Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy8 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files8

Text of CLF-011 Attachment 28.pdf

Extracted from the file · 4 pages · 6,964 characters

Text of CLF-011 Attachment 29.pdf

Extracted from the file · 5 pages · 11,434 characters

  1. Page 38 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 38 of 47 5.5.6 Contractor Insights on DFHPs by Region Our team interviewed contractors from around Oregon, including three from the Portland Metro Area, four from the Mid‑Willamette Valley, three from Central Oregon, and two from Southern Oregon. Though these markets sit within the same state, they represent notably different climate zones, housing stock, dominant heating fuels, and customer motivations—each of which shapes how DFHPs are positioned and sold. Portland Metro Area In the Portland Metro Area, contractors often frame heat pumps and DFHPs through an environmental and electrification lens. They describe customers, especially those with rooftop solar, as interested in reducing or eliminating fossil fuel use, and they use DFHPs to show a practical path toward that goal while keeping flexibility. The pitch often includes the ability to switch between electricity and gas to take advantage of price fluctuations. For Portland area communities reliant on propane for heating, DFHPs also help take advantage of energy-efficient heating in the warmer winter months and reduce reliance on a more expensive fuel. Contractors in Portland point to the limitations of the area’s older housing stock. Many homes have outdated electrical panels, minimal insulation, or single‑pane windows, and these conditions can complicate DFHP adoption or performance. Where customers proceed, installed costs for a new heat pump were cited as markedly more expensive than other areas, ranging from roughly $13,000 up to $25,000. Mid‑Willamette Valley In the Mid-Willamette Valley, contractors describe DFHPs as well‑matched to the local climate and a solid option for households that want to add cooling. Although DFHPs cost more than installing AC alone, sales staff say customers respond to the resilience and control that come with fuel‑switching and backup heat. This is especially true for the number of households relying on propane in their area. These customers like the ability to rely less on propane day‑to‑day while retaining the furnace for very cold snaps or power outages. Reported install costs in the area vary: one contractor cited completed projects as low as about $7,000, while others—who favor variable‑speed systems—put typical totals closer to $12,000–$14,000. Central Oregon Central Oregon contractors generally see the region’s colder winters as a reason not to recommend DFHPs, except in the case of a home relying on bulk fuels, which was one company’s sales strategy for a couple of years. Two of the three interviewed contractors believe that the technology does not perform as well in their climate zone, where extended subfreezing temperatures are common. In addition, DFHPs are viewed as too expensive for households that simply want to add cooling capacity to an existing home, with one contractor saying that “the equipment cost and installation complexity made [DFHPs] impractical” for most retrofit scenarios. Another mentioned that many of the homes they service have furnaces configured in a downflow arrangement. This setup, he explained, can make DFHP retrofits more complicated and
  2. Page 39 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 39 of 47 expensive because airflow and duct layout need to be carefully redesigned to avoid performance losses. Contractors, when selling DFHPs in this area provide extensive education on the maintenance needs of the system in winter, reminding customers to keep the outdoor unit clear of snow and ice to ensure proper airflow. Southern Oregon Contractors in Southern Oregon are particularly excited about DFHPs. Much of their territory is rural, and customers value the chance to use less propane, and in some pockets, heating oil, without giving up the security of a combustion backup. Pure heat pump solutions are considered risky because winter lows can drop to around −10°F; in those conditions, a DFHP is viewed as the practical choice. One contractor recounted cases of significant winter bill shock— January and February bills around $800—when households relied on the wrong configuration. They also note that DFHPs can work well in manufactured housing and can complement hydronic radiant (hot‑water floor) heating when designed appropriately. Comparison of Energy Trust Heat Pump Pilots Energy Trust is currently administering two distinct heat pump pilots, this DFHP and a No-Cost Pilot. There are some commonalities and some differences between the two offerings, as summarized in Table 10 below. The DFHP has (at least in the earlier phases) more stringent eligibility requirements while the No Cost distinction is that it collaborates with regional and local community-based organizations to help deliver the Pilot. The No Cost Pilot has experienced high