Interrogatory responses
Answers to questions 11
Files8
CLF-011 Attachment 25.pdf
PDF · 1.7 MB · 5 pagesText searchable
Download CLF-011 Attachment 25.pdfRead the text of CLF-011 Attachment 25.pdf
CLF-011 Attachment 26.pdf
PDF · 876 KB · 4 pagesText searchable
Download CLF-011 Attachment 26.pdfRead the text of CLF-011 Attachment 26.pdf
CLF-011 Attachment 27.pdf
PDF · 1.6 MB · 3 pagesText searchable
Download CLF-011 Attachment 27.pdfRead the text of CLF-011 Attachment 27.pdf
CLF-011 Attachment 28.pdf
PDF · 1.5 MB · 4 pagesText searchable
Download CLF-011 Attachment 28.pdfRead the text of CLF-011 Attachment 28.pdf
CLF-011 Attachment 29.pdf
PDF · 1.7 MB · 5 pagesText searchable
Download CLF-011 Attachment 29.pdfRead the text of CLF-011 Attachment 29.pdf
CLF-011 Attachment 30.pdf
PDF · 4.9 MB · 47 pagesText searchable
Download CLF-011 Attachment 30.pdfRead the text of CLF-011 Attachment 30.pdf
CLF-011 Attachment 31.pdf
PDF · 4.5 MB · 65 pagesText searchable
Download CLF-011 Attachment 31.pdfRead the text of CLF-011 Attachment 31.pdf
CLF-011 Attachment 32.pdf
PDF · 1.6 MB · 11 pagesText searchable
Download CLF-011 Attachment 32.pdfRead the text of CLF-011 Attachment 32.pdf
Text of CLF-011 Attachment 28.pdf
Extracted from the file · 4 pages · 6,964 characters
Text of CLF-011 Attachment 29.pdf
Extracted from the file · 5 pages · 11,434 characters
Page 1 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 1 of 47 Dual Fuel Heat Pump Pilot Phase I Evaluation Report Energy Trust of Oregon Submitted by Apex Analytics LLC and Ideal Community Strategies March 3, 2026Page 2 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 2 of 47 Table of Contents Executive Summary .............................................................................................................................. 3 1. Introduction ................................................................................................................................... 8 2. Background .................................................................................................................................... 8 3. Evaluation Research Objectives ................................................................................................. 10 4. Research Tasks ........................................................................................................................... 10 Pilot Data Review .......................................................................................................................... 10 Staff Interviews ............................................................................................................................ 11 Installation Contractor Interviews ................................................................................................ 11 Participant Surveys ....................................................................................................................... 12 5. Findings........................................................................................................................................ 13 Pilot Design and Planning ............................................................................................................. 13 Pilot Implementation and Delivery: Early Stage........................................................................... 19 Pilot Implementation and Delivery: DFHP Systems .................................................................... 22 Pilot Implementation and Delivery: Late Stage ........................................................................... 25 DFHP Market Outlook ................................................................................................................... 32 Comparison of Energy Trust Heat Pump Pilots .......................................................................... 37 6. Conclusions and Recommendations ......................................................................................... 39 Appendix .............................................................................................................................................. 43Page 3 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 3 of 47 Executive Summary Energy Trust of Oregon (Energy Trust) initiated the Dual Fuel Heat Pump Pilot (DFHP) to explore the feasibility of developing dual fuel heat pumps as a future Residential measure in its portfolio. DFHP systems are flexible heating and cooling equipment that provide dual-source heating through a central air source heat pump and a natural gas forced air furnace, while also delivering cooling during the summer season. The switch between heating with the heat pump or the furnace is determined by a pre-set switchover temperature based on the outdoor air temperature. The DFHP Pilot was originally proposed in 2022 and driven by interest in installing air conditioning (AC) for vulnerable low-income populations following Oregon’s 2021 "heat dome" event and by staff interest in gaining insights into the technical aspects of performance and customer usage of and experience with it. 1 The pilot originally focused on serving low-income (LI) customers 2 and involved five Oregon investor-owned utilities serving customers with electricity and natural gas. Energy Trust covered 100% of the equipment and installation costs, up to a maximum of $12,000 per unit. Consistent with Energy Trust’s board-approved policy 3, with utility ratepayer funding, Energy Trust encourages the adoption of the most efficient equipment of the fuel of the customer’s choosing and does not attempt to influence customer fuel choice. This heat pump-related pilot aligns with this policy. This process evaluation study is the first in a two-phase