Interrogatory responses
Answers to questions 21, 22, 33
Files6
NECTA-021_Final.pdf
PDF · 112 KB · 1 pageText searchable
Download NECTA-021_Final.pdfRead the text of NECTA-021_Final.pdf
NECTA-021 Attachment 1 REDACTED.pdf
PDF · 1.8 MB · 6 pagesText searchable
Download NECTA-021 Attachment 1 REDACTED.pdfRead the text of NECTA-021 Attachment 1 REDACTED.pdf
NECTA-022_Final.pdf
PDF · 88 KB · 1 pageText searchable
Download NECTA-022_Final.pdfRead the text of NECTA-022_Final.pdf
NECTA-022 Attachment 1 REDACTED.pdf
PDF · 1.8 MB · 8 pagesText searchable
Download NECTA-022 Attachment 1 REDACTED.pdfRead the text of NECTA-022 Attachment 1 REDACTED.pdf
NECTA-022 Attachment 2 REDACTED.pdf
PDF · 2.2 MB · 20 pagesText searchable
Download NECTA-022 Attachment 2 REDACTED.pdfRead the text of NECTA-022 Attachment 2 REDACTED.pdf
NECTA-033_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download NECTA-033_Final.pdfRead the text of NECTA-033_Final.pdf
Text of NECTA-022 Attachment 1 REDACTED.pdf
Extracted from the file · 8 pages · 14,301 characters
Page 11 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-022 Attachment 2 REDACTED Page 11 of 20 Appendix 1 – Instruction for the External and Internal Ground Line Inspection and Supplemental Treatment of Wood Poles A. GENERAL A.1 CONTRACTOR REQUIREMENTS The CONTRACTOR shall furnish all supervision, labor, tools, equipment, transportation, materials, and field handheld portable computers to complete the inspection and supplemental treatment of any poles as authorized by the Company. Eversource will furnish the CONTRACTOR with copies of this specification, maps showing locations of the poles to be inspected and/or treated. The CONTRACTOR is responsible for performing all inspections, internal and external treatments as specified in this contract. The CONTRACTOR shall be responsible at all times for the safety of the general public and for the protection of any individual who may enter the limits of work being completed under the terms of this contract. The CONTRACTOR shall conduct his operations to provide and maintain at all times a safe passage of traffic along all highways, driveways, roads, and detours within the limits of work completed under the terms of this contract. The CONTRACTOR shall furnish all necessary safety precautions to give warning to the public or to others of any dangerous condition to be encountered as a result of this work or their operation. All work shall conform to any safety rules enforced by the Company. All work shall be performed in a workmanlike manner and shall be in accordance with this specification and all applicable Federal and State regulations. The contractor shall strictly adhere to federal, state, and local environmental regulations and the use of any chemicals in protected or water supply areas. The CONTRACTOR shall exercise care to prevent injury to any persons and to prevent damage to any property during the performance of work under the terms of this specification. A.2 PESTICIDE LICENSING AND REPORTING Each crew shall be under the supervision of a full-time, on-site foreman who shall be a Massachusetts State certified pesticide applicator for “wood preservation, remedial treatments.” The CONTRACTOR shall furnish proof of such license requirements to Eversource before initiating any work on such property. The CONTRACTOR shall be responsible for the accurate recording and submitting of all pesticide usage forms required by the various pesticide regulatory agencies and for meeting all Massachusetts State and local municipal rules and regulations. The CONTRACTOR shall be required to submit MSDS information on all chemicals to be used when submitting their bid and to have in their possession copies of any product labels for all preservatives and fumigants used on the Company’s property. These labels shall list the chemical composition, description, direction for use, precautionary statements, warnings, environmental hazards, storage, and disposal instructions and any other relevant information about the product used. Upon request, these labels must be shown to anyone desiring this information. All field crews will carry copies of the MSD sheets. The same crew will also be required to maintain daily inventories of all preservatives used as a precaution against any possible lost product. WMS 08.15 Page 11 of 20 Rev 1Page 12 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-022 Attachment 2 REDACTED Page 12 of 20 A.3 SPILL PREVENTION Chemical spills shall be immediately corrected in a manner consistent with label law following all Federal and State regulations. If a reportable quantity (RQ) is spilled, the incident shall be duly noted to the Company representative in a timely manner. The CONTRACTOR shall provide to each field crew a spill kit containing all of the following as minimum requirements: 1. Absorptive materials (Speedi-dri) minimum 5 pounds 2. Baking soda 3. A watertight container 4. Rubber gloves 5. Tyvek suit (not white- natural brown or green colors only) 6. Ammonia 7. Protective apron 8. Washing soap A.4 PERSONNEL QUALIFICATIONS All pole and/or treating inspectors and