  1. Page 31 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 31 of 106 1 WITNESS JONES: Correct, correct. 2 COMMISSIONER GILMAN: So now, Meadow 3 Mountain generally is to the west -- northwest of 4 Minturn. 5 testimony to then exclude Minturn even though it was 6 in the direct testimony. 7 condition led the Company to understand that Minturn 8 was actually not an NPA area? But I know the Company revised their WITNESS JONES: 9 So what like technical Yeah. So if you are 10 looking at the map right now, it looks like Minturn 11 is downstream of Meadow Mountain and should be in the 12 area, right? 13 we were looking at this map. So that was our initial conclusion when However, after digging a little bit more 14 15 into the as-builts, what we found is there is 16 actually a piece of pipe -- and it is going to be 17 really hard for me to show you this -- upstream of 18 Meadow Mountain that goes up and around and down to 19 Minturn. 20 That is why you are not seeing it on this map. 21 is actually technically fed from the high pressure 22 upstream of the Mountain Meadow regulator station. 23 But it is a distribution piece of pipe. COMMISSIONER GILMAN: So it So even though 24 Meadow Mountain is physically located further away 25 than Minturn, Minturn is fed by a dogleg that comes 31
  2. Page 32 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 32 of 106 1 off from somewhere else? 2 WITNESS JONES: 3 about it exactly correct. 4 Correct. COMMISSIONER GILMAN: You are thinking Okay, okay. 5 Curious, especially just given the issues we are 6 seeing, obviously, on the Eastern Mountain Gas System 7 and where we are now, how much spare capacity is 8 coming into the Western area in terms of capacity for 9 additional growth to these knowns from the west even? 10 Especially if we do count on some flow coming from 11 the west, that essentially presumes that there is 12 still some spare capacity. 13 So I'm not at all clear on how much spare 14 capacity we can count on in the forecasting coming 15 from the west and how close that is getting from a 16 capacity standpoint. 17 WITNESS JONES: Yeah. So I can't give you 18 the exact number of capacity, so this is what I will 19 tell you instead. 20 design day planning process for all of our systems. 21 It is presented in the GIP. 22 So we just recently ran our annual But what we determined is even under the 23 high forecast, which is pretty high, there is no 24 capacity constraints in the Western Mountain Gas 25 System, nor is that limited amount of supply that 32
  3. Page 33 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 33 of 106 1 goes from west to east at risk at all within the 2 ten-year planning horizon. COMMISSIONER GILMAN: 3 Just a quick 4 question. Because there is some quite large towns 5 just past that Meadow Mountain regulator station that 6 could be of some significance in terms of NPAs. Did the Company evaluate any measures at 7 8 that regulator station that would allow more flow 9 through, especially in the case that you could get 10 up-valley reduction through NPAs in like the 11 Vail/Avon area? WITNESS JONES: 12 We did not. And the 13 reason why is it is not just a regulator station, but 14 also the size of the pipe. 15 kind of a short piece of pipe on this map, it is like 16 20 miles. 17 size in order to facilitate more flow from the 18 Western Mountain Gas System was considered cost 19 prohibitive as part of the Mountain Energy Project. And while it looks like And so replacing that pipe to a larger COMMISSIONER GILMAN: 20 Okay. So thank you 21 for that. 22 trying to make sense of that myself, but this is much 23 more helpful. 24 25 I have a better understanding now. I was So in your direct testimony, Ms. Jones, on page 4, you talk about the growth that you've seen, 33
  4. Page 34 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 34 of 106 1 especially from 2019 to 2023, that kind of really 2 brought to a head the need for this project. And the Company indicates that growth in 3 4 Grand Lake, Summit, and Eagle Counties caused the 5 Eastern Mountain Gas System to experience an average 6 customer increase of 1.7 percent annually between 7 those years. 8 County are, in definition sense, not in the Eastern 9 Mountain Gas System, and hydraulically somewhat 10 limited in their actual impact. But it sounds like Eagle and Lake So do you have any idea what the actual 11 12 growth was in Grand and Summit Counties? 13 just seems a little odd saying Eagle County and Lake 14 County are limited in their hydraulic connection, but 15 kind of lumping their growth in with the need for the 16 project. WITNESS JONES: 17 Because it So the Eastern Mountain 18 Gas System includes all of -- I'm sure you already 19 know this, but just so I have my head screwed on 20 straight -- all of Summit County, all of Grand 21 County, a portion of Lake, and then a portion of 22 Eagle. 23 We are aligned on that, right? COMMISSIONER GILMAN: I understood 24 Leadville -- where does Leadville technically fall in 25 terms of which mountain system? It's like the hub 34
  5. Page 35 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 35 of 106 1 here. WITNESS JONES: 2 It's kind of in both. 3 even that little orange part from Leadville up, 4 that's a portion of Lake County as well. COMMISSIONER GILMAN: 5 Yeah. But So I 6 generally understood Leadville to be in the Southern 7 System, unless I'm wrong and it is in the Eastern. 8 So to the extent Leadville is in the Southern System, 9 it would be little, if any, portion of Lake County, 10 at least where there is any development, and Eagle 11 County. 12 WITNESS JONES: Leadville is right where 13 the null point is. 14 unsatisfying, but it is almost like you could draw a 15 line down Leadville, and half of it is in Eastern and 16 half of it is in Southern. 17 within the Leadville area. 18 19 20 And so this is going to be That's what is happening COMMISSIONER GILMAN: But it sounds like none of Eagle County is in the Eastern. WITNESS JONES: There is some of Eagle -- 21 I wish we had an overlay, but there is a portion of 22 Eagle that is also in it. 23 that's like the Red Cliff area. 24 COMMISSIONER GILMAN: 25 And it could be that area Okay. Red Cliff is a very small town, but yeah. 35