effort to evaluate the DFHP Pilot, the second being an impact evaluation to quantify the energy use changes resulting from the DFHP system. The overarching research objective for this DFHP Pilot process evaluation was to understand the interaction between the DFHP systems and customers, the trade allies who install them, and Energy Trust as the administrator of the pilot to inform future decisions regarding applicability of DFHP systems to Energy Trust’s Residential portfolio. Beyond this, the study also sought to evaluate the pilot effectiveness in terms of its ability to deliver and meet its goals – in other words, how the pilot performed. The evaluation focused specifically on four core areas: • • • • Assess customer perspectives on the benefits and concerns or drawbacks of DFHP systems. Evaluate customer insights, experience, and satisfaction in the pilot, covering recruitment, scheduling, installation, and operation. Gather perspectives on the costs, challenges, and process considerations with installing DFHP systems. Understand broader market activity, motivations, barriers, and costs of DFHP installations occurring outside of Energy Trust’s Pilot. This executive summary highlights the pilot’s key research objectives and provides a high-level assessment of the evaluation results. Overall, the DFHP pilot had two primary goals: the first to Loikith, Paul. “The 2021 Pacific Northwest Heatwave (Heat Dome).” The Oregon Encyclopedia, 20 Apr. 2023, www.oregonencyclopedia.org/articles/heat-dome-2021/ 1 This low-income focus was later relaxed to moderate and then no income requirements. Aligning with Oregon’s Decarbonization Policies, https://www.energytrust.org/wpcontent/uploads/2016/11/4.03.000.pdf 2 3Page 4 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 4 of 47 test how the DFHP technology may be a viable offering and understand the resulting changes to energy use (and associated bill impacts) while the second is whether the pilot delivery approach – which targeted a priority customer group 4 of low-income households – is successful and can be scaled. An “ideal” study population (i.e., study design of treatment and control) of homes and occupants is needed to successfully test the first goal, while a broader general population or real-world conditions are required to test the second goal. This tension between these two goals resulted in challenges for the pilot. The pilot was moderately successful in installing new DFHP heating and cooling systems, but fell well short of the original participation targets: the pilot targeted installing 90 DFHP systems, yet had only installed 31 by the time Apex launched the participant survey (September 2025) and another 31 (for a total of 62) by the time of this reporting (February 2026). The DFHP systems substantially improved occupant comfort in the summer (in most homes), though – for a smaller subset of homes – at the expense of anxiety around perceived increased winter heating costs. The Pilot demonstrated collaboration across varied and numerous stakeholders within the constraints of a narrowly focused design. Energy Trust also demonstrated flexibility to make mid-Pilot adjustments to address low enrollment. However, the “moderate” success as noted above is due to this low enrollment rate and the prolonged period of Pilot duration. Recruitment challenges were due to narrow eligibility requirements without corresponding identification and targeting 5, in conjunction with limited opportunity for community-based organizations to provide recruiting support as they have in other efforts. Overall Pilot Performance Key Conclusion: In the Pilot, Energy Trust successfully navigated complex stakeholder collaboration but was restrained by competing stakeholder priorities. The pilot succeeded in delivering new heating and cooling systems to households to better understand the interaction between participants, their new equipment and ultimately, in Phase II of this evaluation, the resulting changes in energy use. The Pilot went through a co-design process that required coordination and buy-in from five utilities on complex decision-making and balancing the varied goals for all stakeholders involved. Stakeholders praised Energy Trust staff for their effective facilitation of "highly technical" conversations during the co-design process. However, the program’s effectiveness was limited by (initially) narrowly defined customer and site eligibility criteria. This approach combined equity goals with a technical study design while overlooking the logistical feasibility with a diminished response and adjustment to staff or utility feedback, resulting in low enrollment (only 62 completed projects out of a target of 90) and a misalignment of objectives. Further, the co-design process also meant sacrificing a portion of technical feasibility to align with external stakeholder inputs and for the greater good of moving forward with a viable Pilot. These shortcomings limited this study’s ability to delve deeper into segmentation and may hamper the second phase impact analysis due to limited participation and usage data, and a mixed composition between income qualified and market rate Pilot participants further diluting the analysis samples. Energy Trust designates low-income customers as a priority group of customers for program participation. See https://blog.energytrust.org/energy-trust-board-adopts-2026-2030-multiyear-plan/ for details about priority customers. 5 The available data available (customer lists) lacked the required information to determine eligibility criteria for enrollment. 