ResponseFiled by Connecticut Light and Power Company dba Eversource Energy9 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files9

Text of NECTA-083 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-084_Final.pdf

Extracted from the file · 1 page · 717 characters

Text of NECTA-084 Attachment 1.pdf

Extracted from the file · 40 pages · 115,317 characters

Text of NECTA-084 Attachment 2.pdf

Extracted from the file · 37 pages · 98,480 characters

  1. Page 5 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 NECTA-084 Attachment 3 Page 5 of 34 Filed Jan. 14, 2011 in DPUC Docket No. 09-12-05, as amended to date Page 5 Any article of equipment attached to a point on a Pole not normally occupied by a strand attachment (i.e., equipment cabinets, terminals, power supplies, etc.). 3. Approved Overlashing Techniques Has the meaning provided in Article IV, Section (2)(b) hereof. 4. Attachment or Pole Attachment A. An Attachment shall consist of the bolts, lags, screws, extension arms (only with specific approval of Owner on an individual case basis), or other hardware necessary to attach one (1) suspension strand or Cable to a Pole, which has been approved by Owner pursuant to the terms of this Agreement or authorized by PURA. B. Two (2) or more suspension strands attached using the same bolts, lags, screws, extension arms, or other hardware shall be considered two (2) or more Attachments, as applicable. C. Hardware and brackets utilized to attach an amplifier, power supply, or other Appurtenance attachment shall be considered one (1) Attachment per each twelve (12) inches (30.48 cm) of linear Pole space occupancy. For illustrative purposes, the construction techniques shown in Exhibit H, Page 1 and Exhibit H, Page 2 constitute two Attachments; and the construction technique shown in Exhibit H, Page 3 hereto constitutes one Attachment. 5. Cable Copper conductors or fiber optic filaments encased in any suitable jacketing or sheath. 6. Facilities or Municipality's Facilities The Cables and all associated equipment, hardware, Attachments, Overlashings and Appurtenances of Municipality (i) which Owner is providing space to be attached to one or more Poles pursuant to the terms of this Agreement and (ii) installed for the sole use of the Municipality for any lawful purpose. The singular term for Facilities is “Facility”. 7. Guy Strand A metal cable (Facility) which is attached to a Pole and Anchor (or another Pole) for the purpose of reducing Pole stress. 8. Law Any and all applicable federal, state and local laws, rules and regulations, orders, ordinances of a governmental authority, including but not limited to orders, rules, tariffs, policies, procedures and regulations of the Public Utilities Regulatory Authority (“PURA”), the Connecticut Department of Public Utility Control (“DPUC”) or any predecessor or successor(s) to PURA or the DPUC and Connecticut General Statute 16-233. 9. Municipality The person, corporation or other legal entity authorized by the Owner under this Agreement to attach its Facilities to Poles and the party responsible for compliance with applicable Law and Owner's rules, tariffs, policies, procedures and regulations regarding such accommodations. The term “Municipality” shall be construed to include a municipal Board of Education, public school department, or regional school district which provides education for the Municipality. 10. Make-Ready Work (Initial/Additional) All work performed by Owner, the Other Owners and/or Other Licensees permitted to attach to Poles, including but not limited to, rearrangements and/or transfers of existing facilities, replacement of a Pole or any other work required to accommodate the attachment of Municipality's Facilities to a Pole. Similar work required after initial
  2. Page 6 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 NECTA-084 Attachment 3 Page 6 of 34 Filed Jan. 14, 2011 in DPUC Docket No. 09-12-05, as amended to date Page 6 attachment to a Pole by the Municipality solely because of the existence of the Municipality's Facilities shall be referred to as "additional Make-Ready Work” . 11. Municipal Gain A single position within the communications gain on a Pole reserved for municipal use in accordance with the terms of Connecticut General Statutes § 16-233 and the conditions detailed in applicable Law, including but not limited to, all applicable tariffs, regulations and orders of PURA or the DPUC. 12. Non-Conforming Construction/Shifting Fee Has the meaning provided in Article VIII of this Agreement. 13. Other Licensees Any person, corporation, or other legal entity, other than the Municipality herein, to whom the Owner and/or Other Owners has or hereafter shall extend an authorization to attach facilities to a Pole. 14. Other Owners Telephone companies that have joint ownership of Poles with Owner and/or those telephone companies that have authorized CL&P to license attachment of Facilities on such telephone companies’ Poles or jointly owned Poles. 15. Overlashing A construction method that allows the Municipality to utilize existing Suspension Strand and Cable to place an additional Cable for its own use. 16. Owner The Connecticut Light and Power Company dba Eversource Energy (“CL&P”) and CL&P’s successors and assigns. 17. Periodic Inspection Inspections conducted by Owner on portions of Municipality's Facilities, to determine that Attachments and Overlashings are authorized and that Attachments and Facilities are maintained in conformance with this Agreement. 