  6. Page 36 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 36 of 106 WITNESS JONES: 1 2 And appreciate that for sure. COMMISSIONER GILMAN: 3 Okay. But I don't 4 think Red Cliff represented significant growth in the 5 last couple years. 6 WITNESS JONES: No. 7 COMMISSIONER GILMAN: So that is just my 8 point is that it is a little difficult to decipher 9 because you include counties that I don't doubt have 10 significant growth, but are not meaningfully part of 11 the Eastern Mountain Gas System, which is a little 12 difficult. Let me see. 13 14 Let me get to my next question here. I wanted to get to -- so talking now about 15 16 some past performance. In your direct testimony, 17 also at page 46, Ms. Jones, you indicated that the 18 Company compared data to as-is modeling and stated 19 that the results of this verification show that the 20 system hydraulic model is aligned with the gas 21 pressure observed in the field and, therefore, is 22 accurate. 23 (The electronic document was displayed.) 24 COMMISSIONER GILMAN: 25 And so I did issue a follow-up question in supplemental direct asking for 36
  7. Page 37 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 37 of 106 1 you to provide the heating validation model to show 2 performance at cold temperatures on the system. 3 you did so as GKJ-15C. And Does this all ring a bell? 4 WITNESS JONES: Yep. 5 COMMISSIONER GILMAN: So I just wanted to 6 confirm a few things. So it looks like what you had 7 provided in GKJ-15C -- and it is confidential. 8 don't need to pull it up. 9 provided was one hydraulic model for the entire 10 mountains, which would be like the complements of all 11 of those. 12 three of these things we have painfully been 13 through -- their connection. We But it looks like what you I think the mountains technically is all So is that accurate? 14 WITNESS JONES: That is correct. 15 COMMISSIONER GILMAN: Okay. Is there any 16 more granular validation that the Company has done 17 specific to the Eastern Mountain Gas System rather 18 than the entire mountain system at large? WITNESS JONES: 19 No. So we modeled those 20 three systems because of the interplay between them. 21 That null point can shift as demand grows on our 22 system. 23 from the west, it makes for a more comprehensive 24 model if we evaluate them all together. 25 And because we are physically receiving gas That being said, so the results of what we 37
  8. Page 38 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 38 of 106 1 showed, showed that the percent variation was less 2 than 5 percent, which is incredibly good. 3 thing that we do is we look at every single major 4 pressure point to also validate that, which is done 5 within the model, kind of. 6 and a pressure within the model. 7 paper, necessarily. 8 isn't any large variance at any point. The other We have like a reference So it's not a work But also, to confirm that there So all of that to say you can infer that a 9 10 good model match on the entire mountains also 11 included a really detailed modeled match on every 12 single point within that system including the Eastern 13 Mountain Gas System. COMMISSIONER GILMAN: 14 How many points are 15 there like within the Eastern Mountain Gas System 16 that would kind of -- I got kind of conflicting 17 information on this in the past. 18 actual points are there where you have granular flow 19 data that you can reference then to validate? WITNESS JONES: 20 I mean, how many That's a great question. 21 I do not have the number off the top of my head. 22 if I had to guess, I would think doing some mental 23 math -COMMISSIONER GILMAN: 24 25 dozens? Is it once? But Is it Is it hundreds? 38
  9. Page 39 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 39 of 106 1 WITNESS JONES: Dozens, yeah. 2 COMMISSIONER GILMAN: So we are in the 3 ballpark. I just want to understand like the scale 4 of what you can actually validate. 5 And then within that GKJ-15C validation 6 that you provided, the temperatures that were used 7 for that validation, both from 2023, were at negative 8 7 degrees Farenheit and negative 15 degrees 9 Farenheit. Does that sound right? 10 WITNESS JONES: 11 COMMISSIONER GILMAN: 12 13 That sounds correct. Do you know where that temperature was modeled or was observed? WITNESS JONES: That would have correlated 14 to the Dillon station, which correlates to the 15 station that is used as part of our design day 16 methodology. 17 COMMISSIONER GILMAN: Okay. And is there 18 any recording as to the temperatures in other 19 portions of the mountains, or it's just a single 20 point temperature? 21 WITNESS JONES: There may be other 22 recordings in SCADA. But the reason we use a Dillon 23 temperature as kind of like our honing in temperature 24 is because that is what we calibrate the model to for 25 our negative 39 design day temperature. 39
  10. Page 40 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 40 of 106 1 So it is important speaking 2 apples-to-apples so that when we scale it to a design 3 day temperature, it is still accurate 4 COMMISSIONER GILMAN: And then curious, do 5 you have any data for validation that's closer to the 6 design day temperature? 7 and negative 15 degrees Farenheit are kind of a world 8 apart from negative 39 degrees Farenheit to like 9 understand if the behavior is still predictable. 10 I mean, clearly negative 7 So just wanted to understand what you have 11 for validation that might be closer to the design 12 temperature. 13 WITNESS JONES: So typically when we pick 14 a temperature, it has to be a temperature that 15 occurred, obviously, because we are comparing it to 16 observed field data. 17 is my recollection that the coldest temperature was 18 that negative 7 -- am I saying the right number? 19 20 21 So for that particular year, it COMMISSIONER GILMAN: Negative 7 and negative 15, I think. WITNESS JONES: Thank you. So negative 15 22 was the coldest temperature that occurred at that 23 Dillon station in that year. 24 done every single year. 25 would have been what is the coldest temperature that That being said, it's So the next heating season 40