Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy8 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files8

Text of CLF-011 Attachment 28.pdf

Extracted from the file · 4 pages · 6,964 characters

Text of CLF-011 Attachment 29.pdf

Extracted from the file · 5 pages · 11,434 characters

  1. Page 11 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 11 of 47 www.familyhandyman.com/article/heat-pump-furnace-dual-fuelsystem/?srsltid=AfmBOopawBTXMbXd0Qv4PEYDFW5Mm6xVAEfVuGF8aKEpZ-dkJjeq0-WG While Energy Trust supports both natural gas and electric efficiency measures, consistent with board policy (as noted above) it does not promote switching from one fuel to another. As a result, offering DFHPs requires a level of coordination between Energy Trust and its funding utilities that is distinct from other measures. 9 The DFHP Pilot initially set numerous building, household, homeowner, and other enrollment requirements. These requirements posed challenges to initial qualification and participation, and Energy Trust updated many of them mid-Pilot to increase the pool of eligible participants. Table 1 summarizes the key Pilot elements and the requirements for those elements for qualification and enrollment. A more detailed discussion of each of these elements is covered in the findings section, while a comparison of these qualifications relative to a concurrent Energy Trust Pilot is included in the final report section below. Table 1 Energy Trust DFHP Pilot Characteristics Pilot Element Requirement Details DFHP system cost cap Max of $12,000 Total install cost should not exceed $12,000 DFHP system capacity 2-ton (24,000 btu/hr) Switchover temperature 35°F House type Single family House vintage Any Existing Heating System Type Furnace <= 5 years old Existing Cooling System No AC Heat Pump System Type Central ducted HP only Income Building condition Secondary infrastructure upgrades: Electric Panels and ductwork Low-income only Later relaxed to allow several townhome units Initially post-1970 as proxy for weatherized home but never enforced Requirement later relaxed to 10 years Requirement later relaxed to allow AC but not-in-working order Requirement later relaxed to allow moderate then no income requirements Sufficiently Weatherized Budget cap limited Did not require significant upgrades that would result in costs above the $12,000 maximum incentive Energy Trust paid 100% of the equipment and installation cost (including labor and necessary secondary infrastructure upgrades), up to a maximum of $12,000 per unit. A limited, prequalified group of installation contractors determined the appropriate sizing and settings for the DFHP system. The program expected most systems to be two-ton (24,000 btu/hr) capacity. DFHP systems were also expected to have a switch-over temperature to the gas furnace set 9 https://www.energytrust.org/wp-content/uploads/2016/11/4.03.000.pdf
  2. Page 12 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 12 of 47 between 30-and 40-degrees Fahrenheit outside air temperature (depending on site and heat pump characteristics). 3. Evaluation Research Objectives Energy Trust and co-funding utility partners identified four core research objectives for the DFHP Pilot. The overarching research objective was to develop a broad understanding of the existing DFHP market, real-world usage of these systems, and behaviors by users of these systems to inform future decisions of their applicability to the Energy Trust Residential program. A secondary research objective was to provide insights to all organizations involved by evaluating the successes and challenges of the Pilot. Apex therefore focused the specific DFHP Pilot research on assessing perceptions, experience, usage and satisfaction with DFHP systems across participants (customers), contractors, Energy Trust staff and utility partners. A summary of the four research objectives and the associated research activities are summarized in Table 2 below. Table 2. DFHP Pilot Phase I Evaluation Research Objectives Research Objective Program perspectives on the costs, challenges, and process considerations with installing DFHP systems. Pilot Data and Document Review Staff, PMC, and Utility Interviews Contractor Interviews Customer perspectives on the benefits and costs of DFHP systems. Customer insights, experience, and satisfaction in the Pilot (recruitment, scheduling, installation, operation). Broader market activity, motivations, barriers and costs of DFHP installations occurring outside of Energy Trust’s Pilot. 4. Participant Surveys Research Tasks To address the objectives of this evaluation, Apex conducted data and document reviews, staff and contractor interviews and participant surveys, as detailed below. Pilot Data Review Apex reviewed program documents and the three “touchpoint” data sources (including installation/contractor invoices) to capture a holistic view of all Pilot data. As part of this process, Apex categorized the detailed notes from the data sources to identify commonalities while capturing anecdotes to share with Energy Trust staff. Through this review, Apex conducted a qualitative thematic analysis to synthesize findings across all data collection activities. We also reviewed program documents (implementation plans, Pilot objectives, logic models, customer facing promotional releases).
