  1. Page 28 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 28 of 52 DISTRIBUTION SYSTEM ENGINEERING MANUAL Overhead General Doc Number: Issued Date: 06.201 19-Dec-25 DSEM Category: Revision: Applicability: Overhead Design Approved by: Signature on File David Gladey Vice President, Distribution Engineering 2 Date: ALL 15-Dec-25 Rev No. Description Date 2 Added new Section 4.0 “pole set spacing”. Updated Section 8.0 (previously) 7.0 for latest conductor practices. Remove Section 8.2.1 Bare Conductor. Section 6.7 Remove PAGS and Adding PoleForeman December 19, 2025 1 Updated Section 5.1 for Pole Class Requirements. 0 Revised to new format. Updated Table 1. July 9, 2024 September 27, 2022
  2. Page 29 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 29 of 52 Table of Contents Section Page 1.0 Scope ........................................................................................................................................3 2.0 Reference Documents...............................................................................................................3 3.0 General .....................................................................................................................................3 4.0 Pole Set Spacing .......................................................................................................................4 5.0 Pole Heights ..............................................................................................................................4 6.0 Pole Class Size .........................................................................................................................4 7.0 Guying .......................................................................................................................................6 8.0 Conductor & Pole Top Construction ..........................................................................................6 9.0 Primary Risers...........................................................................................................................8 10.0 Secondary .................................................................................................................................8 11.0 Neutrals .....................................................................................................................................9 12.0 Eversource Owned All Self-Supporting (ADSS) Cable ..............................................................9 13.0 Transformer...............................................................................................................................9 14.0 Arresters..................................................................................................................................10 15.0 Cutouts ....................................................................................................................................10 16.0 Grounding ...............................................................................................................................10 17.0 Guy Insulators .........................................................................................................................10 18.0 Animal Guards ........................................................................................................................10 19.0 Basic Impulse Insulation Level (BIL) .......................................................................................10 06.201 Page 2 of 10 Rev 2
  3. Page 30 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 30 of 52 1.0 Scope These Construction Guidelines state basic philosophies, preferences, and standards with respect to the construction of overhead primary distribution facilities. . 2.0 Reference Documents DTR Section 04 Clearances DTR Section 07 General Information DTR Section 15 ADSS Fiber Optics Cable DTR Section 16 Arresters & Grounds DTR Section 18 Cutout and Solid Blade Disconnects DTR Section 67 Risers DSEM 06.231 Clearances DSEM 06.241 Conductor Attachment DSEM 06.301 Pole Attachment DSEM Section 06 Overhead Design DSEM Section 09 Arresters DSEM Section 14 Transformer General DSEM Section 15 Overhead Service and Secondaries 3.0 DER 84−7 Tree Wire Burndown – Causes and Mitigation WMS 08.06 Wildlife Guards General These Eversource Energy Distribution Construction Standards are based upon and are in compliance with the following: 3.1.1 The National Electrical Safety Code (NESC) 3.1.2 Regulations of Connecticut state agencies. 3.1.3 Commonwealth of Massachusetts Regulations, Section 220. 3.1.4 The New Hampshire Public Utilities Commission Rules and Regulations for Electric Service, PUC300. These guidelines apply to most overhead primary distribution construction. Additional information or exceptions to these guidelines may be found in specific sections of the Standards. 06.201 Page 3 of 10 Rev 2
