  1. Page 36 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 36 of 52 10.2.5 Location .5.1 If shifting several spans of open wire secondaries is required, remove the open wire and replace it with triplex. .5.2 Single open wire secondary is more susceptible to faults. Locations where faults are likely, such as heavily treed areas, replace the open wire with triplex. Open wire secondary that is in good reliable condition and does not require replacement according to the above guidelines, shall remain in service. Where open wire secondary will be replaced with triplex cable, every effort should be made to locate the secondary at the attachment points indicated in DTR Section 04 – Attachment Points for Secondary & Neutral Cable. Where this is not possible, the preferred clearances shown on DTR Section 04 – Separation of Facilities on a Pole should be used. . 11.0 Neutrals Neutrals shall be sized as follows: 11.1.1 All new neutrals shall be 1/0 ACSR (or equivalent) bare conductor except when a larger conductor is needed; then use 4/0 ACSR. 11.1.2 If existing phase conductors are smaller than 1/0 ACSR (or equivalent) and a bare neutral exists, it shall be used if it is of equal size or larger than the phase conductor, except that #4 bare copper neutrals may be used under certain conditions, as noted below. 11.1.3 If existing phase conductors are equal to or larger than 1/0 ACSR (or equivalent) and a bare neutral exists, it shall be used if it is at least 1/0 ACSR (or equivalent), except that #4 bare copper neutrals may be used under certain conditions, as noted below. Existing #4 bare copper neutrals may be used with up to 1/0 ACSR (or equivalent) phase conductors where the phase conductors are protected by line fuses (up to 140K in Connecticut, 100T in Massachusetts). . 12.0 Eversource Owned All Self-Supporting (ADSS) Cable If ADSS cable is planned to be installed, refer to DSEM 06.231, DSEM 06.241 and DTR Section 15 for installation requirements. 13.0 Transformer Single-voltage transformers shall be used in all cases, except where DSEM Section 14, dictates otherwise. NOTE: It is imperative that for proper protection, lightning arrester leads be as short and as straight as possible. Primary taps to transformers must not be coiled. Doing so presents a significantly higher surge impedance to lightning strikes, materially increasing the effective primary to neutral arrester clamping voltage and resulting in greatly reduced lightning protection. .1.1 Locating transformers, refer to DSEM 06.301 for information on Pole Replacement. 06.201 Page 9 of 10 Rev 2
  2. Page 37 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 37 of 52 14.0 Arresters Lightning arresters shall be used to protect overhead lines, transformers, equipment, and riser cables from damage caused by overvoltage due to surges and lightning strokes. Arresters shall be selected and applied in accordance with the operating voltage of the equipment they are installed to protect. Refer to the DSEM Section 09. 15.0 Cutouts Cutouts shall not be installed at three-phase armless locations, except for single-phase taps and single-phase risers. At locations using three-phase armless vertical construction, cutouts shall never be installed. DTR Section 18. . 16.0 Grounding The system neutral on a multigrounded system shall have all grounds and ground leads connected to it; i.e., equipment grounds (reclosers, regulators, capacitors, transformers, etc), secondary grounds, pole driven grounds, guys, arrester grounds, etc. For grounding on multigrounded wye, delta and unigrounded systems, refer to DTR Section 16. Where two multigrounded circuits are on the same pole line, they shall share a common 1/0 ACSR (or equivalent) bare neutral. At any separation of the circuits, each circuit must have its own neutral. If circuits cross each other, their neutrals shall be bonded together. This practice shall be followed even if circuits are of different voltages or from different sources. . 17.0 Guy Insulators See DTR Section 06. 18.0 Animal Guards Animal guards shall be used on all arresters and bushings on the following equipment: capacitors, capacitor switches, reclosers, regulators, sectionalizers, and transformers. Refer to WMS 08.06 Wildlife Guards. 19.0 Basic Impulse Insulation Level (BIL) The insulation level to which a device can withstand a voltage impulse surge, such as those which occur during switching or lightning strikes, is described as the BIL of that device. 19.1.1 BIL is expressed in kilovolts. 19.1.2 The values within Table 2 are the minimum BIL ratings for equipment installations on their respective circuit voltages. Table 2 – BIL per Circuit Voltage Circuit Voltage (kV) 4.8 15 23 27.6 34.5 06.201 Circuit BIL (kV) 75 95 125 150 150/200 Page 10 of 10 Rev 2
  3. Page 38 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 38 of 52 DISTRIBUTION SYSTEM ENGINEERING MANUAL Pole Tops Doc Number: Issued Date: 06.211 19-Dec-25 DSEM Category: Overhead Design Approved by: Signature on File David Gladey Vice President, Distribution Engineering Rev No. Revision: Applicability: Description 1 Date: ALL 15-Dec-25 Date 1 Updated Section 9.1 removed 556 replaced for 477 December 19, 2025 0 Original September, 2018
  4. Page 39 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 39 of 52 Table of Contents Section Page 1.0 Scope ........................................................................................................................................3 2.0 Reference Documents...............................................................................................................3 3.0 Secondary/Neutral/ADSS Attachment Height ...........................................................................3 4.0 Existing Poles ............................................................................................................................4 5.0 Junction Poles ...........................................................................................................................5 6.0 Cutouts and Lightning Arresters ................................................................................................5 7.0 Span Length Limitations ............................................................................................................6 8.0 Slack Spans ..............................................................................................................................6 9.0 Crossarm Guys .........................................................................................................................7 06.211 Page 2 of 7 Rev 1
