [4] - [3] [Sheet: 20 Rate Development] [1] | [2] | [3] | [4] | [5] | [6] | [7] | [8] | [9] Account | Original Cost | Iowa Curve | Net | Depreciable | Book | Future | Remaining | Total No. | Description | Type | AL | Salvage | Base | Reserve | Accruals | Life | Accrual | Rate DISTRIBUTION PLANT LAND RIGHTS | R4 STRUCTURES AND IMPROVEMENTS | R2.5 STATION EQUIPMENT | R1 COMPUTER HARDWARE - PCs | SQ COMPUTER HARDWARE FULLY ACCRUED AMORTIZED | SQ TOTAL COMPUTER SOFTWARE - 3 YEAR | SQ COMPUTER SOFTWARE - 10 YEAR | SQ COMPUTER SOFTWARE - 5 YEAR | SQ COMPUTER SOFTWARE - 15 YEAR | SQ COMMUNICATION EQUIPMENT COMMUNICATION EQUIPMENT - MICROWAVE | S2 POLES, TOWERS AND FIXTURES | L0 OVERHEAD CONDUCTORS AND DEVICES | R0.5 UNDERGROUND CONDUIT | R1.5 UNDERGROUND CONDUCTORS AND DEVICES | L0 LINE TRANSFORMERS | R0.5 SERVICES | R1.5 METER EQUIPMENT | S0 METERS AMR | S0 BRIDGE | S2 DEMAND METER | S0 NET METER | S0 TIME OF USE METER | S0 ELECTRIC VEHICLE CHARGING STATION | S3 INSTALLATIONS ON CUSTOMERS' PREMISES | L0 STREET LIGHTING AND SIGNAL SYSTEMS | O3 TOTAL DISTRIBUTION PLANT GENERAL PLANT STRUCTURES AND IMPROVEMENTS | R1.5 OFFICE FURNITURE AND EQUIPMENT | SQ OFFICE FURNITURE AND EQUIPMENT - IT TRANSPORTATION EQUIPMENT - CLASS 1 (CARS) | L3 TRANSPORTATION EQUIPMENT - CLASS 2 (LIGHT TRUCKS) | S2 TRANSPORTATION EQUIPMENT - CLASS 3 (MEDIUM TRUCKS) | S2.5 TRANSPORTATION EQUIPMENT - CLASS 4 (HEAVY TRUCKS) | S0.5 TRANSPORTATION EQUIPMENT - CLASS 5 (ROLLING EQUIPMENT) | S3 TRANSPORTATION EQUIPMENT - CLASS 6 (TRAILERS) | L1.5 TRANSPORTATION EQUIPMENT - OTHER | R4 STORES EQUIPMENT | SQ TOOLS, SHOP AND GARAGE EQUIPMENT | SQ LABORATORY EQUIPMENT | SQ POWER OPERATED EQUIPMENT | R0.5 COMMUNICATION EQUIPMENT - OTHER | SQ MISCELLANEOUS EQUIPMENT | SQ TOTAL GENERAL PLANT RESERVE ADJUSTMENT FOR AMORTIZATION COMPUTER HARDWARE - PCs OFFICE FURNITURE AND EQUIPMENT STORES EQUIPMENT TOOLS, SHOP AND GARAGE EQUIPMENT LABORATORY EQUIPMENT COMMUNICATION EQUIPMENT - OTHER MISCELLANEOUS EQUIPMENT TOTAL RESERVE ADJUSTMENT FOR AMORTIZATION TOTAL DEPRECIABLE PLANT [1] From Company depreciation study [2] Average life and Iowa curve shape developed through statistical analysis and professional judgment [3] Net salvage estimates developed through statistical analysis and professional judgment [4] = [1]*(1-[3]) [5] From Company depreciation study [6] = [4] - [5] [7] Composite remaining life based on Iowa cuve in [2]; see remaining life exhibit for detailed calculations [8] = [6] / [7] [9] = [8] / [1] [Sheet: 21 Acct. 364] [1] | [2] | [3] | [4] | [5] | [6] | [7] Age | Exposures | Observed Life | Company R0.5-48 | OCC L0-53 | Company | OCC (Years) | (Dollars) | Table (OLT) | SSD | SSD Sum of Squared Differences | [8] SSD for Truncated OLT Curve | [9] [1] Age in years using half-year convention [2] Dollars exposed to retirement at the beginning of each age interval [3] Observed life table based on the Company's property records. These numbers form the original survivor curve. [4] The Company's selected Iowa curve to be fitted to the OLT. [5] My selected Iowa curve to be fitted to the OLT. [6] = ([4] - [3])^2. This is the squared difference between each point on the Company's curve and the observed survivor curve. [7] = ([5] - [3])^2. This is the squared difference between each point on my curve and the observed survivor curve.
  3. Part 3