4Page 5 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 5 of 47 Customer Perspectives on the Benefits and Costs of DFHP Systems Key Conclusion: High satisfaction with adding cooling was tempered by anxiety over winter heating costs. Participants reported high satisfaction with the systems, driven largely by the life-changing comfort of central air conditioning during summer heat waves, while improving indoor air quality during the wildfire season. Most respondents reported being very satisfied with their new systems, citing benefits including improved sleep, reduced allergies, and quieter operation compared to previous window AC units. The DFHP transformed the home environment for some participants making their homes more comfortable than public spaces (which they had previously believed to offer greater comfort than their homes). Conversely, participants were primarily concerned with potential winter bill increases. Despite preinstallation notice and system walkthroughs, participants expressed concern regarding higher winter electric bills, with some noting that the heat pump was more expensive to run than their previous gas furnace and took significantly longer to heat their homes than the gas furnace alone. 6 There were a few cases of DFHP systems requiring callbacks, 7 requiring contractor visits to address the issue. These included thermostat issues (n=2), self-shutoff (n=1), inability to run cooling cycles (n=1), and a malfunctioning switchover system (n=1) which required an additional five follow-up visits. Customer Insights, Experience, and Satisfaction in the Pilot Key Conclusion: The Pilot delivered strong satisfaction and a smooth experience for most participants. The high satisfaction was driven largely by the immediate quality-of-life improvements provided by central air conditioning. Participants gave high ratings for the early phases of pilot participation — specifically the home walkthrough and installation— praising the convenience of scheduling, the ease of paperwork, and the polite, efficient nature of the contractors. Furthermore, operational reliability was high, with contractors reporting few participant callbacks thanks to an installation process that prioritized customer education (walkthroughs and clear communication). Program Perspectives on Costs, Challenges, and Process Key Conclusion: Flexible and adaptive management lessened initial enrollment challenges caused by restrictive eligibility criteria but increased costs, and other process challenges remained with stakeholders and contractors. Program staff successfully boosted participation mid-pilot by relaxing strict income limits and extending the allowable furnace age (and later relaxing the requirement that homes not have central AC to allow homes with non-functional central AC). These changes were necessary because the initial eligibility criteria—specifically the requirement for low-income homes with newer furnaces and no existing AC—created a "needle in a haystack" recruitment situation. Utility partners reported that the initial co-design process felt prescriptive rather than collaborative, and that communication frequency dropped significantly during implementation, requiring them to proactively seek updates. Contractors Several participants (n=3) complained about DFHP systems taking longer to hit temperature setpoints. Though participants didn’t specify why, we believe it was likely due to several factors: a lag in morning setpoint due to overnight setbacks, generally achieving setpoints when turning the system on or during a cold spell. All three cases complained about timing relative to the gas furnace alone. 7 Callbacks refer to an installation or technical issue that requires the installation contractor to return to the home to address the issue. 6Page 6 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 6 of 47 had mixed feedback with the Pilot and concerns about the inability to develop their own leads which they believe constrained enrollment as well. Broader Market Activity, Motivations, Barriers, and Costs Key Conclusion: DFHPs are viewed as a resilient, albeit still niche home heating, ventilation, and air conditioning (HVAC) solution, and deeper adoption is dampened by high upfront costs. Contractors view DFHPs as a clear beneficial heating and cooling solution for rural homes or those dependent on expensive bulk fuels (propane/oil), offering resilience against extreme cold. 8 DFHP systems represent approximately one-fifth of the contractor residential HVAC business, with contractor expectations for continued, yet moderate, growth. For customers, key motivations are cooling benefits and heating system flexibility. However, widespread adoption is limited by high upfront costs—according to interviewed contractors approximately $1,500 more than standard AC—and skepticism regarding electric bill impacts. In colder climates like Central Oregon, contractors remain hesitant to recommend heat pumps – even DFHP – over strictly gas furnaces due to concerns about performance limitations in sub-freezing temperatures. Cost increases associated with recent inflationary pressure and change in refrigerant types (to more costly options) has also contributed to concerns about costs of these systems as well. Recommendations Based on these findings, the evaluation offers the following recommendations for future DFHP programs or other pilot offerings: 1. Refine Customer Education and Support: The Pilot did a good job of providing walk throughs and key system information to participants, yet some participants still faced challenges and uncertainty about their system. Future programs should develop comprehensive postinstallation training materials (leave-behinds) that specifically address thermostat operations, switchover settings, heat pump performance and operations. Education is critical to managing customer expectations regarding the slower heating speed of heat pumps compared to gas furnaces and mitigating anxiety regarding winter electric bill increases. 