Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

  1. Page 61 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 61 of 106 1 treats the entire mountains as like a monolith rather 2 than like a more localized approach? 3 localized is that consumption data? 4 WITNESS MANN: Or how So the way that we broke 5 this up was the same kind of geographies that we were 6 looking at based on that mapping earlier. 7 each geography, we split the customers into 8 residential, commercial transport, multifamily 9 transport, and multifamily. 10 from Xcel for each region specifically to calibrate 11 the consumption and savings that are available in 12 each of those regions. 13 level. 14 And we used the data So that is the disaggregation COMMISSIONER GILMAN: Okay, thank you. 15 Slightly different topic. 16 time to better organize these for you. 17 So for My fault for not having Ms. Jones, in your rebuttal, you listed a 18 set of operational emergency measures that can be 19 used -- and totally understand it is not the 20 Company's preference, so I already get that -- 21 including regulator station bypass, moratoria, and 22 emergency electric outages to reduce gas heating. 23 And I just wanted to confirm, it's my 24 understanding the Company did not use any of those 25 before siting supplemental supplies in the area in 61
  2. Page 62 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 62 of 106 1 the 2022-2023 season, but I just wanted to confirm 2 that I'm right about that. 3 WITNESS JONES: My guess is -- well, so 4 no, we did not use any emergency measures. 5 say that for a fact based on my knowledge. So I will 6 Operational measures -- I wouldn't want to 7 say for a certainty that we never used them before we 8 sited LNG because they are more of like a system 9 level on the day of. 10 something strange, we might deploy an operational 11 measure such as bypassing a regulator station. 12 it wasn't a normal course of business action. 13 If we are experiencing COMMISSIONER GILMAN: 14 just get some clarity. 15 think is Jones' rebuttal. Okay. But And I want to Hearing Exhibit 111, which I Does that sound right? 16 (The electronic document was displayed.) 17 COMMISSIONER GILMAN: 18 the figure -- yeah, there we go. 19 So page 66, there is Perfect. So this kind of shows this linear 20 regression relationship between ambient temperature 21 and -- or minimum daily temperature and gas demand. 22 And I was wondering if you could help me understand 23 what portion of the data on this chart is observed 24 and what portion is kind of forecasted or 25 extrapolated. 62
  3. Page 63 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 63 of 106 WITNESS JONES: 1 So this chart is not 2 observed. 3 Company assumes the relationship would be between the 4 design day peak hour gas demand and the minimum daily 5 temperature. 6 This is meant to represent what the And so this is the curve that we use. So if we have observed data at negative 7 30, how do we get it to negative 39? 8 the linear regression on this chart here. 9 what it's meant to demonstrate. 10 We would follow So that's Where we get this data is actually a 11 recommendation from industry experts. 12 Synergi Gas CMM modular, which correlates heating 13 degree days to hourly gas consumption. 14 recommend a regression similar to this. 15 COMMISSIONER GILMAN: Okay. So we use the And they Understood. 16 And it would just be -- if it's in an area where you 17 are using a different design temperature, the graph 18 just stops earlier, right? 19 WITNESS JONES: Yeah. And it's more so 20 meant to show -- so if we do our model verification 21 with observed data -- and again, I'm going to use 22 negative 30 as an example. 23 that model is accurate or within a reasonable level 24 of accuracy, using this regression is how we would 25 then scale it up to get our design day conditions. Once we determine that 63
  4. Page 64 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 64 of 106 COMMISSIONER GILMAN: 1 2 Understood. Okay. Got it. 3 And then so the Company provided some 4 analysis on rebuttal about the continued need for 5 supplemental supply, as you pointed out, Ms. Jones, 6 even at somewhat warmer design day suggestions like 7 in the low negative 30s. 8 confirm at what ambient temperature the Company 9 currently presumes the shortfall would show up in an 10 operational problem for them. 11 confirm that. WITNESS JONES: 12 And I just wanted to I just wanted to Yeah. So based on our 13 most recent modeling for the upcoming heating season, 14 so 2025 to '26, we would begin to experience 15 insufficient inlet pressures in Breckenridge at 16 negative 23 degrees Farenheit. 17 negative -- I'm looking. And then it is It is in my rebuttal, so I want to make 18 19 sure I don't say the wrong number. 20 moment. I was right. 21 Hold on just one So for your records, it is 22 on page 30. But we would begin to experience 23 insufficient pressures in Keystone at negative 19 24 degrees. 25 temperature considered in my rebuttal testimony. So far warmer than any design day 64
  5. Page 65 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 65 of 106 COMMISSIONER GILMAN: 1 Okay. So that the 2 volume is smaller than immediate need is more acute 3 in Keystone, I guess? 4 describe that? WITNESS JONES: 5 6 Is that the right way to It is a warmer temperature in which we start to need gas. COMMISSIONER GILMAN: 7 Okay. Related to 8 that, you identify in your direct testimony that the 9 parameter for the Keystone supplemental supply was a 10 maximum injection rate of 285 mscfh which is, to my 11 understanding, the same injection rate being planned 12 for Breckenridge even though the shortfall in gross 13 numbers is far higher in Breckenridge. So I just wanted to kind of understand the 14 15 perspective of how do those required injection rates 16 end up the same when the Breckenridge shortfall is 17 several magnitudes bigger than the Keystone 18 shortfall? WITNESS JONES: 19 Yeah, happy to clarify 20 that. So the maximum injection rate of commercially 21 available LNG equipment is usually around the 285 22 mscfh mark. 23 when we were developing the hybrid portfolio that it 24 should not exceed 285. 25 results, the injection flow rate in Keystone is less So we used that as a design parameter But when we actually got the 65