work foremen performing these procedures shall be trained and/or experienced in the inspection and supplemental treatment of wood poles for a minimum of four (4) months. Eversource reserves the right to review and approve evidence of previous experience and training in the form of a letter of reference and/or resumes. Supervision of pole inspectors, treating inspectors and work foremen shall be performed by the CONTRACTOR using qualified supervisors with a minimum of three (3) years of experience in the art of pole inspection and supplemental treatment. This supervision must reside with the Eversource service territory or adjacent Utility’s property. The Supervisor must maintain a telephone with an answering device or service to accept incoming Eversource phone calls. In addition, all Supervisors will carry a cellular telephone. CONTRACTOR supervisors shall review and spend a minimum of ten (10%) percent of the hours logged by each work foreman (i.e., one foreman working forty (40) hours would require a minimum of four (4) hours of supervision per week) on the job site every week. The CONTRACTOR shall supply documentation of this time at the request of Eversource. WMS 08.15 Page 12 of 20 Rev 1Page 13 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-022 Attachment 2 REDACTED Page 13 of 20 A.5 REPORTING & INVOICING Before starting work, the CONTRACTOR must notify the authorized Company representative of all plans. Should the CONTRACTOR close their operation in one area/district/region / etc. again the Company representative must be notified. The CONTRACTOR’s supervisor shall keep the Company’s representative well informed of their work progress and all action taken accordingly. The CONTRACTOR’s supervisor will provide daily email notifications showing towns to be inspected the following day. When submitting invoices for payment, each invoice will be cross-referenced to indicate the corresponding foreman, work completed by category, and dates completed. Invoicing shall only be done after complete circuit inspection data is submitted to Eversource. Invoices are only to be submitted after all inspections on each circuit pole line are completed. Each invoice shall indicate the district, circuit, and town. Invoices for restorations are only to be submitted when all are completed for each circuit. Circuits that may extend into more than one town shall require an invoice for each town. Each invoice shall identify the district, circuit, and town. Accurate records of all work and evaluation of each pole must be generated on the field, handheld computers supplied and maintained by the CONTRACTOR. Samples of all reports to be generated along with any information pertinent to the unit can be supplied to the Company before work commences. The successful CONTRACTOR of this specification must have the capability to collect, process, and deliver all generated field information, billing, work summaries, pole maintenance summaries, and rejected pole summaries using this technology. Weekly progress updates are necessary, or as otherwise required by Eversource. CDs formatted to the Company’s specification will be supplied if requested. Information may be transferred to the Company by email as an option. A.6 QUALITY CONTROL At the option of the Company, their representative and the CONTRACTOR’s representative may inspect completed work on a regular basis. The quality control check is intended to satisfy the Company of the proper performance of the CONTRACTOR according to the provisions of this specification and is not intended to substitute for careful supervision by the CONTRACTOR’s personnel. The cost of the CONTRACTOR portion of the quality controls will be included in the bid-documented prices. The original ground line inspection plug shall be bored out with the hole depth measured to comply with Section B.4 of this specification. Fumigant plug(s) will be bored out and the depth of these holes measured to ensure compliance with Section D of this specification. If for reasons beyond the CONTRACTOR’s control, the fumigant holes cannot be bored to the required depth, this fact and associated reasons will be recorded into the pole file. All short holes will be reviewed and may have to be re-bored and retreated with the full quantity of the fumigant required, at the Company’s discretion. The CONTRACTOR’s cost of reapplication shall be borne by the CONTRACTOR. WMS 08.15 Page 13 of 20 Rev 1Page 14 of 20
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 15 of 20
