Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

  1. Page 1 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 36 Page 1 of 45 Colorado PUC E-Filings System Hearing Exhibit 103, Attachment JLC-1 Proceeding No. 23A-____G Page 1 of 45 Atmos Energy Colorado Natural Gas Market Potential Study – Clean Heat Plan Submitted by Apex Analytics LLC with Brightline Group December 29, 2023
  2. Page 2 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 36 Page 2 of 45 Hearing Exhibit 103, Attachment JLC-1 Proceeding No. 23A-____G Page 2 of 45 Table of Contents 1. Introduction .......................................................................................... 1 Project Overview.................................................................................... 1 Clean Heat Plan Incremental Energy Efficiency Potential ............................... 1 2. Creation of Clean Heat EE Portfolios .......................................................... 4 Approach ...................................................................................... 4 2.1.1 Development of Energy Efficiency Measures for Least Cost Portfolio .. 4 2.1.2 Development of Energy Efficiency Measures for Emissions Target Portfolio........................................................................ 5 2.1.3 Development of Energy Efficiency Measures for Preferred Portfolio .... 5 2.1.4 Development of Recovered Methane Resource Potential .................. 6 Resulting Portfolio Costs and Savings of EE Measures........................... 6 3. EE Pilot Program Descriptions and Assumptions .......................................... 7 Pilot Development Rationale ............................................................ 7 Gas Heat Pumps ............................................................................ 7 3.2.1 Opportunity Description ............................................................. 7 3.2.2 Barriers and Research Questions ................................................. 8 3.2.3 Estimated Costs and Savings ...................................................... 9 Manufactured Housing Early Retirement............................................. 9 3.3.1 Opportunity Description ............................................................. 9 3.3.2 Barriers and Research Questions ............................................... 10 3.3.3 Estimated Costs and Savings .................................................... 10 4. Recovered Methane .............................................................................. 11 Appendix 1: EE Potential Study Methods and Results ...................................... 13 1. Potential Study Methodology .................................................................. 13 Study Approach ................................................................................... 13 Overview .................................................................................... 13 Customer Segmentation and Forecast Disaggregation ........................ 15 1.2.1 Customer Segmentation .......................................................... 15 APEX ANALYTICS Page | i
  3. Page 3 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 36 Page 3 of 45 Hearing Exhibit 103, Attachment JLC-1 Proceeding No. 23A-____G Page 3 of 45 Technical Potential ....................................................................... 16 1.3.1 Measure Development ............................................................. 17 Economic Potential ....................................................................... 19 Achievable Potential ..................................................................... 20 1.5.1 Market Adoption Rates ............................................................. 21 2. Market Characterization & Baseline Forecast ............................................. 21 3. Residential Sector Potential ................................................................... 23 Program Achievable Potential ......................................................... 23 Maximum Achievable Potential ....................................................... 27 Comparisons ............................................................................... 30 4. Non-Residential Sector Potential ............................................................. 31 Program Achievable Potential ......................................................... 31 Maximum Achievable Potential ....................................................... 36 Comparisons ............................................................................... 39 Appendix 2: Top Measures – Program Achievable ........................................... 41 Appendix 3: Top Measures – Maximum Achievable.......................................... 42 APEX ANALYTICS Page | ii
