Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy8 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files8

Text of CLF-011 Attachment 28.pdf

Extracted from the file · 4 pages · 6,964 characters

Text of CLF-011 Attachment 29.pdf

Extracted from the file · 5 pages · 11,434 characters

  1. Page 18 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 18 of 47 The technical specifications ensured equipment compatibility and optimized heat pump performance, but layering these constraints created a narrow pool of “best case” eligible participants. Multiple Energy Trust staff members felt the eligibility requirements could have been expanded to better represent a real-life household scenario. While the various eligibility requirements created controlled conditions that cleanly framed the technology's performance, the constraints limited staff’s understanding of how the measure would perform across the broader population with typically irregular conditions (e.g., older furnaces). One staff member stated that "I would have liked us to design the pilot in a way to know how the measure would behave in a typical situation and we ended up going with this really complicated set of conditions for who could/couldn't participate." Utility staff also commented on the eligibility criteria, finding it an obstacle to participants. Multiple utilities had only a few participants at the time of interviews in spring 2024. One electric utility staff member noted the geographic eligibility in hotter Oregon climates clashed with the program requirements for no AC: "They want to be in the hottest climate in the service territory, like Southern Oregon, and there was 114 degrees a few years ago. Good luck finding something without AC." This observation highlighted the disconnect between targeting eligible hotter utility territories and the requirement for homes without existing cooling systems. CLEAResult staff echoed program staff and utilities, reporting that the pilot's requirements were "extensive," resulting in only a few hundred residents on their marketing lists. They characterized the participant search as seeking a "super specific home" and described the cumulative effect of multiple requirements as finding a "needle in a haystack." The prerequisites for eligibility made recruitment the program's primary obstacle rather than the layered filters acting as screening method. All three interviewed participating contractors were disappointed that they were required to route any customer leads back through the program staff vetting process and to rely on pilot staff to identify eligible households. Contractors felt this limited the program’s reach and prevented them from helping more people. One contractor believed participation uptake was slow partly because many households assumed the pilot offer was “too good to be true.” One factor contributing to contractor frustration and reluctance to participate in interviews for the evaluation process was the perception that they "didn't see the jobs" despite signing up and investing time and effort for the pilot. In one more recent case, a newly onboarded contractor was required to bring in their own participants, as existing leads were directed to the original contractors for that region. Contractors believed the Pilot did a good job of aligning requirements with home characteristics that are suitable for DFHP systems. For example, contractor sales representatives and installers typically recommend DFHPs for homes with existing furnaces less than ten years old, adequate insulation, and properly sized, well-sealed ductwork. Ideal candidates have sufficient electrical panel capacity, minimizing upgrade costs and installation complexity. Mid-sized homes, generally under 2,800 square or smaller, with standard floor plans and accessible outdoor space for the heat pump unit are considered the best fit. Newer (1980’s or 90’s and newer) or recently weatherized homes with double-pane windows and modern construction practices perform especially well, as they retain heat efficiently and allow the system to operate near peak performance.
  2. Page 19 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 19 of 47 Contractors generally agreed with the factors that disqualified candidates for the Pilot. Factors that may deem a home unsuitable for a DFHP system are poor insulation, limited outdoor space, or requiring significant duct or electrical upgrades. Furnaces with a down flow configuration make it difficult to add a heat pump coil. Older homes with poor insulation, outdated or undersized ductwork, or single-pane windows often need substantial improvements before DFHP systems become feasible. Panel upgrades are also frequently needed in older homes, although one contractor noted that they can sometimes move other appliances over to gas to free up panel space for a heat pump. Yet, early in the pilot, one contractor encountered several cases in which a household was initially told they qualified, only for the contractor to later discover that the home’s electrical panel could not support a heat pump. They felt the pilot’s initial screening was inadequate and regretted “dashing people’s hopes.” Otherwise, contractors said pilot staff generally did a good job preparing households for their visits. Two contractors noted that after pilot staff conducted an assessment, they also performed their own site visit before scheduling installation. One contractor in the Mid-Willamette Valley noted a nearby town’s local permitting restrictions prohibited the installation of ducted heat pump systems. 12 Additionally, tight lot sizes and structural challenges such as additions or inaccessible crawl spaces can complicate or rule out DFHP installations. 