Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 27, 32, 35, 36, 39

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy5 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files5

Search terms highlighted
Eversource rate increase is on 4 pages of the text below, highlighted. Go to the first matchClear highlighting
4 pages match
Words on different pages
Words on different pages
Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set DEEP-01 Date Issued October 06, 2026 BETP-036 Page 1 of 1 Date Filed: October 26, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling and Elli Ntakou Request from: Department of Energy and Environmental Protection Question: (Climate Change Vulnerability Study) Refer to Exhibit CLP-TSP-4. Did the Company review the 2025 Connecticut Grid Resilience Assessment, issued by the University of Connecticut Eversource Center, as part of its preparation of the Climate Vulnerability Study? a. Did the Company participate in the development of the 2025 Connecticut Grid Resilience Assessment Response: Please refer to CLP-TSP-4, at 10. The climate hazard assessment was completed in early 2025. The 2025 Connecticut Grid Resilience Assessment was published in November 2025.

Text of BETP-039_Final.pdf

Extracted from the file · 1 page · 872 characters

Words on different pagesRead the text of BETP-039_Final.pdf

As listed on the current system

Question(s) Answered 27, 32, 35, 36, 39 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/26/2026

This filing on the current system (opens in a new tab)