  3. Page 13 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 13 of 47 Staff Interviews Apex conducted interviews with respondents from Energy Trust, the Program Management Contractor (PMC) CLEAResult, and utilities (summarized in Table 3). Apex developed a single interview guide including broad questions applicable to all interviewees as well as more targeted questions relevant to staff in each organization. Apex recruited, scheduled, and conducted one-on-one interviews with Energy Trust staff (n=5), with CLEAResult staff (n=3), and utility staff (n=5). Table 3 DFHP Staff Interview Summary Completed Interviews Time Period Pilot Role Energy Trust 5 March-April 2025 pilot design CLEAResult (PMC) 3 April-May 2025 pilot delivery Utility 5 June-July 2025 pilot design Staff Installation Contractor Interviews Contractors play a significant role in shaping customer expectations, experiences, and understanding of DFHP technology. The Apex team attempted to conduct interviews with all seven partnered contractors participating in the pilot, ultimately interviewing three. In addition, our team interviewed ten non‑participating contractors. The non‑participant contractors were trade allies that Energy Trust and CLEAResult identified as likely installing DFHPs outside of the Pilot with knowledge of the market and were selected to be representative of the Pilot geographic distribution as well. The contractors interviewed represented technical, on the ground estimators and installers (2), sales staff (4), managers (4), and general managers (3) from companies with experience selling and installing DFHPs. Contractors received a $100 gift card for completing an interview. The sample frame and the number of interviews completed by region and pilot participation are included in Table 4, below. Table 4. Contractor Interviews by Participation and Region Sample Frame Region Completed Interviews Participant NonParticipant Participant NonParticipant Central 1 2 1 2 Mid-Willamette 2 5 1 4 Portland Metro 2 8 1 2 Southern 2 4 0 2 Total 7 19 3 10 Apex worked with the implementation contractor to make warm introductions and made multiple attempts to reach participating contractors. Yet, it was challenging to reach
  4. Page 14 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 14 of 47 participating contractors for a variety of reasons, including firms changing ownership, data collection during the busy spring and summer season, and difficulty reaching appropriate individuals within contractor organizations. Ultimately, we were unable to reach several contractors despite over five recruitment attempts to schedule an interview. Contractor interviews focused on understanding the heat pump and DFHP market and documenting participating contractors’ experiences with the pilot. Interviews also explored contractors’ perspectives on the communities and climate regions they serve, the homes where they typically work, necessary upgrades, and the applicability of DFHPs. Specific areas of inquiry included whether a two‑ton system was expected to meet local heating and cooling needs, the size and condition of existing ductwork, and how often contractors encounter barriers to DFHP installation in the homes they service. We also asked about current and projected DFHP sales, how contractors compare DFHPs to other HVAC options, and—among participating contractors—their views on pilot communications, customer suitability and education, quality control processes, customer satisfaction, and billing and payment timelines. Participant Surveys Evaluating the Pilot requires understanding participants' direct experiences with their DFHP systems. To capture these experiences, Apex designed a participant survey based on findings from the document review and staff interviews. Apex distributed recruitment emails to invite a census of DFHP Pilot participants to complete a 10-15 minute online survey through Qualtrics. Our initial target was an approximate 50% response rate given the benefits received through the pilot, advance notification about the survey as a requirement of program participation, and the offering of a generous incentive. Apex used the Tango Card service to distribute respondent incentives in the form of electronic gift cards redeemable at a wide variety of businesses. Given the lower than expected number of participants at the time of the survey (at the time of survey recruitment, there were 35 potential recipients out of a total of 51 who had eventually participated by this reporting timeframe in November 2025), we offered an increased, $75 incentive. The survey explored topics beyond the original primary research questions, including the following: • • • • • Participants’ adjustments to thermostat or DFHP settings Participants’ setback scheduling (evening, morning, workday) and any adjustments to these setbacks Need for contractor callbacks, the issues, and whether they had been resolved Participants use of the new air conditioning and benefits (health / safety / comfort) Participant perceptions of changes to energy bills As the DFHP Pilot participation fell short of program targets, we had limited ability to produce findings by segmenting participants into different segments and therefore the analysis lacks the potential to meaningfully differentiate findings across these groups. Yet, the very high response rate is notable at 83% (Table 5) and is a positive indicator of Pilot design and delivery.