5.1.4 Relaxation of Eligibility Requirements The Pilot faced increasing challenges recruiting viable households due to the strict initial design criteria, requiring a loosening of the requirements to boost recruitment. The eligibility changes occurred in the following order: Moderate Income Expansion: To address the most significant barriers, program staff first loosened income limits to allow moderate-income households (aligned with Energy Trust's "Savings Within Reach" criteria) to participate alongside low-income households. The income expansion occurred in March 2024. Furnace Age: The second eligibility expansion occurred in May 2025. This change increased the maximum allowable gas furnace age from five years to ten years. Removal of Income Limits: As recruitment challenges persisted, the income requirement was relaxed further, eventually opening the pilot to all income levels (market rate) with no restrictions. Energy Trust implemented this change concurrently with the furnace age change, in May 2025. Non-Functional AC Allowance: Finally, the strict requirement prohibiting any existing central air conditioning was modified to allow homes with non-functioning central AC (verified as not working for at least a year) to qualify. Energy Trust implemented this final change between August and September of 2025. According to staff interviews, the relaxation of the income qualification requirement and the furnace age extension were cited as providing the "biggest bump" in participant enrollment. This contractor couldn’t get a permit to install a ducted heat pump in the City of Detroit (about an hour East of Salem). The contractor noted the city doesn’t allow ducted heat pumps because the outside equipment is too big, so only ductless heat pumps can be installed. 12
  3. Page 20 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 20 of 47 5.1.5 Coordination and Communication Utility stakeholders had mixed experiences with the co-design process, with some praising the facilitation between gas and electric utilities, while others felt their input was not incorporated into the pilot design. The utility stakeholders had mixed experiences with the co-design process, with some utilities feeling the process balanced gas and electric utilities well, while others felt the design did not reflect utility input. Utilities who expressed satisfaction with the design phase praised Energy Trust's facilitation between gas and electric utilities and the technical aspects of the discussion. One gas utility shared their appreciation for how Energy Trust managed balancing the different priorities of all five utilities; an electric utility stated that Energy Trust did "a great job of facilitating conversations that were highly technical." However, some utilities felt that though balancing utility stakeholders in conversation went well, their input and considerations were not incorporated in the program design. One gas utility stated that the process was prescriptive rather than collaborative, with few avenues to influence the pilot structure in a meaningful way. They described the stakeholder codesign process led by Energy Trust as, "This is the parameters and what we have: Jump on board or not, we'll push it through either way." Another gas utility echoed this sentiment regarding specific design elements, noting that on key issues like income targeting and AC requirements, "Our feedback wasn't incorporated into the pilot design." Notably, multiple utilities described flagging the risk that participation would be constrained by the drafted eligibility requirements. One utility suggested that the restrictive eligibility requirements in the program design were the product of "trying to please too many stakeholders." The result was a process that satisfied some stakeholders while leaving others feeling their input did not meaningfully shape the final program design. These communication challenges continued beyond design, as ongoing coordination between the program and utilities decreased significantly during implementation. Utility partners consistently shared that they received infrequent updates from Energy Trust, with one utility representative sharing that program updates seemed to have "fell off everyone's radar." Multiple respondents described having to proactively request information, with one stating that "I send emails and see if there's an increase in participation, that's how I get updates." Several utilities requested a more regular reporting structure for the pilot rather than the infrequent communication they experienced. All three participating contractors described communication challenges with the Pilot. One wished they had been consulted earlier in the pilot’s design, particularly around the home‑assessment process and key assumptions. Another said the pilot experienced multiple rounds of PMC staff turnover, making it hard to know who to contact or how to stay updated. They had not heard from the pilot in some time and were disappointed that more families in their community had not been served. A third contractor submitted a household they believed would qualify but received only a brief rejection without follow‑up or explanation. 5.1.6 Marketing Strategy Energy Trust conducted varied marketing approaches, primarily direct mail campaigns and website promotion. These varied outreach efforts did not generate much increase in either participant enrollment or general interest. CLEAResult staff noted that direct mail campaigns "have not really worked the way they were expecting to," despite co-branding efforts with
