Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

  1. Page 51 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 51 of 106 1 project costs to do so? 2 to the settlement? 3 4 5 Is that accurate with regard WITNESS PEUQUET: Yes. I can chime in on this one, Commissioner Gilman. That's correct. The Settlement Agreement 6 still keeps that provision in the Company's direct 7 and rebuttal cases alive that if there is a request, 8 then it's -- as we proposed in our filed testimony, 9 it would be a portion of project costs, just less the 10 electric infrastructure costs, which we think we are 11 getting a little bit far afield of directly serving 12 an LDC, to essentially take the whole project cost 13 divided by the shortfall to create kind of a dollar 14 per mscfh that would be applied to their request. 15 COMMISSIONER GILMAN: Okay. So, yeah, 16 that is my next question. I think in Mr. Matley's 17 direct, which is now you, Mr. Peuquet, I think it was 18 indicated it would be $220,225 per mscfh. 19 was on page 46 of his direct, although I don't think 20 we need to pull it up, but just for your reference. 21 WITNESS PEUQUET: 22 COMMISSIONER GILMAN: And that Yes. Is that still your 23 understanding? I don't think the settlement 24 delineated like a unit cost. 25 understanding that the settlement reference would be So is it still your 51
  2. Page 52 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 52 of 106 1 to that value from the direct testimony? 2 WITNESS PEUQUET: That's correct. 3 didn't change in the settlement. 4 still there. 5 COMMISSIONER GILMAN: That The process is Okay. And to your 6 understanding and agreement in the Settlement 7 Agreement, would that value be updated to reflect the 8 actual cost of the portfolio? 9 So, for example, we have some kind of 10 slight immediate reductions in supplemental supply. 11 But, of course, we are still working with a potential 12 plus 100 percent on the supplement supply value. 13 there seems a wide range of what this actually costs 14 at this point. 15 16 17 So So is that number intended to be adjusted to reflect the actual? WITNESS PEUQUET: Yes. I believe we 18 described it in direct testimony. 19 pull it up just to be sure. 20 to be actual costs of the project, in which case, 21 right, is supplemental supply costs. 22 that a bit yesterday, right? 23 estimates that -- sorry, there is ranges around that 24 point estimate at this time. 25 We might have to I think we intended that We talked about But there is So I think it is the expectation that the 52
  3. Page 53 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 53 of 106 1 particular value might change a little bit, but it is 2 the concept that we were more putting out here in our 3 filed case. COMMISSIONER GILMAN: 4 Okay. Thank you. 5 Just wanted to understand -- put some more color 6 around the plan for those potential charges that 7 appear in the Settlement Agreement. Couple more questions on the shortfall and 8 9 calculations. So MCC witness Takahashi indicated 10 that building code design temperature in the project 11 area is negative 13 degrees Farenheit. 12 words, the mechanical systems are designed to serve 13 the entirety of the load at negative 13 degrees 14 Farenheit. In other And then if you consider that most, if not 15 16 all, homes would have mechanical systems undersized 17 to continue to demand more gas all the way down to 18 negative 39 degrees Farenheit, that the Company 19 likely overcedes [sic] its peak gas need by around 9 20 percent. 21 The only way I see this like particularly 22 addressed in your rebuttal was I think you all 23 characterized MCC as advocating for a negative 13 24 degree design day temperature. 25 how I interpreted it. That wasn't exactly But instead, assuming that 53
  4. Page 54 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 54 of 106 1 they were arguing that the vast majority of building 2 mechanical systems would max out their peak gas draw 3 somewhere between negative 13 and negative 39 degrees 4 Farenheit, even assuming some rational amount of 5 oversizing. You know, their argument, I think, was 6 7 that the linear regression for extreme low 8 temperatures is inaccurate and unlikely to occur, and 9 that you will max out some significant portion of 10 mechanical systems. 11 So I'm just curious what reasoning the 12 Company has to assume that all mechanical systems 13 will continue to operate all the way down to negative 14 39 degrees continuing to demand more gas all the way 15 as the ambient temperature drops. WITNESS JONES: 16 So there is two reasons 17 for that. The first is observed system data. So 18 while we don't have observed system data, 19 particularly in the Eastern Mountain Gas System, to 20 negative 39 in the recent past, we did include in my 21 rebuttal testimony some information on linear 22 regression of load at lower temperatures like 23 negative 30. 24 are still seeing that design day peak hour gas demand 25 will increase as it correlates to temperature. And so based on observed field data, we 54
  5. Page 55 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 55 of 106 And I could pull that up if that is 1 2 helpful. COMMISSIONER GILMAN: 3 4 I'm trying to find it for myself. Yeah, let me see, it is in your rebuttal. 5 WITNESS JONES: Yes. 6 COMMISSIONER GILMAN: I would like to 7 better understand the coldest temperature that the 8 Company actually has validation on. 9 WITNESS JONES: 10 my rebuttal testimony. So this is on page 82 of It's figure GKJ-R-18. 11 (The electronic document was displayed.) 12 WITNESS JONES: For a little bit of 13 context, this is for a different gas system from the 14 Eastern Mountain Gas System, but we selected it 15 because it's relatively simple. 16 supply going into kind of a distribution system, and 17 so there is a really clear indication of the design 18 day demand and the temperature. It's got a single 19 It's not as clear to get this type of 20 linear regression when you have a system like the 21 Eastern Mountain Gas System which relies on several 22 different supply points and also has quite a bit of 23 line pack. 24 rate quite as clear. 25 system. You might not be able to see the flow So that's why we chose this 55
