Interrogatory responses
Answers to questions 11
Files8
CLF-011 Attachment 25.pdf
PDF · 1.7 MB · 5 pagesText searchable
Download CLF-011 Attachment 25.pdfRead the text of CLF-011 Attachment 25.pdf
CLF-011 Attachment 26.pdf
PDF · 876 KB · 4 pagesText searchable
Download CLF-011 Attachment 26.pdfRead the text of CLF-011 Attachment 26.pdf
CLF-011 Attachment 27.pdf
PDF · 1.6 MB · 3 pagesText searchable
Download CLF-011 Attachment 27.pdfRead the text of CLF-011 Attachment 27.pdf
CLF-011 Attachment 28.pdf
PDF · 1.5 MB · 4 pagesText searchable
Download CLF-011 Attachment 28.pdfRead the text of CLF-011 Attachment 28.pdf
CLF-011 Attachment 29.pdf
PDF · 1.7 MB · 5 pagesText searchable
Download CLF-011 Attachment 29.pdfRead the text of CLF-011 Attachment 29.pdf
CLF-011 Attachment 30.pdf
PDF · 4.9 MB · 47 pagesText searchable
Download CLF-011 Attachment 30.pdfRead the text of CLF-011 Attachment 30.pdf
CLF-011 Attachment 31.pdf
PDF · 4.5 MB · 65 pagesText searchable
Download CLF-011 Attachment 31.pdfRead the text of CLF-011 Attachment 31.pdf
CLF-011 Attachment 32.pdf
PDF · 1.6 MB · 11 pagesText searchable
Download CLF-011 Attachment 32.pdfRead the text of CLF-011 Attachment 32.pdf
Text of CLF-011 Attachment 28.pdf
Extracted from the file · 4 pages · 6,964 characters
Text of CLF-011 Attachment 29.pdf
Extracted from the file · 5 pages · 11,434 characters
Page 8 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 8 of 47 Memo To: Board of Directors From: Cody Kleinsmith, Evaluation Project Manager Andrew Shepard, Senior Project Manager - Residential Marshall Johnson, Sector Lead - Residential cc: Date: March 27, 2026 Re: Staff Response to Phase One of the Dual-Fuel Heat Pump Pilot Evaluation The Dual-Fuel Heat Pump Pilot originated out of joint interest from Energy Trust, the Oregon Public Utility Commission (OPUC), and utilities in studying the emerging heating, air-conditioning, and ventilation (HVAC) system configuration and fit within Energy Trust’s Residential program portfolio in 2022. This memo recaps phase one of the pilot evaluation, with phase two slated to begin in Q4 2026. Phase one of the evaluation studied the pilot development and administration process, the customer sentiments about their installed measures, and trade ally perspectives on the pilot and technology overall. The pilot’s design was collaboratively developed between Energy Trust, the OPUC and utilities. The resulting customer and site eligibility requirements attempted to balance multiple objectives and priorities, which included both developing effective technical learnings and serving customers experiencing low incomes. This resulted in difficulties in identifying eligible customers and a large number of disqualifications among customers who submitted applications. Eventually, income, furnace age and presence of air-conditioning eligibility requirements were relaxed to prioritize measure installation while maintaining the key requirements for an effective technical study. This allowed the pilot to recruit from a wider pool of potential participants and the number of installations steadily increased. To address pilot design challenges in future pilots Energy Trust will center discussions internally and with external collaborators around core research objectives first. As additional objectives arise during pilot development, the pilot team will employ iterative reviews of these objectives to determine if they conflict or align with the core research objectives. In addition to difficulties with identifying eligible customers, Energy Trust staff and trade allies also observed a lack of trust from customers who were identified as eligible. Many potential participants expressed that the program seemed “too good to be true” due to Energy Trust paying for the entire cost of the equipment and installation. In future pilots where Energy Trust identifies that program skepticism may be a barrier to recruiting participants, Energy Trust will identify and utilize different recruitment and marketing approaches. These approaches may include incorporating community-based organizations (CBOs) as recruitment and delivery partners, which has been successful in other pilots and programs where Energy Trust pays the full cost of the measures. The customers who participated in the pilot expressed high satisfaction with the participation process and high satisfaction with the addition of central cooling to their home. If the pilot leads to a broader offering, this finding will inform future dual-fuel heat pump marketing strategies and campaigns by targeting areas where fewer homes have central cooling, centering the cooling benefit in marketing materials and encouragingPage 9 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 9 of 47 contractors to provide dual-fuel heat pump quotes to customers looking to replace their air conditioning systems. Customers who participated in the pilot expressed some uncertainty about how to operate their systems effectively after they were installed. Energy Trust developed several educational resources