Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

  1. Page 57 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 57 of 106 WITNESS JONES: 1 Yes. The ASHRAE 2 temperature for St. Cloud, Minnesota is negative 3 11.4. 4 COMMISSIONER GILMAN: 5 temperature is not necessarily the building 6 department's design temperature. 7 building department's design temperature? 8 9 10 WITNESS JONES: information. The ASHRAE What is the I do not have that I apologize. COMMISSIONER GILMAN: No worries. I mean, 11 building departments have the say if they refer to 12 other resources or not. 13 And what is the Company's design day 14 temperature for that portion of the gas system? 15 WITNESS JONES: Again, I don't recall it 16 off the top of my head, but it's colder than Eastern 17 Mountain Gas System. 18 please don't quote me. 19 record that it is colder than the Eastern Mountain 20 Gas System's design day temperature using the same 21 methodology -- consistent methodology for that of 22 what we use for Public Service. 23 COMMISSIONER GILMAN: I think it is negative 42, but I would just say on the Okay. And then this 24 data, it looks like, goes down to negative 28. 25 Which, look, I agree, if we are outside, it might not 57
  2. Page 58 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 58 of 106 1 make a big difference if it was negative 28 or 2 negative 39. 3 that 11 degrees does seem to make a difference in 4 terms of data. They both feel very, very cold. But And so I'm curious, is there any data that 5 6 goes lower than negative 28? I means, it sounds like 7 at least 13 degrees kind of unknown with regard to 8 the design day temperature behavior. 9 WITNESS JONES: For this particular 10 system, we did not identify a data set that goes 11 below negative 28. 12 exist, just that we didn't find it for the purposes 13 of my testimony. That doesn't mean it doesn't 14 COMMISSIONER GILMAN: 15 WITNESS JONES: Okay. No worries. I will say, though, if 16 there is skepticism about the design day temperature, 17 one of the things that we did put in my rebuttal 18 testimony was an analysis at negative 31. 19 continued to prove that the Mountain Energy Project, 20 including all of its components, were required in 21 order to serve the supply constraint in the Eastern 22 Mountain Gas System. 23 a warmth of eight degrees. 25 And that's a reduction of -- or COMMISSIONER GILMAN: 24 thank you. And that I did see that, I just wanted to get to my St. Cloud 58
  3. Page 59 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 59 of 106 1 questions answered. 2 in my list. 3 you another couple of questions. 4 I knew they were there somewhere Excellent. Let me switch gears and ask So the Company assumes -- the Company 5 utilizes an assumption that 34 percent of the 6 existing residential boilers and 13 percent of 7 existing residential furnaces -- existing residential 8 furnaces are already energy efficient, which is a 9 value pulled from their Colorado-wide DSM potential 10 study from 2022, I believe. 11 And so I was curious if this has been 12 validated at all or confirmed like specific to the 13 mountain areas to understand if that ratio would be 14 the same or different? 15 WITNESS JONES: Jordan, I believe that 16 question is directed to you. 17 correct me if I'm wrong. 18 WITNESS MANN: Maybe Kerry. Yeah. Please So for this project, 19 we did rely on some of the data from the most recent 20 Colorado potential study from 2022. 21 includes the efficiency estimations of the boilers 22 and furnaces. 23 study as part of that project to assess that in the 24 specific Breckenridge region. 25 And that We did not conduct a full baseline COMMISSIONER GILMAN: Okay. And I'm also 59
  4. Page 60 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 60 of 106 1 curious -- something I was a little confused about. 2 I believe the NPA study showed a higher average home 3 size, especially in the Eastern Mountain Gas System 4 and Breckenridge area. 5 mountains. 6 I said. Well, no, it is only the So mountains more generally. Forget what Mountains more generally. I was a little confused if the NPA 7 8 analysis did or did not then follow through with that 9 higher home size assumption in the peak capacity 10 impacts. 11 WITNESS MANN: So implicitly, I would say 12 it does in the sense that we are using the data from 13 the forecasting team to calibrate the savings that 14 are available through measures like electrification. 15 So while we kind of start with the Xcel 16 TRM to kind of do a bottom up estimate on the savings 17 that are available, it is then calibrated to the 18 estimated consumption for those customers. 19 did that on a regional and customer class basis. 20 And we So that home size isn't explicitly in the 21 calculation for, you know, the energy savings 22 available for some of these measures, but it is 23 calibrated in the consumption data, which would be 24 influenced by the home size. 25 COMMISSIONER GILMAN: Okay. And that 60
  5. Page 61 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 61 of 106 1 treats the entire mountains as like a monolith rather 2 than like a more localized approach? 3 localized is that consumption data? 4 WITNESS MANN: Or how So the way that we broke 5 this up was the same kind of geographies that we were 6 looking at based on that mapping earlier. 7 each geography, we split the customers into 8 residential, commercial transport, multifamily 9 transport, and multifamily. 10 from Xcel for each region specifically to calibrate 11 the consumption and savings that are available in 12 each of those regions. 13 level. 14 And we used the data So that is the disaggregation COMMISSIONER GILMAN: Okay, thank you. 15 Slightly different topic. 16 time to better organize these for you. 17 So for My fault for not having Ms. Jones, in your rebuttal, you listed a 18 set of operational emergency measures that can be 19 used -- and totally understand it is not the 20 Company's preference, so I already get that -- 21 including regulator station bypass, moratoria, and 22 emergency electric outages to reduce gas heating. 23 And I just wanted to confirm, it's my 24 understanding the Company did not use any of those 25 before siting supplemental supplies in the area in 61