  4. Page 4 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 36 Page 4 of 45 Hearing Exhibit 103, Attachment JLC-1 Proceeding No. 23A-____G Page 4 of 45 1. Introduction Project Overview Apex Analytics and its subcontractor Brightline Group (collectively, the “Apex Team” or the “Team”) performed the attached market potential study to inform Atmos Energy’s development of portfolios to fulfill the statutory requirements for a Clean Heat Plan (“CHP”). The Apex Team assessed the available technical, economic, and achievable energy savings potential from natural gas energy efficiency (“EE”) measures and technologies both as part of, and incremental to, those contemplated in Atmos Energy’s ongoing Demand-Side Management (“DSM”) Strategic Issues proceeding (Proceeding No. 23A-0216G). This 2023 CHP analysis version is based upon inputs and methodologies used in the 2022 market potential study analysis prepared by the Apex Team to inform Atmos Energy’s DSM program in compliance with § 40-3.2-103, C.R.S. and related rules and orders promulgated by the Colorado Public Utilities Commission (the “Commission”). This 2023 CHP study considered alternative scenarios with additional cost-effectiveness screenings and incentive levels as compared to the 2022 DSM analysis. Clean Heat Plan Incremental Energy Efficiency Potential Energy savings potential within the CHP study horizon of 2023 through 2032 is significantly larger than historical Atmos Energy DSM program results due to several primary factors: 1. As with the 2022 market potential study, more measures (including building envelope measures) pass the MTRC based on the social cost of emissions benefits being included. 2. Higher CHP incentives and program budgets enable higher achievements. 3. Compared to the 2022 market potential study, additional measures pass the CHP MTRC cost-effectiveness test because the economic screen threshold was dropped to a Total Resource Cost (“TRC”) benefit-cost ratio of 0.4 for program achievable and 0.01 for maximum achievable. To calculate incremental EE amounts available for the CHP portfolios, the Apex Team used the technical, maximum achievable, and program achievable levels of EE from this CHP EE potential assessment and subtracted out Atmos Energy’s existing DSM plans. Table 1 summarizes annual incremental energy savings available for the CHP (the first year savings of incremental participants in a program) by potential level APEX ANALYTICS Page | 1
  5. Page 5 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 36 Page 5 of 45 Hearing Exhibit 103, Attachment JLC-1 Proceeding No. 23A-____G Page 5 of 45 (technical, maximum, and program achievable); Table 2 summarizes cumulative energy savings potential (savings from measures installed in previous years with lifetimes extending to that year plus the new savings for new participants in that year); and Figure 1 compares the CHP energy savings potential to forecasted energy sales. Table 1: Annual CHP Incremental Energy Savings Potential for EE Measures by Potential Level Milestone Year Technical Maximum Achievable Program Achievable Annual Incremental Energy Savings (therms) 2025 2,744,287 1,402,500 800,000 2030 2,956,421 1,714,696 1,060,044 Annual Budget ($ Millions) 2025 n/a $9.8 $3.8 2030 n/a $11.6 $5.3 Table 2: Cumulative Energy Savings Potential by Potential Level Time Horizon Technical Maximum Achievable Program Achievable Cumulative (therms) APEX ANALYTICS 2023–2025 7,362,184 3,515,378 1,713,716 2023–2030 18,989,749 9,357,275 5,225,147 Page | 2
  6. Page 6 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 36 Page 6 of 45 Hearing Exhibit 103, Attachment JLC-1 Proceeding No. 23A-____G Page 6 of 45 Figure 1: Cumulative Energy Savings Potential as a % of Total Sales Forecast 14.0% 12.9% 12.0% 10.0% 8.0% 2025 6.0% 4.0% 2030 6.4% 5.4% 3.5% 2.0% 2.6% 1.3% 0.0% Technical Maximum Achievable Program Achievable Using the approach described above from the maximum and program achievable potential, the Apex Team optimized the Clean Heat Plan additional EE resources as shown in Table 3. Table 3: Clean Heat Portfolios Year 2024 2025 2026 2027 2028 2029 2030 Least Cost Least Cost Portfolio Portfolio Clean Heat Clean Heat Additional Incremental DSM DSM Cumulative Budget Savings ($Millions) (Therms) 64,779 196,079 478,493 837,697 1,217,597 1,610,795 2,025,837 APEX ANALYTICS $0.5 $1.1 $2.7 $3.2 $3.4 $3.4 $3.4 Emissions Target Portfolio Clean Heat Additional DSM Cumulative Savings (Therms) 87,221 288,290 643,561 1,205,946 1,830,566 2,521,476 3,270,054 Emissions Target Portfolio Clean Heat Incremental DSM Budget ($Millions) Preferred Portfolio Clean Heat DSM Cumulative Savings (Therms) Preferred Portfolio Clean Heat Incremental DSM Budget ($Millions) $0.9 $2.3 $5.1 $8.0 $8.7 $9.1 $9.5 64,779 196,079 478,493 837,697 1,217,597 1,610,795 2,025,837 $0.5 $1.1 $2.7 $3.2 $3.4 $3.4 $3.4 Page | 3