for customers including a frequently asked questions page on its website, on-demand call center support and information included on forms and recruitment materials. However, customers still expressed a lack of knowledge about the resources available to them and how to access them. As part of its HVAC Advocate Pilot in 2026, Energy Trust will explore how to better direct customers to resources and will provide a wide range of resource types for all accessibility levels. This may include printed brochures and leave-behinds, more in-depth education administered directly by program staff, or other support strategies. Some participants expressed concerns about the changes to their winter heating bills. Potential utility bill impacts were highlighted in recruitment materials and during on-site visits from Energy Trust staff, however participants still expressed anxiety about the scale of these impacts or how they may show up in their home. The scale of utility billing impacts as a result of this pilot will be studied in depth in phase two of the evaluation. As Energy Trust conducts that research and determines the future fit of dual-fuel heat pumps in the Residential Program portfolio, we will determine if additional research on smart controls that select the most cost-effective fuel source and time-of-use rates is an effective way to counteract participants’ winter heating cost anxieties. Energy Trust will begin phase two of this pilot evaluation in Q4 2026. This second phase will evaluate the energy use impacts, energy cost impacts, peak demand impacts and greenhouse-gas emission impacts of the installed dual-fuel heat pump measures for both electric and gas utility fuels. The information gathered from both the first and second phase of the pilot evaluation will be used to determine the measure fit within Energy Trust’s Board policies, regulatory framework and implementation of the 2025-2030 Strategic Plan and 2026-2030 Multiyear Plan. Results from the second phase of the evaluation are expected to be published in Q2 2027.Page 10 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 10 of 47 1. Introduction This report details the process-oriented findings for Energy Trust of Oregon’s Dual Fuel Heat Pump Pilot (DFHP) evaluation. The report provides details on Pilot history and design and includes insights from qualitative feedback from three groups of stakeholders (internal, implementation, and utility staff), participating trade ally and non-participating HVAC contractors, and an online survey to capture insights into the participant experience and satisfaction with the DFHP pilot. 2. Background Energy Trust, in partnership with the five investor-owned utilities whose customers fund Energy Trust’s programs and the Oregon Public Utility Commission (OPUC), is exploring the feasibility of developing DFHPs as a future Residential measure in Energy Trust’s portfolio. The goal of the DFHP Pilot is to collect information about the existing market and real-world behaviors of DFHP systems to inform future decisions of their applicability to the Energy Trust Residential program. Energy Trust approaches this pilot as an objective facilitator of data collection and analysis, not as an advocate nor opponent to this technology. DFHPs are flexible combined building heating and cooling systems: DFHP’s offer dual-source heating through an electric central air source heat pump and a natural gas forced air furnace while also delivering summer season cooling through the electric central air source heat pump. The DFHP operates like any other central air conditioning system in the summer, pushing warmer air outside and cooler air inside. As the outdoor temperatures drop and the demand for heating increases, the DFHP system effectively runs in reverse, pumping warm air into the home and purging colder air out of the home. The DFHP system – through a connected thermostat – selects which heating system to run based on a set switchover temperature. A switchover temperature establishes the outdoor temperature at which the system switches from running the heat pump condenser to the natural gas furnace. The advantages of DFHP systems is that they may avoid more substantial electric panel upgrades and offers the flexibility of running the most efficient system during the appropriate season to provide the best home space conditioning comfort while also limiting exposure to high utility bills. Figure 1. DFHP System Source: https:/Page 11 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 11 of 47 www.familyhandyman.com/article/heat-pump-furnace-dual-fuelsystem/?srsltid=AfmBOopawBTXMbXd0Qv4PEYDFW5Mm6xVAEfVuGF8aKEpZ-dkJjeq0-WG While Energy Trust supports both natural gas and electric efficiency measures, consistent with board policy (as noted above) it does not promote switching from one fuel to another. As a result, offering DFHPs requires a level of coordination between Energy Trust and its funding utilities that is distinct from other measures. 