participation rates and experienced greater enrollment relative to the DFHP. Table 10 Concurrent Energy Trust Heat Pump Pilots Pilot Element House type Vintage Existing Heating System Type Existing Cooling System Heat Pump System Type DFHP No Cost HP Pilot No AC Single family, Small MF < 5 units, larger affordable MF Any Any electric or bulk fuel (no natural gas) Any Single family Any Furnace <= 5 years old Central ducted HP only Central or Ductless Low-income only (later relaxed) Low-income only Building condition Sufficiently Weatherized Project cost cap $12,000 Sufficiently Weatherized $7,200 for a DHP $17,500 for a HP Income Secondary infrastructure upgrades: Electric Panels and Ductwork Did not require significant upgrades that would result in costs above the maximum incentive Do not require upgrades
  3. Page 40 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 40 of 47 Design Inception Limited to approved Energy Trust TA list (n=7) Senior Executive (top-down) Delivery Partners PMC only PMC and CBO Utility Involvement Indirect N/A Trade Ally (contractors) pool Open to Energy Trust TA’s Standard bottom-up
  4. Page 41 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 41 of 47 6. Conclusions and Recommendations The Dual Fuel Heat Pump (DFHP) Pilot delivered "life-changing" cooling benefits to customers while facilitating a deeper understanding of DFHP systems, perceptions, and usage. Despite the complexity of coordinating five partner utilities among other stakeholders, the Pilot delivered high-quality DFHP system installations that provided high value to participating homes at no cost to the resident. However, the Pilot’s overall performance was dampened by a design process that initially prioritized strict eligibility requirements over technical feasibility. This dynamic resulted in recruitment bottlenecks that required mid-pilot adjustments to mitigate and resolve. While participants were very satisfied with the Pilot and the addition of summer cooling benefits, the evaluation revealed participants concerns regarding heat pump heating performance, anxiety regarding increased winter electric bills, and some minor confusion around operation and settings. The following conclusions and recommendations are structured differently than in the Executive Summary. This final report section reviews the key benefits and successes of the Pilot, along with challenges according to each of the primary groups involved in the DFHP Pilot. We include relevant recommendations accompanying each subsection. The Pilot Overall (Program Staff) Key Benefits and Successes: The primary success of the Pilot administration was staff’s iterative responses to recurrent challenges. When initial strict eligibility criteria threatened to stall the pilot, staff successfully diagnosed the bottlenecks and relaxed income limits and furnace age requirements, which provided the biggest bump in participant enrollment. Key Challenges: The key challenges to delivery of the Pilot were conflicting goals and recruitment barriers. Staff noted a mismatch in goals where the initial design objectives focused on serving low-income households conflicted with the staff’s need for technical learning. This divergent design created a needle in a haystack recruitment scenario and the qualification criteria—specifically requiring low-income participants, a newer gas furnace, and no existing AC—proved too restrictive. Staff identified recruitment as the Pilot’s primary constraint, ultimately leading to an extended pilot duration. Recommendations: • Formalize Protocols for Mandate-Driven Pilots: Develop a clear process and decision-making framework for all pilots while ensuring this process captures pilots initiated by leadership requests and external partners. This path should define the primary strategic goal (e.g., equity vs. technical learning) at the outset to ensure resources and design requirements align with that objective. Utility Partners Key Benefits and Successes: The Pilot successfully brought together five utilities across electric and natural gas industries. Utilities recognized the value of the collaboration, with some praising Energy Trust for doing "a great job of facilitating conversations" that were technically complex and required fuel-neutral facilitation. Key Challenges: While utilities participated in design sessions, many felt the process was prescriptive rather than collaborative. Partners reported that their input on important elements
