    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 2 of 30 Regulator Guide 13.102 Regulators Section 13.10 Ampere Loading Increase for Limited Range Operation Table 1 below lists regulators by voltage, kVA and current capability. Table 1 − Regulator Current Ratings KVA at 10% Voltage Regulation & Rated Current (kVA) Rated Load Current at 10% (Full Range) Voltage Regulation (Amps) Rated Load Current at 7.5% Voltage Regulation (Amps) Rated Load Current at 5% Voltage Regulation (Amps) 7,620* 76.2 100 120 160 7,620* 114.3 150 180 240 7,620* 167 219 263 350 7,620* 250 328 394 525 7,620* 333 438 526 668# 7,620* 416 548 658 668# 14,400 144 100 120 160 14,400 288 200 240 320 14,400 432 300 360 480 14,400 576 400 480 640 19,920 100 50 60 80 19,920 200 100 120 160 19,920 400 200 240 320 27,600 400 145 174 232 Voltage (Volts) * These regulators have taps that permit use with different primary voltages. The kVA ratings in this table are for operation at 7,620 volts. See Table 2 on the following page for other voltages. # Contact limitation Multi−Voltage Regulators (2,500 − 7,970 volts) The following table considers one regulator Item #527265 which has several taps, allowing its connection in circuits with regulator voltages ranging from 2,500 volts through 7,970 volts. The table illustrates that the kVA rating changes with the application voltage, but the current rating remains constant. This particular 100 amp regulator is rated at 76.2 kVA, but only when used at 7,620 volts. Table 2 − Regulator SC 527265 7,620 V, 95 kV BIL Application Voltage (Volts) KVA at 10% Voltage Regulation and Rated Current (kVA) Rated Load Current at 10% (Full Range) Voltage Regulation (Amps*) Rated Load Current at 5% Voltage Regulation (Amps*) 2,500 25.0 100 160 5,000 50.0 100 160 7,200 72.0 100 160 7,620 76.2 100 160 7,970 79.7 100 160 * For the 150 amp regulator, multiply kVA and current values by 1.5. For the 219 amp regulator, multiply the kVA and current values by 2.19. This table demonstrates the importance of sizing regulators based on current capability and range. Eversource Energy December 2015 Distribution System Engineering Manual
  2. Page 3 of 30Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 3 of 30 Regulator Guide 13.103 Regulators Section 13.10 MISCELLANEOUS POINTS OF INTEREST 1. Although a circuit may be considered unigrounded, regulators at its source may be connected line to ground since the neutral is available at the source. It is only on the circuit where the neutral conductor has not been extended that regulators must be connected line−to−line. 2. One can take advantage of the increase ampere rating of a regulator if its range in limited to less than + / − 10 percent in combination with the 15 percent range offered by using three line−to−line regulators. The 1.5 multiplier (see DSEM Page 13.156) applies to all ranges, so if a regulator is limited to + / − 7.5 percent, but is part of a bank of three regulators, each connected line−to−line, the overall regulation is 1.5 x 7.5 percent = 11.25 percent, and the current rating is 120 percent of the regulator nameplate. 3. Recognize that regulation with two line−to−line connected regulators will result in a neutral shift. This can cause problems with zero−sequence voltage schemes (such as 59N schemes) connected downstream of the regulator. The neutral sensed by line−to−ground connected potential transformers for a 59N scheme is the earth which represents the neutral at the circuit source, not the output of the regulator, but the phases are the output of the regulator. This can lead to a false sensing of a neutral shift and mis−operation of the 59N scheme. The following are two examples of sizing regulators for particular applications: 1. What size regulators are needed for a three phase four−wire MGY circuit, using three single phase regulators? Assume the circuit voltage is 13800 GrdY / 7970 volts, with a connected load of 3,000 kVA, and 10 percent voltage regulation is needed. LOAD AMPERES = LOAD PER PHASE = 3000 kVA /3 = 3000 kVA = 125.6A L− N VOLTAGE 7.96 kV 7.96 kV (3) VOLTAGE RANGE = 7.96 kV x (0.10) = 0.796 kV REGULATOR kVA = 125.6 A x (0.796 kV) = 100 kVA Each regulator should be 100 kVA or more and rated more than 100 amps with a voltage regulation range of 10 percent. Since the current exceeds the 100 amp rating of the 76.2 kVA regulator, use the 219 amp, 167 kVA regulator. 