9 The DFHP Pilot initially set numerous building, household, homeowner, and other enrollment requirements. These requirements posed challenges to initial qualification and participation, and Energy Trust updated many of them mid-Pilot to increase the pool of eligible participants. Table 1 summarizes the key Pilot elements and the requirements for those elements for qualification and enrollment. A more detailed discussion of each of these elements is covered in the findings section, while a comparison of these qualifications relative to a concurrent Energy Trust Pilot is included in the final report section below. Table 1 Energy Trust DFHP Pilot Characteristics Pilot Element Requirement Details DFHP system cost cap Max of $12,000 Total install cost should not exceed $12,000 DFHP system capacity 2-ton (24,000 btu/hr) Switchover temperature 35°F House type Single family House vintage Any Existing Heating System Type Furnace <= 5 years old Existing Cooling System No AC Heat Pump System Type Central ducted HP only Income Building condition Secondary infrastructure upgrades: Electric Panels and ductwork Low-income only Later relaxed to allow several townhome units Initially post-1970 as proxy for weatherized home but never enforced Requirement later relaxed to 10 years Requirement later relaxed to allow AC but not-in-working order Requirement later relaxed to allow moderate then no income requirements Sufficiently Weatherized Budget cap limited Did not require significant upgrades that would result in costs above the $12,000 maximum incentive Energy Trust paid 100% of the equipment and installation cost (including labor and necessary secondary infrastructure upgrades), up to a maximum of $12,000 per unit. A limited, prequalified group of installation contractors determined the appropriate sizing and settings for the DFHP system. The program expected most systems to be two-ton (24,000 btu/hr) capacity. DFHP systems were also expected to have a switch-over temperature to the gas furnace set 9 https://www.energytrust.org/wp-content/uploads/2016/11/4.03.000.pdfPage 12 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 12 of 47 between 30-and 40-degrees Fahrenheit outside air temperature (depending on site and heat pump characteristics). 3. Evaluation Research Objectives Energy Trust and co-funding utility partners identified four core research objectives for the DFHP Pilot. The overarching research objective was to develop a broad understanding of the existing DFHP market, real-world usage of these systems, and behaviors by users of these systems to inform future decisions of their applicability to the Energy Trust Residential program. A secondary research objective was to provide insights to all organizations involved by evaluating the successes and challenges of the Pilot. Apex therefore focused the specific DFHP Pilot research on assessing perceptions, experience, usage and satisfaction with DFHP systems across participants (customers), contractors, Energy Trust staff and utility partners. A summary of the four research objectives and the associated research activities are summarized in Table 2 below. Table 2. DFHP Pilot Phase I Evaluation Research Objectives Research Objective Program perspectives on the costs, challenges, and process considerations with installing DFHP systems. Pilot Data and Document Review Staff, PMC, and Utility Interviews Contractor Interviews Customer perspectives on the benefits and costs of DFHP systems. Customer insights, experience, and satisfaction in the Pilot (recruitment, scheduling, installation, operation). Broader market activity, motivations, barriers and costs of DFHP installations occurring outside of Energy Trust’s Pilot. 4. Participant Surveys Research Tasks To address the objectives of this evaluation, Apex conducted data and document reviews, staff and contractor interviews and participant surveys, as detailed below. Pilot Data Review Apex reviewed program documents and the three “touchpoint” data sources (including installation/contractor invoices) to capture a holistic view of all Pilot data. As part of this process, Apex categorized the detailed notes from the data sources to identify commonalities while capturing anecdotes to share with Energy Trust staff. Through this review, Apex conducted a qualitative thematic analysis to synthesize findings across all data collection activities. We also reviewed program documents (implementation plans, Pilot objectives, logic models, customer facing promotional releases).Page 13 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 13 of 47 Staff Interviews Apex conducted interviews with respondents from Energy Trust, the Program Management Contractor (PMC) CLEAResult, and utilities (summarized in Table 3). Apex developed a single interview guide including broad questions applicable to all interviewees as well as more targeted questions relevant to staff in each organization. Apex recruited, scheduled, and conducted one-on-one interviews with Energy Trust staff (n=5), with CLEAResult staff (n=3), and utility staff (n=5). Table 3 DFHP Staff Interview Summary