  4. Page 31 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 31 of 52 4.0 Pole Set Spacing Pole set spacing must maintain minimum clearances to allow ample space to work on and around the pole without obstruction. Minimum set distance for adjacent structures without equipment on them is to be no less than 15 feet. This accounts for both poles having no equipment being set on them. Minimum set spacing for adjacent structures with equipment installed on them is to be no less than 25 feet. This spacing is required when one or both structures have equipment installed 5.0 Pole Heights Selection is dependent on the amount of pole−top space that is required for the type of construction that is being used. Specific Construction Standards indicate the amount of pole space that is required. In general, 45 foot poles shall be the minimum height used for circuit backbones and 40 foot poles shall be the minimum height used for single- & three- phase lateral construction. Secondary attachments should be positioned near the bottom of the allotted pole space and care shall be taken to provide adequate clearances in the span as shown in DTR Section 04. 35-foot poles shall only be used for the following applications: 5.4.1 Stub poles used for guying purposes. 5.4.2 Service and streetlighting poles with secondary cable only on the pole. 5.4.3 Poles installed on private property and in rights of way that will only support secondary conductors; 40-foot poles shall be used if it is determined that primary conductors may be installed in the future. 5.4.4 In NH, solely owned line extensions where it appears reasonable that sole ownership will remain beyond three years. When proper clearances may be obtained on existing poles that are involved in line rebuilds, economics dictate that poles in good condition remain in use. See DSEM 06.241. 6.0 Pole Class Size The minimum pole class size installed on the backbone shall be Class 2. For rebuilds do not replace existing poles if the poles meet minimum loading requirements. Refer to Table 1 for more detail on minimum pole class requirements. New poles installed in Eversource three-phase lines in distribution Rights−of−Way are to be direct embedded self−weathering steel poles, class and height to be determined by Engineering. Pole options other than steel will require approval from managers or above in Operations and Engineering. The use of steel poles in other situations such as single-phase lines, jointly owned facilities, or other special situations is by exception only and requires approval from managers, or above, in Operations and Engineering. Steel poles shall not be used for service poles. 06.201 Page 4 of 10 Rev 2
  5. Page 32 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 32 of 52 The following table details the minimum pole class requirements for specific installations on the distribution system. Table 1 – Minimum Pole Class Requirements Construction Type Minimum Pole Class Required Primary (Three-Phase) Backbone 45-foot, Class 2 Primary (Single- & Three-Phase) Laterals 40-foot, Class 2 Primary Junction & Equipment Poles* Class 1 Roadside Distribution Right of Way NOTE: Standard Construction & Junction Poles Class 1 Steel Equipment Poles* Class 1** Wood poles are the primary pole choice for Distribution construction, but composite has been approved as an alternative option for environmentally sensitive areas. For service, secondary and stub poles, calculation software determines pole minimum pole class required for stub poles. Minimum class 3 poles should be installed. * Equipment pole construction is defined as major assets installed on the pole, e.g., Reclosers, Switches, Regulators, Capacitor Banks, Stepdown Transformers, or a Three-phase Bank of Transformers, etc. Basic equipment such as cutouts, single phase transformers, stand-off brackets, etc., are not to be considered a part of the equipment requirement. ** Steel poles are the primary pole choice for ROW construction, but wood shall be used for equipment poles or poles with additional attachments outside of typical construction with Manager approval. DTR Section 10 in the Overhead Construction book details steel pole construction, both in open and spacer configurations. For pole replacement guidelines see DSEM 06.301. To determine the proper minimum pole class required, applied loads on conductors, cables, equipment, and supporting structures in both the vertical and horizontal direction must be taken into account. Applied loads occur from weight and wind on the following: conductors and cables including ice, equipment, support equipment, and hardware. Additional loads on the pole include the effects due to guying, and guy attachment height locations. Use IKEP PoleForeman computer program, or other Company approved program, to determine the proper pole class required. PoleForeman program can be accessed requesting to Eversource IT Department with supervisor approval. 6.7.1 Select Users Guide under the Help drop down menu for PoleForeman User Manual. . 06.201 Page 5 of 10 Rev 2
  6. Page 33 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 33 of 52 7.0 Guying Refer to DTR Section 06 for guying general requirements. 8.0 Conductor & Pole Top Construction Conductor type shall be selected according to the following: Covered Conductor 8.1.1 Covered conductor shall be used in all cases as this has proven to be the most reliable construction. However, it is only reliable when installed properly, with lightning arresters and arc protection clamps or wraparound covering, correctly applied. (See DER 84−7 and this guide). When new covered conductor is installed: .1.1. Install on polyethylene vise−top or tie−top insulators. Refer to DTR Section 07. .1.2. Skinned areas shall be kept to a minimum. Do not skin the covering unless it is necessary to install connectors or splices. .1.3. At locations where the covering has been skinned, and no lightning arresters will be installed, one of two methods shall be used for arc protection: .1.3a. Wraparound covering (i.e. gel-wrap) shall be the preferred method used to restore the integrity of the covering when the skinned portions are close to the pole and/or tree contacts are likely. .1.3b. Where it is not possible to cover a bare spot completely with wraparound covering (i.e. long skinned spans, transitions from bare conductor to covered conductor) Arc Protection Clamps (APCs) shall be installed to provide arc protection. .1.4. At locations where the covering has been skinned, and lightning arresters will be installed, APCs or wraparound covering are not required. 