  4. Page 21 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 21 of 47 utilities that were intended to increase the credibility of the offer. CLEAResult staff stated that marketing efforts "started too late, and they had a tiny list of people to market to," and timing and lack of urgency compounded with an already small eligibility list. While detailed letters produced higher response rates than postcards or emails, interested households did not often meet the eligibility criteria. The complexity of dual-fuel heat pump technology and installations did not help communication, as some interviewees reported that the value proposition in marketing materials was unclear, especially to those who had recently received weatherization services and a home energy audit. 13 Pilot Implementation and Delivery: Early Stage Energy Trust’s PMC, CLEAResult, helped facilitate, organize, recruit and select contractors, and oversee the management of the Pilot. Contractors played an important role in the Pilot, serving as a key contact point for installation and system setup, operations, and guidance. The following section details the recruitment of and involvement of contractors in the delivery of the Pilot along with equipment selection, the installation process, and system setup. 5.2.1 Contractor Recruitment Energy Trust enrolled contractors for the DFHP Pilot by utilizing a structured Request for Proposal (RFP) process to choose a pre-selected group of trade ally installation contractors from their existing network. This approach, informed by prior experience, was intended to limit the contractor group to facilitate Pilot feedback and insights regarding the DFHP system installations, and to ensure Pilot requirements were met with quality installations. The decision to use a small, exclusive group was viewed as a "win-win" by staff, giving contractors unique access to projects. Participating contractors generally found the enrollment process itself to be "straightforward and easy.” Due to changes in an existing company ownership during the Pilot, program staff approved a new contractor in one region though this contractor was required to develop their own leads, departing from the other contractor requirements. 14 5.2.2 Participant Intake Process Energy Trust’s residential Program Management Contractor (PMC) oversaw a multi-stage participant intake and audit process. The following steps were the main participant intake steps to enroll customers. • • Targeting and Outreach: The program identified potential participants through utility data and direct marketing (letters/emails) based on eligibility criteria. Phone Screening: PMC staff (CLEAResult) conducted initial phone screenings to verify eligibility criteria (e.g., income, gas furnace age, no existing AC) and explained the Pilot offering, associated benefits, and the potential bill impacts to customers. These DFHP candidates were those identified through the CAA participant lists. To ensure existing partners still received the leads from the program to avoid departing from the original agreement. 13 14
  5. Page 22 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 22 of 47 • • • • Program Audit: For those passing the initial phone screening, program staff performed in-home audits to verify technical requirements (e.g., ductwork, electrical capacity, weatherization) and confirmed customer interest. Contractor Assignment: Eligible participants were assigned to a pool of seven preselected trade ally contractors for installation. Contractor Assessment and Installation: The assigned contractor conducted their own technical verification, determined DFHP sizing/components, installed and set up the system. Final Verification: Program staff conducted a post-installation verification visit to test that the system was installed and operating correctly. Participants reported high levels of satisfaction with the early phase of the Pilot experience, including the home walkthrough and intake process. Survey questions regarding the Energy Trust home walkthrough covered scheduling convenience, ease of completing forms, politeness of the person conducting the walkthrough, understanding what was happening, knowing the next steps, and effectiveness in answering questions. These topics received overwhelmingly positive responses, and participants frequently gave them the highest satisfaction ratings possible (the percentage of respondents strongly agreeing the process was well done is summarized in Figure 2).The remaining percentage of respondents reported somewhat agreeing to the intake process being well done. Figure 2 DFHP Participant Intake Process Satisfaction (Percentage Strongly Agreeing Process was Well Done) 100% 80% 60% 40% 20% 0% Scheduling Application Forms Staff Politeness Strongly agree Neither agree nor disagree (n=0) Strongly disagree (n=0) Clear Instructions Clear Next Steps Answering Questions Somewhat agree Somewhat disagree (n=0) 5.2.3 Installation Contractors reported that the installation of DFHP systems was generally smooth and efficient, with few issues reported. Contractors described their processes as well-refined, incorporating customer education throughout each stage of engagement, sales, installation, and follow-up to ensure homeowners understand system operation and maintenance. Most DFHP Pilot installations proceeded without difficulty, though occasional adjustments were required for ductwork, electrical capacity, or thermostat setup. During our interviews in the
