  1. Page 12 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 12 of 30 Construction Standard Variation A STEP TRANSFORMER PLATFORM UP TO 7,266 LBS PER POSITION B CENTER BRACE POLE KIT OVER 7,266 LBS PER POSITION C D E F G H I J K L M M L K J I H G F E D C B A 1 1 2 4 1 14 3 3 32 2 75 24 Construction Reference Document DTR17.046.1A DTR17.046.0B U= Capital Item M= Standard Item L = Lobby UM Item Description Item Number EA PLATFORM EQUIPMENT 18' X 4' MAX WT 7,266 LBS PER POSITION M 566849 EA POLE KIT EXTRA F/2EHD PLATFORMS M 566319 EA CROSSARM FIBERGLASS 21 FT 3-5/8 X 4-5/8 IN SQ HDW/HOLES M 566485 EA BOLT MACHINE GS 3/4 X 16 IN W/SQ NUT L 536269 EA INSULATOR SUSP POLYMER SILC 35 KV L 522669 EA LINK STRAIGHT G 3-1/4 X 5/8 IN 40M L 551441 EA WASHER SQUARE FLAT GS 2-1/4 IN 13/16 H L 539282 EA BOLT MACHINE GS 5/8 X 24 IN SQ HEAD W/SQ NUT L 536261 FT CABLE COVERED EPR TAP CU 4/0 37 STR SD L 513408 EA CONN BAR CU 6 TO 250 KCMIL L 516327 Revision: 1 Page: 1 of 1
  2. Page 13 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 13 of 30 CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION Design Guide for Platform Mounted Installations Document Number: Issued Date: Revised Date: Revision: DTR 20.360 21-Apr-20 21-Aug-26 2 Applicability: ALL ***This Document Supersedes DTR 20.403*** Scope: This document provides guidance for the methods of setting distribution poles that support voltage regulator and transformer platforms. Safety: Providing a work environment, free of recognized hazards is a value at Eversource. Therefore, prior to the start of any work, ensure that you are familiar and knowledgeable with all Eversource Safety Rules, Policies and Procedures that are applicable to the work and tasks at hand and perform a job brief at the job site, prior to commencing work. PPE requirements to protect the worker shall be followed as required in the Eversource Employee Safety Manual. Approved by: Signature on File Chad Gandolfi Manager, T&D Standards Engineering Rev No. Date: Description 1 Consolidated with DTR 20.403. Updated scope to include transformers, added additional references & designs options. Reviewed per NESC 2023 0 Original Document 2 18-Aug-26 Date August 21, 2026 November 10, 2023 April 21, 2020
  3. Page 14 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 14 of 30 Table of Contents Section Page 1.0 Introduction ...............................................................................................................................3 2.0 Reference Documents...............................................................................................................3 3.0 General .....................................................................................................................................3 4.0 Design Options..........................................................................................................................3 5.0 Soil Evaluation ..........................................................................................................................5 6.0 Regulator Platform Design Options ...........................................................................................6 DTR 20.360 Page 2 of 11 Rev 2
  4. Page 15 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 15 of 30 1.0 Introduction Multiple voltage regulators set on platforms are extremely heavy and require additional structural support, particularly when poles are set in poor soil. Additional setting depths and support are necessary to prevent poles from shifting. This document provides designs for a stable footing. Portions of this work may require the use of heavier construction equipment than is typically used in the installation of utility poles. The designs in this document should not be assumed to be applicable to all field conditions. Site conditions factors shall be considered before utilizing this standard, including the actual soil strengths, existing ground water table, and pole loading. When this standard is deemed necessary, it shall be used exactly per the details shown. 2.0 3.0 Reference Documents DTR 20.400 Voltage Regulator Installations & Grounding, WYE and Delta DTR 16.711 Platform Mounted Regulator Grounding and Notes DTR 20.361 35 kV MGY & Below – Three Regulators Installation DTR 20.371 35 kV Delta/UGY & below – Two or Three Regulators Installation DTR 20.051 MGY Regulator Bypass Switch Guide DTR 20.052 Delta Regulator Bypass Switch Guide DTR 16.201 Overhead Grounding & Bonding Guide DTR 16.211 Grounding on Overhead Multi-grounding Primary System DTR 16.411 Grounding on Overhead Delta or Unigrounded Primary System DTR 16.311 MGY – Equipment and Control Grounding DTR 16.413 Delta or Unigrounded - Equipment and Control Grounding DTR 05.045 Steel Casing for Distribution Poles General Dig Safe procedures must be adhered to prior to any excavation. Distribution Poles shall be installed on level ground/ surface whenever possible, a minimum of 6 feet from any sloping grade. If an installation location has been reviewed by Engineering and deemed unavoidable, the slope shall NOT be steeper than a grade of one vertical foot by four horizontal feet; a 25 percent maximum slope. 