Completed Interviews Time Period Pilot Role Energy Trust 5 March-April 2025 pilot design CLEAResult (PMC) 3 April-May 2025 pilot delivery Utility 5 June-July 2025 pilot design Staff Installation Contractor Interviews Contractors play a significant role in shaping customer expectations, experiences, and understanding of DFHP technology. The Apex team attempted to conduct interviews with all seven partnered contractors participating in the pilot, ultimately interviewing three. In addition, our team interviewed ten non‑participating contractors. The non‑participant contractors were trade allies that Energy Trust and CLEAResult identified as likely installing DFHPs outside of the Pilot with knowledge of the market and were selected to be representative of the Pilot geographic distribution as well. The contractors interviewed represented technical, on the ground estimators and installers (2), sales staff (4), managers (4), and general managers (3) from companies with experience selling and installing DFHPs. Contractors received a $100 gift card for completing an interview. The sample frame and the number of interviews completed by region and pilot participation are included in Table 4, below. Table 4. Contractor Interviews by Participation and Region Sample Frame Region Completed Interviews Participant NonParticipant Participant NonParticipant Central 1 2 1 2 Mid-Willamette 2 5 1 4 Portland Metro 2 8 1 2 Southern 2 4 0 2 Total 7 19 3 10 Apex worked with the implementation contractor to make warm introductions and made multiple attempts to reach participating contractors. Yet, it was challenging to reachPage 14 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 14 of 47 participating contractors for a variety of reasons, including firms changing ownership, data collection during the busy spring and summer season, and difficulty reaching appropriate individuals within contractor organizations. Ultimately, we were unable to reach several contractors despite over five recruitment attempts to schedule an interview. Contractor interviews focused on understanding the heat pump and DFHP market and documenting participating contractors’ experiences with the pilot. Interviews also explored contractors’ perspectives on the communities and climate regions they serve, the homes where they typically work, necessary upgrades, and the applicability of DFHPs. Specific areas of inquiry included whether a two‑ton system was expected to meet local heating and cooling needs, the size and condition of existing ductwork, and how often contractors encounter barriers to DFHP installation in the homes they service. We also asked about current and projected DFHP sales, how contractors compare DFHPs to other HVAC options, and—among participating contractors—their views on pilot communications, customer suitability and education, quality control processes, customer satisfaction, and billing and payment timelines. Participant Surveys Evaluating the Pilot requires understanding participants' direct experiences with their DFHP systems. To capture these experiences, Apex designed a participant survey based on findings from the document review and staff interviews. Apex distributed recruitment emails to invite a census of DFHP Pilot participants to complete a 10-15 minute online survey through Qualtrics. Our initial target was an approximate 50% response rate given the benefits received through the pilot, advance notification about the survey as a requirement of program participation, and the offering of a generous incentive. Apex used the Tango Card service to distribute respondent incentives in the form of electronic gift cards redeemable at a wide variety of businesses. Given the lower than expected number of participants at the time of the survey (at the time of survey recruitment, there were 35 potential recipients out of a total of 51 who had eventually participated by this reporting timeframe in November 2025), we offered an increased, $75 incentive. The survey explored topics beyond the original primary research questions, including the following: • • • • • Participants’ adjustments to thermostat or DFHP settings Participants’ setback scheduling (evening, morning, workday) and any adjustments to these setbacks Need for contractor callbacks, the issues, and whether they had been resolved Participants use of the new air conditioning and benefits (health / safety / comfort) Participant perceptions of changes to energy bills As the DFHP Pilot participation fell short of program targets, we had limited ability to produce findings by segmenting participants into different segments and therefore the analysis lacks the potential to meaningfully differentiate findings across these groups. Yet, the very high response rate is notable at 83% (Table 5) and is a positive indicator of Pilot design and delivery.Page 15 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 15 of 47 Table 5 DFHP Participant Survey Disposition Participant Sample Frame (Population) All 5. 