Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

  1. Page 17 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 17 of 106 1 distribution system peaks, especially considering 2 that those distribution system peaks are projected to 3 happen at cold temperatures, not hot temperatures? 4 WITNESS JONES: For the purpose of CBA 5 analysis, no. 6 Company witness Thompson if that was considered at 7 all as he evaluated what electric distribution system 8 infrastructure upgrades may be required to support 9 the Mountain Energy Project. 10 WITNESS THOMPSON: 11 12 You might want to follow up with So I can follow up with that, Grace. The capacity of the feeders that we use 13 would essentially be the summer peaking system. 14 thing I will say is there is several different 15 variables with it, right? You have elevation that 16 you have to account for. You have to account for 17 wind speed, ambient temperature. 18 One So there is a lot of inputs that account 19 for that capacity. 20 looking into in terms of capacity -- the available 21 capacity of the feeders in the winter months. 22 And it is one thing that we are COMMISSIONER GILMAN: As it is currently 23 done, you are using the kind of weather expectations 24 of the summer even on the portion of the system that 25 is winter peaking and for the addition of these loads 17
  2. Page 18 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 18 of 106 1 that are adding to a winter peak rather than a summer 2 peak? WITNESS THOMPSON: 3 4 From my understanding, yes, that's correct. COMMISSIONER GILMAN: 5 Okay. In the CBA, 6 curious on the avoided gas commodity cost if the 7 Company grossed that up at all to account for lost 8 and unaccounted for gas as was directed in the GIP M 9 docket. 10 WITNESS JONES: So for this application, 11 that wouldn't necessarily be appropriate because the 12 avoided gas commodity was from the baseline gas 13 infrastructure project, which was also a supplemental 14 supply facility. 15 the area, there is really no line loss associated 16 with transportation of that gas. 17 COMMISSIONER GILMAN: And so since it's all localized in Okay. Then the GIP 18 M docket also directed the Company to utilize the 19 actual revenue requirement associated with the 20 infrastructure project -- understandably, this is a 21 slightly different animal given that the 22 infrastructure project is also a supplemental 23 supply -- in order to appropriately capture the 24 actual expected cost of the project is expected to be 25 borne by ratepayers. So I'm curious if the Company 18
  3. Page 19 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 19 of 106 1 has made any adjustments to their CBAs in that 2 regard. WITNESS JONES: 3 So I think this was 4 discussed in the miscellaneous docket, but it is the 5 Company's position that we could either look at 6 revenue or net salvage. 7 direction of including the net salvage value in order 8 to appropriately quantify what the actual capital 9 investment would be of any electric infrastructure or 10 gas infrastructure. And the Company took the COMMISSIONER GILMAN: 11 Okay. Related to 12 indoor air pollutants, the M docket also directed the 13 Company to try to quantify indoor air pollutant 14 impacts where possible. 15 an update if the Company has attempted to do so or 16 included in any information in the CBA in that 17 regard. 18 And I was just curious for WITNESS JONES: The Company still does not 19 believe that there is really a justifiable or 20 quantifiable measure or method in order to determine 21 those indoor air pollutants. 22 but not quantified. So they were included 23 I will also say that it's my opinion that 24 those would pretty much be de minimis in the overall 25 look of net present value at this scale. 19
  4. Page 20 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 20 of 106 COMMISSIONER GILMAN: 1 Okay. So just to 2 clarify in my mind, is it the Company's position that 3 there are no indoor impacts or -- indoor air quality 4 impacts, or that you don't have a quantifiable number 5 to use to represent the indoor air quality impacts? WITNESS JONES: 6 Thank you for clarifying. 7 It is the latter, the quantification method. 8 COMMISSIONER GILMAN: Okay. So as part of 9 the settlement, you know, it seems to me that the 10 Company appears to be expecting that the CBA will, at 11 least to some degree, be relitigated in the 2025 Gas 12 Infrastructure Plan that was filed in May; and that 13 the Company is essentially planning to use that CBA 14 framework, whatever comes out of the 2025 GIP, in the 15 December 2028 Mountain Energy filing. 16 if you followed all that, but if you can confirm that 17 is the plan. WITNESS JONES: 18 Yes. I don't know But I would also 19 clarify that that language was really added as a 20 method to like clarify that whatever the most recent 21 planning tools are, those should be the tools used in 22 2028. 23 are going to use our most updated methodology. 24 25 So it goes a little bit without saying that we But we wanted to make sure that there was a specific point within the settlement order to 20
  5. Page 21 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 21 of 106 1 recognize the fact that a lot of our planning 2 methodologies, including the CBA tool, may evolve. 3 And one of the ways that it may evolve is as an 4 output from the 2025 Gas Infrastructure Plan. But also, the Company reevaluates these on 5 6 an annual basis. So whatever the most recent 7 up-to-date tool is that the Company is advocating for 8 should be that that is used in the 2028 Interim 9 Regulatory Filing. COMMISSIONER GILMAN: 10 Okay, got it. And 11 then, you know, there was a lot of testimony here 12 from many parties with regard to forecasting 13 methodology, planning assumptions, design day 14 methodology, temperature values. And while the Company has some plans to, 15 16 you know, test kind of minimally a few of those 17 points in the 2028 filing, many of those things, you 18 know, don't come to kind of a definitive resolution, 19 I would say, with the Settlement Agreement. So does the Company believe that the 2025 20 21 GIP is also a venue to be analyzing and litigating 22 those issues, or do you see that happening elsewhere 23 as an outcome of this proceeding? WITNESS JONES: 24 25 I would answer that two ways. 21