  5. Page 40 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 40 of 52 1.0 Scope The standards herein indicate the amount of pole space required for each pole-top configuration. This standard is designed to provide enough clearance on the pole for a line worker in a bucket truck to gain access to the field side of the pole, when necessary. A minimum of 60 inches is required between the primary and secondary conductors, and to provide the maximum available working clearance, the intent is to attach the secondary or neutral conductors, or if applicable, Eversource-owned all dielectric selfsupporting (ADSS) cable on the pole at the lowest point of our allocated space. 2.0 Reference Documents DSEM 06.201 Overhead General DSEM 06.231 Clearances DSEM 06.241 Conductor Attachment DSEM Section 06 Overhead Design DSEM Section 09 Arrester 3.0 DTR 04.045 Joint Pole Space Allocation Guide DTR 04.047 Attachment Points for Secondary and Neutral Cable DTR 04.111 Minimum Vertical Clearance for Joint Pole Lines DTR 04.225 Minimum Vertical Clearance Between Conductors on the Same Pole DTR 06.035 Conductor Storm-Loaded Tensions DTR 10.045 35 kV MGY and Below, Single-Phase Double Dead-end and Tap DTR 10.061 35 kV MGY and Below Single-Phase Taps DTR 32.143 Slack Spans Sag & Tension Primary Conductor – Spacer Cable & Aerial Cable DTR 32.183 Slack Spans Sag & Tension – 1/0 ACSR Neutral-Messenger – 1/0 Secondary Cable DTR Section 10 Distribution Pole Tops DTR Section 16 Arresters & Grounds DTR Section 18 Cutout and Solid Blade Disconnects DTR Section 32 Conductors Secondary/Neutral/ADSS Attachment Height The secondary or neutral attachment point is determined by the amount of pole space we have purchased on each pole. The amount of space allocated to Eversource Energy is determined by the pole height, if the pole is jointly owned with the telephone company or if Eversource has purchased additional height. The amount of space we have allocated is specified on DTR 04.045. All joint occupants in the Eversource operating territories (CT, WMA, & NH) have agreed to accept the space allocations as shown on this Standard. 06.211 Page 3 of 7 Rev 1
  6. Page 41 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 41 of 52 We have specified the secondary/ neutral or, if applicable, ADSS cable attachment point to be two inches above the point shown on DTR 04.045 in order to provide enough space on the pole to allow for the sag of the secondary/neutral or ADSS conductors without violating the National Electrical Safety Code. 3.2.1 Secondary/ neutral or, if applicable, ADSS cable attachment points are specified on DTR 04.047 for various combinations of pole height requirements. These conductors should be attached at the mounting heights specified within this standard in order to maximize fully utilize our entire allocated pole space to our maximum advantage, that is, to provide as much clearance as possible for our line crews. Our pole specification has been revised to provide a predrilled hole for the secondary/neutral or ADSS cable mounting bracket. Failure to utilize this space by not attaching our secondary/neutral or ADSS conductors as low on the pole as possible generally results in the appropriation of our allocated space by the communications (telephone or cable television) companies who creep up the pole into the “neutral space” or into our allocated space. This can lead to injuries resulting from clearance violations by the communications companies. When we purchase additional pole height, we must be sure that our secondary conductor is installed as far down on the pole as we are allowed to be, within the space allocated to our Company by the purchase of the extra height. Refer to DTR 04.047 to determine the secondary/neutral or ADSS attachment height when our Company purchases additional height. Example 3.4.1 Eversource requires 109 inches to build a specific pole top: A 45-foot pole is needed to provide the clearances required in our Standards, but the telephone company will only agree to joint ownership of a 40-foot pole, forcing us to purchase the additional five feet. In this case, even though we initially required only 109 inches, our attachment point should be at 136 inches. This allows us to fully utilize the space on the pole that we have purchased to provide as much clearance as possible for our line crews. 4.0 Existing Poles Existing poles should not be replaced just to achieve the increased clearances shown in these new Standards. If existing poles are in good condition, do not require replacement for other reasons, and meet the preferred clearance requirements as specified in DTR 04.225, economics dictate that they should remain in service. If it is practical to do so without violating the clearance requirements shown in DTR 04.111, the secondary/neutral and ADSS conductors should be lowered to the attachment heights shown on DTR 04.047 when work is performed on existing poles. When existing poles are replaced, they shall be sized for the necessary height to achieve the increased clearances set forth in the current Standards. This may occasionally require replacement of adjacent poles to prevent excessive strain on pole hardware and to achieve proper line profile. Also, poles that are being replaced need to be correctly sized for class. Refer to DSEM 06.201. 06.211 Page 4 of 7 Rev 1