8.1.2 When adding additional phases of standard covered conductor to an existing single-phase 85 mil covered conductor circuit, replacement of the 85 mil conductor is not necessary, unless the conductor is damaged. The existing covered conductor should be evaluated as listed below. When evaluating existing covered conductor: .2.1. In the span, check the condition of the conductor and covering. .2.1a. If the conductor is damaged, replace it. .2.1b. If only the covering is damaged, skin it back to good covering and install wraparound covering or an APC as outlined above. If excessive skinning is required, or if skinning will result in tree related problems, replace the conductor. .2.2. At porcelain insulators, check the condition of the conductor, covering, insulator, and tie. If an insulator replacement is required, refer to DTR Section 07, for insulator selection. .2.2a. If all are good, leave the installation intact. 06.201 Page 6 of 10 Rev 2
  7. Page 34 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 34 of 52 .2.2b. If the tie or insulator alone is deteriorated and the covering is good, install a new insulator. .2.2c. If the covering is deteriorated and there is no damage to the conductor, skin it back to good covering, and install wraparound covering or APCs as outlined above. Install a new insulator. .2.2d. If the conductor is damaged, splice in new covered conductor, install a new standard insulator, and install wraparound covering or APCs at the splices as outlined above. 8.1.3 If there is extensive damage throughout several spans, install new standard insulators and new covered conductor. 8.1.4 It is imperative for the protection of covered conductor, that lightning arresters and APCs, or wraparound covering, be applied properly. 8.1.5 Covered conductor is not fully insulated; it must be treated as bare conductor during installation and maintenance. Spacer Cable 8.2.1 Three-phase spacer cable construction is: .1.1 For use in treed areas where it is not possible to get the necessary clearances for crossarm construction. .1.2 For use if required for clearances when a second circuit is needed on the same pole line. 8.2.2 Spacer cable construction will perform reliably when installed properly with lightning arresters correctly applied. (See DER 84-7 and this guide). 8.2.3 APCs shall not be used on spacer cable. Their use would seriously reduce phase−to−phase clearance. 8.2.4 Spacer cable is not fully insulated; it must be treated as bare conductor during installation and maintenance. Aerial Cable 8.3.1 Three-phase aerial cable construction is: .1.1. For express circuits only. .1.2. For use only where it is not practical to use less expensive crossarm or spacer cable construction. .1.3. For use if required for clearance when a second or third circuit is needed on the same pole line (such use may reduce pole replacement). .1.4. Not recommended for construction of an under−bridge section of an overhead line. The Connecticut DOT prohibits attachment of aerial cable to state bridges. 8.3.2 All aerial cables shall have their messengers and cable sheathes effectively grounded. (ANSI C2, NESC−2023 Rule 230C1). 8.3.3 The use of Y−splices and T−joints is forbidden on new aerial cable installations. 06.201 Page 7 of 10 Rev 2
  8. Page 35 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 35 of 52 Crossarm Construction 8.4.1 8-foot and 10-foot composite crossarms are the standard for all three-phase applications. (See DTR Section 10). Use in rural and suburban areas where optimum tree-trimming can be achieved. 8.4.2 Use the compact crossarm design (4-foot and 5-foot arms) in heavily treed suburban areas, where tree trimming is restricted, and proper clearances cannot always be maintained. Vertical Construction 8.5.1 Vertical construction can be considered for areas where longer spans are required, or width is restricted such as along a right−of−way shared with transmission lines. (See DTR Section 10). 9.0 Primary Risers Where primary cable risers are installed: 9.1.1 No more than two Eversource Energy risers (primary and secondary combined total) shall be attached to a pole. 9.1.2 No more than one three-phase primary riser shall be attached to a pole. 9.1.3 Although not preferred, two single-phase risers may be attached to a pole. 9.1.4 The installation of both a three-phase and a single-phase primary riser on the same pole is not allowed. 9.1.5 Only one primary cable (either single- or three-phase) shall be installed in a riser conduit. See DTR Section 12. . 10.0 Secondary Secondaries shall be 1/0 triplex, except in cases where larger secondaries are required. (See DSEM Section 13). Existing open wire secondary that is in good operating condition should remain in service whenever possible. When evaluating open wire secondary to determine whether it should be replaced with triplex secondary cable, consider the following factors: 10.2.1 Clearances − Primary to secondary clearances should be reviewed (see DTR Section 04). If it is necessary to relocate the secondary on the pole in order to obtain the clearance that is required, replace the open wire with triplex. 10.2.2 Neutral Sizing − Neutral sizing guidelines should be reviewed (see below Section 10.0 Neutrals). If the open wire secondary neutral is used as the system neutral and is insufficient for use with the primary conductors, replace the open wire with appropriately sized triplex. 10.2.3 Voltage Drop − The open wire secondary voltage drop should be calculated as shown on DSEM Section 15. If larger secondary conductors are required due to excessive voltage drop, replace the open wire with triplex. 10.2.4 Condition − The open wire secondaries should be examined to determine their condition. If the conductors are found to be in poor physical condition, replace the open wire with triplex. 06.201 Page 8 of 10 Rev 2