  6. Page 23 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 23 of 47 summer, contractors noted that the recent refrigerant transition to R-454B 15 and the related supply challenges disrupted installation timelines throughout the height of their installation season; these issues do not appear to have impacted the perception of the Pilot from the participant perspective. Participants reported high levels of satisfaction with the Pilot installation process. On survey questions regarding installation, respondents “Strongly Agreed” that they were able to easily schedule the installation at a convenient time, that the installers were polite and respectful, and that installers cleaned up afterward (Figure 3). Figure 3 DFHP Participant Installation Process Satisfaction (Percentage Strongly Agreeing Process was Well Done) Percent Agreeing 100% 80% 60% 40% 20% 0% Scheduling Strongly agree Somewhat disagree Staff Politeness Clean-up Somewhat agree Strongly disagree (n=0) Timing And Prep Answering Questions Neither agree nor disagree In terms of installation challenges, most contractors reported only a few issues with new DFHP systems post installation, which they attributed to heavy investment in customer education throughout the process. This education begins at the sales call and continues through the home visit and installation to verify that participants can operate equipment. Several contractors also perform customer follow-ups post walk-through to ensure customer satisfaction and provide reminders on using their DFHP. Contractors said that customers most commonly reported issues included occasional thermostat calibration problems and defrost mode noise complaints. Equipment defects were rare, with most callbacks attributed to homeowner misunderstanding rather than installation errors. Contractors credited consistent communication and system walk-throughs as key to reducing these incidents. On the occasions when issues arose, they were typically addressed through follow-up visits, remote thermostat adjustments, or manufacturer support. One contractor also mentioned a quality incentive program that rewarded their installers for completing jobs without callbacks. Challenges with installation from the participant perspective involved a small number of respondents who indicated they did not receive sufficient information about operation and performance. Six (out of 24 respondents answering this question) reported not receiving 15 R32 is another refrigerant that is allowed in the newer requirements.
  7. Page 24 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 24 of 47 information about setting the DFHP system to maximize energy savings, seven (out of 27 respondents) reported not receiving information about setting the DFHP system to maximize the comfort of their home, and five (out of 27 respondents) reported not receiving information about maintaining the DFHP system so it continues to operate efficiently. The program provided an engagement guide printout that included high level system operation and performance information to all participants which included details that specifically addressed these operational aspects. Pilot Implementation and Delivery: DFHP Systems Details around the DFHP systems that were installed through the Pilot are important to help Energy Trust understand contractor preferences and feedback to inform future offerings while also containing important explanatory attributes that will be used for the second phase of this study which will examine system performance and energy use. 5.3.1 System Size The Pilot had originally targeted the installation of two-ton DFHP systems but ultimately allowed contractors to determine the appropriate capacity based on home characteristics and cooling load calculations. Contractors reported that the most common system size they install is between 2.5 and 3 tons, which they noted aligns with the heating and cooling loads of typical single-family homes in Oregon and those installed through this Pilot. Most contractors mentioned performing load calculations to confirm sizing and ensure eligibility for program quality checks, particularly for systems above 3 tons. Almost half – twenty of the 44 16 – DFHP systems provided in the tracking database with capacity data had capacities greater than the original Pilot cap (two-ton). The tracking database had 51 total sites and while all 51 included total installation cost data only 44 installations included a reported capacity value. 16
  8. Page 25 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 25 of 47 Figure 4 HP Capacity for DFHP Systems Participant Count 25 Pilot Capacity Cap: 24k 20 15 10 5 0 16k-22k 23k-25k 26k-33k >34k DFHP Capacity Range 5.3.2 Project Costs Interviewed contractors’ (both participating and non-participating) estimates of the installation costs for a 2-ton DFHP system, in a home that does not need any upgrades, varied widely based on the type of system the contractor preferred, the capacity, single or variable speed motors, and the efficiency of the system. Both participating and non-participating contractors’ estimates for total costs largely aligned with the DFHP Pilot cost caps. The Pilot had original targeted for contractors to install no more than a two‑ton system and keep total installation costs at or below $12,000. Four interviewed contractors reported that basic DFHP systems with minimal installation barriers typically range from $7,000 to $9,000. Six contractors said that the total cost of a typical 2-ton system generally falls between $12,000 and $14,000. On the high end, two contractors noted that final costs for high-efficiency or inverter-driven models can reach $17,000 to $25,000. Contractors in the Mid‑Willamette Valley and Central Oregon felt these parameters were reasonable. However, a Portland‑area contractor said the cap forced them to use equipment that was less advanced than what they typically recommend. Several contractors noted that costs have increased 5–10% in the past year due to manufacturer price adjustments, with tariff impacts expected to raise prices further. On average, contractors estimated DFHP systems are approximately $1,500 more expensive than traditional air conditioning systems. These contractor estimates are similar to the tracking data reporting total installation cost provided by Energy Trust staff. The majority of systems installed fell at or below the $12,000 cost cap, though nine of the 51 DFHP systems provided in the tracking database had total installed costs exceeding the Pilot cap ($12,000). 17 The most 17 The Pilot allowed this flexibility with the $12,000 cap due to these later period installations.