4.0 Design Options Three (3) regulator designs are offered to assure stability. Designs outside of these criteria should be reviewed by T&D Standards Engineering. Design criteria are based on three (3) regulators of 8,100 lbs. each. No pole shall be installed in a wetland or State resource area without prior approval from Eversource, the local City/Town Conservation Department and/or other Environmental Protection Agencies that have jurisdiction. DTR 20.360 Page 3 of 11 Rev 2
  5. Page 16 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 16 of 30 Unstable soil shall be considered soil that does not conform to a minimum classification as clay, sandy clay, silty clay, or does not have an allowable minimum lateral bearing pressure of 1500 psf. If there is doubt about the suitability of the bearing surface at the proposed depth, a soil boring may be required. The pole shall be installed within a steel casing pipe, or caisson, under certain conditions as dictated by tables 1 and 2. Instructions for caisson type construction are provided in DTR 05.045. Below are the required foundations per construction structure placement and soil condition. When a design is selected from Table 2, match the associated letter of the site’s soil condition to the required foundation embedment listed in Table 1. See Section 5.0 for information on soil evaluation. Table 1 Foundation Legend 10’ Wood pole embedment 10’,36” Caisson embedment 12’,36” Caisson embedment 14’,48” Caisson embedment A B C D Table 2 – Required Foundation per Structure Placement and Soil Condition Regulator Platform Construction, Conductor Loading Condition Tangent construction, full conductor tension w/ minimal deflection & plumbness Pole Class Strong Soils Dry Weak Soils Saturated Dry Saturated Granular Cohesive Granular Cohesive Granular Cohesive Granular Cohesive H2 A A B B B B D C Slack Span w/ minimal deflection & plumbness Class 1 A A B B B B C C Platform offset from conductor run, No wire tension or plumbness Class 1 A A B A B B C C DTR 20.360 Page 4 of 11 Rev 2
  6. Page 17 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 17 of 30 5.0 Soil Evaluation A site evaluation shall be conducted to determine soil types. Previously disturbed soil and man-made backfill should be avoided when possible. 5.1.1 Cohesive soil is defined as sticky soil and can be termed as clay or sticky clay. Cohesive soil does not crumble and is hard to break up when dry. 5.1.2 Granular soil contains gravel, sand, or silt (coarse grained soil) with little or no clay content. Granular soil cannot be molded when moist and crumbles easily when dry If soil conditions are questionable, an Eversource approved Contractor shall be used to perform a site evaluation. Table 3 – Soil Definitions Soil Type Strong, Granular Strong, Cohesive Weak, Granular Weak, Cohesive DTR 20.360 Total Unit Wt. (pcf) Friction Angle (Deg) 116 39 120 102 113 Page 5 of 11 Cohesion 1900 33 1000 Rev 2
  7. Page 18 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 18 of 30 6.0 Regulator Platform Design Options Design Option 1 – Conductors under tension. Platform Cutout (TYP.) Regulator (TYP.) Platform Platform Panel (TYP.) CONDUCTORS DTR 20.360 Number of wires: three (3) 566 AAC – 19 Str Tension: 5310 lb. each (60% of 8850lb breaking strength per NESC 261.H.1 Span: 150 feet Pull: 8 feet at 150 foot span (3 degrees) Page 6 of 11 Rev 2
  8. Page 19 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 19 of 30 Platform Cutout (TYP.) Panel (TYP.) CONDUCTORS DTR 20.360 Number of wires: three (3) 477 AAC – 150 mil XLPE Covering Tension: 5016 lb. each (60% of 8360lb breaking strength per NESC 261.H.1 Span: 150 feet Pull: 8 feet at 150 foot span (3 degrees) Page 7 of 11 Rev 2
  9. Page 20 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 20 of 30 Design Option 2 – Conductors with slack spans. Platform Cutout (TYP.) Regulator (TYP.) Platform Platform Panel (TYP.) CONDUCTORS DTR 20.360 Number of wires: three (3) 566 AAC – 19 Str Tension: 500 lb. each (slack span Span: 80 feet Pull: 4.2 feet at 80 foot span (3 degrees) Page 8 of 11 Rev 2
  10. Page 21 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 21 of 30 Platform Cutout (TYP.) Panel (TYP.) CONDUCTORS DTR 20.360 Number of wires: three (3) 477 AAC – 150 mil XLPE Covering Tension: 500 lb. each (slack span) Span: 80 feet Pull: 4.2 feet at 80 foot span (3 degrees) Page 9 of 11 Rev 2
Words on different pages
No matches
Words on different pages

As listed on the current system

Question(s) Answered 133 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/03/2026

This filing on the current system (opens in a new tab)