2. Align Eligibility Criteria with Technical Objectives: Future pilots should align eligibility requirements to meet the technical objectives of the pilot, which may be more reflective of the general population. This pilot showed that relaxing income and furnace age-limits was essential for viable participation volume. Furthermore, the program might consider adjusting to a variable income model with partially funded systems for more moderate- or higher-income levels. This would also allow some relaxation of the system cost caps, further broadening the possible range of qualified homes. Loosening other restrictions might also allow a pilot to focus on collecting robust technical and operational data on energy savings relative to a more limited set of homes. 3. Strengthen Pilot Procedures and Communication: Establish a formal procedural framework for pilot projects that defines primary strategic goals (e.g., equity vs. technical learning) at the outset. This framework should ensure bi-directional collaboration, ensuring external partners Contractors also view resilience during power outages as a benefit to DFHPs. While DFHPs do not function without electric power this perspective remains present and, in some edge cases, a DFHP may be powered with a backup generator with less electric draw than a wholly electric HVAC system. 8Page 7 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 7 of 47 and implementation staff can influence design parameters to avoid misalignment in objectives and ultimately Pilot outcomes. Regular, scheduled updates should replace ad-hoc communication with external partners. 4. Address Winter Cost Anxiety and Bill Impacts: Future program messaging must balance the promotion of cooling benefits with the reality of potential winter bill increases (perceived by some participants and true increased bills experienced by others). One option is for future programs to consider exploring "smart switching" controls that utilize time-of-use rates or realtime cost signals to automatically prioritize the most economic fuel source, thereby protecting low-income participants from bill “surprises”. 5. Strengthen Partnering with Contractors and Community Organizations: To overcome recruitment challenges, staff should engage with trade ally contractors early in the pilot process to help identify the overall number of potentially eligible households, assess the viability of reaching program targets based on that population size, and identify specific households that are potential participants. Leveraging community-based organizations can serve as warm introductions, validating the legitimacy of the Pilot and as a means of addressing customer concerns over the “too good to be true” upgrades like those offered by the DFHP Pilot. Integrating these partnerships early in the design phase of the Pilot ensures that eligibility criteria align with the technical reality of housing stock in the area.Page 8 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 8 of 47 Memo To: Board of Directors From: Cody Kleinsmith, Evaluation Project Manager Andrew Shepard, Senior Project Manager - Residential Marshall Johnson, Sector Lead - Residential cc: Date: March 27, 2026 Re: Staff Response to Phase One of the Dual-Fuel Heat Pump Pilot Evaluation The Dual-Fuel Heat Pump Pilot originated out of joint interest from Energy Trust, the Oregon Public Utility Commission (OPUC), and utilities in studying the emerging heating, air-conditioning, and ventilation (HVAC) system configuration and fit within Energy Trust’s Residential program portfolio in 2022. This memo recaps phase one of the pilot evaluation, with phase two slated to begin in Q4 2026. Phase one of the evaluation studied the pilot development and administration process, the customer sentiments about their installed measures, and trade ally perspectives on the pilot and technology overall. The pilot’s design was collaboratively developed between Energy Trust, the OPUC and utilities. The resulting customer and site eligibility requirements attempted to balance multiple objectives and priorities, which included both developing effective technical learnings and serving customers experiencing low incomes. This resulted in difficulties in identifying eligible customers and a large number of disqualifications among customers who submitted applications. Eventually, income, furnace age and presence of air-conditioning eligibility requirements were relaxed to prioritize measure installation while maintaining the key requirements for an effective technical study. This allowed the pilot to recruit from a wider pool of potential participants and the number of installations steadily increased. To address pilot design challenges in future pilots Energy Trust will center discussions internally and with external collaborators around core research objectives first. As additional objectives arise during pilot development, the pilot team will employ iterative reviews of these objectives to determine if they conflict or align with the core research objectives. In addition to difficulties with identifying eligible customers, Energy Trust staff and trade allies also observed a lack of trust from customers who were identified as eligible. Many potential participants expressed that the program seemed “too good to be true” due to Energy Trust paying for the entire cost of the equipment and installation. In future pilots where Energy Trust identifies that program skepticism may be a barrier to recruiting participants, Energy Trust will identify and utilize different recruitment and marketing approaches. These approaches