Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

  1. Page 21 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 21 of 106 1 recognize the fact that a lot of our planning 2 methodologies, including the CBA tool, may evolve. 3 And one of the ways that it may evolve is as an 4 output from the 2025 Gas Infrastructure Plan. But also, the Company reevaluates these on 5 6 an annual basis. So whatever the most recent 7 up-to-date tool is that the Company is advocating for 8 should be that that is used in the 2028 Interim 9 Regulatory Filing. COMMISSIONER GILMAN: 10 Okay, got it. And 11 then, you know, there was a lot of testimony here 12 from many parties with regard to forecasting 13 methodology, planning assumptions, design day 14 methodology, temperature values. And while the Company has some plans to, 15 16 you know, test kind of minimally a few of those 17 points in the 2028 filing, many of those things, you 18 know, don't come to kind of a definitive resolution, 19 I would say, with the Settlement Agreement. So does the Company believe that the 2025 20 21 GIP is also a venue to be analyzing and litigating 22 those issues, or do you see that happening elsewhere 23 as an outcome of this proceeding? WITNESS JONES: 24 25 I would answer that two ways. 21
  2. Page 22 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 22 of 106 So first, I think that they are, you know, 1 2 planning assumptions that were presented in the 2025 3 Gas Infrastructure Plan. 4 opportunity to, you know, consider them within the 5 constructs of litigation of that plan. So certainly, there is an Also, I would say the same thing I said 6 7 kind of about the CBA analysis, which is that as part 8 of the annual design day planning, the Company is 9 evaluating our -- all of our planning assumptions. 10 So as we continue to evolve, which I think we expect 11 to do, we will be using the most up-to-date 12 assumptions regarding our planning in the 2028 13 Interim Regulatory Filing. COMMISSIONER GILMAN: 14 15 Okay. I wanted to move on to a slightly different area from CBA -- 16 WITNESS JONES: Okay. 17 COMMISSIONER GILMAN: To some of the 18 system hydraulics and the connection between portions 19 of the system. It may be helpful, Ms. Federico, to pull 20 21 up Hearing Exhibit 102. 22 might be helpful for us to look at. 23 of going to page 20, which has figure 4.6 -- 4-6, I 24 guess. 25 GKJ-2 has a map that just I was thinking (The electronic document was displayed.) 22
  3. Page 23 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 23 of 106 1 COMMISSIONER GILMAN: Maybe we can blow 2 this up to kind of focus primarily on the green and 3 pink area to really like understand the confluence of 4 these areas hydraulically. 5 6 Thanks. I think that will work, but I thought it might be nice to have a graphic up. 7 So the first question is just in a broad 8 sense, can you help me understand -- as I understand 9 it, Leadville is kind of where we see that Y shape 10 take place, right, in the orange. 11 leg is blue. 12 And then the one And so to my understanding, that kind of 13 delineates to the east is the Eastern Mountain, to 14 the west is the Western Mountain, to the south is the 15 Southern Mountain. 16 the three meeting there. 17 And that is kind of the hub of Help me understand the hydraulic 18 connection of the three and kind of the limitations 19 in flow that moves regularly and in certain 20 circumstances between those three areas. 21 WITNESS JONES: Would you prefer I start 22 with design day conditions or the rest of the year? 23 Because they are slightly different. 24 25 COMMISSIONER GILMAN: Go with normal, and then take me to design day, if you can. 23
  4. Page 24 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 24 of 106 WITNESS JONES: 1 Okay, perfect. So you are 2 correct. So the Western Mountain Gas System is the 3 part from Rifle all the way over through that Y -- 4 that orange y, right? 5 right. And so that flows from left to And what happens during normal operating 6 7 conditions as well as design day conditions, for that 8 matter, is a certain amount of the gas supply from 9 the Western Mountain Gas System is fed down that 10 lateral. 11 can't see it. 12 I'm pointing at it, and I'm realizing you But down the orange lateral. So depending on the temperature, it will 13 go the direction where the most demand is. So 14 typically, during like very cold winters, it will 15 flow up the blue lateral and then into the Eastern 16 Mountain Gas System. 17 potential that it also flows down into the Southern, 18 but it kind of goes through that Y point. 19 The Southern System is pretty If it is warmer, there is a 20 self-contained during the majority -- during the 21 winter, but does flow up into the Eastern during 22 normal operating conditions. 23 of Durango, Colorado. 24 25 So that's right outside You can't see it on the screen right now, and I think that is fine. But it flows all the way 24
  5. Page 25 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 25 of 106 1 up to, again, that Leadville area. 2 cold, design day conditions, it will null right 3 there. 4 from Southern to Eastern during design day 5 conditions, but it can flow up into that area during 6 other times of the year. So there is not a whole lot of gas that comes The -- pause me at any time if you have 7 8 And if it's very questions, too. 9 COMMISSIONER GILMAN: No, go ahead. 10 WITNESS JONES: So then Eastern is Okay. 11 really going to be from that Marshall compressor 12 station, which is on the right-hand side of the 13 screen, obviously flowing down into the Y. 14 This one is a little bit more complicated 15 because, as I discussed, during normal conditions, so 16 kind of year-round, it can receive gas from the West. 17 It could potentially receive gas from the South. 18 it also receives -- pretty much the primary amount of 19 gas comes from the Northern System and the Denver 20 System. 21 But And that's because the Northern and Denver 22 System is where we actually have the supply 23 interconnections with our interstate pipelines. 24 the supply physically has to go through the North, 25 through Denver, to Marshall in order to be able to be So 25