  5. Page 42 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 42 of 47 (such as income targeting and AC requirements) was not incorporated, leading to a feeling that the pilot was trying to please too many stakeholders rather than optimizing for successful delivery of the Pilot. There were gaps in coordination and communication during implementation, mostly attributable to focusing on deeper recruitment. Utilities reported receiving infrequent updates and often had to proactively solicit information regarding participation numbers and project status. Partially stemming from these challenges and partially from interest in retaining control over their own pilots, some utilities opted to run their own DFHP Pilots to test this technology themselves. Recommendations: • Strengthen Stakeholder Communication and Collaboration: Establish a formal communication cadence (e.g., quarterly reviews) with utilities. Future co-developed (or codesigned) Pilots should ensure bi-directional collaboration, allowing utilities to have a voice that may contribute to design conditions that might avoid misalignment with consumer and market realities. Contractors Key Benefits and Successes: Contractors were strong proponents of the technology for specific use cases, viewing DFHPs as a "best of both worlds" solution for resilience against power outages and extreme cold. Once assigned a project, contractors reported that the installation process was generally smooth and efficient, describing it as "well-refined". Contractors were also aligned with program requirements and with technical best practices by standardizing system sizing around a 30°F balance point and a 35°F switchover temperature to maximize economic efficiency (also consistent with a recent NEEA study, noted earlier). Key Challenges: Contractors expressed frustration that they were not permitted to recruit their own participants. Contractors felt this no-recruitment policy was a missed opportunity, limited the program's reach, and left them waiting for leads that often did not materialize. The $12,000 cost cap was viewed as problematic, particularly in the Portland Metro area. It forced some contractors to install equipment "less advanced than what they typically recommend" (e.g., single-stage vs. variable-speed). Early in the pilot, contractors noted that paperwork was burdensome and payments were delayed, creating cash-flow challenges since they had to front the upfront cost of the system and installation. Recommendations: • Enhance Cost Flexibility: Re-evaluate rigid per-unit cost caps. Future programs should allow for cost variability based on regional pricing and equipment tier (e.g., variable speed) to ensure the best technical solutions are applied. Further, as future pilots may expand eligibility from purely income-qualified to market rate customers, consider including partial cost contributions/offsets from market rate customers to stretch or augment program budgets. • Consider Contractor Engagement for co-design and eventual Lead Development: Leverage the trade ally network by partnering with contractors early in the design phase. Contractor inclusion can help determine the overall number of potentially eligible households, assess the viability of reaching program targets based on that population size, and identify neighborhoods that may represent attractive prospective participants for a pilot. A pilot or program can authorize trade allies to mine their own databases and perform technical pre-screening (the physical equipment eligibility criteria) to identify the specific housing characteristics required,
  6. Page 43 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 43 of 47 effectively acting as funnels for eligible homes. Once a candidate is identified, contractors can facilitate a warm handoff to program staff for eligibility (i.e., sensitive income verification), leveraging their trusted relationship to validate the no-cost offer which customers otherwise viewed as too good to be true. The program should also ensure short debriefs or feedback loops for rejections, to ensure trade ally awareness of why the customer was rejected to avoid discouragement of continued lead development. Customers (Participants) Key Benefits and Successes: Participant satisfaction with the Pilot and with DFHP systems was overwhelmingly positive, driven primarily by the addition of central air conditioning. Prior to installation, many participants found relief in public spaces during summer heat waves relative to their homes; post-installation, this dynamic flipped, with homes the more comfortable option. Participants also rated the Pilot and installation experience highly, noting installers were polite and efficient and the process smooth and seamless. Key Challenges: Despite pre-installation awareness and communication, the most significant customer concern was financial anxiety regarding winter operations. Several participants noted concerns around the expense of running the heat pump in winter relative to previous gas furnace. Some participants perceived the heat pump as heating the home more slowly than their previous gas furnace, sometimes struggling to meet setpoint temperatures or providing cooler supply air than they are accustomed to with their gas furnace. A small cohort reported confusion regarding thermostat settings and how to maximize energy savings. Recommendations: • Refine Customer Education: Provide detailed post-installation training materials (leavebehinds) that specifically address thermostat operations, switchover settings, and expectations regarding heating speed. • Address Winter Cost Anxiety: Future messaging must balance cooling benefits with realistic education about potential winter