may include incorporating community-based organizations (CBOs) as recruitment and delivery partners, which has been successful in other pilots and programs where Energy Trust pays the full cost of the measures. The customers who participated in the pilot expressed high satisfaction with the participation process and high satisfaction with the addition of central cooling to their home. If the pilot leads to a broader offering, this finding will inform future dual-fuel heat pump marketing strategies and campaigns by targeting areas where fewer homes have central cooling, centering the cooling benefit in marketing materials and encouragingPage 9 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 9 of 47 contractors to provide dual-fuel heat pump quotes to customers looking to replace their air conditioning systems. Customers who participated in the pilot expressed some uncertainty about how to operate their systems effectively after they were installed. Energy Trust developed several educational resources for customers including a frequently asked questions page on its website, on-demand call center support and information included on forms and recruitment materials. However, customers still expressed a lack of knowledge about the resources available to them and how to access them. As part of its HVAC Advocate Pilot in 2026, Energy Trust will explore how to better direct customers to resources and will provide a wide range of resource types for all accessibility levels. This may include printed brochures and leave-behinds, more in-depth education administered directly by program staff, or other support strategies. Some participants expressed concerns about the changes to their winter heating bills. Potential utility bill impacts were highlighted in recruitment materials and during on-site visits from Energy Trust staff, however participants still expressed anxiety about the scale of these impacts or how they may show up in their home. The scale of utility billing impacts as a result of this pilot will be studied in depth in phase two of the evaluation. As Energy Trust conducts that research and determines the future fit of dual-fuel heat pumps in the Residential Program portfolio, we will determine if additional research on smart controls that select the most cost-effective fuel source and time-of-use rates is an effective way to counteract participants’ winter heating cost anxieties. Energy Trust will begin phase two of this pilot evaluation in Q4 2026. This second phase will evaluate the energy use impacts, energy cost impacts, peak demand impacts and greenhouse-gas emission impacts of the installed dual-fuel heat pump measures for both electric and gas utility fuels. The information gathered from both the first and second phase of the pilot evaluation will be used to determine the measure fit within Energy Trust’s Board policies, regulatory framework and implementation of the 2025-2030 Strategic Plan and 2026-2030 Multiyear Plan. Results from the second phase of the evaluation are expected to be published in Q2 2027.Page 10 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 10 of 47 1. Introduction This report details the process-oriented findings for Energy Trust of Oregon’s Dual Fuel Heat Pump Pilot (DFHP) evaluation. The report provides details on Pilot history and design and includes insights from qualitative feedback from three groups of stakeholders (internal, implementation, and utility staff), participating trade ally and non-participating HVAC contractors, and an online survey to capture insights into the participant experience and satisfaction with the DFHP pilot. 2. Background Energy Trust, in partnership with the five investor-owned utilities whose customers fund Energy Trust’s programs and the Oregon Public Utility Commission (OPUC), is exploring the feasibility of developing DFHPs as a future Residential measure in Energy Trust’s portfolio. The goal of the DFHP Pilot is to collect information about the existing market and real-world behaviors of DFHP systems to inform future decisions of their applicability to the Energy Trust Residential program. Energy Trust approaches this pilot as an objective facilitator of data collection and analysis, not as an advocate nor opponent to this technology. DFHPs are flexible combined building heating and cooling systems: DFHP’s offer dual-source heating through an electric central air source heat pump and a natural gas forced air furnace while also delivering summer season cooling through the electric central air source heat pump. The DFHP operates like any other central air conditioning system in the summer, pushing warmer air outside and cooler air inside. As the outdoor temperatures drop and the demand for heating increases, the DFHP system effectively runs in reverse, pumping warm air into the home and purging colder air out of the home. The DFHP system – through a connected thermostat – selects which heating system to run based on a set switchover temperature. A switchover temperature establishes the outdoor temperature at which the system switches from running the heat pump condenser to the natural gas furnace. The advantages of DFHP systems is that they may avoid more substantial electric panel upgrades and offers the flexibility of running the most efficient system during the appropriate season to provide the best home space conditioning comfort while also limiting exposure to high utility bills. Figure 1. DFHP System Source: https:/
Text of CLF-011 Attachment 31.pdf
Extracted from the file · 65 pages · 155,190 characters
Text of CLF-011 Attachment 32.pdf
Extracted from the file · 11 pages · 34,299 characters
As listed on the current system
Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026