Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

Text of CLF-011 Attachment 36.pdf

Extracted from the file · 45 pages · 69,752 characters

Text of CLF-011 Attachment 37.pdf

Extracted from the file · 20 pages · 35,205 characters

  1. Page 4 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 38 Page 4 of 13 Hearing Exhibit 115, Rebuttal Testimony of Matthew H. Nelson Proceeding No. 23A-0632G Page 4 of 12 1 Company witness Ms. Kathleen Ocanas provides testimony on Atmos Energy’s position 2 regarding including in the Company’s CHP portfolios clean heat resources that are 3 consistent with Atmos Energy’s only core business – the provision of natural gas service 4 to end-use customers. 5 emissions and result in the provision of safe, reliable, and affordable service in a just and 6 reasonable manner without burdening customers with any costs unrelated to the provision 7 of natural gas service. For Atmos Energy, neither electrification nor thermal energy 8 networks fall within those parameters. 9 Q. Thus, the Company has proposed only resources that lower IN ADDITION TO THE POINTS MADE BY MS. OCANAS, ARE THERE OTHER 10 CONCERNS AND CHALLENGES ASSOCIATED WITH IMPLEMENTING 11 THERMAL ENERGY NETWORKS FOR THE COMPANY? 12 A. There are significant challenges associated with implementing thermal energy networks. 13 For example, thermal energy systems are notably expensive and Staff’s proposed budget 14 of $2.58 million over four years would not be sufficient based on the known costs 15 associated with actual thermal energy network projects.1 16 Further, Atmos Energy isn’t a thermal energy heating company and has not 17 constructed a system like this before. There are many unknowns and it’s likely that any 18 effort to develop a new thermal energy network system would be challenging. Atmos 19 Energy would have customer acquisition costs associated with convincing customers to 20 pursue this relatively unknown heating source, along with unknowns around permitting, 21 engineering, and many other elements of development. All of these factors should be 22 expected to create upward pressures on cost. The cost of designing and installing new 1 Answer Testimony of Staff Witness Haglund (Hearing Exhibit 200) at 22-23.
  2. Page 5 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 38 Page 5 of 13 Hearing Exhibit 115, Rebuttal Testimony of Matthew H. Nelson Proceeding No. 23A-0632G Page 5 of 12 1 thermal energy systems is high, posing challenges for scaling and initial investment 2 recovery. As discussed in the Apex Supplemental CHP Analysis Report,2 in the recent 3 pilots proposed in New York, the estimated construction costs for geothermal network 4 projects ranged from $10 million to over $100 million,3 depending on the project scope 5 and size. 6 Additional challenges and cost risks include: 7 • 8 connectivity complicates adoption, especially in scenarios involving renters and 9 landlords. Further, unless there is a significant budget to support income qualified 10 customers, the need to purchase new equipment could potentially exclude certain 11 low- to moderate-income customer demographics. 12 • 13 rural areas potentially offering more favorable conditions for geothermal extraction 14 and distribution. In less dense environments, there will be an increase in the miles 15 of pipe to customer ratio, thus leading to higher costs. 16 • 17 be challenging, particularly given the upfront costs associated with installing the 18 necessary equipment. While the savings from geothermal energy could potentially 19 offset some costs over the long run, the initial investment required from customers 2 The requirement for customers to install specific equipment for system The effectiveness of thermal energy systems can vary by location, with less Recruiting customers to adopt a new technology like geothermal energy can Hearing Exhibit 111, Attachment JLC-1 at 4. While initial budgets ranged between $10-$25 million, some in the field projects have seen escalation into the $50 to $100 million territory. National Grid Utility Thermal Energy Network and Jobs Act Monthly Progress and Expenditure Report, Case 22-M-0429, March 15, 2024, available at https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId={40C8438E-0000-C113-B25151ADA58175E2}. 3