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 16 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-022 Attachment 2 REDACTED Page 16 of 20 The lowest hole (1 inch above grade) is the first to be filled with a fumigant. Once a vial has been properly inserted, with an open-end pointed downward, a plastic plug will be inserted into the hole. A tight fit with the plug is necessary. Working upwards and around the pole, insert the vials followed by plugging the holes. An appropriate tag should be placed five to six feet above the ground line, facing the street if there is one, indicating the year and type of treatments and fumigant used. Precautions should be used in the handling of all fumigants. Label directions must be followed in all handling, application, and disposal procedures. Fumigants must be applied following all State and Federal laws. Special attention is necessary when working near any waterways, wetlands, drinking supply areas, and wells. C.2 INTERNAL TREATMENT FOR VOIDS, HEART ROT OR INSECTS Poles having internal voids should be treated with Osmose COP-R-NAP or equivalent as approved by the Company. After the extent of the void has been determined through proper boring (as described by Section B.4), the preservative shall be pumped into the bottom hole until it begins to exit the pole from the next higher hole. This procedure should be followed until the cavity is filled or a maximum of one (1) gallon (or more as approved by the Company) has been applied. All holes should be plugged with a properly treated and sized wooden or plastic dowel. C.3 TREATMENT OF POLES WITH CARPENTER ANT – TERMITE DAMAGE Evidence of carpenter ant or termite damage is illustrated by (1) fresh wood saw dust around the base of the pole (usually below a seasoned check) and/or (2) boring around the check reveals noticeable voids. Hammer sounding the pole will indicate a localized area where the problem may exist. The amount of sawdust can also be a sign of the amount of damage. Poles exhibiting clear signs of carpenter ant or termite damage should be treated as described below. Poles having severe damage may be candidates for restoration or possibly replacement. Before applying any treatment, remove the wood dust from the base of the pole. This will facilitate re-inspection when looking for evidence of re-infestation. To treat the infested pole, use a power drill and bore a minimum of four holes next to the infested seasoned check. A sudden release of torque will indicate entry into the insect chambers. Drilling should continue until solid wood is encountered. Drill downward at a forty-five-degree angle and parallel to the seasoned check. All holes need to be flooded with the insecticide/preservative solution (Osmose COP-R-NAP or other approved product by the Company) until either rejection of the solution or a maximum of one (1) gallon has been applied. All holes will be plugged with a treated wooden dowel. Care should be taken in handling the solution to avoid any spillage and/or skin contact. Care must be specially taken when inserting the wooden dowels into the treated holes. Splash or spray from the solution can be present and appropriate protective eyewear is required. All product label instructions must be followed. The Company may recommend additional precautions over and above the label requirements. WMS 08.15 Page 16 of 20 Rev 1Page 17 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-022 Attachment 2 REDACTED Page 17 of 20 C.4 GENERAL PRECAUTIONS AND REQUIREMENTS FOR FUMIGANTS, PRESERVATIVES, AND INSECTICIDES The wood preservatives used under the scope of this specification are potentially toxic to man and may cause damage to the environment if not handled and used properly following all label requirements and applicable laws. No product will be used if the pole is located within fifty (50) feet of any surface water unless such water is deemed temporary. If any State or Federal law exceeds this requirement, that law(s) will be followed. Any container containing any wood preservative will be kept under lock and key unless under the direct control of a CONTRACTOR’s employee having authority to use such product. Empty preservative containers will be removed from the worksite and disposed of in accordance with all rules, laws, and regulations both on a Federal and State level. All label requirements will be followed. All applications shall conform to any, and all federal, state, and local regulations having any jurisdiction over pesticide applications. The CONTRACTOR must follow all Federal and State regulations for proper use of all safety equipment and/or articles of clothing. This includes but is not limited to hardhats, protective aprons, gloves, goggles, etc. D. POLE TAGGING AND IDENTIFICATION All inspected and/or treated poles shall be marked with a nailed metallic, weatherproof tag identifying the work performed, CONTRACTOR name, and date when work was completed. The Company must approve the tagging scheme used in advance. The CONTRACTOR will supply all tags unless other arrangements are made in advance of the project starting. Tags are to be placed five to six feet above the ground line on the roadside of the pole and below the Company’s identification marker. If the pole has been previously inspected and/or treated, the new tag will be attached directly below the existing tag(s). Appropriate industry standard red tags shall be used to identify reject poles, and their climbability (Electromark Climbguard tags or equal). Two per pole shall be installed on the road and field-side at approx. 