2. What size regulators are needed for a three phase, three−wire delta circuit, using two single phase regulators? Assume the voltage is 4,800V, the connected load is 789 kVA, and 10 percent voltage regulation is needed. LOAD AMPERES = LOAD PER PHASE = 789 kVA /3 = 789 kVA = 95A L− N VOLTAGE* 4.8 kV/√3 4.8 kV √3 *Although the electrical neutral is not physically available, an electrical neutral exists and can be used for mathematical calculations of balanced three−phase circuits. VOLTAGE RANGE = 4.8 kV x (0.10) = 0.48 kV (Remember: the regulator is connected line−to−line on a delta circuit.) REGULATOR kVA = 95A x (0.48 kV) = 45.6 kVA Each regulator should be 45.6 kVA. Since the current is below the 100−amp rating of the 76.2 kVA regulator, it can be used. Eversource Energy December 2015 Distribution System Engineering Manual
  3. Page 4 of 30

    Regulators Section 13.10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 4 of 30 Regulator Guide 13.104 SELECTION OF RANGE − Circuit design constraints will usually limit the voltage regulation to 4 percent. Therefore, regulators on general purpose feeders can normally be locked off at ±5 percent and a current rating of 160 percent of nameplate can be assumed. A wider range might be applicable for regulators located at the end of a long segment of an express line having no tapped loads, such as a right−of−way segment. With no tapped load on the right−of−way, voltage levels along it may fall below normal limits. The regulator can establish proper voltage at the end of the right−of−way or at tap points. EMERGENCY LOADING − The overload capability of a regulator is determined by its previous loading, the range of regulation that is allowed, thermal properties of its insulation and the rating of its tap changer. Tables 3 and 4 on the following pages are based on the thermal properties. The upper limit is due to the limitation of the tap changer. The table is conservative. More detailed information on particular regulators is available from Distribution Material & Construction Standards. Eversource Energy December 2015 Distribution System Engineering Manual
  4. Page 5 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 5 of 30 Regulator Guide 13.105 Regulators Section 13.10 Table 3 − Emergency Loading − Maximum Amps Based on 90 Percent Previous Load Voltage Rating Nameplate Amps 7,620 V 100 7,620 V (Note 4) 150 7,620 V 219 7,620 V 328 7,620 V 438 7,620 V 548 14,400 V (Note 4) 50 14,400 V 100 Hours  10% Regulation 0 C 32 F 30 C 86 F 1 2 4 8 24 1 2 4 8 24 200 200 186 166 148 240 240 240 240 222 200 172 151 134 118 240 240 227 201 177 1 2 4 8 24 350 350 350 350 324 350 350 331 293 258 1 2 4 8 24 1 2 4 8 24 1 2 4 8 24 535 535 535 535 485 668 668 668 668 648 668 668 668 668 668 535 535 495 440 387 668 668 661 587 517 668 668 668 668 647 1 2 4 8 24 1 2 4 8 24 100 100 93 83 74 200 200 186 166 148 100 86 76 67 59 200 172 151 134 118  5% Regulation 0 C − 30 C 32 F − 86 F 200 240 350 535 668 668 100 200 Notes 1. Temperatures refer to the 24−hour average ambient. 2. These ratings are based on ANSI C57.95−1984 and are calculated for normal loss of life. 3. For McGraw−Edison regulators manufactured prior to June 1982, do not load the units above the nameplate current rating. 4. No longer standard but may be found in service. Eversource Energy December 2015 Distribution System Engineering Manual