  6. Page 22 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 22 of 106 So first, I think that they are, you know, 1 2 planning assumptions that were presented in the 2025 3 Gas Infrastructure Plan. 4 opportunity to, you know, consider them within the 5 constructs of litigation of that plan. So certainly, there is an Also, I would say the same thing I said 6 7 kind of about the CBA analysis, which is that as part 8 of the annual design day planning, the Company is 9 evaluating our -- all of our planning assumptions. 10 So as we continue to evolve, which I think we expect 11 to do, we will be using the most up-to-date 12 assumptions regarding our planning in the 2028 13 Interim Regulatory Filing. COMMISSIONER GILMAN: 14 15 Okay. I wanted to move on to a slightly different area from CBA -- 16 WITNESS JONES: Okay. 17 COMMISSIONER GILMAN: To some of the 18 system hydraulics and the connection between portions 19 of the system. It may be helpful, Ms. Federico, to pull 20 21 up Hearing Exhibit 102. 22 might be helpful for us to look at. 23 of going to page 20, which has figure 4.6 -- 4-6, I 24 guess. 25 GKJ-2 has a map that just I was thinking (The electronic document was displayed.) 22
  7. Page 23 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 23 of 106 1 COMMISSIONER GILMAN: Maybe we can blow 2 this up to kind of focus primarily on the green and 3 pink area to really like understand the confluence of 4 these areas hydraulically. 5 6 Thanks. I think that will work, but I thought it might be nice to have a graphic up. 7 So the first question is just in a broad 8 sense, can you help me understand -- as I understand 9 it, Leadville is kind of where we see that Y shape 10 take place, right, in the orange. 11 leg is blue. 12 And then the one And so to my understanding, that kind of 13 delineates to the east is the Eastern Mountain, to 14 the west is the Western Mountain, to the south is the 15 Southern Mountain. 16 the three meeting there. 17 And that is kind of the hub of Help me understand the hydraulic 18 connection of the three and kind of the limitations 19 in flow that moves regularly and in certain 20 circumstances between those three areas. 21 WITNESS JONES: Would you prefer I start 22 with design day conditions or the rest of the year? 23 Because they are slightly different. 24 25 COMMISSIONER GILMAN: Go with normal, and then take me to design day, if you can. 23
  8. Page 24 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 24 of 106 WITNESS JONES: 1 Okay, perfect. So you are 2 correct. So the Western Mountain Gas System is the 3 part from Rifle all the way over through that Y -- 4 that orange y, right? 5 right. And so that flows from left to And what happens during normal operating 6 7 conditions as well as design day conditions, for that 8 matter, is a certain amount of the gas supply from 9 the Western Mountain Gas System is fed down that 10 lateral. 11 can't see it. 12 I'm pointing at it, and I'm realizing you But down the orange lateral. So depending on the temperature, it will 13 go the direction where the most demand is. So 14 typically, during like very cold winters, it will 15 flow up the blue lateral and then into the Eastern 16 Mountain Gas System. 17 potential that it also flows down into the Southern, 18 but it kind of goes through that Y point. 19 The Southern System is pretty If it is warmer, there is a 20 self-contained during the majority -- during the 21 winter, but does flow up into the Eastern during 22 normal operating conditions. 23 of Durango, Colorado. 24 25 So that's right outside You can't see it on the screen right now, and I think that is fine. But it flows all the way 24
  9. Page 25 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 25 of 106 1 up to, again, that Leadville area. 2 cold, design day conditions, it will null right 3 there. 4 from Southern to Eastern during design day 5 conditions, but it can flow up into that area during 6 other times of the year. So there is not a whole lot of gas that comes The -- pause me at any time if you have 7 8 And if it's very questions, too. 9 COMMISSIONER GILMAN: No, go ahead. 10 WITNESS JONES: So then Eastern is Okay. 11 really going to be from that Marshall compressor 12 station, which is on the right-hand side of the 13 screen, obviously flowing down into the Y. 14 This one is a little bit more complicated 15 because, as I discussed, during normal conditions, so 16 kind of year-round, it can receive gas from the West. 17 It could potentially receive gas from the South. 18 it also receives -- pretty much the primary amount of 19 gas comes from the Northern System and the Denver 20 System. 21 But And that's because the Northern and Denver 22 System is where we actually have the supply 23 interconnections with our interstate pipelines. 24 the supply physically has to go through the North, 25 through Denver, to Marshall in order to be able to be So 25
  10. Page 26 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 26 of 106 1 transported down into the Eastern Mountain Gas 2 System. COMMISSIONER GILMAN: 3 Okay. Help me 4 understand, what do the colors of the pipes like more 5 or less represent here? WITNESS JONES: 6 7 They represent different pipe sizes, but the size itself is confidential. COMMISSIONER GILMAN: 8 Okay, got it. Is 9 blue bigger than orange, or orange is bigger than 10 blue? WITNESS JONES: 11 That is a wonderful 12 question that I actually do not recall off the top of 13 my head. 14 COMMISSIONER GILMAN: 15 WITNESS JONES: 16 COMMISSIONER GILMAN: Okay. Apologies for that. Just curious. 17 Trying to figure out -- do you know what the pink 18 dotted represents there between, you know, roughly 19 Meadow Mountain and Edwards? WITNESS JONES: 20 Could you scroll down? 21 think there might be a legend. 22 Over on the right. 23 at my version. 24 thing. 25 box. I If there is not. . . Maybe it's redacted. Let me look We should be looking at the same It looks like it was gone. It was in a black Interesting. 26

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026