  5. Page 15 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 15 of 47 Table 5 DFHP Participant Survey Disposition Participant Sample Frame (Population) All 5. 35 Successful Completes 29 Response Rate 83% Findings The findings presented below are structured to follow the general evolution and development of the Pilot. The section begins with a review of the Pilot design and planning stage, from inception and design and through the initial development phase. Most of this discussion stems from staff interviews and document review. The next section moves through the early aspects of implementation and delivery, including contractor and participant engagement and recruitment, enrollment, and installation from both participant and contractor interviews. The findings then delve into the installed DFHP systems including a review of system size, cost, switchover temperature, and thermostats. The system information came from staff and contractor interviews and is compared against actual program tracking data. The findings then shift to the late-stage implementation and delivery with perspectives from both participant and contractor lens through the system usage, operation, participant behavior, satisfaction, and includes feedback from participants and contractors alike. We end this section with a discussion of outlook on the DFHP market and for this Pilot and this technology in general and a brief comparison of heat pump pilots. Pilot Design and Planning The section begins with a review of the Pilot design and planning stage, from inception and design and through the initial planning development phase. Most of this discussion stems from staff interviews and document review. 5.1.1 Pilot Inception The DFHP Pilot was originally proposed in the fall of 2022 by Energy Trust senior executive staff with the goal of demonstrating Energy Trust’s commitment to serving low-income (LI) customers by offering free DFHP systems. The initial focus on LI households was particularly influenced by the 2021 "heat dome" event that was directly responsible for over one-hundred heat-related fatalities in Oregon, prompting a strong desire to provide air conditioning (AC) for vulnerable populations. 10 The Pilot was also a response to requests from the Oregon Public Utility Commission (OPUC) and various utilities to study DFHPs. Both gas and electric utilities expressed curiosity about the real-life implementation and usage of a DFHP solution. To date, Energy Trust has maintained a fuel-neutral policy to prohibit incentivizing or promoting one fuelsource over another; incentivizing dual-fuel systems was a new approach and opportunity to study the technology’s benefits and drawbacks. The Pilot moved into design and planning in 2023, which involved a co-design process for the DFHP Pilot where Energy Trust staff, five partner electric and natural gas utilities, and other stakeholders convened to determine the project's structure, eligibility requirements, and 10 "Heat Dome, 2021." Oregon Encyclopedia, www.oregonencyclopedia.org/articles/heat-dome-2021/.
  6. Page 16 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 16 of 47 objectives. The process yielded constructive outcomes while suffering from governance and decision-making challenges. Energy Trust staff facilitated the discussions, earning praise from stakeholders for handling "highly technical" conversations and balancing the competing priorities of all five utilities. Energy Trust staff also described the early design phase as successful and shared that all groups had an "equal opportunity for input.” Some utility partners indicated that Energy Trust’s high-level leadership had disproportionate influence on the pilot’s design. 5.1.2 Pilot Objectives From Energy Trust's perspective, the pilot aimed to inform technical knowledge about dual-fuel heat pump systems in residential applications. A staff member described the primary learning objective of the pilot: "What you're trying to understand is the basic interaction between this equipment, how does it function." The program also aimed to differentiate between installation issues and equipment performance in a controlled environment, with one staff member asking: "Is the main learning we didn't install them right? Or that we installed them right but they didn't perform the way we expected?" Additionally, Energy Trust viewed the pilot as an opportunity to improve utility collaboration practices and described a secondary goal of understanding “how to better coordinate with utilities to do a project like this.” Yet, there was some degree of misalignment of objectives across pilot design stakeholders. As one Energy Trust staff member explained, there was a "mismatch in goals” with "what a pilot is and should be used for." This resulted in a push for a focus on providing cooling to low-income customers. While staff acknowledged this showcased Energy Trust's community support and commitment to equity, they noted it conflicted with the traditional pilot objective of providing technical learnings. The low-income requirement constrained the participant pool, especially when combined with other pilot eligibility criteria like furnace age and lack of AC, limiting the pilot's ability to provide sufficient data for technical analysis. Both gas and electric utility representatives were