35 Successful Completes 29 Response Rate 83% Findings The findings presented below are structured to follow the general evolution and development of the Pilot. The section begins with a review of the Pilot design and planning stage, from inception and design and through the initial development phase. Most of this discussion stems from staff interviews and document review. The next section moves through the early aspects of implementation and delivery, including contractor and participant engagement and recruitment, enrollment, and installation from both participant and contractor interviews. The findings then delve into the installed DFHP systems including a review of system size, cost, switchover temperature, and thermostats. The system information came from staff and contractor interviews and is compared against actual program tracking data. The findings then shift to the late-stage implementation and delivery with perspectives from both participant and contractor lens through the system usage, operation, participant behavior, satisfaction, and includes feedback from participants and contractors alike. We end this section with a discussion of outlook on the DFHP market and for this Pilot and this technology in general and a brief comparison of heat pump pilots. Pilot Design and Planning The section begins with a review of the Pilot design and planning stage, from inception and design and through the initial planning development phase. Most of this discussion stems from staff interviews and document review. 5.1.1 Pilot Inception The DFHP Pilot was originally proposed in the fall of 2022 by Energy Trust senior executive staff with the goal of demonstrating Energy Trust’s commitment to serving low-income (LI) customers by offering free DFHP systems. The initial focus on LI households was particularly influenced by the 2021 "heat dome" event that was directly responsible for over one-hundred heat-related fatalities in Oregon, prompting a strong desire to provide air conditioning (AC) for vulnerable populations. 10 The Pilot was also a response to requests from the Oregon Public Utility Commission (OPUC) and various utilities to study DFHPs. Both gas and electric utilities expressed curiosity about the real-life implementation and usage of a DFHP solution. To date, Energy Trust has maintained a fuel-neutral policy to prohibit incentivizing or promoting one fuelsource over another; incentivizing dual-fuel systems was a new approach and opportunity to study the technology’s benefits and drawbacks. The Pilot moved into design and planning in 2023, which involved a co-design process for the DFHP Pilot where Energy Trust staff, five partner electric and natural gas utilities, and other stakeholders convened to determine the project's structure, eligibility requirements, and 10 "Heat Dome, 2021." Oregon Encyclopedia, www.oregonencyclopedia.org/articles/heat-dome-2021/.Page 16 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 16 of 47 objectives. The process yielded constructive outcomes while suffering from governance and decision-making challenges. Energy Trust staff facilitated the discussions, earning praise from stakeholders for handling "highly technical" conversations and balancing the competing priorities of all five utilities. Energy Trust staff also described the early design phase as successful and shared that all groups had an "equal opportunity for input.” Some utility partners indicated that Energy Trust’s high-level leadership had disproportionate influence on the pilot’s design. 5.1.2 Pilot Objectives From Energy Trust's perspective, the pilot aimed to inform technical knowledge about dual-fuel heat pump systems in residential applications. A staff member described the primary learning objective of the pilot: "What you're trying to understand is the basic interaction between this equipment, how does it function." The program also aimed to differentiate between installation issues and equipment performance in a controlled environment, with one staff member asking: "Is the main learning we didn't install them right? Or that we installed them right but they didn't perform the way we expected?" Additionally, Energy Trust viewed the pilot as an opportunity to improve utility collaboration practices and described a secondary goal of understanding “how to better coordinate with utilities to do a project like this.” Yet, there was some degree of misalignment of objectives across pilot design stakeholders. As one Energy Trust staff member explained, there was a "mismatch in goals” with "what a pilot is and should be used for." This resulted in a push for a focus on providing cooling to low-income customers. While staff acknowledged this showcased Energy Trust's community support and commitment to equity, they noted it conflicted with the traditional pilot objective of providing technical learnings. The low-income requirement constrained the participant pool, especially when combined with other pilot eligibility criteria like furnace age and lack of AC, limiting the pilot's ability to provide sufficient data for technical analysis. Both