  3. Page 6 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 38 Page 6 of 13 Hearing Exhibit 115, Rebuttal Testimony of Matthew H. Nelson Proceeding No. 23A-0632G Page 6 of 12 1 may deter adoption, especially for those with limited financial resources. Utilities 2 considering undertaking these investments will need to develop strategies to 3 educate customers about geothermal energy and where to find financing options or 4 incentives to encourage participation. None of these processes are in place. 5 • 6 networks also have ongoing operating and maintenance costs that are less known 7 or proven than other fuels. As seen in the NYSEG pilot mentioned in the Apex 8 Supplemental CHP Analysis Report, these can include pumping costs, maintenance 9 labor costs, and miscellaneous system repairs, which can amount to hundreds of 10 thousands of dollars annually.4 11 Q. 12 13 Finally, in addition to the high upfront construction costs, thermal energy DO YOU AGREE THAT THERMAL ENERGY SYSTEMS OFFER A POTENTIAL NEW VALUE STREAM TO GAS UTILITIES IN COLORADO? A. The strategic development of thermal energy systems offers a potential path toward 14 diversification and sustainability in utilities’ service offerings. However, the execution of 15 a new business strategy includes new risks and requires careful planning, significant 16 investment, and collaborative efforts with stakeholders across the service territory to 17 overcome the inherent challenges and delivery of thermal energy solutions. 18 Given the high costs and risks associated with thermal energy networks, as 19 evidenced by other utility pilot projects in New York and Massachusetts, those pursuing 20 thermal energy networks should approach these investments cautiously and strategically. 21 Given the concern around exceeding the CHP budget cap expressed by UCA and Staff 22 (which Atmos Energy agrees with), thermal energy networks will not be the most cost4 Hearing Exhibit 111, Attachment JLC-1 at 5.
  4. Page 7 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 38 Page 7 of 13 Hearing Exhibit 115, Rebuttal Testimony of Matthew H. Nelson Proceeding No. 23A-0632G Page 7 of 12 1 effective way to achieve the emissions goals. And if such projects were pursued, close 2 collaboration with regulators to establish supportive rate-making mechanisms and 3 prudency review processes will be critical to the success of any such initiatives. 4 A comparison of Staff’s recommended budget of $2.58 million over four years with 5 the initial budgets for other smaller scale thermal energy network projects identified in the 6 Apex Supplemental CHP Analysis Report, which ranged between $10-$25 million, 7 highlights the misalignment in budget expectations.5 Given these examples, the Staff’s 8 recommended budget of $2.58 million for thermal energy networks (under the umbrella of 9 beneficial electrification) significantly underestimates the cost of such networks when 10 compared to the costs of similar projects (and doesn’t account for customer recruitment or 11 ongoing O&M). 12 Even if Atmos Energy were in the business of providing thermal energy networks, 13 the Company could not be expected to deliver a full-scale thermal network within Staff’s 14 recommended budget over four years. Additionally, if thermal networks are to be pursued, 15 there also many remaining issues that must be answered such as whether this service is a 16 regulated utility service for which Atmos Energy has a certificate of public convenience 17 and necessity, how the costs for those projects should be recovered in a manner consistent 18 with established ratemaking principles, and the numerous operational issues discussed 19 above. 5 Hearing Exhibit 111, Attachment JLC-1 at 4-5.
  5. Page 8 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 38 Page 8 of 13 Hearing Exhibit 115, Rebuttal Testimony of Matthew H. Nelson Proceeding No. 23A-0632G Page 8 of 12 1 2 III. Q. HOW DID THE INTERVENORS RESPOND TO THE PROPOSED PILOT 3 PROGRAMS 4 PORTFOLIO? 5 A. PILOT PROGRAMS INCLUDED IN THE COMPANY’S PREFERRED CHP Dr. England and Mr. Turner both criticized the Company’s design for Manufactured Home 6 Early Retirement and Natural Gas Heat Pumps (“GHP”) pilot programs. However, Dr. 7 England recommended that the pilots be rejected while Mr. Turner recommends that the 8 pilots be approved with modifications. 