  6. Page 66 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 66 of 106 1 than what we need in Breckenridge. And so, again, I can point you to my 2 3 testimony. So it was more of like do not exceed, and 4 we never did. So please hold on that one. COMMISSIONER GILMAN: 5 So that's not 6 actually the planned injection rate? 7 WITNESS JONES: 8 No. So if you look at my direct testimony, page 166. 9 (The electronic document was displayed.) 10 WITNESS JONES: It is going to be Table 11 GKJ-D-10. 12 maximum hourly flow rate is that 285, but Keystone is 13 77, which was one of the reasons that we believed 14 that CNG is more than sufficient to -- as the 15 preferred supplemental supply facility in Keystone. 16 And to your point, the Breckenridge COMMISSIONER GILMAN: And is it that the 17 commercially available equipment kind of generally 18 all is built to operate at this 285 mscfh, or are you 19 able to actually order smaller equipment that is more 20 suited for that actual flow rate for Keystone? 21 WITNESS JONES: It depends on what type of 22 equipment you are talking about. So LNG commercially 23 available equipment will go up to 285. 24 it at something higher, there would be an engineering 25 solution, of course, to boost the -- If you want 66
  7. Page 67 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 67 of 106 COMMISSIONER GILMAN: 1 Well, just for 2 Keystone. You are doing CNG in Keystone. And it 3 seems like you set equipment parameters at 285. 4 only need 78. 5 right-sized down for that instantaneous flow rate 6 that is needed at the CNG in Keystone? 7 WITNESS JONES: You So, is the equipment then kind of It won't be set for 8 exactly 77, but the commercially available hourly 9 flow rate for CNG equipment is lower than that 285. 10 If we want to understand the parameters a 11 little bit more, I'm sure Ms. Roberts would be happy 12 to answer some questions on what is commercially 13 available for CNG equipment. 14 COMMISSIONER GILMAN: 15 to understand like the sizing a little more. 16 I was thrown off by the like don't exceed what we 17 were actually using, like what was actually going to 18 be utilized there. 19 Okay. I just wanted I think I had a few questions where I will refer 20 to your rebuttal testimony, Ms. Jones, related to the 21 new forecast that the Company developed in rebuttal. 22 (The electronic document was displayed.) 23 WITNESS JONES: 24 COMMISSIONER GILMAN: 25 Certainly. rebuttal here, Ms. Federico? So we are in the Yes. Can we go to page 67
  8. Page 68 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 68 of 106 1 24? Perfect. 2 So a large part of the revision to the 3 forecast in your rebuttal includes the addition of 4 what the Company characterizes as the large discrete 5 new business requests that you received essentially 6 between the direct case and rebuttal; is that 7 correct? 8 WITNESS JONES: That is correct. 9 COMMISSIONER GILMAN: Okay. And does this 10 figure, GKJ-R-2, represent the entirety of those new 11 business large discrete requests, or are there others 12 we are not seeing here? 13 WITNESS JONES: It is the entirety of the 14 large discrete new business requests received since 15 the initial filing. 16 COMMISSIONER GILMAN: Okay. And then what 17 is the status of these to get you on this list -- to 18 get you in this pie chart, if you will? 19 signed applications? 20 of these requests? 21 Are these You know, what is the maturity WITNESS JONES: Yeah, in order to be on 22 the pie chart, so these customers would have had to 23 file a builder call line request. 24 them into the hydraulic model to analyze if there was 25 any direct infrastructure costs required for them to We would have put 68
  9. Page 69 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 69 of 106 1 come on, and then resubmitted that to the customer, 2 and they signed their agreements. COMMISSIONER GILMAN: 3 4 So these are signed agreements? 5 WITNESS JONES: 6 COMMISSIONER GILMAN: 7 Okay. Correct. the sizes we are looking at. To meet service at Okay. So if we look at this, the blue sliver 8 9 right at the top, 12:00 to 12:30 or 1:00, is 6.2 10 mscfh. 11 new business requests that you have in Summit County. 12 Do you agree with that? And that is the discrete -- large discrete 13 WITNESS JONES: I do. 14 COMMISSIONER GILMAN: Okay. Do you know 15 what portion of that is in Breckenridge? 16 given the acuteness -- I guess or Keystone given the 17 acuteness of the needs for NPA and load reductions 18 specific to those areas, do you have any 19 disaggregation for us to understand the location of 20 these loads? WITNESS JONES: 21 22 23 Kind of I do not off the top of my head. COMMISSIONER GILMAN: Okay. Did the 24 Company, as part of this analysis -- because I know 25 you go on -- and like we will get there, but on pages 69
  10. Page 70 of 106

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 20 Page 70 of 106 1 I think 52 and 53, you do new shortfall calculations 2 where you compare the -- a little confusing because I 3 think you called the new one the base forecast or 4 something. 5 rebuttal case there in terms of shortfall. But you compared the direct case to the So given that there is a real acuteness to 6 7 where loads -- well, I guess let me test my theory, 8 first. 9 technical attachment that showed like the ratios of 10 if you have a reduction in this area, it is worth 62 11 percent, or whatever it may be, to the Breckenridge 12 shortfall. We looked at the table previously in your Do you recall that? 13 WITNESS JONES: Yes. 14 COMMISSIONER GILMAN: So I want to 15 understand -- my theory is if that works when you 16 reduce load and it is worth that much, is the 17 opposite also true that when you add load, it is of a 18 proportional impact to that shortfall in that area 19 assuming that load is added, you know, in a different 20 area of the system? 21 WITNESS JONES: 22 COMMISSIONER GILMAN: 23 24 25 Yes. So the closer -Did you understand that? WITNESS JONES: I did, thank you. So the closer you are to the immediate insufficient 70