Interrogatory responses
Answers to questions 132
Files6
NECTA-132_Final.pdf
PDF · 209 KB · 4 pagesText searchable
Download NECTA-132_Final.pdfRead the text of NECTA-132_Final.pdf
NECTA-132 Attachment 1.pdf
PDF · 3.0 MB · 52 pagesText searchable
Download NECTA-132 Attachment 1.pdfRead the text of NECTA-132 Attachment 1.pdf
NECTA-132 Attachment 2.pdf
PDF · 221 KB · 2 pagesText searchable
Download NECTA-132 Attachment 2.pdfRead the text of NECTA-132 Attachment 2.pdf
NECTA-132 Attachment 2.xlsx
Excel · 99 KBText searchable
Download NECTA-132 Attachment 2.xlsxRead the text of NECTA-132 Attachment 2.xlsx
NECTA-132 Attachment 3.pdf
PDF · 1.9 MB · 8 pagesText searchable
Download NECTA-132 Attachment 3.pdfRead the text of NECTA-132 Attachment 3.pdf
NECTA-132 Attachment 4.pdf
PDF · 1.8 MB · 8 pagesText searchable
Download NECTA-132 Attachment 4.pdfRead the text of NECTA-132 Attachment 4.pdf
Page 21 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 21 of 52 SPC-ARM-002 MATERIAL SPECIFICATION Revision 1 Tolerances Tolerances (+/-) 4.0 B 1/32” D 1/8” F ¼” Drilling Requirements Figure Number Description 3.5” X 4.5” X 10’, 8 Pin Douglas Fir Crossarm 1 5.75” X 7.75” X 21’ – 4 Pin Douglas Fir Crossarm, NH 2 5.75” X 7.75” X 24’ 6” – Douglas Fir Crossarm, NH 3 Figure 1 – 10’, 8-Pin ArmPage 22 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 22 of 52 SPC-ARM-002 MATERIAL SPECIFICATION Figure 2 – 5.75” X 7.75” X 21’ – 4 Pin Arm, NH Figure 3 – 5.75” X 7.75” X 24’ 6” – 0 Pin Arm, NH Revision 1Page 23 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 23 of 52 This pin shall meet all applicable requirements of ANS C135.22-1988 with the exception that longitudinal load be toward the rigid steel pole and the pin mounted as show below in the TEST ASSEMBLY. STANDARD 1” LEAD THREAD 9/16” 1-3/8” A A 1-7/8” SECTION A-A MAX 10º DEFLEC 32” 6 ” ADAPTER PLATE 3 “X 6” X 1/2” WELDED ACROSS LEGS OF CHANNEL 1200 LB LOAD 5-1/2” ADAPTER PLATE 3” 11/16” DIAMETER HOLE 8-1/2” RIGID STEEL POLE 5” 1/2” FILLER PLATE 1” 11/16” X 1-1/2” SLOT ORIGINAL PIN – POLE TOP – 32” 08/16/76 APPROVED 12/12/22 EVERSOURCE ENERGY CONSTRUCTION STANDARD SPC-P-351 5Page 24 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 24 of 52 STRUCTURE LIMIT A3 STRUCTURE LIMIT A5 Note For the vise top insulator the range in feet of pull of a corner when installing a conductor in the top position is as follows: 1/0 ACSR bare and covered, 0-9; 477 Kcmil bare and covered, 0-5. STRUCTURE LIMIT A6 STRUCTURE LIMIT A6 Notes 1. Refer to DTR 04.047 for secondary and neutral attachment heights. 2. Install double deadends with a pole top pin for single phase extensions with a change in wire size. 3. Select straight strain clamps from DTR 07.035. ORIGINAL 05/24/89 APPROVED 12/02/24 35 KV MGY AND BELOW ARMLESS CONSTRUCTION SINGLE-PHASE TANGENT THROUGH DEAD END EVERSOURCE ENERGY CONSTRUCTION STANDARD DTR 10.027 7Page 25 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 25 of 52 Construction Standard Variation A A3 CONST 35KV 1PH 24 IN POLE TOP PIN COV AL/BAR WIRE B Intentionally Left Blank C A3 CONST 35KV 1PH 36 IN POLE TOP PIN COV AL/BAR WIRE D Intentionally Left Blank E A5 CONST 35KV 1PH LARGE CORNER AL/ACSR COV - CT/MA F A5 CONST 35KV 1PH LARGE CORNER AL/ACSR COV - NH G A5 CONST 35KV 1PH LARGE CORNER AL/ACSR BAR - CT/MA H A5 CONST 35KV 1PH LARGE CORNER AL/ACSR BAR - NH I A5 CONST 35KV 1PH LARGE CORNER COPPER WIRE - CT/MA J A6 CONST 23KV 1PH SINGLE DEADEND - CT/MA K A6 CONST 35KV 1PH SINGLE DEADEND - NH L A6 CONST 35KV 1PH DOUBLE DEADEND ANGLE - CT/MA M A6 CONST 35KV 1PH DOUBLE DEADEND ANGLE - NH M L K J I H G F E 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 2 2 2 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 D C 1 B A 2 2 1 1 2 1 2 Construction Reference Document DTR10.027.5A --DTR10.027.5C --DTR10.027.4E DTR10.027.4F DTR10.027.4G DTR10.027.4H DTR10.027.4I DTR10.027.4J DTR10.027.4K DTR10.027.4L DTR10.027.4M U= Capital Item M= Standard Item L = Lobby UM Item Description Item Number EA PIN INSULATOR POLE TOP EPOXY/FG 1 IN THRD 36 IN M 526298 EA BOLT EYE GS 5/8 X 16 IN W/SQ NUT L 601629 EA BOLT MACHINE GS 5/8 X 14 IN SQ HEAD W/SQ NUT L 536259 EA CLAMP ANGLE AL 1/0-556 BARE WIRE L 514905 EA CLAMP ANGLE G 4-4/0 CU,19#8 AW,0000127 AWA L 514906 EA EYELET STD LONG G FOR 5/8 IN BOLT L 520214 EA INSULATOR VISE TOP 35 KV 1 IN PIN POLY COMPOSITE L 605137 EA INSULATOR SUSP POLYMER SILC 35 KV 10M CLV FIT 18-20 IN L 522669 EA LINK EXTENSION G 10 IN CLV/EYE ENDS 9MLB L 551508 EA PIN INSULATOR POLE TOP G 1 IN THRD 24 IN L 526306 EA WASHER SQUARE CURVED GS 3 IN 13/16 H L 539280 EA WASHER SQUARE FLAT GS 2-1/4 IN 13/16 H L 539282 Revision: 5 Page: 1 of 1Page 26 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 26 of 52 STRUCTURE LIMIT C1 Notes 1. Refer to DTR 07.011 Structure Limits. 2. Select guy strain insulator and associated material from Section 06. 3. Use 3.5 inch square washers, Item #539295, on the top of the crossarms when installing any insulator to avoid fracturing the composite arm. 35 KV MGY AND BELOW – FIBERGLASS CROSSARM CONSTRUCTION – THREE-PHASE – TANGENT AND SMALL CORNER APPROVED ORIGINAL 05/13/14 10/30/24 EVERSOURCE ENERGY CONSTRUCTION STANDARD DTR 10.421 1Page 27 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 27 of 52 Construction Standard Variation A C1 CONST 35KV FG 3PH TAN/SMALL COR 8 FT-COVER AND BARE WIRE B Intentionally Left Blank C C1 CONST 35KV FG 3PH TAN/SMALL COR 10 FT- COVER AND BARE WIRE D Intentionally Left Blank E F G H I J K L M M L K J I H G F E D C 1 4 3 2 1 4 4 2 B A 1 4 3 2 1 4 4 2 Construction Reference Document DTR10.421.3A --DTR10.421.3C --- U= Capital Item M= Standard Item UM Item Description EA CROSSARM FIBERGLASS 3-5/8 X 4-5/8 IN 8 FT 6H TAN W/BKT EA CROSSARM FIBERGLASS 3-5/8 X 4-5/8 IN 10 FT 8H TAN W/BKT EA BOLT MACHINE GS 5/8 X 14 IN SQ HEAD W/SQ NUT EA INSULATOR VISE TOP 35 KV 1 IN PIN POLY COMPOSITE EA PIN INSULATOR 1 IN THREAD 7.75 IN SHANK 8 IN HGT GALV EA PIN INSULATOR POLE TOP G 1 IN THRD 24 IN EA WASHER SQUARE FLAT GS 3-1/2 IN FOR 5/8 BOLT EA WASHER SQUARE CURVED GS 3 IN 13/16 H EA WASHER SPRING 5/8 IN GALV Revision: 3 L = Lobby Item Number M 501024 M 501025 L 536259 L 605137 L 526300 L 526306 L 539295 L 539280 538784 L Page: 1 of 1Page 28 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 28 of 52 DISTRIBUTION SYSTEM ENGINEERING MANUAL Overhead General Doc Number: Issued Date: 06.201 19-Dec-25 DSEM Category: Revision: Applicability: Overhead Design Approved by: Signature on File David Gladey Vice President, Distribution Engineering 2 Date: ALL 15-Dec-25 Rev No. Description Date 2 Added new Section 4.0 “pole set spacing”. Updated Section 8.0 (previously) 7.0 for latest conductor practices. Remove Section 8.2.1 Bare Conductor. Section 6.7 Remove PAGS and Adding PoleForeman December 19, 2025 1 Updated Section 5.1 for Pole Class Requirements. 0 Revised to new format. Updated Table 1. July 9, 2024 September 27, 2022Page 29 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 29 of 52 Table of Contents Section Page 1.0 Scope ........................................................................................................................................3 2.0 Reference Documents...............................................................................................................3 3.0 General .....................................................................................................................................3 4.0 Pole Set Spacing .......................................................................................................................4 5.0 Pole Heights ..............................................................................................................................4 6.0 Pole Class Size .........................................................................................................................4 7.0 Guying .......................................................................................................................................6 8.0 Conductor & Pole Top Construction ..........................................................................................6 9.0 Primary Risers...........................................................................................................................8 10.0 Secondary .................................................................................................................................8 11.0 Neutrals .....................................................................................................................................9 12.0 Eversource Owned All Self-Supporting (ADSS) Cable ..............................................................9 13.0 Transformer...............................................................................................................................9 14.0 Arresters..................................................................................................................................10 15.0 Cutouts ....................................................................................................................................10 16.0 Grounding ...............................................................................................................................10 17.0 Guy Insulators .........................................................................................................................10 18.0 Animal Guards ........................................................................................................................10 19.0 Basic Impulse Insulation Level (BIL) .......................................................................................10 06.201 Page 2 of 10 Rev 2Page 30 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 30 of 52 1.0 Scope These Construction Guidelines state basic philosophies, preferences, and standards with respect to the construction of overhead primary distribution facilities. . 2.0 Reference Documents DTR Section 04 Clearances DTR Section 07 General Information DTR Section 15 ADSS Fiber Optics Cable DTR Section 16 Arresters & Grounds DTR Section 18 Cutout and Solid Blade Disconnects DTR Section 67 Risers DSEM 06.231 Clearances DSEM 06.241 Conductor Attachment DSEM 06.301 Pole Attachment DSEM Section 06 Overhead Design DSEM Section 09 Arresters DSEM Section 14 Transformer General DSEM Section 15 Overhead Service and Secondaries 3.0 DER 84−7 Tree Wire Burndown – Causes and Mitigation WMS 08.06 Wildlife Guards General These Eversource Energy Distribution Construction Standards are based upon and are in compliance with the following: 3.1.1 The National Electrical Safety Code (NESC) 3.1.2 Regulations of Connecticut state agencies. 3.1.3 Commonwealth of Massachusetts Regulations, Section 220. 3.1.4 The New Hampshire Public Utilities Commission Rules and Regulations for Electric Service, PUC300. These guidelines apply to most overhead primary distribution construction. Additional information or exceptions to these guidelines may be found in specific sections of the Standards. 06.201 Page 3 of 10 Rev 2
Text of NECTA-132 Attachment 3.pdf
Extracted from the file · 8 pages · 10,921 characters
Text of NECTA-132 Attachment 4.pdf
Extracted from the file · 8 pages · 11,115 characters
As listed on the current system
Question(s) Answered 132 (The Connecticut Light and Power Company) Date Filed: 11/05/2026