  5. Page 6 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 6 of 30 Regulator Guide 13.106 Regulators Section 13.10 Table 4 − Emergency Loading − Maximum Amps Based on 90 Percent Previous Load Voltage Rating Nameplate Amps 19920V 27600V 30 C 86 F 0 C − 30 C 400 1 2 4 8 24 668 668 668 664 592 668 668 604 536 472 668 50 1 2 4 8 24 100 100 93 83 74 100 86 76 67 59 100 100 1 2 4 8 24 200 200 186 166 148 200 172 151 134 118 200 200 1 2 4 8 24 350 350 350 320 296 350 344 302 268 236 350 335 1 2 4 8 24 668 668 623 556 496 668 576 506 449 395 668 668 668 668 632 145 1 2 4 8 24 290 290 270 241 215 290 249 219 194 171 464 399 350 311 274 300 19920V 32 F 350 344 302 268 236 535 516 453 402 354 14400V 19920V 0 C  5% Regulation 350 350 350 332 296 535 535 535 498 444 200 19920V (Note 4)  10% Regulation 1 2 4 8 24 1 2 4 8 24 14400V 14400V Hours 32 F − 86 F 350 535 Notes 1. Temperatures refer to the 24−hour average ambient. 2. These ratings are based on ANSI C57.95−1984 and are calculated for normal loss of life. 3. For McGraw−Edison regulators manufactured prior to June 1982, do not load the units above the nameplate current rating. 4. No longer standard but may be found in service. Eversource Energy December 2015 Distribution System Engineering Manual
  6. Page 7 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 7 of 30 Regulator Guide 13.107 Regulators Section 13.10 ARRESTERS − Regulators come equipped with a surge arrester between the source and load bushings. The arrester can be either connected externally or internally under oil, depending on the design of the manufacturer. This arrester is connected across one of the regulator windings and is designed to protect against surges but does not provide complete lightning protection. This is because it is connected across the winding and not from the winding to ground. Consequently lightning arresters must be installed from both the source bushing to ground and from the load bushing to ground. Regulators are purchased with these arresters installed. TAKING REGULATORS OFF LINE − REGULATORS MUST ALWAYS HAVE THEIR TAP CHANGERS IN THE NEUTRAL POSITION BEFORE THEY ARE TAKEN OFF AN ENERGIZED LINE, otherwise a violent regulator failure could occur. The worst possible situation is removing a regulator with the tap changer one position removed from neutral. This will cause high circulating currents to flow which are in the range of hundreds of times normal. IF THE TAP CHANGER CANNOT BE PLACED IN THE NEUTRAL POSITION, THE CIRCUIT MUST BE DE−ENERGIZED PRIOR TO TAKING THE REGULATOR OFF THE LINE. All Regulators have a mechanical position indicator with the neutral position clearly marked. Newer controls have a small light which illuminates when the regulator is in the neutral position. BYASS SWITCH − Regulator installations shall include a special bypass switch to avoid customer interruptions when the regulator is taken off line. This switch passes through two positions with one manual movement of the operator. The first position connects the source and load ends of the circuit. The second disconnects the regulator from the line. REGULATOR CONTROLS − Regulator controls have the following features. Consult Protection & Controls Engineering or the Zone Manager for the settings to be used. 1. Base Voltage And Bandwidth − These two control settings define the normal output range of the regulator. The bandwidth setting gives the voltage range beyond which the regulator will operate to raise or lower the voltage. The base voltage setting determines the midpoint of the range. Example: To maintain an average of 120 volts with a maximum high voltage of 120.75 volts and a minimum of 119.25 volts. Bandwidth = 120.75 − 119.25 = 1.5 volts Average Voltage = Base Voltage = Max Voltage − Bandwidth 2 Average Voltage = 120.75 − 1.5 = 120 volts 2 2. Line Drop Compensation − In order that voltage regulators can automatically maintain a predetermined voltage at some point remote from the regulator location, line drop compensators are required in the regulator control circuit. The voltage at this remote point, commonly referred to as the regulation point or load center, is to be kept constant regardless of the magnitude, or power factor, of the load. This is accomplished by the dial settings of the adjustable resistance and reactance elements located on the control panel of the regulator. The adjustable resistance and reactance elements considered as a unit is called the line drop compensator. On the Company system, line drop compensation is not used except for specially engineered applications such as long express circuits with their load at the far end. For general purpose feeders with distributed load, line drop compensation will not be calculated or maintained. Eversource Energy December 2015 Distribution System Engineering Manual
