Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

  1. Page 97 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 97 of 106 1 mean, obviously, I would agree that 5,000 times two 2 is 10,000. 3 apples-to-apples given that that is for a longer time 4 period than the 5,000. I'm just not certain we are comparing COMMISSIONER GILMAN: 5 That is what I was 6 trying to understand like if there was some cyclical 7 nature you understand about it. 8 ratio is a straight ratio, which makes an assumption, 9 it would appear that the 2025 numbers are 10 considerably lower. WITNESS JONES: 11 You know, if the Unfortunately, I don't 12 know much about the cyclical nature, so wouldn't be 13 able to comment on that. COMMISSIONER GILMAN: 14 Okay. On page 59 of 15 your rebuttal -- I hope I have the page right this 16 time. No. MS. BRAMA: 17 Commissioner Gilman, I'm sorry 18 to interrupt, but I saw Ms. Roberts come off mute, 19 and I didn't know if she had something to add before 20 we move on. 21 COMMISSIONER GILMAN: 22 WITNESS ROBERTS: Go ahead. I just wanted to talk a 23 bit to this seasonality. And I do believe there is 24 seasonality, as you were pointing out, Commissioner 25 Gilman, with construction. 97
  2. Page 98 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 98 of 106 1 And so if we are looking at the first 2 portion of the year, not quite knowing if it is half 3 or not, I think we are generally speaking to the 4 5,000 could be a little bit low because these first 5 months of the year are colder, and you may see less 6 construction. 7 right way there. So generically, you are thinking the 8 COMMISSIONER GILMAN: 9 about when construction starts. 10 when construction ends. 11 determinative factor, I mean, there might be a fair 12 bet for any time of the year, but I'm not quite sure. 13 I agree with you I don't know about So if that is the WITNESS ROBERTS: If you are starting 14 construction, the construction ends later, which the 15 hookup is going to be on the later end of the year. 16 COMMISSIONER GILMAN: Could be, if you 17 have a 12-month construction cycle. 18 Some people do things different. 19 20 21 Can we try page 56? there is a table here. I don't know. Sorry about that. So There we go. Just curious. So this shows the 22 forecasted design day peak hour growth rates from 23 2030 -- by 2025 to 2035 in the low forecast 24 sensitivity. 25 total and residential peak design day hour growth? What is the big dip in 2029 in the 98
  3. Page 99 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 99 of 106 WITNESS JONES: 1 Yeah, that is a good 2 question. Not having the forecast inputs in front of 3 me, I wouldn't be able to answer. COMMISSIONER GILMAN: 4 And you don't know 5 what the dip after 2033 is, either? 6 WITNESS JONES: 7 COMMISSIONER GILMAN: I do not. Okay. I wanted to 8 understand a little bit the way I'm thinking about 9 understanding the coincidence of especially the 10 potential of electric resistance backup or peak 11 electric heating need and coincidence with the 12 existing system peak. So in your supplemental direct, Ms. Jones, 13 14 you had indicated the gas system has two peaks, one 15 in the morning and then a slightly smaller one in the 16 evening. 17 because you don't have, you know, intelligent meters, 18 basically, out there. 19 approximation. And the exact difference isn't quantified So it is basically an But since there is the potential for that, 20 21 your assumption is that there is 100 percent 22 coincidence with the evening electric winter mountain 23 peak. Is that fair? 24 WITNESS JONES: That sounds correct, yes. 25 COMMISSIONER GILMAN: For the electric -- 99
  4. Page 100 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 100 of 106 WITNESS JONES: 1 I think in my supplemental 2 testimony, we do acknowledge there is potential that 3 that is conservative. 4 planning, we find that to be reasonable. But for the purposes of COMMISSIONER GILMAN: 5 Okay. And I was 6 trying to figure out if we are still using -- like if 7 those are, as I understand from your previous 8 testimony, kind of extrapolated on the idea of what 9 the gas system may demand at this negative 39 degrees 10 Farenheit, then convert it to electric, made a COP of 11 one. 12 of extreme temperature occurring at that point in the 13 day? Is there just a lower likelihood of that sort I mean, it seems to me that like predawn, 14 15 sure, that might be your coldest time of the whole 16 day. 17 sun -- I mean, let's face it, like it doesn't snow 18 when it is that cold, right? 19 somewhat sunny day. I will buy it. But like after a whole day of So it is like a 20 Is it really possible that we have as 21 extreme of temperature that is coincident with an 22 evening peak as would be for a predawn peak? 23 WITNESS JONES: So it doesn't really -- it 24 doesn't -- so typically, the minimum daily 25 temperature is going to occur in the evening, right, 100
  5. Page 101 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 101 of 106 1 coincident with the morning peak, right? 2 really a matter of how gas is consumed throughout the 3 entire day in order to accommodate that minimum 4 temperature. 5 But it's It doesn't mean that that minimum 6 temperature occurred at the exact same time as the 7 peak gas consumption occurred, but rather that was 8 the behavior of the gas consumption when it peaked in 9 order to accommodate that negative 39 degree 10 temperature. 11 COMMISSIONER GILMAN: Okay. I get that. 12 And I have a slew of questions -- I'm so sorry for 13 you -- also on like the litany of temperatures and 14 how we sort through that. 15 But as this relates to the electric 16 impact, now it's not a gas load anymore. 17 electric load now. 18 of it depends on what happens all through the day. 19 This is like more of an instantaneous situation, 20 right, if I'm understanding my physics properly on 21 the electric system. 22 It is an So there is not that sponginess So is it still accurate to be planning the 23 gas that then gets converted at negative 39 when, 24 really, what we are trying to do is estimate the 25 electric impact at a time of day certain coincident 101
