Interrogatory responses
Answers to questions 132
Files6
NECTA-132_Final.pdf
PDF · 209 KB · 4 pagesText searchable
Download NECTA-132_Final.pdfRead the text of NECTA-132_Final.pdf
NECTA-132 Attachment 1.pdf
PDF · 3.0 MB · 52 pagesText searchable
Download NECTA-132 Attachment 1.pdfRead the text of NECTA-132 Attachment 1.pdf
NECTA-132 Attachment 2.pdf
PDF · 221 KB · 2 pagesText searchable
Download NECTA-132 Attachment 2.pdfRead the text of NECTA-132 Attachment 2.pdf
NECTA-132 Attachment 2.xlsx
Excel · 99 KBText searchable
Download NECTA-132 Attachment 2.xlsxRead the text of NECTA-132 Attachment 2.xlsx
NECTA-132 Attachment 3.pdf
PDF · 1.9 MB · 8 pagesText searchable
Download NECTA-132 Attachment 3.pdfRead the text of NECTA-132 Attachment 3.pdf
NECTA-132 Attachment 4.pdf
PDF · 1.8 MB · 8 pagesText searchable
Download NECTA-132 Attachment 4.pdfRead the text of NECTA-132 Attachment 4.pdf
Page 41 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 41 of 52 We have specified the secondary/ neutral or, if applicable, ADSS cable attachment point to be two inches above the point shown on DTR 04.045 in order to provide enough space on the pole to allow for the sag of the secondary/neutral or ADSS conductors without violating the National Electrical Safety Code. 3.2.1 Secondary/ neutral or, if applicable, ADSS cable attachment points are specified on DTR 04.047 for various combinations of pole height requirements. These conductors should be attached at the mounting heights specified within this standard in order to maximize fully utilize our entire allocated pole space to our maximum advantage, that is, to provide as much clearance as possible for our line crews. Our pole specification has been revised to provide a predrilled hole for the secondary/neutral or ADSS cable mounting bracket. Failure to utilize this space by not attaching our secondary/neutral or ADSS conductors as low on the pole as possible generally results in the appropriation of our allocated space by the communications (telephone or cable television) companies who creep up the pole into the “neutral space” or into our allocated space. This can lead to injuries resulting from clearance violations by the communications companies. When we purchase additional pole height, we must be sure that our secondary conductor is installed as far down on the pole as we are allowed to be, within the space allocated to our Company by the purchase of the extra height. Refer to DTR 04.047 to determine the secondary/neutral or ADSS attachment height when our Company purchases additional height. Example 3.4.1 Eversource requires 109 inches to build a specific pole top: A 45-foot pole is needed to provide the clearances required in our Standards, but the telephone company will only agree to joint ownership of a 40-foot pole, forcing us to purchase the additional five feet. In this case, even though we initially required only 109 inches, our attachment point should be at 136 inches. This allows us to fully utilize the space on the pole that we have purchased to provide as much clearance as possible for our line crews. 4.0 Existing Poles Existing poles should not be replaced just to achieve the increased clearances shown in these new Standards. If existing poles are in good condition, do not require replacement for other reasons, and meet the preferred clearance requirements as specified in DTR 04.225, economics dictate that they should remain in service. If it is practical to do so without violating the clearance requirements shown in DTR 04.111, the secondary/neutral and ADSS conductors should be lowered to the attachment heights shown on DTR 04.047 when work is performed on existing poles. When existing poles are replaced, they shall be sized for the necessary height to achieve the increased clearances set forth in the current Standards. This may occasionally require replacement of adjacent poles to prevent excessive strain on pole hardware and to achieve proper line profile. Also, poles that are being replaced need to be correctly sized for class. Refer to DSEM 06.201. 06.211 Page 4 of 7 Rev 1Page 42 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 42 of 52 5.0 Junction Poles Most junction pole Standards show only the hardware for the tap or crossover construction. This allows a variety of junction poles to be built by selecting the main line construction from other DTR Section 10 standards. Appropriate main line construction options are defined for each junction pole by the Structure Limit at the top of each page. The junction pole hardware mounting heights have been established to provide proper clearances from the main line construction. If the conditions exceed the Structure Limit shown for the main line, another Standard may already exist for the main line Structure Limit you desire; or perhaps it is not possible to build this junction pole combination without violating Eversource Energy’s clearance standards (see DSEM Section 06) or the National Electrical Safety Code. Contact T&D Standards if junction pole combinations are needed that are not found in these Construction Standards. Example 5.2.1 DTR 10.061, which is the Standard for a single−phase tap, specifies the Main Line Structure Limit as: C2, A3 (CROSSARM REPLACEMENT STYLE ONLY). 