9 Dr. England’s main points of criticism include the high cost per ton of CO2 abated, 10 the low market penetration, and the high administration costs. Specifically, for the GHP 11 Pilot, he highlights that the cost per ton of CO2 avoided is $1,011.99, compared to $551.88 12 for the Preferred Portfolio without the GHP Pilot. For the Manufactured Home Early 13 Retirement Pilot, the cost per ton of CO2 avoided is $836.82, compared to $550.76 for the 14 Preferred Portfolio without this pilot. Additionally, the GHP Pilot impacts only 0.0213% 15 of residential customers and 0.16% of new furnace replacements over three years, while 16 the Manufactured Home Early Retirement Pilot benefits only 0.27% of manufactured 17 homes and 0.0213% of residential customers. Furthermore, he points out that the estimated 18 administration costs for the GHP Pilot are 33% of the total costs, and for the Manufactured 19 Home Early Retirement Pilot, they are 25% of the total costs. Ultimately, Dr. England 20 recommends that both pilot programs be rejected. 21 Mr. Turner’s criticisms focus on the equity proposals and pilot design. 22 emphasizes the importance of taking meaningful steps to identify the needs of income- 23 qualified customers. Mr. Turner questions the specific allocation and impact of the budget He
  6. Page 9 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 38 Page 9 of 13 Hearing Exhibit 115, Rebuttal Testimony of Matthew H. Nelson Proceeding No. 23A-0632G Page 9 of 12 1 for income-qualified customers within each portfolio. He also highlights the potential 2 benefits and challenges of the Manufactured Home Early Retirement Pilot, particularly its 3 cost-effectiveness and market penetration. Mr. Turner acknowledges the effort to allocate 4 resources for income-qualified customers but expresses concerns about whether the 5 proposed measures will adequately address their needs. Mr. Turner recommends that the 6 pilot projects be approved with certain modifications detailed in his answer testimony. 7 Q. 8 9 DOES ATMOS ENERGY AGREE WITH DR. ENGLAND’S CRITICISMS REGARDING THE PILOTS AND ULTIMATE RECOMMENDATION? A. No. Fundamentally, pilot programs are designed to test new approaches, gather data, and 10 learn from the implementation process. The primary goal is to evaluate the feasibility, 11 effectiveness, and scalability of new technologies and programs, rather than achieving 12 immediate widespread impact. While there is a presumption that some of the aspects of 13 the pilot may not make sense at scale, the Company designed these pilots as pathways for 14 compliance. While the initial cost per ton of CO2 abated may seem high compared to other 15 aspects of the preferred portfolio, pilots are essential for understanding the real-world 16 application and long-term benefits of these technologies, and they are expected to reveal 17 pathways that could improve the application of the technology. Early-stage investments 18 often have higher costs that decrease as the program scales and efficiencies are realized. It 19 would be unreasonable to compare proposed piloted technology to a mature technology. 20 Further, GHG emissions reductions through heat pumps are not the sole purpose of 21 these pilots. While the GHP Pilot impacts a small percentage of the customer base, the 22 pilot is crucial for understanding customer feedback, installation requirements, and 23 measuring awareness and availability of GHPs.
  7. Page 10 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 38 Page 10 of 13 Hearing Exhibit 115, Rebuttal Testimony of Matthew H. Nelson Proceeding No. 23A-0632G Page 10 of 12 1 The Manufactured Home Early Retirement Pilot targets a vulnerable and 2 underserved population living in outdated and inefficient homes. By replacing these homes 3 with energy-efficient models, we not only reduce CO2 emissions but also improve the 4 living conditions and reduce energy bills for income-qualified households. 5 underserved group provides valuable insights into the challenges and opportunities of 6 deploying GHPs to hard-to-reach individuals that may not have access to traditional energy 7 efficiency measures. While delivering these savings is anticipated to be more expensive 8 during this pilot, the development of specific programs to serve hard to reach income- 9 qualified customers is consistent with the policy goals of the statute and is appropriate in a 10 small-scale pilot. 