    [8] = Sum of squared differences. The smallest SSD represents the best mathematical fit. [9] = Sum of squared differences up to the truncation point (bold line) [Sheet: 22 Acct. 365] [1] | [2] | [3] | [4] | [5] | [6] | [7] Age | Exposures | Observed Life | Company R0.5-46 | OCC R0.5-52 | Company | OCC (Years) | (Dollars) | Table (OLT) | SSD | SSD Sum of Squared Differences | [8] SSD for Truncated OLT Curve | [9] [1] Age in years using half-year convention [2] Dollars exposed to retirement at the beginning of each age interval [3] Observed life table based on the Company's property records. These numbers form the original survivor curve. [4] The Company's selected Iowa curve to be fitted to the OLT. [5] My selected Iowa curve to be fitted to the OLT. [6] = ([4] - [3])^2. This is the squared difference between each point on the Company's curve and the observed survivor curve. [7] = ([5] - [3])^2. This is the squared difference between each point on my curve and the observed survivor curve. [8] = Sum of squared differences. The smallest SSD represents the best mathematical fit. [9] = Sum of squared differences up to the truncation point (bold line) [Sheet: 23 Acct. 366] [1] | [2] | [3] | [4] | [5] | [6] | [7] Age | Exposures | Observed Life | Company R1.5-75 | OCC R1.5-82 | Company | OCC (Years) | (Dollars) | Table (OLT) | SSD | SSD Sum of Squared Differences | [8] SSD for Truncated OLT Curve | [9] [1] Age in years using half-year convention [2] Dollars exposed to retirement at the beginning of each age interval [3] Observed life table based on the Company's property records. These numbers form the original survivor curve. [4] The Company's selected Iowa curve to be fitted to the OLT. [5] My selected Iowa curve to be fitted to the OLT. [6] = ([4] - [3])^2. This is the squared difference between each point on the Company's curve and the observed survivor curve. [7] = ([5] - [3])^2. This is the squared difference between each point on my curve and the observed survivor curve. [8] = Sum of squared differences. The smallest SSD represents the best mathematical fit. [9] = Sum of squared differences up to the truncation point (bold line) [Sheet: 24 Acct. 367] [1] | [2] | [3] | [4] | [5] | [6] | [7] Age | Exposures | Observed Life | Company R0.5-50 | OCC L0-55 | Company | OCC (Years) | (Dollars) | Table (OLT) | SSD | SSD Sum of Squared Differences | [8] SSD for Truncated OLT Curve | [9] [1] Age in years using half-year convention [2] Dollars exposed to retirement at the beginning of each age interval [3] Observed life table based on the Company's property records. These numbers form the original survivor curve. [4] The Company's selected Iowa curve to be fitted to the OLT. [5] My selected Iowa curve to be fitted to the OLT. [6] = ([4] - [3])^2. This is the squared difference between each point on the Company's curve and the observed survivor curve. [7] = ([5] - [3])^2. This is the squared difference between each point on my curve and the observed survivor curve. [8] = Sum of squared differences. The smallest SSD represents the best mathematical fit. [9] = Sum of squared differences up to the truncation point (bold line) [Sheet: 25 Acct. 373] [1] | [2] | [3] | [4] | [5] | [6] | [7] Age | Exposures | Observed Life | Company L0-18 | OCC O3-25 | Company | OCC (Years) | (Dollars) | Table (OLT) | SSD | SSD Sum of Squared Differences | [8] SSD for Truncated OLT Curve | [9] [1] Age in years using half-year convention [2] Dollars exposed to retirement at the beginning of each age interval [3] Observed life table based on the Company's property records. These numbers form the original survivor curve. [4] The Company's selected Iowa curve to be fitted to the OLT. [5] My selected Iowa curve to be fitted to the OLT. [6] = ([4] - [3])^2. This is the squared difference between each point on the Company's curve and the observed survivor curve.
  4. Part 4