5.2.2 This means that either C1 or C2 construction (crossarms with the conductors installed on pin insulators) may be used for the main line. Large corners or dead ends (C3 and C4), where the conductors are further down on the pole, are not suitable for the main line construction because these styles of construction position the main line conductors too low on the pole to maintain proper clearance from the tap conductors. Also, only single−phase ridge pin construction (A3) or the crossarm replacement style of three−phase armless construction (A3), which uses the upswept brackets, can be used for this pole’s main line construction; the straight armless construction bracket positions the main line conductors too low on the pole to maintain proper clearance from the tap conductors. This is also true of either single− or three−phase large corner construction (A5), three−phase armless dead−end construction (A6), and all spacer cable styles of construction. Main line single−phase dead−end construction (A6) should be built according to DTR 10.045 to provide maximum clearance. Crossarm 5.3.1 Generally, 8-foot crossarms are used for three−phase construction. 10-foot arms are required when cutouts are installed on all three phases. 10-foot arms are also required for other applications and are specified on the particular Construction Standard, for example, poles with recloser bypass disconnect switches. 10-foot crossarms are recommended in commercial and industrial areas where risers might be installed in the future. 5.3.2 In New Hampshire, 10-foot crossarms shall be used for all 35 kV construction. 6.0 Cutouts and Lightning Arresters These pieces of equipment are shown on the Construction Standard, indicating where they are installed, if required. However, these items are not provided on the pageback. This allows the engineer or technician who is laying out the job the flexibility to select the properly sized items from the Cutout Guide (DTR Section 18) and the Lightning Arrester Guide (DSEM Section 09 and DTR Section 16), without having to search through the extensive number of variations that would be required to provide all the possible combinations of these items. 06.211 Page 5 of 7 Rev 1Page 43 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 43 of 52 7.0 Span Length Limitations These Standards are designed to prevent 1/0 triplex secondary, or 1/0 ACSR neutral from violating the minimum separation requirements between power and communications facilities as described in DSEM 06.231 and DTR Section 32. This limits our span lengths for secondary cable installations to: 7.1.1 200 feet under the conditions described in Clearances on DSEM 06.231. For aerial cable installations the span length is limited to 175 feet. If the limitations described on DSEM 06.231 are exceeded, then adjustments must be made to the attachment points of the primary, secondary and/or the communications conductors so that these conductors do not violate the requirements of DSEM 06.241. Refer to DSEM Section 06.241 to determine the necessary separation between these conductors at the pole. Clearances are calculated using the conductor condition that produces the closest approach. 7.1.2 Refer to DTR Section 32 of the Construction Standards for the sag of various types of conductors. In addition, conductor separation at the pole should not be less than the preferred vertical separation between conductors as shown in DTR 04.225 and shall not be less than the minimum dimension shown on this page. 8.0 Slack Spans Slack span construction is a method to reduce conductor and cable tension and associate pole class and guying requirements. All possible steps should be taken to obtain normal necessary guying without slack span construction. However, slack span construction is an option where there is insufficient space to install guys with longer leads that would otherwise be required based on maximum storm loaded tensions. Larger pole class, e.g. H1 and H2 is a factor as well. Reduced tension on conductor and cable for slack spans will have greater sag therefore, span lengths are not to exceed 80 feet. See DTR 32.143 and DTR 32.183 for slack span sag and tension. See DTR 06.035 for slack span storm loaded tension values to be used for guying purposes. Poles preceding the slack span shall be installed as Deadends with guys based on conductor full storm loaded tensions. Also, install a guy for the corner pole based on the reduced tensions of the slack span conductors. All primary tongue and clevis joints shall be assembled with an antistatic clip, Item #515256, to prevent radio and television interference which results when an assembly is not installed under full tension. Automatic type splices shall not be used due to lack of adequate tension to establish a proper electrical connection. If there is a need to extend slack spans, replace them with longer conductors. 06.211 Page 6 of 7 Rev 1Page 44 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 44 of 52 Figure 1 – Corner Pole Slack Span 9.0 Crossarm Guys Crossarm guys should not be installed if there is any way to avoid their use. All possible steps should be taken to balance the conductor load evenly on the crossarms. When crossarm guys cannot be avoided, use 14M alumoweld cable for balancing 1/0 ACSR−477 AAC conductors. 