  9. Page 26 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 26 of 47 expensive DFHP systems were still less than ten percent above the price cap and eight of the nine systems were installed more recently (after May 2025). This timing is relevant as contractors had noted the recent and substantial price increases for these systems. Figure 5 Total Installed Cost for DFHP Systems (n=51) 40 34 Participant Count 35 30 25 20 15 10 9 8 5 0 $9k-$11k $11k-$12k $12k-$13k DFHP Cost Range 5.3.3 Switchover Temperatures Contractors consistently reported that 35°F is the most common switchover temperature used for DFHP systems, aligning with Energy Trust Pilot guidelines. The switchover temperature Pilot staff initially recommended and which contractors followed is consistent with the findings from a new study conducted for NEEA on DFHP performance. 18 For extended-capacity or variablespeed systems, switchover points are often set lower—typically between 15°F and 20°F, depending on the equipment and the home’s insulation and comfort needs. Some installers adjust settings slightly higher (up to 40–45°F) when homeowners prefer warmer indoor temperatures or when fuel costs make early gas engagement more economical. According to interviewed contractors, while a few customers requested to fine-tune their switchover temperatures, most leave the settings as installed. Contractors typically advise against homeowner adjustments, explaining that improper changes can reduce efficiency and extend warm-up times. Only one DFHP survey respondent indicated making a change to the switchover temperature though the new temperature they provided was 35°F, the same as the Pilot recommended temperature. 19 Dual-Fuel Heat Pump Systems Analysis, Larson Energy Research, September 4, 2025. https://neea.org/wp-content/uploads/2025/09/Dual-Fuel-Heat-Pump-Systems-Analysis.pdf 19 One other respondent indicated they changed the switchover but the temperature they provided, 67, would indicate they confused the switchover with the heating setpoint temperature. 18
  10. Page 27 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 27 of 47 5.3.4 Thermostats As a learning outcome from this Pilot, Energy Trust is interested in what systems were installed and are typically recommended or used by trade ally contractors. Further, system information like thermostats will allow greater insights from the second phase of this study where an impact analysis is planned. Contractors all had one or two thermostats they recommend for customers, with Honeywell and Ecobee being the most commonly recommended to customers, as shown in Table 6. According to program tracking data, the thermostats installed for all participants (not just survey respondents) tended to be almost exclusively Ecobee, with two Honeywell and two heat pump system manufacturer-specific. Table 6. Thermostats Recommended by Interviewed Contractors and Installed by Pilot Thermostat Number of Recommendations Installed in Pilot (tracking data) Honeywell (Pro / T6 / 8000) 6 2 Ecobee 5 47 OEM specific 3 2 (Carrier, Lennox) Contractors cited the benefits of Honeywell thermostats, describing their reliability, ease of programming, and compatibility with outdoor sensors for accurate switchover control. Ecobee thermostats were found to be popular among tech-oriented homeowners due to mobile app access, though a couple of contractors noted reliability issues in rural areas where Wi-Fi connectivity is weak. In these locations, Wi-Fi-based thermostats may pull outdoor temperature data from remote weather stations, which can result in inaccurate readings and poor switchover performance. Some manufactures of DFHP systems such as Lennox, Mitsubishi, American Standard, or Daikin require system-specific thermostats. Contractors valued these for their seamless integration and reduced setup errors. In contrast, Nest thermostats were repeatedly flagged as problematic and unable to manage a dual fuel system properly. One contractor stated this should be addressed with the upcoming 4th generation model. Pilot Implementation and Delivery: Late Stage The following section details the late stage of Pilot delivery which mostly involves the Pilot and DFHP system experience from the end user perspective, including the participants’ experience and satisfaction with their DFHP systems and the key benefits and challenges. The bulk of the feedback for this section came from the participant survey, though contractor interview feedback is included where relevant. 5.4.1 DFHP Experience and Satisfaction Consistent with the primary Pilot objective of providing access to cooling to a vulnerable population, households reported that the improved comfort due to the DFHP’s cooling capability was the greatest benefit. A majority (26 of 28 responding to this question) of DFHP participants highlighted their increased home comfort after receiving AC with several (n=4) specifically noting no longer needing to use “inconvenient window AC units.” Other notable benefits

Text of CLF-011 Attachment 31.pdf

Extracted from the file · 65 pages · 155,190 characters

Text of CLF-011 Attachment 32.pdf

Extracted from the file · 11 pages · 34,299 characters

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)