interested in collecting data and learning about dual fuel heat pump applications. Utilities participated in the co-design stakeholder sessions. Their primary goal in participating in the pilot was to understand the implications of dual fuel heat pump systems on customers' homes, comfort, and bills. Program staff and utility stakeholders agreed that providing cooling benefits for customers was a central program benefit, especially after Oregon's 2021 heat dome event highlighted the need for air conditioning in some communities. Staff and stakeholders prioritized reaching customers who wouldn't otherwise have access to cooling. While providing cooling was an essential program outcome for the targeted population, program staff and stakeholders also recognized the risk of increasing customers' energy bills. As staff described, the challenge was providing cooling benefits while "doing no harm" and minimizing the impact to household utility bills. Utility motivations for participating in the pilot varied significantly by fuel type. Gas utilities approached the pilot with an interest in exploring emissions reduction strategies to meet statewide goals. In contrast, electric utilities were primarily seeking combination solutions with gas utilities to manage potential challenges related to electric peak load and supply. Combined utilities had a desire to learn how dual fuel systems could support both their electric and gas business.
  7. Page 17 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 17 of 47 5.1.3 Eligibility and Recruitment The pilot established narrow participant eligibility requirements that created significant recruitment challenges. The Pilot originally targeted installing 90 DFHP systems for a specific home type: in more recently built (post-1970’s) low-to-moderate-income owner-occupied singlefamily homes with natural gas-heat (furnaces installed within the past five years). Homes had to be sufficiently weatherized, determined either by record of participation in a utility or Community Action Agency (CAA)-operated low-income assistance program or through an inhome audit. Other requirements included having compatible ducting and electric panels 11, lack of an existing central air conditioning system, and being a continuously occupied residence with 12+ months of associated natural gas and electric energy use data available. DFHP participants must also be customers of a participating electric (Portland General Electric or Pacific Power) and natural gas (NW Natural, Cascade Natural Gas or Avista Natural Gas) utility within Energy Trust service territory. An Energy Trust staff member identified income requirements as "the biggest thing" hindering recruitment efforts, although all eligibility requirements were obstacles to some degree. On the other hand, even with relaxing income requirements, the Pilot did not immediately or quickly meet enrollment goals. One staff member described how beyond the income requirement, each specific program requirement was picked out, to ensure quality of installations, minimize risk of technical issues and customer dissatisfaction, and create regular data for evaluation. • • • • Air Conditioning: “The aspect of not allowing AC in home, that was an aspect of, “if we’re putting in heat pumps, we don’t want to rip out good equipment, let’s go for homes that need the equipment.” From an evaluation point-of-view, we wanted all homes to meet this criteria, so we really leaned into ‘homes must not have ducted AC.’ Gas Furnace: The decisions around the technical criteria for the homes like the gas furnace needing to be 1-5 years old, that’s from how gas furnaces work with heat pumps, and gas furnaces can come with different types of motors. New gas furnaces have ECM motors, they work better with heat pumps and old furnace won’t be as efficient. We wanted the equipment to age out together, have furnace to be same vintage of heat pump, be the same age. Duct System: We wanted the ducting system to be in relatively good order, because heat pumps need a better duct system than gas furnace, need that better air flow. Super important in operation of HP. We thought people could have bad experiences if they have ducting that’s really bad and the heat pump doesn’t work, so we looked at homes with duct systems without high need of repair. Weatherization: Same reason we looked for some level of weatherization. Didn’t want to lose air through insulation or windows, hard for heat pumps to keep up. We had some evaluation led restraints, technical restraints, layer them all together, you have design of pilot." 200-Amp electrical panels were given preference over smaller panels which were assessed for eligibility on a site-by-site basis. 11
