Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 42, 43, 46, 49, 50, 51, 52, 53, 55, 58, 59

Files15

Text of NECTA-049_Final.pdf

Extracted from the file · 1 page · 2,454 characters

Text of NECTA-050_Final.pdf

Extracted from the file · 2 pages · 3,316 characters

Text of NECTA-051_Final.pdf

Extracted from the file · 3 pages · 6,025 characters

Text of NECTA-051 Attachment 1.pdf

Extracted from the file · 75 pages · 443,201 characters

Text of NECTA-051 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-052 Page 1 of 2 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Each year for the past five years, provide the average makeready work interval (from application to close-out) separately for solely-owned poles and jointlyowned poles. Response: The table below provides the average number of days between receipt of a completed application (including payment of applicable application fees) and issuance of the license for power only solely owned poles and jointly owned poles. The Company notes that these intervals represent the total elapsed time between receipt of a completed application and issuance of a license, not solely the duration of make ready construction activities. As a result, the reported intervals encompass multiple stages of the pole attachment process, including application review, survey and engineering activities, telecommunication survey and engineering for jointly owned poles, coordination and concurrence among pole owners, make ready billing, receipt of make ready payment by Eversource, Frontier, or both as applicable, make ready construction, and final licensing. Accordingly, the reported intervals are influenced by numerous factors, many of which are outside of Eversource’s control and vary significantly by project.
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-052 Page 2 of 2 These factors include, but are not limited to: • Delays in payment by requesting attachers or other parties • Delays associated with third party attachers completing required transfer or make ready work • Coordination requirements among multiple entities on jointly owned pole lines • Delays in obtaining permits, municipal approvals or traffic control requirements • Customer driven schedule changes or project modifications • Contractor availability and scheduling constraints • Weather events, emergency restoration activities, and other unforeseen field conditions • Delays associated with obtaining access to private property or rights-of-way • Disputes regarding responsibility for make ready work or associated costs Because these and other factors can materially affect the time between application and licensing, without reflecting Eversource’s own performance, any calculated average would be skewed and potentially misleading.

Text of NECTA-053_Final.pdf

Extracted from the file · 1 page · 1,146 characters

Text of NECTA-055_Final.pdf

Extracted from the file · 2 pages · 1,379 characters

Text of NECTA-058_Final.pdf

Extracted from the file · 2 pages · 3,898 characters

Text of NECTA-059_Final.pdf

Extracted from the file · 1 page · 1,617 characters

Text of NECTA-059 Attachment 1.pdf

Extracted from the file · 1 page · 1,258 characters

Text of NECTA-059 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 42, 43, 46, 49, 50, 51, 52, 53, 55, 58, 59 (The Connecticut Light and Power Company) Date Filed: 09/23/2026

This filing on the current system (opens in a new tab)