  7. Page 8 of 30

    Regulators Section 13.10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 8 of 30 Regulator Guide 13.108 3. Voltage Limit Control − The maximum and minimum voltage levels allowed at the regulator terminals can be set with this control. When line drop compensation is used, the regulator tries to maintain the desired voltage at some point remote from the regulator. Consequently the voltage at the regulator could rise above acceptable levels if incorrect line−drop−compensation settings are applied, or if load levels are much larger than anticipated. The voltage limit control overrides the line drop compensator and will not allow the voltage to rise above or fall below the selected voltage limits. 4. Reverse−Power Flow − Distribution regulators are normally installed on radial circuits with one source of power, thus power flows through the regulator in only one direction, from a source to the load. There are situations, however, where power can flow through the regulator in the reverse direction. This generally occurs when the source circuit is changed such as by tying two circuits together during switching or by operation of an auto−loop scheme. Where the reverse power flow option will be used, ensure that enough current will flow to operate the regulator regardless of the direction of feed. This may require the placement of the regulator away from the tie point to ensure that it will be sufficiently loaded for power flow in either direction. Unless a source side potential transformer is added to the regulator, and a modification made to the control, a reverse power flow condition will cause the regulator to malfunction, since a regulator control monitors the load side voltage. This modification is a standard option on regulators ordered for CT & WMA beginning in 1993 and can be added to most older regulators. The option is referred to as the reverse−power flow option. Note − The reverse power flow option is designed to work when the regulator is connected to a single source whether it be on the normal source side or the normal load side. It may not work properly when sources are connected to both the source and load side at the same time, such as when a generator source is connected to the load side while the circuit remains connected to the substation on the source side. In general, the source with the lower impedance at the regulator location will dominate voltage control regardless of the direction of power flow. Therefore, for a case with a weak generator on one side of the regulator and a strong system source on the other, the reverse−power flow option is better not used, and voltage sensing should always be done on the side of the regulator farther from the strong system source. Distribution Engineering should be consulted when regulators are installed on circuits which have generation connected downstream of the regulator. 5. Meter Package − Regulator controls have a meter package which will give the following information: a. Present voltage, current and power factor (whether leading or lagging) b. Line drop compensation calculated voltage. This is the voltage which is calculated from the settings put into the line drop compensator and if the settings were put in correctly this voltage should be seen at the remote point considered to be the “load center.” c. Minimum and maximum voltages at the regulator terminals. d. Maximum current and power factor. REGULATORS AND RECLOSER LOOP SCHEMES − There are limitations on the use of regulators in recloser loop schemes. See the Recloser Guide in DSEM Section 10. SQUIRREL GUARDS − Squirrel guards are shipped with new units. Draw guards from stock for all units without guards. Eversource Energy December 2015 Distribution System Engineering Manual