  7. Page 42 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 42 of 52 5.0 Junction Poles Most junction pole Standards show only the hardware for the tap or crossover construction. This allows a variety of junction poles to be built by selecting the main line construction from other DTR Section 10 standards. Appropriate main line construction options are defined for each junction pole by the Structure Limit at the top of each page. The junction pole hardware mounting heights have been established to provide proper clearances from the main line construction. If the conditions exceed the Structure Limit shown for the main line, another Standard may already exist for the main line Structure Limit you desire; or perhaps it is not possible to build this junction pole combination without violating Eversource Energy’s clearance standards (see DSEM Section 06) or the National Electrical Safety Code. Contact T&D Standards if junction pole combinations are needed that are not found in these Construction Standards. Example 5.2.1 DTR 10.061, which is the Standard for a single−phase tap, specifies the Main Line Structure Limit as: C2, A3 (CROSSARM REPLACEMENT STYLE ONLY). 5.2.2 This means that either C1 or C2 construction (crossarms with the conductors installed on pin insulators) may be used for the main line. Large corners or dead ends (C3 and C4), where the conductors are further down on the pole, are not suitable for the main line construction because these styles of construction position the main line conductors too low on the pole to maintain proper clearance from the tap conductors. Also, only single−phase ridge pin construction (A3) or the crossarm replacement style of three−phase armless construction (A3), which uses the upswept brackets, can be used for this pole’s main line construction; the straight armless construction bracket positions the main line conductors too low on the pole to maintain proper clearance from the tap conductors. This is also true of either single− or three−phase large corner construction (A5), three−phase armless dead−end construction (A6), and all spacer cable styles of construction. Main line single−phase dead−end construction (A6) should be built according to DTR 10.045 to provide maximum clearance. Crossarm 5.3.1 Generally, 8-foot crossarms are used for three−phase construction. 10-foot arms are required when cutouts are installed on all three phases. 10-foot arms are also required for other applications and are specified on the particular Construction Standard, for example, poles with recloser bypass disconnect switches. 10-foot crossarms are recommended in commercial and industrial areas where risers might be installed in the future. 5.3.2 In New Hampshire, 10-foot crossarms shall be used for all 35 kV construction. 6.0 Cutouts and Lightning Arresters These pieces of equipment are shown on the Construction Standard, indicating where they are installed, if required. However, these items are not provided on the pageback. This allows the engineer or technician who is laying out the job the flexibility to select the properly sized items from the Cutout Guide (DTR Section 18) and the Lightning Arrester Guide (DSEM Section 09 and DTR Section 16), without having to search through the extensive number of variations that would be required to provide all the possible combinations of these items. 06.211 Page 5 of 7 Rev 1
  8. Page 43 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 43 of 52 7.0 Span Length Limitations These Standards are designed to prevent 1/0 triplex secondary, or 1/0 ACSR neutral from violating the minimum separation requirements between power and communications facilities as described in DSEM 06.231 and DTR Section 32. This limits our span lengths for secondary cable installations to: 7.1.1 200 feet under the conditions described in Clearances on DSEM 06.231. For aerial cable installations the span length is limited to 175 feet. If the limitations described on DSEM 06.231 are exceeded, then adjustments must be made to the attachment points of the primary, secondary and/or the communications conductors so that these conductors do not violate the requirements of DSEM 06.241. Refer to DSEM Section 06.241 to determine the necessary separation between these conductors at the pole. Clearances are calculated using the conductor condition that produces the closest approach. 7.1.2 Refer to DTR Section 32 of the Construction Standards for the sag of various types of conductors. In addition, conductor separation at the pole should not be less than the preferred vertical separation between conductors as shown in DTR 04.225 and shall not be less than the minimum dimension shown on this page. 8.0 Slack Spans Slack span construction is a method to reduce conductor and cable tension and associate pole class and guying requirements. All possible steps should be taken to obtain normal necessary guying without slack span construction. However, slack span construction is an option where there is insufficient space to install guys with longer leads that would otherwise be required based on maximum storm loaded tensions. Larger pole class, e.g. H1 and H2 is a factor as well. Reduced tension on conductor and cable for slack spans will have greater sag therefore, span lengths are not to exceed 80 feet. See DTR 32.143 and DTR 32.183 for slack span sag and tension. See DTR 06.035 for slack span storm loaded tension values to be used for guying purposes. Poles preceding the slack span shall be installed as Deadends with guys based on conductor full storm loaded tensions. Also, install a guy for the corner pole based on the reduced tensions of the slack span conductors. All primary tongue and clevis joints shall be assembled with an antistatic clip, Item #515256, to prevent radio and television interference which results when an assembly is not installed under full tension. Automatic type splices shall not be used due to lack of adequate tension to establish a proper electrical connection. If there is a need to extend slack spans, replace them with longer conductors. 06.211 Page 6 of 7 Rev 1
  9. Page 44 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 44 of 52 Figure 1 – Corner Pole Slack Span 9.0 Crossarm Guys Crossarm guys should not be installed if there is any way to avoid their use. All possible steps should be taken to balance the conductor load evenly on the crossarms. When crossarm guys cannot be avoided, use 14M alumoweld cable for balancing 1/0 ACSR−477 AAC conductors. 06.211 Page 7 of 7 Rev 1
  10. Page 45 of 52

