Interrogatory responses
Answers to questions 132
Files6
NECTA-132_Final.pdf
PDF · 209 KB · 4 pagesText searchable
Download NECTA-132_Final.pdfRead the text of NECTA-132_Final.pdf
NECTA-132 Attachment 1.pdf
PDF · 3.0 MB · 52 pagesText searchable
Download NECTA-132 Attachment 1.pdfRead the text of NECTA-132 Attachment 1.pdf
NECTA-132 Attachment 2.pdf
PDF · 221 KB · 2 pagesText searchable
Download NECTA-132 Attachment 2.pdfRead the text of NECTA-132 Attachment 2.pdf
NECTA-132 Attachment 2.xlsx
Excel · 99 KBText searchable
Download NECTA-132 Attachment 2.xlsxRead the text of NECTA-132 Attachment 2.xlsx
NECTA-132 Attachment 3.pdf
PDF · 1.9 MB · 8 pagesText searchable
Download NECTA-132 Attachment 3.pdfRead the text of NECTA-132 Attachment 3.pdf
NECTA-132 Attachment 4.pdf
PDF · 1.8 MB · 8 pagesText searchable
Download NECTA-132 Attachment 4.pdfRead the text of NECTA-132 Attachment 4.pdf
Page 15 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 15 of 52 SPC-ARM-001 MATERIAL SPECIFICATION Revision 1 Figure 7 – 3 5/8’’ x 4 5/8’’ x 10’, Fiberglass Dead-end Crossarm Figure 8 – 3 5/8’’ x 4 5/8’’ x 10’, Fiberglass Dead-end Crossarm (BROWN) NH ONLY Page 9 of 12Page 16 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 16 of 52 SPC-ARM-001 MATERIAL SPECIFICATION Revision 1 Figure 9 – 3 5/8’’ x 4 5/8’’ x 10’, Fiberglass Heavy Duty Crossarm (BROWN) Figure 10 – 3 5/8’’ x 4 5/8’’ x 21’’, Bare Fiberglass Crossarm Page 10 of 12Page 17 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 17 of 52 SPC-ARM-001 MATERIAL SPECIFICATION Revision 1 Figure 11 – 3 5/8’’ x 4 5/8’’ x 8’, Fiberglass Alley Arm Page 11 of 12Page 18 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 18 of 52 SPC-ARM-001 MATERIAL SPECIFICATION Revision 1 Figure 12– 3 5/8’’ x 4 5/8’’ x 10’, Fiberglass Alley Arm Page 12 of 12Page 19 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 19 of 52 SPC-ARM-002 MATERIAL SPECIFICATION Revision 1 Distribution Wood Crossarms 1.0 2.0 3.0 4.0 Scope .................................................................................................................................. 2 Reference Codes and Standards......................................................................................... 2 Specifications ...................................................................................................................... 2 Species .................................................................................................................... 2 Treatment and Preservation ..................................................................................... 2 Dimensions and Drilling ........................................................................................... 2 Tolerances ............................................................................................................... 3 Drilling Requirements .......................................................................................................... 3 Rev # Description Date 1 Eversource Reformat 03/3/2017 0 Original – supersedes M4700. 02/25/2013 Approval CWPPage 20 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 20 of 52 MATERIAL SPECIFICATION SPC-ARM-002 1.0 Revision 1 Scope This specification covers the requirements for wood crossarms used in the distribution line construction by Eversource Electrical Distribution Companies. 2.0 Reference Codes and Standards The distribution wood crossarms furnished under this specification shall meet all applicable requirements of the following codes and standards unless otherwise specified herein: 3.0 • ANSI O5.3 and AWPA M5-98 • AWPA C1-98 and C25-95 Specifications Species 3.1.1 All crossarms shall be made from Douglas Fir. Treatment and Preservation 3.2.1 Preservatives shall be pentachlorophenol. 3.2.2 Treatment and retention shall be in compliance with the latest revision of AWPA Standard C25. 3.2.3 The preservative shall penetrate all the sapwood. It shall penetrate heartwood and sapwood longitudinally from the pin holes, bolt holes and ends, a minimum of 3 inches. 3.2.4 The treating methods shall not injure the wood. After treatment, crossarms shall be free of tarry, greasy or sticky material, and of oil exudation and pentachlorophenol, and shall remain so. Dimensions and Drilling 3.3.1 Dimensions and drilling shall be in accordance with the drawings of this specification. All holes (including pinholes) shall be 11/16” in diameter, unless otherwise noted on drawings, with a +/- 1/32” tolerance. Drawings are not to scale. 3.3.2 All drilling shall be done prior to treatment.Page 21 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 21 of 52 SPC-ARM-002 MATERIAL SPECIFICATION Revision 1 Tolerances Tolerances (+/-) 4.0 B 1/32” D 1/8” F ¼” Drilling Requirements Figure Number Description 3.5” X 4.5” X 10’, 8 Pin Douglas Fir Crossarm 1 5.75” X 7.75” X 21’ – 4 Pin Douglas Fir Crossarm, NH 2 5.75” X 7.75” X 24’ 6” – Douglas Fir Crossarm, NH 3 Figure 1 – 10’, 8-Pin ArmPage 22 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 22 of 52 SPC-ARM-002 MATERIAL SPECIFICATION Figure 2 – 5.75” X 7.75” X 21’ – 4 Pin Arm, NH Figure 3 – 5.75” X 7.75” X 24’ 6” – 0 Pin Arm, NH Revision 1Page 23 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 23 of 52 This pin shall meet all applicable requirements of ANS C135.22-1988 with the exception that longitudinal load be toward the rigid steel pole and the pin mounted as show below in the TEST ASSEMBLY. STANDARD 1” LEAD THREAD 9/16” 1-3/8” A A 1-7/8” SECTION A-A MAX 10º DEFLEC 32” 6 ” ADAPTER PLATE 3 “X 6” X 1/2” WELDED ACROSS LEGS OF CHANNEL 1200 LB LOAD 5-1/2” ADAPTER PLATE 3” 11/16” DIAMETER HOLE 8-1/2” RIGID STEEL POLE 5” 1/2” FILLER PLATE 1” 11/16” X 1-1/2” SLOT ORIGINAL PIN – POLE TOP – 32” 08/16/76 APPROVED 12/12/22 EVERSOURCE ENERGY CONSTRUCTION STANDARD SPC-P-351 5Page 24 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 24 of 52 STRUCTURE LIMIT A3 STRUCTURE LIMIT A5 Note For the vise top insulator the range in feet of pull of a corner when installing a conductor in the top position is as follows: 1/0 ACSR bare and covered, 0-9; 477 Kcmil bare and covered, 0-5. STRUCTURE LIMIT A6 STRUCTURE LIMIT A6 Notes 1. Refer to DTR 04.047 for secondary and neutral attachment heights. 2. Install double deadends with a pole top pin for single phase extensions with a change in wire size. 3. Select straight strain clamps from DTR 07.035. ORIGINAL 05/24/89 APPROVED 12/02/24 35 KV MGY AND BELOW ARMLESS CONSTRUCTION SINGLE-PHASE TANGENT THROUGH DEAD END EVERSOURCE ENERGY CONSTRUCTION STANDARD DTR 10.027 7
Text of NECTA-132 Attachment 3.pdf
Extracted from the file · 8 pages · 10,921 characters
Text of NECTA-132 Attachment 4.pdf
Extracted from the file · 8 pages · 11,115 characters
As listed on the current system
Question(s) Answered 132 (The Connecticut Light and Power Company) Date Filed: 11/05/2026