  8. Page 9 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 9 of 30 ***This Document Supersedes DTR 20.374*** NOTE 2 NOTE 3 Figure 1 – MGY Grounding Diagram Notes 1. For secondary and neutral attachment point refer to DTR 04.047. 2. Platform ground and neutral conductor shall be the same size as or larger than the system neutral. 3. See DTR 16.201 for overhead grounding and bonding guide. For control grounding and material, see DTR 16.311. ORIGINAL 08/21/26 APPROVED 08/21/26 PLATFORM MOUNTED REGULATOR GROUNDING AND NOTES EVERSOURCE ENERGY CONSTRUCTION STANDARD ALL DTR 16.711 0
  9. Page 10 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 10 of 30 ***This Document Supersedes DTR 20.374*** REGULATOR TANK GROUNDS PLATFORM PLATFORM GROUND NOTE 2 POLE GROUNDS CONTROL BOXES POLE GROUNDS NOTE 3 Figure 2 – DELTA/UGY Grounding Diagram Notes 1. If there is a secondary neutral on this pole, it shall not be bonded to the equipment/control grounds. 2. Platform grounds shall be #2 copper. 3. See DTR 16.201 for overhead grounding and bonding guide. For grounding details and materials see DTR 16.413. ORIGINAL 08/21/26 APPROVED 08/21/26 PLATFORM MOUNTED REGULATOR GROUNDING AND NOTES EVERSOURCE ENERGY CONSTRUCTION STANDARD ALL DTR 16.711 0
  10. Page 11 of 30

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 14, 2026 NECTA-133 Attachment 1 Page 11 of 30 STRUCTURE LIMIT C1 – See DTR 07.011 NOTE 1, 6, 11 NOTE 9 NOTE 8 NOTE 8 PH 1 H1 PH 2 X1 H1 PH 3 X1 H1 X1 136″ NOTE 10 NOTE 4, 5 PLATFORM GROUND NOTE 12 MIN. 40″ HIGHEST COMMUNCATION CABLE FOR MINIMUM VERTICAL CLEARANCES SEE NOTE 3 Maintain a minimum of eight inches from any hardware to energized portions of bushing or leads (NESC Rule 235E1) BOLT TRANSFORMERS TO PLATFORM SEE NOTE 7 18′ Notes 1. Poles shall be minimum Class 1. Refer to DTR 20.360 which provides guidance on methods of setting poles associated with platform installations. Refer to DTR 05.303 which provides guidance on methods of steel casing foundation for distribution poles. 2. For anchors, guys, and pole class refer to Section 06. For overhead pole top construction and tap clearances, refer to Section 10. Select primary and secondary tap wire from DTR 32.200. See DSEM 08.151 for more tap wire information. Select all overhead distribution line connectors adhering to Section 33. Ground and select arrestors according to Section 16. Engineering to select cutouts and fusing schedule adhering to Section 18 – Cutouts & Fusing. For transformer connection diagrams, refer to Section 17. 3. For minimum vertical clearances refer to DTR 04.115. Consider the platform as a Category 1 conductor. 4. For secondary and neutral attachment point refer to DTR 04.047. 5. Secondary cable may be attached to these poles, but live legs shall not be connected through. 6. Care should be taken to install platform structures in locations where their visibility to the public is minimized. 7. Transformers must be bolted to platform. Bolts and sound pads will be included with platform. 8. Source and load-side cutouts may be installed on crossarm shown, on adjacent poles, or on 21’ crossarm above the transformers. 9. Use 35 kV rated polymer suspension insulators Item #522669 for phase breaks. 10. Select step transformer from CAT 2014. 11. Refer to DTR 17.500 for more detail on overhead step transformer construction. 12. Install a super extra heavy-duty platform for transformers weighing up to 7,266 lbs. each. Install a super extra heavy-duty center pole brace kit for transformers weighing above 7,266 lbs. each. ORIGINAL 04/05/11 APPROVED 09/18/26 35 KV & BELOW - WYE-WYE - THREE-PHASE STEP-UP/DOWN TRANSFORMER INSTALLATION - PLATFORM MOUNT EVERSOURCE ENERGY CONSTRUCTION STANDARD DTR 17.046 ALL 4
Words on different pages
No matches
Words on different pages

As listed on the current system

Question(s) Answered 133 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/03/2026

This filing on the current system (opens in a new tab)