06.211 Page 7 of 7 Rev 1Page 45 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 45 of 52 Construction Grades 06.221 Overhead Design Section 06.22 GENERAL − The National Electrical Safety Code (NESC) specifies three grades of construction for power lines: B, C, and N. Grade C is used for most construction and our Standards are based on that grade. When greater strength is required to provide a higher safety factor, Grade B is specified. Variations are included in the Standards to raise the safety factor for Grade B construction (see below). The third Grade, N, weaker than C, is not used by Eversource Energy. In addition, storm resiliency criteria were created to provide greater strength to the distribution system. Refer to DESM Section 02.50 Storm Resiliency Guideline for additional details. For the purposes of this Standard, all voltage designations are phase−to−ground for effectively grounded circuits or phase−to−phase for delta or unigrounded circuits, unless otherwise specified. GRADE B LOCATIONS − These requirements for Grade B construction meet or exceed the requirements of the NESC (Section 24). Grade B construction is required for: All supply cables and conductors of any voltage that cross over or overhang railroads or limited−access highways. Ramps and turning roadways in the interchanges associated with these highways are also considered part of limited access highways. Delta supply circuits, greater than 5 kV (phase−to−phase), that cross over, or are installed on the same structure with, a communications circuit. This restriction does not apply to effectively grounded aerial cables and 27.6 kV unigrounded wye circuits. It is an Eversource requirement that conductor fastenings for 27.6 kV unigrounded wye circuit meet Grade B requirements. See DSEM 06.222. Delta circuits greater than 8.7 kV (phase−to−phase), except in rights−of−way that are owned, leased or eased, and maintained by Eversource Energy. This restriction does not apply to effectively grounded aerial cables. Primary circuits less than 8.7 kV (phase−to−phase), if installed above a circuit that is greater than 8.7 kV (phase−to−phase). This is not recommended construction. This restriction does not apply to effectively grounded aerial cables and 27.6 kV unigrounded wye circuits. It is an Eversource requirement that conductor fastenings for 27.6 kV unigrounded wye circuits meet Grade B requirements. See DSEM 06.222. The transition poles between Grade C and Grade B construction must be double dead−end construction When construction changes from Grade C to Grade B, anchor guying shall be installed to support the transition pole in the event of conductor failure in the Grade C sections. Refer to GUYING − GENERAL REQUIREMENTS in DTR Section 06 for guying details. POLE CLASS SIZE AND GUYING REQUIREMENTS − To determine the proper pole class size and guying requirements, use the Eversource Pole and Guy Size (PAGS) computer program, or other Company approved program. Select construction Grades B or C, as applicable. The PAGS program can be accessed from the Company’s intranet by going to the on−line Distribution Standards Bookshelf. Select On−Line Tools/Design Calculators/ ES Pole & Guy Size (PAGS) Program. For the user guide, select ES PAGS User Manual. For background technical information about engineering principles used in the program calculations, select ES PAGS Engineering Manual. WOOD CROSSARMS − The crossarms used by Eversource are sufficient for Grade B for C1, C2, and C3 construction. For C4 construction, the number of crossarms specified in DTR 07.011 is sufficient for Grade C. If Grade B construction is required, the following chart shall be used: No. of Crossarms Eversource Energy April 2017 Maximum Tension Per Conductor 2 1100 3 2700 4 4300 Distribution System Engineering ManualPage 46 of 52
Overhead Design Section 06.22 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 46 of 52 Construction Grades 06.222 FIBERGLASS CROSSARMS − Fiberglass crossarms used by Eversource are sufficient for Grade B and C construction. CONDUCTORS − Tensions and sags, as listed in DTR Section 32, are acceptable for Grade B construction. INSULATORS AND TIES − Vise−top insulators meet the requirements of Grade B construction when the conductor is in the top position. Vise−top insulators with the conductor in the side tied position do not have enough holding power to meet the requirements of Grade B. When installing the conductor in the side tied position, the following shall be used: S Bare Aluminum Conductors − poly−tie−top insulators and #2 bare aluminum tie wire, Item #563990. S Bare Copper Conductors − poly−tie−top insulators and #6 bare copper tie wire, Item #563992. S Covered Conductor − poly−tie−top insulators and #2 aluminum covered tie wire, Item #563989. Do not use polyurethane ties for Grade B construction. Spacer cable in spreaders with polyurethane ties is not considered to be Grade B construction unless the conductors are captured at each pole in the top position of a vise−top insulator or tied to insulators with wire ties. Eversource Energy April 2017 Distribution System Engineering ManualPage 47 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 47 of 52 DISTRIBUTION SYSTEM ENGINEERING MANUAL PoleForeman Guidelines Doc Number: Issued Date: 06.715 18-Sep-26 DSEM Category: Overhead Design Approved by: Signature on File David Gladey Vice President, Distribution Engineering Rev No. 0 Description Original Document Revision: Applicability: 0 Date: ALL 18-Sep-26 Date September 18, 2026Page 48 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 48 of 52 Table of Contents Section Page 1.0 Introduction ...............................................................................................................................3 2.0 Reference Documents...............................................................................................................3 3.0 Definitions .................................................................................................................................3 4.0 Program Usage Guidelines .......................................................................................................4 Appendix A .........................................................................................................................................5 06.715 Page 2 of 6 Rev 0Page 49 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 49 of 52 1.0 Introduction This document provides applications details of when to use the PoleForeman line design program. PoleForeman shall be used when installing new or rebuilding overhead distribution lines and pole tops. This guideline applies to all operating companies and distribution system voltages, 35 kV and below. 2.0 3.0 Reference Documents DTR 06.025 Guying – Determining Strength Requirements DTR 07.011 Structure Limits DTR 04.047 Attachment Points for Secondary and Neutral Cable Definitions PoleForeman is used to evaluate pole loading, structural capacity, and associated attachments for overhead distribution construction. Calculations ensure compliance with Eversource Construction Standards and confirm that poles, equipment, and support hardware meet required strength and sag criteria under applicable loading conditions. PoleForeman incorporates all application structural components into the calculation, including: 3.3.1 Crossarms, pole-top pins, crossarm pins 3.3.2 Post, Vice-top, and dead-end insulators & hardware 3.3.3 Messenger, conductor brackets & hardware (Spacer Construction) 3.3.4 Wood, composite & steel poles 3.3.5 All guying materials 3.3.6 Communications cables and associated 3rd party hardware where applicable Guy lead length is a critical factor in evaluating loading on a pole; shorter lead lengths increase vertical and horizontal loading. In ideal construction, an anchor installation 2/3 the lead-to-height ratio is ideal, but field conditions do not always allow for this. 3.4.1 The relationship between lead and height is illustrated in Figure 1. This table shows the effect of lead-to-height ratio on required guy strength. Refer to DTR 06.025 Guying – Determining Strength Requirements for additional guidance. Figure 1 – Guy Strength VS Lead-to-Height Ratio 06.715 Page 3 of 6 Rev 0Page 50 of 52
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-132 Attachment 1 Page 50 of 52 4.0 Program Usage Guidelines Tangent & Light Angle Construction 4.1.1 For tangent and light-angle construction that complies with Eversource Construction Standards (refer DTR 07.011), a PoleForeman calculation is not required if span lengths are 200 feet or less and all guying and conductorattachment requirements are satisfied. This exemption applies to crossarm, spacer cable, aerial cable, or multi-circuit construction types. Pre-run calculations supporting these conditions are provided in Appendix A. 4.2.1 Pole loading analysis is sensitive to numerous variables. Any construction detail or field condition deviating from standard design assumptions can significantly influence calculated loading. .1.1. All sample calculations in Appendix A were developed using less than ideal field conditions for each construction type, including maximum allowable light angles and shortened guy lead lengths. A full list of assumptions and input parameters is provided in the Appendix. Construction Conditions requiring PoleForeman Calculations 4.3.1 A Pole Foreman calculation is required when: .1.1. The conductor angle exceeds the standard tangent/light-angle conditions or when structural loading becomes unbalanced or compounded, including: .1.1a. Medium & Heavy Angle (Corner poles) .1.1b. Dead ends .1.1c. Junction Poles .1.1d. All structures involved in Grade B or Grade C when in highway crossings, to confirm pole loading and sag conditions under worst-case requirements. .1.2. Installing equipment: .1.2a. Transformer banks or single units 25 kVA and above .1.2b. Capacitor Banks .1.2c. Voltage Regulator .1.2d. 3-phase Switches .1.2e. Primary metering equipment .1.3. Installing 3rd party antennas, battery-backup units, or other heavy communication equipment are mounted on corner poles. .1.3a. If equipment is not available in the Pole Foreman preset library, a User-Defined entry must be created using the known physical characteristics (geometry, weight, and attachment height). 06.715 Page 4 of 6 Rev 0
Text of NECTA-132 Attachment 3.pdf
Extracted from the file · 8 pages · 10,921 characters
Text of NECTA-132 Attachment 4.pdf
Extracted from the file · 8 pages · 11,115 characters
As listed on the current system
Question(s) Answered 132 (The Connecticut Light and Power Company) Date Filed: 11/05/2026