11 Q. 12 13 This IS STAFF’S RECOMMENDATION GENERALLY CONSISTENT WITH YOUR POSITION? A. Yes. While Staff witness Mr. Turner raises issues with the details of how the pilots would 14 work, he recognizes that innovation is essential to long-term sustainability. Mr. Turner 15 recognized Atmos Energy’s collaborative efforts with Habitat for Humanity and 16 encouraged the approach of developing pilots to directly impact income-qualified 17 customers. He recommends some modifications to address the challenges he identifies 18 with respect to market penetration and understanding and meeting the needs of income- 19 qualified customers, which Ms. Ocanas testifies that Atmos Energy supports incorporating. 20 In addition to testimony provided by Ms. Ocanas regarding the pilots, I also note that GHPs 21 have the potential to give savings to income-qualified customers or small business 22 customers, in particular those who may rent or lease space, and may not be able to make a 23 fuel switching decision.
  8. Page 11 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 38 Page 11 of 13 Hearing Exhibit 115, Rebuttal Testimony of Matthew H. Nelson Proceeding No. 23A-0632G Page 11 of 12 1 2 IV. Q. 3 4 RECOVERED METHANE WHAT IS YOUR POSITION REGARDING THE COST RECOVERY FOR RM AS DISCUSSED BY STAFF WITNESS MR. HAGLUND? A. Staff’s proposed method of cost recovery is an acceptable method for recovery of the 5 purchase of RM as a commodity as long as the full cost is recovered. The Company is 6 amenable to recovering part of the costs through the Gas Cost Adjustment (“GCA”) while 7 the incremental costs for RM are recovered through the CHP Rider as discussed by Ms. 8 Ocanas. 9 Q. 10 11 HOW WOULD THE SEPARATION OF COSTS BETWEEN THE GCA AND OTHER COST RECOVERY MECHANISM BE ADDRESSED? A. The Company does not expect to obtain bids that separate the costs of RM into distinct 12 components for the commodity and environmental attributes. Therefore, it is reasonable 13 to use the existing GCA rate for a given period as the portion of the purchased RM to be 14 recovered through the GCA, with the remaining cost to be recovered through the CHP 15 Rider. 16 17 V. Q. STAFF RECOMMENDS CHP COST RECOVERY THAT ALL CHP COSTS BE RECOVERED 18 VOLUMETRICALLY RATHER THAN THROUGH A COMBINATION OF 19 FIXED AND VOLUMETRIC CHARGES. HOW DO YOU RESPOND? 20 A. I disagree. In my direct testimony, I described how gas utility cost recovery should be 21 aligned with Colorado’s policy goals that are focused on reducing gas utility throughput 22 and associated emissions. Specifically, I described how utility cost recovery should move 23 away from using volumetric rates to recover fixed costs, whether through decoupling
  9. Page 12 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 38 Page 12 of 13 Hearing Exhibit 115, Rebuttal Testimony of Matthew H. Nelson Proceeding No. 23A-0632G Page 12 of 12 1 and/or moving toward recovering additional fixed costs associated with gas utility service 2 through fixed rates. Staff’s recommendation that CHP costs be recovered exclusively 3 through volumetric rates completely ignores the cost recovery impacts associated with 4 Colorado’s decarbonization policies (including Staff’s own recommendations in this 5 proceeding) and the need to maintain the utility’s financial stability. Moreover, Staff’s 6 recommendation will undermine bill affordability for customers by introducing 7 unnecessary volatility through volumetric recovery. 8 Q. DOES THIS CONCLUDE YOUR REBUTTAL TESTIMONY? 9 A. Yes, this concludes my rebuttal testimony.
  10. Page 13 of 13

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 13, 2026 CLF-011 Attachment 38 Page 13 of 13 BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF ATMOS ENERGY CORPORATION'S APPLICATION FOR APPROVAL OF ITS 2024-2028 CLEAN HEAT PLAN. PROCEEDING NO. 23A-0632G AFFIDAVIT I, Matthew H. Nelson, declare under the penalty of perjury under the law of Colorado that the above testimony was prepared by me or under my supervision, control, and direction; that the testimony is true and correct to the best of my information, knowledge and belief; and that I would give the same testimony orally if asked under oath. s/ Matthew H. Nelson Matthew H. Nelson Apex Analytics LLC Principal, Regulatory Policy 32184694_v8

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/27/2026

This filing on the current system (opens in a new tab)