  6. Page 102 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 102 of 106 1 with an evening peak? WITNESS JONES: 2 I may see if either Tanner 3 or Kerry or Jordan have a little bit more information 4 on the performance of electric heating. 5 slightly out of my subject matter expertise. 6 would certainly be happy to hear more from other 7 folks. COMMISSIONER GILMAN: 8 That is So I And the questions 9 were around like if we are using negative 39 to size 10 the maximum size of this hypothetical electric load 11 to give our electric impacts, is that the appropriate 12 assumption to be making when we kind of know when 13 that electric system peaks and it is not predawn? WITNESS JONES: 14 Yeah. I mean, for the 15 purposes of planning, I would say that I agree. And 16 I think that we have put into my testimony that it is 17 a conservative assumption regarding the amount of 18 incremental electric demand that may occur on the 19 system. 20 more about that. I'm sure other folks can talk a little bit But as a reminder, this is really the 21 22 value that we use in our CBA tool in order to 23 calculate the marginal cost for distribution, 24 transmission, and generation. 25 anyway. So it is not perfect, 102
  7. Page 103 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 103 of 106 And for the purposes of the Mountain 1 2 Energy Project, what that led to was the realization 3 that a hybrid portfolio, particularly Hybrid 4 Portfolio (2), was cost-effective as compared to any 5 traditional gas infrastructure project that the 6 Company would propose. So, in my opinion, this is more of a 7 8 fringe argument. Did we get the number perfectly 9 correct? 10 acknowledged. 11 mutually exclusive option to another, I do think it 12 is reasonable. Probably not. And I think that that is But for the purposes of comparing one COMMISSIONER GILMAN: 13 Okay. I do want to 14 wrap this up relatively soon because I said 4:00, so 15 I intend to mean 4:00. 16 no. 17 into some tangent. 18 Maybe one more question. I'll save it for tomorrow. No, It will probably go So I just want to check with you, 19 Ms. Brama, Ms. Pacheco, anything before we take a 20 recess until 9:00 a.m. tomorrow? 21 MS. BRAMA: Yes, Commissioner Gilman. We 22 thought perhaps it is worth asking, do you need all 23 the witnesses tomorrow, or are there any witnesses we 24 can excuse at this point from your perspective? 25 COMMISSIONER GILMAN: I mean, I have some 103
  8. Page 104 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 104 of 106 1 more questions -- I'll just give you some areas -- on 2 end use assumptions, GIP relationship and 3 identification, NPA more specifically, cost recovery, 4 supplemental supply. 5 excludes anyone, but that's what I have left. 6 finished probably most of the forecasting and 7 shortfall questions. MS. BRAMA: 8 So I don't know that that Okay, thank you. 9 helpful to know. 10 the question just in case. But I That is We thought we should at least ask I think the other question was just about 11 12 timing for tomorrow. Since we only have one day of 13 hearing left and the other witnesses and UCA's cross 14 and some other cross, we just thought it would be 15 worth checking in on timing overall. COMMISSIONER GILMAN: 16 Hold on. I've got it 17 here. 18 got three or so hours of cross tomorrow. MS. BRAMA: 19 20 I'll pull it up. Yep. I think we have I think that was our math roughly as well. COMMISSIONER GILMAN: 21 I've got 3.8 -- 22 well, I think Mr. Acerra might have just a couple 23 questions. 24 will certainly be trying to move prudently along. 25 And I think people should be available for the So I think we are going to be okay, but I 104
  9. Page 105 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 105 of 106 1 afternoon, but we will make sure it happens tomorrow. 2 MS. BRAMA: 3 COMMISSIONER GILMAN: 4 Yeah, thanks for checking. Any other matters from anyone else before 5 6 Thank you. we wrap up today? In that case, we will be in recess until 7 8 9:00 a.m. tomorrow. 9 tomorrow. 10 this panel. 11 will move into witnesses from the other parties 12 starting with Staff. 15 First thing will be continue questioning We will go to redirect. Thank you. 13 14 I'll see you all at 9:00 a.m. Appreciate it. And then we Everyone enjoy your night. (Thereupon, the proceedings concluded.) 16 17 18 19 20 21 22 23 24 25 105
  10. Page 106 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 106 of 106 1 REPORTER'S CERTIFICATE 2 3 The above and foregoing is a true and 4 complete transcription of my stenographic notes taken 5 in my capacity as Hearings Reporter for the 6 Department of Regulatory Agency in Denver, Colorado, 7 at the time and place noted. 8 9 Dated at Colorado Springs, Colorado, this 21st day of August, 2025. 10 Hearings Reporter 11 12 _/s/ Tracy D. Boulais______ Tracy D. Boulais, RPR, RMR, CRR 13 14 15 16 17 18 19 20 21 22 23 24 25 106

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)