  7. Page 7 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 36 Page 7 of 45 Hearing Exhibit 103, Attachment JLC-1 Proceeding No. 23A-____G Page 7 of 45 2. Creation of Clean Heat EE Portfolios Approach Figure 2 summarizes the process for applying the potential estimates to support clean heat EE portfolios with savings and budgets. Figure 2: Clean Heat Portfolio Development • Start with program and maximum achievable program potential. • Allocate the most cost-effective measures to Least Cost Portfolio and all measures to the Emissions Develop Portfolios Target Portfolio. Calculate incremental EE Measures • Subtract savings associated with planned DSM program. • Estimate budget ramp based on planned DSM ramp • For Least Cost Portfolio, reduce budget and savings to align with budget cap Calibrate to • Calibrate incremental clean heat EE portfolios with Budget Cap and/or updated budgets Budget Ramp 2.1.1 Development of Energy Efficiency Measures for Least Cost Portfolio To assess the incremental EE resource in the Least Cost Portfolio, the Apex Team targeted the most cost-effective measures above the planned DSM amounts of $2.1 million. This portfolio uses a mix of measures and assumptions from both the APEX ANALYTICS Page | 4
  8. Page 8 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 36 Page 8 of 45 Hearing Exhibit 103, Attachment JLC-1 Proceeding No. 23A-____G Page 8 of 45 maximum achievable potential and the program achievable potential. We optimized the measures assessed through the potential study to maximize GHG emissions savings per budget dollar by: Removing the measures with the lowest GHG emissions savings per budget dollar from the program achievable potential; and Assuming higher incentives and adoption of the most cost-effective measures within the maximum achievable potential. Measures that were shifted to higher incentives and higher adoption included replace-on-burnout gas furnaces, gas boilers, and gas water heaters. We estimated new incremental EE for the Least Cost Portfolio by subtracting the budget associated with Atmos Energy’s planned DSM Program from the total of the most cost-effective measures in the potential study. As a final step, we incorporated a ramp-up period to allow for the orderly expansion of EE budgets and savings considering the marketplace challenges such as contractor workforce and equipment availability to deliver the EE measures included in the Portfolio with over five times current DSM spending levels. 2.1.2 Development of Energy Efficiency Measures for Emissions Target Portfolio In the Emissions Target Portfolio, the Apex Team developed a plan to maximize the total savings from EE measures by: Including every measure from the maximum achievable potential in the portfolio, regardless of its cost-effectiveness (using the MTRC); and Increasing the incentives for all measures to 100% of incremental cost. We developed the Emissions Target Portfolio estimates by subtracting the planned DSM from a portfolio that includes all available measures to estimate the maximum amount of additional EE available. The Apex Team estimated budget and savings for the Emissions Target Portfolio by subtracting the existing DSM Program planned budget and savings from the total. As a final step, we incorporated a ramp-up period to allow for the orderly expansion of EE budgets and savings considering the marketplace challenges such as contractor workforce and equipment availability to deliver the EE measures included in the Portfolio with over ten times current DSM spending levels. 2.1.3 Development of Energy Efficiency Measures for Preferred Portfolio At the direction of Atmos Energy, the Apex Team developed the Preferred Portfolio by: APEX ANALYTICS Page | 5
  9. Page 9 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 36 Page 9 of 45 Hearing Exhibit 103, Attachment JLC-1 Proceeding No. 23A-____G Page 9 of 45 Applying a similar spending limit to the Least Cost Portfolio, Employing maximum incentives for the most cost-effective EE measures, and Decreased renewable natural gas (“RNG”) targets. 2.1.4 Development of Recovered Methane Resource Potential The Apex Team analyzed the responses to a joint Request for Information (“RFI”) issued earlier in 2023 by Atmos Energy and other Colorado gas distribution companies related to RNG. The RFI requested costs and availability of RNG that meets the definition of recovered methane in the statute. Resulting Portfolio Costs and Savings of EE Measures Table 4 shows the therm savings and incremental budgets for the three Clean Heat Portfolios described above. Table 4: Incremental DSM Portfolio Summary Costs and Therm Savings Year 2024 2025 2026 2027 2028 2029 2030 Least Cost Least Cost Portfolio Portfolio Additional Incremental DSM DSM Cumulative Budget Savings ($Millions) (therms) 64,779 196,079 478,493 837,697 1,217,597 1,610,795 2,025,837 $0.5 $1.1 $2.7 $3.2 $3.4 $3.4 $3.4 Emissions Target Portfolio Additional DSM Cumulative Savings (therms) 87,221 288,290 643,561 1,205,946 1,830,566 2,521,476 3,270,054 Emissions Target Portfolio Incremental DSM Budget ($Millions) Preferred Portfolio Additional DSM Cumulative Savings (therms) Preferred Portfolio Incremental DSM Budget ($Millions) $0.9 $2.3 $5.1 $8.0 $8.7 $9.1 $9.5 64,779 196,079 478,493 837,697 1,217,597 1,610,795 2,025,837 $0.5 $1.1 $2.7 $3.2 $3.4 $3.4 $3.4 Table 5 shows the GHG savings and cost per metric ton (“MT”) of GHG reductions for each Clean Heat Portfolio. APEX ANALYTICS Page | 6
  10. Page 10 of 45