bill increases. Program design should explore "smart switching" controls that utilize time-of-use rates to automatically prioritize the most economic fuel source. Outlook for DFHP and the Program Conclusion: The market for DFHPs shows cautious optimism but currently remains a niche offering constrained by customer economics. While the DFHP technology delivers high satisfaction for cooling and resilience, widespread adoption is stalled by high upfront costs and the concern that operating costs (electric bill rates) may increase in regions with continued low gas rates. Technical analysis from a recent NEEA study confirms that sizing systems correctly (30°F balance point) and utilizing smart controls can contribute to a more effective system allowing the economics to work for the average consumer. The second phase of this study, exploring the system performance and energy use changes associated with the DFHP will help reveal additional insights, complemented by findings from this first phase study. Recommendations: • Target Resilience and Bulk Fuels: Marketing and program design should specifically target rural regions and homes dependent on expensive delivered fuels (propane/oil). In these
  7. Page 44 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 44 of 47 markets, the economic case for fuel-switching is strongest, and the resilience against power outages and extreme cold provides a clear value proposition. • Implement Smart Switching: To make DFHPs viable for a broader population, future offerings should leverage "smart switching" controls. Utilizing real-time Time-of-Use (TOU) rates or GHG signals to control fuel selection can significantly reduce consumer costs and emissions compared to simple temperature-based switchover.
  8. Page 45 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 45 of 47 Appendix Demographics Apex summarized the demographics of survey respondents. 100% (n=29) of DFHP respondents were English speaking. Only three of the 29 indicated having changed the occupancy of their home during the Pilot. A majority of respondents were white or European-American (n=25). Table 11 DFHP Respondent Ethnicity Ethnicity White or European-American White or European-American, Hispanic or Latino White or European-American, Japanese Filipino Prefer not to answer DFHP Pilot Count 25 1 1 1 1 Household (Participant Intake Data) The following tables summarize the characteristics and demographics of the participant homes based on the provided customer tracking data. DFHP system efficiency varied across the installations, with the average SEER2 cooling efficiency of 8.4 and a HSPF2 heating efficiency of 15.4. Figure 11 HP Efficiency (SEER2 and HSPH2) for DFHP Systems 12 11 HSPF2 10 9 8 7 6 12 14 16 18 20 22 24 SEER2 Red circle represents Pilot average Home Vintage and Size The vast majority of projects involve older single-family detached homes, with a median age centered around the 1920s to 1950s. The data shows a high prevalence of homes built between
  9. Page 46 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 46 of 47 1920 and 1979. Almost all recorded projects are for "Single-family detached home.” Only three entries listed "Multifamily home.” Conditioned square footage was varied, from a low of 744 sq ft to a high of 3,000 sq ft. Table 12 Home Vintage and Size Count (N=38 Average Conditioned Square projects) Footage (HH SQ Ft) 6 ~1300 sq ft (range: 927 to 1,616) 8 ~1420 sq ft (range: 748 to 2,472) 10 ~1480 sq ft (range: 744 to 2,468) Home Year Built Range (Approx.) 1906–1920 1925–1937 1940–1958 1965–1998 13 ~1800 sq ft (range: 1,050 to 3,000) 2000–2021 5 ~1630 sq ft (range: 1,209 to 2,100) Note: Three entries had a NULL value for HomeYearBuilt. Geographic Distribution (Major Locations) The majority of projects are concentrated in the Portland metropolitan area. Outside of Portland, clusters of Pilot installation occurred in Bend and Klamath Falls, suggesting there was some differentiation in regional coverage beyond the primary Portland metropolitan area. Table 13 DFHP Pilot Geographic Distribution Project Count City (Approx.) Portland (and surrounding areas) Bend Klamath Falls Salem Redmond 29 10 4 4 4 Existing Conditions and Improvements Existing Heating and Cooling: • Prior Cooling: The most commonly listed pre-existing cooling system was Portable or window AC, or Fan(s) (ceiling, box, window). One respondent noted having an evaporative cooler. • Supplemental Heat: Several homes used auxiliary heat sources, including electric wall or space heater(s) and wood stove/fireplace or gas fireplace. Recent Home Improvements: • 10 respondents made recent home improvements. • The most common improvements cited were roofing, windows, and insulation (including attic insulation) and one rooftop solar array.
  10. Page 47 of 47

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 47 of 47

Text of CLF-011 Attachment 31.pdf

Extracted from the file · 65 pages · 155,190 characters

Text of CLF-011 Attachment 32.pdf

Extracted from the file · 11 pages · 34,299 characters

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)