6 ft above grade. The following styles shall be used: • Type C Tag- White arrow with a white encircled X on red background shall identify Priority 1 poles or any priority poles that are not safe to climb. Arrow will point in direction of the defect. (Electromark Climb-Replace Tag) • Type B Tag- White plain arrow on red background shall be used on priority or restorable poles that are not in poor condition. Arrow will point in direction of the defect. (Electromark Climb-Care Tag) WMS 08.15 Page 17 of 20 Rev 1Page 18 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-022 Attachment 2 REDACTED Page 18 of 20 E. WORK SUMMARIES The CONTRACTOR shall track the course of all work in progress. Weekly summaries shall include but not be limited to the following information: Total number of poles reviewed. Total Dollars Invested Breakdown of Each Pricing Category Total Number of Rejected Poles Total Number of Restorable Rejected Poles Average Price per Pole Invested Summaries will be completed by a foreman. In addition, a year-to-date summary will track the overall progress of the job collectively totaling “all” work completed to that specific date. F. SPECIAL NOTES The CONTRACTOR will complete all work in a timely and professional manner. The Company will be notified by the CONTRACTOR of a scheduled starting date. The Company will set a pre-arranged schedule for meeting with the CONTRACTOR to schedule the overall progress and completion of the project. WMS 08.15 Page 18 of 20 Rev 1Page 19 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-022 Attachment 2 REDACTED Page 19 of 20 Appendix 2 – Reporting Format Inspection results shall be provided in Microsoft Excel files with the following information, as a minimum. Other information, if part of standard Contractor format or which the Contractor uses for internal purposes, may also be included with proper labeling. One format (field location and identification, data types, etc.) shall be used for all reports. Circuit – If provided by the Company – otherwise shall be left blank (if applicable) Division – The Area Work Center (AWC) the inspections are taking place. Town – This is typically provided in the pole inspection list – obtain from maps if not provided. NOTE: Pole identification numbers are unique by town, so it is extremely important that this information be listed correctly Route Number, Pole Number, Sub ID Number – This is typically provided in the pole inspection list or taken in the field as part of the circuit checks. General Information – Surface type (dirt, concrete, asphalt), year last inspected, previous cycle information, date of current inspection, and location information (street name, right-of-way number, or other) Stencils – Indicate if equipment poles are properly stenciled. Grounds – Indicate the condition of pole grounds (OK, damaged/broken, or do not exist) Condition of Pole – Rejected, priority pole, restorable, and recommended reinforcement method. Ground Line Inspection Details – Inspection code (Osmose standard designations), original circumference, effective circumference, primary reject code, and notes pertaining to ground line inspections (size of voids, type of insect, high priority needs, etc.) Visual Inspection Results – Description of woodpecker holes (sizes and quantity, or state none found), pole splits or cracks, any pole top defects, any attachment defects (damaged cross arm, insulator, guy wire, etc.), notes on any or all of these items which would help the Company evaluate condition, and indication if above ground maintenance or follow-up is required due to these items (yes or no). Inspection Restrictions – If a pole cannot be accessed for specified inspections due to a fence, water, etc., or if the pole cannot be treated due to environmental / community concerns, provide specific information. WMS 08.15 Page 19 of 20 Rev 1Page 20 of 20
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 09, 2026 NECTA-022 Attachment 2 REDACTED Page 20 of 20 Attachments on Rejected Poles – Rejected poles require additional notations regarding the types of construction on the pole in order to prioritize pole replacements. This shall include the following four categories (list revised in 2004): • • • Transformer/ large equipment pole (exclude risers, lighting, and fuses). Single circuit, three-phase primary wires at the pole top Double circuit, three-phase primary wires at the pole top Pole Steps – Are there any pole steps in the pedestrian area? (For heights lower than 7 feet only, note # of steps in remarks, and remove) Roadway Markers – Is a reflective roadway marker needed? To clarify: Poles missing roadway markers shall be identified in locations that are extremely vulnerable to vehicle damage, on rural roads within 2 ft of pavement that are both curved and non-curbed, on roads with speed limits exceeding 30 mph, and on state roads. Vegetation Issues – Note if vines or limbs are within six inches of primary. In addition, each pole record shall include all original Eversource GIS data provided for poles inspected. WMS 08.15 Page 20 of 20 Rev 1
Text of NECTA-033_Final.pdf
Extracted from the file · 1 page · 1,443 characters
As listed on the current system
Question(s) Answered 21, 22, 33 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026