  8. Page 18 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 18 of 47 The technical specifications ensured equipment compatibility and optimized heat pump performance, but layering these constraints created a narrow pool of “best case” eligible participants. Multiple Energy Trust staff members felt the eligibility requirements could have been expanded to better represent a real-life household scenario. While the various eligibility requirements created controlled conditions that cleanly framed the technology's performance, the constraints limited staff’s understanding of how the measure would perform across the broader population with typically irregular conditions (e.g., older furnaces). One staff member stated that "I would have liked us to design the pilot in a way to know how the measure would behave in a typical situation and we ended up going with this really complicated set of conditions for who could/couldn't participate." Utility staff also commented on the eligibility criteria, finding it an obstacle to participants. Multiple utilities had only a few participants at the time of interviews in spring 2024. One electric utility staff member noted the geographic eligibility in hotter Oregon climates clashed with the program requirements for no AC: "They want to be in the hottest climate in the service territory, like Southern Oregon, and there was 114 degrees a few years ago. Good luck finding something without AC." This observation highlighted the disconnect between targeting eligible hotter utility territories and the requirement for homes without existing cooling systems. CLEAResult staff echoed program staff and utilities, reporting that the pilot's requirements were "extensive," resulting in only a few hundred residents on their marketing lists. They characterized the participant search as seeking a "super specific home" and described the cumulative effect of multiple requirements as finding a "needle in a haystack." The prerequisites for eligibility made recruitment the program's primary obstacle rather than the layered filters acting as screening method. All three interviewed participating contractors were disappointed that they were required to route any customer leads back through the program staff vetting process and to rely on pilot staff to identify eligible households. Contractors felt this limited the program’s reach and prevented them from helping more people. One contractor believed participation uptake was slow partly because many households assumed the pilot offer was “too good to be true.” One factor contributing to contractor frustration and reluctance to participate in interviews for the evaluation process was the perception that they "didn't see the jobs" despite signing up and investing time and effort for the pilot. In one more recent case, a newly onboarded contractor was required to bring in their own participants, as existing leads were directed to the original contractors for that region. Contractors believed the Pilot did a good job of aligning requirements with home characteristics that are suitable for DFHP systems. For example, contractor sales representatives and installers typically recommend DFHPs for homes with existing furnaces less than ten years old, adequate insulation, and properly sized, well-sealed ductwork. Ideal candidates have sufficient electrical panel capacity, minimizing upgrade costs and installation complexity. Mid-sized homes, generally under 2,800 square or smaller, with standard floor plans and accessible outdoor space for the heat pump unit are considered the best fit. Newer (1980’s or 90’s and newer) or recently weatherized homes with double-pane windows and modern construction practices perform especially well, as they retain heat efficiently and allow the system to operate near peak performance.
  9. Page 19 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 19 of 47 Contractors generally agreed with the factors that disqualified candidates for the Pilot. Factors that may deem a home unsuitable for a DFHP system are poor insulation, limited outdoor space, or requiring significant duct or electrical upgrades. Furnaces with a down flow configuration make it difficult to add a heat pump coil. Older homes with poor insulation, outdated or undersized ductwork, or single-pane windows often need substantial improvements before DFHP systems become feasible. Panel upgrades are also frequently needed in older homes, although one contractor noted that they can sometimes move other appliances over to gas to free up panel space for a heat pump. Yet, early in the pilot, one contractor encountered several cases in which a household was initially told they qualified, only for the contractor to later discover that the home’s electrical panel could not support a heat pump. They felt the pilot’s initial screening was inadequate and regretted “dashing people’s hopes.” Otherwise, contractors said pilot staff generally did a good job preparing households for their visits. Two contractors noted that after pilot staff conducted an assessment, they also performed their own site visit before scheduling installation. One contractor in the Mid-Willamette Valley noted a nearby town’s local permitting restrictions prohibited the installation of ducted heat pump systems. 12 Additionally, tight lot sizes and structural challenges such as additions or inaccessible crawl spaces can complicate or rule out DFHP installations. 