  6. Page 26 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 26 of 106 1 transported down into the Eastern Mountain Gas 2 System. COMMISSIONER GILMAN: 3 Okay. Help me 4 understand, what do the colors of the pipes like more 5 or less represent here? WITNESS JONES: 6 7 They represent different pipe sizes, but the size itself is confidential. COMMISSIONER GILMAN: 8 Okay, got it. Is 9 blue bigger than orange, or orange is bigger than 10 blue? WITNESS JONES: 11 That is a wonderful 12 question that I actually do not recall off the top of 13 my head. 14 COMMISSIONER GILMAN: 15 WITNESS JONES: 16 COMMISSIONER GILMAN: Okay. Apologies for that. Just curious. 17 Trying to figure out -- do you know what the pink 18 dotted represents there between, you know, roughly 19 Meadow Mountain and Edwards? WITNESS JONES: 20 Could you scroll down? 21 think there might be a legend. 22 Over on the right. 23 at my version. 24 thing. 25 box. I If there is not. . . Maybe it's redacted. Let me look We should be looking at the same It looks like it was gone. It was in a black Interesting. 26
  7. Page 27 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 27 of 106 COMMISSIONER GILMAN: 1 Yeah, I don't think 2 I've seen it. Different types than I've seen 3 anywhere else. I'm trying to figure out what it is. WITNESS JONES: 4 I think it is a different 5 pipe size. I'm not entirely clear why it is dotted. 6 Yeah, apologies for that. 7 but I think it is just a different pipe size. I'm not entirely clear, 8 COMMISSIONER GILMAN: 9 So then, Ms. Federico, if we can go to 10 page 23. 11 if you can go to 4-6 for me. 12 revised version? Table 4-6 here shows essentially -- yeah, LEGAL ASSISTANT: 13 14 spreadsheet from 116. 15 Revision 1. 16 Yeah, no worries. Oh, is this like a This is the one on the Doesn't look like it is a COMMISSIONER GILMAN: Okay. There is 17 something that is called Table 4-6, Ratio of Peak 18 Hour Reduction to Capacity Delivered, is what I'm 19 trying to look at. 20 LEGAL ASSISTANT: 21 COMMISSIONER GILMAN: 22 23 you for finding that. Okay. Yes. Okay, perfect, thank Was I wrong on the page? So looking at this, this, as I 24 understand it, would represent kind of the hydraulic 25 connection associated with if we took action, had an 27
  8. Page 28 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 28 of 106 1 NPA in a certain area, how impactful is that to 2 Breckenridge, Keystone, and upper Grand Lake as like 3 a ratio, basically? Is that fair? WITNESS JONES: 4 Yeah, that is correct. 5 we looked at design day conditions for this table. 6 And we looked at based on different areas how a 7 reduction in the design day peak hour would impact 8 the pressure -- insufficient pressure in that area. 9 And so this kind of shows the closer you So 10 are to the constraint or the insufficient pressure 11 point, the higher the ratio, meaning that it has more 12 direct impact on the pressure. 13 tool in the potential analysis, but also to determine 14 where it was appropriate and kind of the best bang 15 for our buck to implement NPA measures and 16 technologies. And we use this as a COMMISSIONER GILMAN: 17 Okay, got it. 18 how were these amounts arrived upon? 19 output of hydraulic modeling? 20 these? 21 WITNESS JONES: And This is, again, Or how do you come to So this took quite a bit 22 of hydraulic modeling. So we used the Synergi Gas 23 hydraulic model. 24 of did polygons that you saw on that map. 25 we did is we reduced the load by 10 percent in those And we pulled it up as is and kind And what 28
  9. Page 29 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 29 of 106 1 areas, and then saw the residual reduction in the 2 pressure. 3 order to determine what the highest percentage was. 4 So if it was one-to-one or if it was a different 5 value. 6 And we did that for each of the areas in COMMISSIONER GILMAN: Okay. And as I 7 understand -- maybe we can go back to that map, which 8 was page 20, Ms. Federico. 9 So in the supplemental direct, I 10 understood that the Eastern Mountain Gas System, and 11 I think as you said today, receives a limited amount 12 of supply from the Western System. 13 limited by potentially two things; the supply that is 14 contracted in the west at Rifle, and then the actual 15 capacity from Rifle to its destination? 16 the two fair restrictions? 17 WITNESS JONES: 18 second part, it is the Rifle pipeline. 19 specifically, on the map right there, there is a dot 20 called Meadow Mountain. 21 station that controls the amount of supply that we 22 can get down that lateral into the East. And that's Are those I would maybe -- the But even more That is actually a regulator 23 And I would say that it's the capacity of 24 that pipeline downstream of Meadow Mountain that kind 25 of limits the amount of supply that we are able to 29
  10. Page 30 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 30 of 106 1 move from the West to the East. 2 COMMISSIONER GILMAN: Okay. That gets to 3 part of my question is like what is the key limiting 4 factor here? 5 factor is more that regulator station rather than 6 necessarily like the pipe capacity from, say, Minturn 7 to Leadville? So it sounds like the key limiting WITNESS JONES: 8 Well, you would have to 9 fix a couple things, right? So the first limiting 10 factor is that little lateral downstream of Meadow 11 Mountain. 12 So say that that has no limit whatsoever. 13 The next limiting factor is going to be that kind of 14 black and pink pipeline because it also has a 15 capacity limit. 16 orange line. It's just higher than the blue and Hopefully, I'm making sense. But pretend that is not an issue now. 17 18 it's a matter of, do we have enough contracted 19 supply? 20 COMMISSIONER GILMAN: 21 WITNESS JONES: 22 Okay. Now Okay. Does that make sense? You have to fix all the problems. COMMISSIONER GILMAN: 23 Is that like the 24 order in which they are technical barriers here for 25 that? 30

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)