gas and electric utility representatives were interested in collecting data and learning about dual fuel heat pump applications. Utilities participated in the co-design stakeholder sessions. Their primary goal in participating in the pilot was to understand the implications of dual fuel heat pump systems on customers' homes, comfort, and bills. Program staff and utility stakeholders agreed that providing cooling benefits for customers was a central program benefit, especially after Oregon's 2021 heat dome event highlighted the need for air conditioning in some communities. Staff and stakeholders prioritized reaching customers who wouldn't otherwise have access to cooling. While providing cooling was an essential program outcome for the targeted population, program staff and stakeholders also recognized the risk of increasing customers' energy bills. As staff described, the challenge was providing cooling benefits while "doing no harm" and minimizing the impact to household utility bills. Utility motivations for participating in the pilot varied significantly by fuel type. Gas utilities approached the pilot with an interest in exploring emissions reduction strategies to meet statewide goals. In contrast, electric utilities were primarily seeking combination solutions with gas utilities to manage potential challenges related to electric peak load and supply. Combined utilities had a desire to learn how dual fuel systems could support both their electric and gas business.Page 17 of 47
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 30 Page 17 of 47 5.1.3 Eligibility and Recruitment The pilot established narrow participant eligibility requirements that created significant recruitment challenges. The Pilot originally targeted installing 90 DFHP systems for a specific home type: in more recently built (post-1970’s) low-to-moderate-income owner-occupied singlefamily homes with natural gas-heat (furnaces installed within the past five years). Homes had to be sufficiently weatherized, determined either by record of participation in a utility or Community Action Agency (CAA)-operated low-income assistance program or through an inhome audit. Other requirements included having compatible ducting and electric panels 11, lack of an existing central air conditioning system, and being a continuously occupied residence with 12+ months of associated natural gas and electric energy use data available. DFHP participants must also be customers of a participating electric (Portland General Electric or Pacific Power) and natural gas (NW Natural, Cascade Natural Gas or Avista Natural Gas) utility within Energy Trust service territory. An Energy Trust staff member identified income requirements as "the biggest thing" hindering recruitment efforts, although all eligibility requirements were obstacles to some degree. On the other hand, even with relaxing income requirements, the Pilot did not immediately or quickly meet enrollment goals. One staff member described how beyond the income requirement, each specific program requirement was picked out, to ensure quality of installations, minimize risk of technical issues and customer dissatisfaction, and create regular data for evaluation. • • • • Air Conditioning: “The aspect of not allowing AC in home, that was an aspect of, “if we’re putting in heat pumps, we don’t want to rip out good equipment, let’s go for homes that need the equipment.” From an evaluation point-of-view, we wanted all homes to meet this criteria, so we really leaned into ‘homes must not have ducted AC.’ Gas Furnace: The decisions around the technical criteria for the homes like the gas furnace needing to be 1-5 years old, that’s from how gas furnaces work with heat pumps, and gas furnaces can come with different types of motors. New gas furnaces have ECM motors, they work better with heat pumps and old furnace won’t be as efficient. We wanted the equipment to age out together, have furnace to be same vintage of heat pump, be the same age. Duct System: We wanted the ducting system to be in relatively good order, because heat pumps need a better duct system than gas furnace, need that better air flow. Super important in operation of HP. We thought people could have bad experiences if they have ducting that’s really bad and the heat pump doesn’t work, so we looked at homes with duct systems without high need of repair. Weatherization: Same reason we looked for some level of weatherization. Didn’t want to lose air through insulation or windows, hard for heat pumps to keep up. We had some evaluation led restraints, technical restraints, layer them all together, you have design of pilot." 200-Amp electrical panels were given preference over smaller panels which were assessed for eligibility on a site-by-site basis. 11
Text of CLF-011 Attachment 31.pdf
Extracted from the file · 65 pages · 155,190 characters
Text of CLF-011 Attachment 32.pdf
Extracted from the file · 11 pages · 34,299 characters
As listed on the current system
Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026