  6. Page 62 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 62 of 106 1 the 2022-2023 season, but I just wanted to confirm 2 that I'm right about that. 3 WITNESS JONES: My guess is -- well, so 4 no, we did not use any emergency measures. 5 say that for a fact based on my knowledge. So I will 6 Operational measures -- I wouldn't want to 7 say for a certainty that we never used them before we 8 sited LNG because they are more of like a system 9 level on the day of. 10 something strange, we might deploy an operational 11 measure such as bypassing a regulator station. 12 it wasn't a normal course of business action. 13 If we are experiencing COMMISSIONER GILMAN: 14 just get some clarity. 15 think is Jones' rebuttal. Okay. But And I want to Hearing Exhibit 111, which I Does that sound right? 16 (The electronic document was displayed.) 17 COMMISSIONER GILMAN: 18 the figure -- yeah, there we go. 19 So page 66, there is Perfect. So this kind of shows this linear 20 regression relationship between ambient temperature 21 and -- or minimum daily temperature and gas demand. 22 And I was wondering if you could help me understand 23 what portion of the data on this chart is observed 24 and what portion is kind of forecasted or 25 extrapolated. 62
  7. Page 63 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 63 of 106 WITNESS JONES: 1 So this chart is not 2 observed. 3 Company assumes the relationship would be between the 4 design day peak hour gas demand and the minimum daily 5 temperature. 6 This is meant to represent what the And so this is the curve that we use. So if we have observed data at negative 7 30, how do we get it to negative 39? 8 the linear regression on this chart here. 9 what it's meant to demonstrate. 10 We would follow So that's Where we get this data is actually a 11 recommendation from industry experts. 12 Synergi Gas CMM modular, which correlates heating 13 degree days to hourly gas consumption. 14 recommend a regression similar to this. 15 COMMISSIONER GILMAN: Okay. So we use the And they Understood. 16 And it would just be -- if it's in an area where you 17 are using a different design temperature, the graph 18 just stops earlier, right? 19 WITNESS JONES: Yeah. And it's more so 20 meant to show -- so if we do our model verification 21 with observed data -- and again, I'm going to use 22 negative 30 as an example. 23 that model is accurate or within a reasonable level 24 of accuracy, using this regression is how we would 25 then scale it up to get our design day conditions. Once we determine that 63
  8. Page 64 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 64 of 106 COMMISSIONER GILMAN: 1 2 Understood. Okay. Got it. 3 And then so the Company provided some 4 analysis on rebuttal about the continued need for 5 supplemental supply, as you pointed out, Ms. Jones, 6 even at somewhat warmer design day suggestions like 7 in the low negative 30s. 8 confirm at what ambient temperature the Company 9 currently presumes the shortfall would show up in an 10 operational problem for them. 11 confirm that. WITNESS JONES: 12 And I just wanted to I just wanted to Yeah. So based on our 13 most recent modeling for the upcoming heating season, 14 so 2025 to '26, we would begin to experience 15 insufficient inlet pressures in Breckenridge at 16 negative 23 degrees Farenheit. 17 negative -- I'm looking. And then it is It is in my rebuttal, so I want to make 18 19 sure I don't say the wrong number. 20 moment. I was right. 21 Hold on just one So for your records, it is 22 on page 30. But we would begin to experience 23 insufficient pressures in Keystone at negative 19 24 degrees. 25 temperature considered in my rebuttal testimony. So far warmer than any design day 64
  9. Page 65 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 65 of 106 COMMISSIONER GILMAN: 1 Okay. So that the 2 volume is smaller than immediate need is more acute 3 in Keystone, I guess? 4 describe that? WITNESS JONES: 5 6 Is that the right way to It is a warmer temperature in which we start to need gas. COMMISSIONER GILMAN: 7 Okay. Related to 8 that, you identify in your direct testimony that the 9 parameter for the Keystone supplemental supply was a 10 maximum injection rate of 285 mscfh which is, to my 11 understanding, the same injection rate being planned 12 for Breckenridge even though the shortfall in gross 13 numbers is far higher in Breckenridge. So I just wanted to kind of understand the 14 15 perspective of how do those required injection rates 16 end up the same when the Breckenridge shortfall is 17 several magnitudes bigger than the Keystone 18 shortfall? WITNESS JONES: 19 Yeah, happy to clarify 20 that. So the maximum injection rate of commercially 21 available LNG equipment is usually around the 285 22 mscfh mark. 23 when we were developing the hybrid portfolio that it 24 should not exceed 285. 25 results, the injection flow rate in Keystone is less So we used that as a design parameter But when we actually got the 65
  10. Page 66 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 66 of 106 1 than what we need in Breckenridge. And so, again, I can point you to my 2 3 testimony. So it was more of like do not exceed, and 4 we never did. So please hold on that one. COMMISSIONER GILMAN: 5 So that's not 6 actually the planned injection rate? 7 WITNESS JONES: 8 No. So if you look at my direct testimony, page 166. 9 (The electronic document was displayed.) 10 WITNESS JONES: It is going to be Table 11 GKJ-D-10. 12 maximum hourly flow rate is that 285, but Keystone is 13 77, which was one of the reasons that we believed 14 that CNG is more than sufficient to -- as the 15 preferred supplemental supply facility in Keystone. 16 And to your point, the Breckenridge COMMISSIONER GILMAN: And is it that the 17 commercially available equipment kind of generally 18 all is built to operate at this 285 mscfh, or are you 19 able to actually order smaller equipment that is more 20 suited for that actual flow rate for Keystone? 21 WITNESS JONES: It depends on what type of 22 equipment you are talking about. So LNG commercially 23 available equipment will go up to 285. 24 it at something higher, there would be an engineering 25 solution, of course, to boost the -- If you want 66

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)