5.1.4 Relaxation of Eligibility Requirements The Pilot faced increasing challenges recruiting viable households due to the strict initial design criteria, requiring a loosening of the requirements to boost recruitment. The eligibility changes occurred in the following order: Moderate Income Expansion: To address the most significant barriers, program staff first loosened income limits to allow moderate-income households (aligned with Energy Trust's "Savings Within Reach" criteria) to participate alongside low-income households. The income expansion occurred in March 2024. Furnace Age: The second eligibility expansion occurred in May 2025. This change increased the maximum allowable gas furnace age from five years to ten years. Removal of Income Limits: As recruitment challenges persisted, the income requirement was relaxed further, eventually opening the pilot to all income levels (market rate) with no restrictions. Energy Trust implemented this change concurrently with the furnace age change, in May 2025. Non-Functional AC Allowance: Finally, the strict requirement prohibiting any existing central air conditioning was modified to allow homes with non-functioning central AC (verified as not working for at least a year) to qualify. Energy Trust implemented this final change between August and September of 2025. According to staff interviews, the relaxation of the income qualification requirement and the furnace age extension were cited as providing the "biggest bump" in participant enrollment. This contractor couldn’t get a permit to install a ducted heat pump in the City of Detroit (about an hour East of Salem). The contractor noted the city doesn’t allow ducted heat pumps because the outside equipment is too big, so only ductless heat pumps can be installed. 12
  10. Page 20 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 20 of 47 5.1.5 Coordination and Communication Utility stakeholders had mixed experiences with the co-design process, with some praising the facilitation between gas and electric utilities, while others felt their input was not incorporated into the pilot design. The utility stakeholders had mixed experiences with the co-design process, with some utilities feeling the process balanced gas and electric utilities well, while others felt the design did not reflect utility input. Utilities who expressed satisfaction with the design phase praised Energy Trust's facilitation between gas and electric utilities and the technical aspects of the discussion. One gas utility shared their appreciation for how Energy Trust managed balancing the different priorities of all five utilities; an electric utility stated that Energy Trust did "a great job of facilitating conversations that were highly technical." However, some utilities felt that though balancing utility stakeholders in conversation went well, their input and considerations were not incorporated in the program design. One gas utility stated that the process was prescriptive rather than collaborative, with few avenues to influence the pilot structure in a meaningful way. They described the stakeholder codesign process led by Energy Trust as, "This is the parameters and what we have: Jump on board or not, we'll push it through either way." Another gas utility echoed this sentiment regarding specific design elements, noting that on key issues like income targeting and AC requirements, "Our feedback wasn't incorporated into the pilot design." Notably, multiple utilities described flagging the risk that participation would be constrained by the drafted eligibility requirements. One utility suggested that the restrictive eligibility requirements in the program design were the product of "trying to please too many stakeholders." The result was a process that satisfied some stakeholders while leaving others feeling their input did not meaningfully shape the final program design. These communication challenges continued beyond design, as ongoing coordination between the program and utilities decreased significantly during implementation. Utility partners consistently shared that they received infrequent updates from Energy Trust, with one utility representative sharing that program updates seemed to have "fell off everyone's radar." Multiple respondents described having to proactively request information, with one stating that "I send emails and see if there's an increase in participation, that's how I get updates." Several utilities requested a more regular reporting structure for the pilot rather than the infrequent communication they experienced. All three participating contractors described communication challenges with the Pilot. One wished they had been consulted earlier in the pilot’s design, particularly around the home‑assessment process and key assumptions. Another said the pilot experienced multiple rounds of PMC staff turnover, making it hard to know who to contact or how to stay updated. They had not heard from the pilot in some time and were disappointed that more families in their community had not been served. A third contractor submitted a household they believed would qualify but received only a brief rejection without follow‑up or explanation. 5.1.6 Marketing Strategy Energy Trust conducted varied marketing approaches, primarily direct mail campaigns and website promotion. These varied outreach efforts did not generate much increase in either participant enrollment or general interest. CLEAResult staff noted that direct mail campaigns "have not really worked the way they were expecting to," despite co-branding efforts with

Text of CLF-011 Attachment 31.pdf

Extracted from the file · 65 pages · 155,190 characters

Text of CLF-011 Attachment 32.pdf

Extracted from the file · 11 pages · 34,299 characters

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026