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 36 Page 10 of 45 Hearing Exhibit 103, Attachment JLC-1 Proceeding No. 23A-____G Page 10 of 45 Table 5: Incremental DSM Portfolio GHG Savings and Cost per MT CO2 Year 2024 2025 2026 2027 2028 2029 2030 3. Least Cost Portfolio Additional DSM CO2 Savings (MT CO2) Least Cost Portfolio Cost per Ton ($/CO2) Emissions Target Portfolio Additional DSM CO2 Savings (MT CO2) Emissions Target Portfolio Cost per Ton ($/CO2) Preferred Portfolio Additional DSM CO2 Savings (MT CO2) Preferred Portfolio Cost per Ton ($/CO2) 344 1,041 2,539 4,446 6,462 8,549 10,751 $145.4 $157.9 $180.1 $167.9 $168.6 $162.9 $154.4 463 1,530 3,415 6,400 9,715 13,382 17,354 $194.4 $215.5 $270.5 $268.0 $262.5 $248.2 $239.1 344 1,041 2,539 4,446 6,462 8,549 10,751 $145.4 $157.9 $180.1 $167.9 $168.6 $162.9 $154.4 EE Pilot Program Descriptions and Assumptions Pilot Development Rationale Atmos Energy asked the Apex Team to identify new and emerging opportunities in EE that go beyond what is typically offered around the country. The Apex Team identified two opportunities, gas heat pumps (“GHPs”), which represent an opportunity applicable to residential customers served by Atmos Energy, and manufactured housing early retirement, which specifically addresses a difficult to improve section of the built environment that is not currently readily served by existing programs. Gas Heat Pumps 3.2.1 Opportunity Description GHPs operate in a similar fashion to other heat pump technologies by moving heat from a source to a sink. GHPs are currently available in the commercial and industrial sector and residential appliances have recently begun to be manufactured, with availability expected in 2024. GHPs have the capability of space heating, space cooling, and water heating and are particularly well suited to colder and high-elevation climate applications, and in contrast to electric heat pumps, do not have challenges meeting the heating load in these climates. APEX ANALYTICS Page | 7

Text of CLF-011 Attachment 37.pdf

Extracted from the file · 20 pages · 35,205 characters

Text of CLF-011 Attachment 38.pdf

Extracted from the file · 13 pages · 21,336 characters

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026