  6. Page 56 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 56 of 106 1 And what we looked at was several years of 2 data at different temperatures and then the resulting 3 average flow rate. 4 and that probably has to do with, you know, actual 5 usage during that time. 6 some people aren't. And so there is some variation, Some people are on vacation, But you will see a linear regression going 7 8 from negative 12 to 30, which we thought was 9 reasonable for the purposes of presenting in my 10 testimony. 11 flow rate is indicative of the supply into the area, 12 which is directly proportionate to the design day 13 peak hour gas demand in the area. And it continues to increase. COMMISSIONER GILMAN: 14 15 sorry, I have questions. 16 Minnesota, correct? So the Thank you. And I'm This is the St. Cloud, 17 WITNESS JONES: That's correct. 18 COMMISSIONER GILMAN: I had questions 19 about this, so I wanted to like skip to them and ask 20 you. 21 WITNESS JONES: Yep. 22 COMMISSIONER GILMAN: Okay. Does the 23 Company have any information as to what the building 24 department design temperature is there for mechanical 25 systems? 56
  7. Page 57 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 57 of 106 WITNESS JONES: 1 Yes. The ASHRAE 2 temperature for St. Cloud, Minnesota is negative 3 11.4. 4 COMMISSIONER GILMAN: 5 temperature is not necessarily the building 6 department's design temperature. 7 building department's design temperature? 8 9 10 WITNESS JONES: information. The ASHRAE What is the I do not have that I apologize. COMMISSIONER GILMAN: No worries. I mean, 11 building departments have the say if they refer to 12 other resources or not. 13 And what is the Company's design day 14 temperature for that portion of the gas system? 15 WITNESS JONES: Again, I don't recall it 16 off the top of my head, but it's colder than Eastern 17 Mountain Gas System. 18 please don't quote me. 19 record that it is colder than the Eastern Mountain 20 Gas System's design day temperature using the same 21 methodology -- consistent methodology for that of 22 what we use for Public Service. 23 COMMISSIONER GILMAN: I think it is negative 42, but I would just say on the Okay. And then this 24 data, it looks like, goes down to negative 28. 25 Which, look, I agree, if we are outside, it might not 57
  8. Page 58 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 58 of 106 1 make a big difference if it was negative 28 or 2 negative 39. 3 that 11 degrees does seem to make a difference in 4 terms of data. They both feel very, very cold. But And so I'm curious, is there any data that 5 6 goes lower than negative 28? I means, it sounds like 7 at least 13 degrees kind of unknown with regard to 8 the design day temperature behavior. 9 WITNESS JONES: For this particular 10 system, we did not identify a data set that goes 11 below negative 28. 12 exist, just that we didn't find it for the purposes 13 of my testimony. That doesn't mean it doesn't 14 COMMISSIONER GILMAN: 15 WITNESS JONES: Okay. No worries. I will say, though, if 16 there is skepticism about the design day temperature, 17 one of the things that we did put in my rebuttal 18 testimony was an analysis at negative 31. 19 continued to prove that the Mountain Energy Project, 20 including all of its components, were required in 21 order to serve the supply constraint in the Eastern 22 Mountain Gas System. 23 a warmth of eight degrees. 25 And that's a reduction of -- or COMMISSIONER GILMAN: 24 thank you. And that I did see that, I just wanted to get to my St. Cloud 58
  9. Page 59 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 59 of 106 1 questions answered. 2 in my list. 3 you another couple of questions. 4 I knew they were there somewhere Excellent. Let me switch gears and ask So the Company assumes -- the Company 5 utilizes an assumption that 34 percent of the 6 existing residential boilers and 13 percent of 7 existing residential furnaces -- existing residential 8 furnaces are already energy efficient, which is a 9 value pulled from their Colorado-wide DSM potential 10 study from 2022, I believe. 11 And so I was curious if this has been 12 validated at all or confirmed like specific to the 13 mountain areas to understand if that ratio would be 14 the same or different? 15 WITNESS JONES: Jordan, I believe that 16 question is directed to you. 17 correct me if I'm wrong. 18 WITNESS MANN: Maybe Kerry. Yeah. Please So for this project, 19 we did rely on some of the data from the most recent 20 Colorado potential study from 2022. 21 includes the efficiency estimations of the boilers 22 and furnaces. 23 study as part of that project to assess that in the 24 specific Breckenridge region. 25 And that We did not conduct a full baseline COMMISSIONER GILMAN: Okay. And I'm also 59
  10. Page 60 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 60 of 106 1 curious -- something I was a little confused about. 2 I believe the NPA study showed a higher average home 3 size, especially in the Eastern Mountain Gas System 4 and Breckenridge area. 5 mountains. 6 I said. Well, no, it is only the So mountains more generally. Forget what Mountains more generally. I was a little confused if the NPA 7 8 analysis did or did not then follow through with that 9 higher home size assumption in the peak capacity 10 impacts. 11 WITNESS MANN: So implicitly, I would say 12 it does in the sense that we are using the data from 13 the forecasting team to calibrate the savings that 14 are available through measures like electrification. 15 So while we kind of start with the Xcel 16 TRM to kind of do a bottom up estimate on the savings 17 that are available, it is then calibrated to the 18 estimated consumption for those customers. 19 did that on a regional and customer class basis. 20 And we So that home size isn't explicitly in the 21 calculation for, you know, the energy savings 22 available for some of these measures, but it is 23 calibrated in the consumption data, which would be 24 influenced by the home size. 25 COMMISSIONER GILMAN: Okay. And that 60