  9. Page 36 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 36 of 52 10.2.5 Location .5.1 If shifting several spans of open wire secondaries is required, remove the open wire and replace it with triplex. .5.2 Single open wire secondary is more susceptible to faults. Locations where faults are likely, such as heavily treed areas, replace the open wire with triplex. Open wire secondary that is in good reliable condition and does not require replacement according to the above guidelines, shall remain in service. Where open wire secondary will be replaced with triplex cable, every effort should be made to locate the secondary at the attachment points indicated in DTR Section 04 – Attachment Points for Secondary & Neutral Cable. Where this is not possible, the preferred clearances shown on DTR Section 04 – Separation of Facilities on a Pole should be used. . 11.0 Neutrals Neutrals shall be sized as follows: 11.1.1 All new neutrals shall be 1/0 ACSR (or equivalent) bare conductor except when a larger conductor is needed; then use 4/0 ACSR. 11.1.2 If existing phase conductors are smaller than 1/0 ACSR (or equivalent) and a bare neutral exists, it shall be used if it is of equal size or larger than the phase conductor, except that #4 bare copper neutrals may be used under certain conditions, as noted below. 11.1.3 If existing phase conductors are equal to or larger than 1/0 ACSR (or equivalent) and a bare neutral exists, it shall be used if it is at least 1/0 ACSR (or equivalent), except that #4 bare copper neutrals may be used under certain conditions, as noted below. Existing #4 bare copper neutrals may be used with up to 1/0 ACSR (or equivalent) phase conductors where the phase conductors are protected by line fuses (up to 140K in Connecticut, 100T in Massachusetts). . 12.0 Eversource Owned All Self-Supporting (ADSS) Cable If ADSS cable is planned to be installed, refer to DSEM 06.231, DSEM 06.241 and DTR Section 15 for installation requirements. 13.0 Transformer Single-voltage transformers shall be used in all cases, except where DSEM Section 14, dictates otherwise. NOTE: It is imperative that for proper protection, lightning arrester leads be as short and as straight as possible. Primary taps to transformers must not be coiled. Doing so presents a significantly higher surge impedance to lightning strikes, materially increasing the effective primary to neutral arrester clamping voltage and resulting in greatly reduced lightning protection. .1.1 Locating transformers, refer to DSEM 06.301 for information on Pole Replacement. 06.201 Page 9 of 10 Rev 2
  10. Page 37 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 37 of 52 14.0 Arresters Lightning arresters shall be used to protect overhead lines, transformers, equipment, and riser cables from damage caused by overvoltage due to surges and lightning strokes. Arresters shall be selected and applied in accordance with the operating voltage of the equipment they are installed to protect. Refer to the DSEM Section 09. 15.0 Cutouts Cutouts shall not be installed at three-phase armless locations, except for single-phase taps and single-phase risers. At locations using three-phase armless vertical construction, cutouts shall never be installed. DTR Section 18. . 16.0 Grounding The system neutral on a multigrounded system shall have all grounds and ground leads connected to it; i.e., equipment grounds (reclosers, regulators, capacitors, transformers, etc), secondary grounds, pole driven grounds, guys, arrester grounds, etc. For grounding on multigrounded wye, delta and unigrounded systems, refer to DTR Section 16. Where two multigrounded circuits are on the same pole line, they shall share a common 1/0 ACSR (or equivalent) bare neutral. At any separation of the circuits, each circuit must have its own neutral. If circuits cross each other, their neutrals shall be bonded together. This practice shall be followed even if circuits are of different voltages or from different sources. . 17.0 Guy Insulators See DTR Section 06. 18.0 Animal Guards Animal guards shall be used on all arresters and bushings on the following equipment: capacitors, capacitor switches, reclosers, regulators, sectionalizers, and transformers. Refer to WMS 08.06 Wildlife Guards. 19.0 Basic Impulse Insulation Level (BIL) The insulation level to which a device can withstand a voltage impulse surge, such as those which occur during switching or lightning strikes, is described as the BIL of that device. 19.1.1 BIL is expressed in kilovolts. 19.1.2 The values within Table 2 are the minimum BIL ratings for equipment installations on their respective circuit voltages. Table 2 – BIL per Circuit Voltage Circuit Voltage (kV) 4.8 15 23 27.6 34.5 06.201 Circuit BIL (kV) 75 95 125 150 150/200 Page 10 of 10 Rev 2
Words on different pages
Words on different pages

Text of NECTA-132 Attachment 3.pdf

Extracted from the file · 8 pages · 10,921 characters

Text of NECTA-132 Attachment 4.pdf

Extracted from the file · 8 pages · 11,115 characters

As listed on the current system

Question(s) Answered 132 (The Connecticut Light and Power Company) Date Filed: 11/05/2026