    [7] = ([5] - [3])^2. This is the squared difference between each point on my curve and the observed survivor curve. [8] = Sum of squared differences. The smallest SSD represents the best mathematical fit. [9] = Sum of squared differences up to the truncation point (bold line)
Words on different pages
Words on different pages

Scanned pages of ROE - 11 Graham, Corporate Finance 179-81,208,330,357,440-41,509.pdf

Read by machine from a scan · 11 pages · may contain errors, especially in numbers

Scanned pages of ROE - 10 Bodie, Essentials of Investments 149,382-83,395,410,416-17.pdf

Read by machine from a scan · 8 pages · may contain errors, especially in numbers

Scanned pages of ROE - 9 Damodaran, Investment Valuation 62-4,162,187,196-97, 279, 285-86, 306-7.pdf

Read by machine from a scan · 15 pages · may contain errors, especially in numbers

Scanned pages of ROE - 4 Kolbe, The Cost of Capital 21.pdf

Read by machine from a scan · 2 pages · may contain errors, especially in numbers

Scanned pages of Depreciation Systems, Wolf (cited pages).pdf

Read by machine from a scan · 35 pages · may contain errors, especially in numbers

Scanned pages of Depreciation of Group Properties (Bulletin 155), Winfrey (cited pages).pdf

Read by machine from a scan · 13 pages · may contain errors, especially in numbers

Text of DEPR - Public Utility Depreciation Practices, NARUC (cited pages).pdf

Extracted from the file · 20 pages, 19 without text · 1,997 characters

Scanned pages of DEPR - Stat Analyses of Industrial Prop Retirements (Bulletin 125), Winfrey (cited pages).pdf

Read by machine from a scan · 2 pages · may contain errors, especially in numbers

Scanned pages of ROE - 24 Pratt, Cost of Capital 1195.pdf

Read by machine from a scan · 2 pages · may contain errors, especially in numbers

Text of ROE - 23 Damodaran ERP Estimate Paper 2015.pdf

Extracted from the file · 120 pages · 268,757 characters

Text of ROE - 22 Gordon, Capital Equipment Analysis.pdf

Extracted from the file · 10 pages, 1 without text · 25,884 characters

Scanned pages of ROE - 21 Dimson, Triumph of the Optimists 4,34,65,173,131,133,194.pdf

Read by machine from a scan · 8 pages · may contain errors, especially in numbers

Scanned pages of ROE - 20 Ibbotson 2012, pp. 77-78.pdf

Read by machine from a scan · 3 pages · may contain errors, especially in numbers

Text of ROE - 19 Vasicek, A Note on Using Cross-Sectional Information.pdf

Extracted from the file · 7 pages · 17,615 characters

Text of ROE - 18 Blume, On the Assessment of Risk.pdf

Extracted from the file · 11 pages · 25,911 characters

Text of ROE - 17 Gombola, Time-Series Processes of Utility Betas.pdf

Extracted from the file · 12 pages, 2 without text · 33,718 characters

Text of ROE - 15 Sharpe, A Simplified Model for Portfolio Analysis.pdf

Extracted from the file · 18 pages · 32,658 characters

Text of ROE - 14 Fama, Efficient Capital Markets.pdf

Extracted from the file · 36 pages, 35 without text · 1,755 characters

As listed on the current system

Question(s) Answered 1 thru 9 (OCC) Date Filed: 11/10/2026

This filing on the current system (opens in a new tab)