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 45 of 52 Construction Grades 06.221 Overhead Design Section 06.22 GENERAL − The National Electrical Safety Code (NESC) specifies three grades of construction for power lines: B, C, and N. Grade C is used for most construction and our Standards are based on that grade. When greater strength is required to provide a higher safety factor, Grade B is specified. Variations are included in the Standards to raise the safety factor for Grade B construction (see below). The third Grade, N, weaker than C, is not used by Eversource Energy. In addition, storm resiliency criteria were created to provide greater strength to the distribution system. Refer to DESM Section 02.50 Storm Resiliency Guideline for additional details. For the purposes of this Standard, all voltage designations are phase−to−ground for effectively grounded circuits or phase−to−phase for delta or unigrounded circuits, unless otherwise specified. GRADE B LOCATIONS − These requirements for Grade B construction meet or exceed the requirements of the NESC (Section 24). Grade B construction is required for: All supply cables and conductors of any voltage that cross over or overhang railroads or limited−access highways. Ramps and turning roadways in the interchanges associated with these highways are also considered part of limited access highways. Delta supply circuits, greater than 5 kV (phase−to−phase), that cross over, or are installed on the same structure with, a communications circuit. This restriction does not apply to effectively grounded aerial cables and 27.6 kV unigrounded wye circuits. It is an Eversource requirement that conductor fastenings for 27.6 kV unigrounded wye circuit meet Grade B requirements. See DSEM 06.222. Delta circuits greater than 8.7 kV (phase−to−phase), except in rights−of−way that are owned, leased or eased, and maintained by Eversource Energy. This restriction does not apply to effectively grounded aerial cables. Primary circuits less than 8.7 kV (phase−to−phase), if installed above a circuit that is greater than 8.7 kV (phase−to−phase). This is not recommended construction. This restriction does not apply to effectively grounded aerial cables and 27.6 kV unigrounded wye circuits. It is an Eversource requirement that conductor fastenings for 27.6 kV unigrounded wye circuits meet Grade B requirements. See DSEM 06.222. The transition poles between Grade C and Grade B construction must be double dead−end construction When construction changes from Grade C to Grade B, anchor guying shall be installed to support the transition pole in the event of conductor failure in the Grade C sections. Refer to GUYING − GENERAL REQUIREMENTS in DTR Section 06 for guying details. POLE CLASS SIZE AND GUYING REQUIREMENTS − To determine the proper pole class size and guying requirements, use the Eversource Pole and Guy Size (PAGS) computer program, or other Company approved program. Select construction Grades B or C, as applicable. The PAGS program can be accessed from the Company’s intranet by going to the on−line Distribution Standards Bookshelf. Select On−Line Tools/Design Calculators/ ES Pole & Guy Size (PAGS) Program. For the user guide, select ES PAGS User Manual. For background technical information about engineering principles used in the program calculations, select ES PAGS Engineering Manual. WOOD CROSSARMS − The crossarms used by Eversource are sufficient for Grade B for C1, C2, and C3 construction. For C4 construction, the number of crossarms specified in DTR 07.011 is sufficient for Grade C. If Grade B construction is required, the following chart shall be used: No. of Crossarms Eversource Energy April 2017 Maximum Tension Per Conductor 2 1100 3 2700 4 4300 Distribution System Engineering Manual
Words on different pages
Words on different pages

Text of NECTA-132 Attachment 3.pdf

Extracted from the file · 8 pages · 10,921 characters

Text of NECTA-132 Attachment 4.pdf

Extracted from the file · 8 pages · 11,115 characters

As listed on the current system

Question(s) Answered 132 (The Connecticut Light and Power Company) Date Filed: 11/05/2026

This filing on the current system (opens in a new tab)