18. Pole or Utility Pole A Pole solely owned or jointly owned by the Owner and/or by an Other Owner and used to support Owner's facilities, as well as the facilities of an Other Owner, Municipality and/or Other Licensees. 19. Post-Construction Inspection The work operations and functions performed by Owner to measure and/or visually observe Municipality's Attachments, Overlashings and/or Facilities, during or after completion of the construction of such Attachments, Overlashings and/or Facilities, to determine that all Attachments, Overlashings and/or Facilities have been authorized and constructed in conformance with the standards required by this Agreement. 20. Pre-Construction Survey The work operations and functions performed by Owner to process Municipality's application for Attachments to the point just prior to performing any necessary Make-Ready Work. There are two elements of the Pre-Construction Survey: (1) field inspection of the existing facilities, and (2) administrative effort required to
  3. Page 7 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 NECTA-084 Attachment 3 Page 7 of 34 Filed Jan. 14, 2011 in DPUC Docket No. 09-12-05, as amended to date Page 7 process the Municipality’s application and prepare the Make-Ready Work. 21. Suspension Strand (messenger cable) A metal cable attached to a Pole and used to support facilities. 22. Unit Cost A dollar amount subject to periodic revision, applicable to specified work operations and functions, including materials and labor costs. 23. Unauthorized Attachment/Unnoticed Overlashing Fee Has the meaning provided in Article VIII of this Agreement.. ARTICLE III PERMITS AND CONSENTS 1 Permits and Consents a. The Poles covered by this Agreement shall be only such Poles, within the public right-of-way area defined by Municipality's application(s), as may be amended, which are owned in whole or in part by Owner. Connecticut General Statute Section 16-233 and the May 17, 2000 DPUC decision in Docket No. 99-03-25RE01 provide Municipality with the right to attach Facilities to “one gain upon each public utility [P]ole” in accordance with applicable Law. Municipality shall be responsible for obtaining from Other Owners, private and/or public authority any necessary easement, right of way, license, permit, permission, certification or franchise, if any, which is required by applicable Law to construct, operate and/or maintain its facilities on private and public property at the location of the Pole to which Municipality seeks to attach its Facilities. The Owner does not warrant the validity or apportionability of any rights it may hold to place Facilities in the public right-of-way and on private property. This Agreement is made with the Municipality on an “AS IS” basis, subject to applicable Law and existing and future rights of third parties, if any; Owner makes no representation, covenant or warranty as the quality of, scope of, and title to, the rights granted to Municipality under this Agreement. b. Poles are used and are to continue to be used primarily for the Owner's present and future purposes and for the present and future purposes of Other Owners; provided, however, Connecticut General Statute Section 16-233 and the May 17, 2000 DPUC decision in Docket No. 99-03-25RE01 provide Municipality with the right to attach Facilities to “one gain upon each public utility [P]ole” in accordance with applicable Law. Any licenses for Attachments and/or Facilities under this Agreement are personal to Municipality and are not for use by any entity other than Municipality for its own business purposes unless otherwise agreed to in writing by Owner. 2. Requirement to Construct and Maintain a Pole and Anchor Nothing contained herein shall be construed to compel the Owner or Other Owners to construct, reconstruct, retain, extend, repair, place, replace or maintain any Pole or Anchor or other facility not needed for the Owner's or Other Owners’ own service requirements. In the event that Owner abandons any Pole to which Municipality's Facilities are attached, Owner shall provide Municipality notice of such abandonment. ARTICLE IV PROCEDURES 1. Application for Authorization a. Owner agrees with Municipality to provide space on an “AS IS” basis to allow attachment of its Facilities to any Poles, within its municipal boundaries, for which Owner has the power and privilege of granting licenses within Owner's operating territory in the State of Connecticut in accordance with all applicable Law.
  4. Page 8 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 NECTA-084 Attachment 3 Page 8 of 34 Filed Jan. 14, 2011 in DPUC Docket No. 09-12-05, as amended to date Page 8 b. Whenever the Municipality seeks to attach its Facilities to any Poles, it shall make an application therefor on the forms provided by a Owner, or through software provided for such application. Copies of forms are appended to this Agreement as Exhibits A and B and Internet access to such forms is intended to be made available on a Owner’s Web Site. The Municipality shall specify the location of the Pole or Poles involved and shall specify what Facilities it wishes to attach to each Pole. Municipality must receive authorization from the Owner prior to commencing any attachment work. Municipality shall furnish Owner with such engineering data as requested by Owner including the type of signal being carried. Each application shall include the Application Fee as set forth in Article VIII, Rates and Charges. When the Municipality submits an application to attach its Facilities to any Poles, the Owner will cooperate by responding to the Municipality’s questions concerning which attachment options and techniques are feasible to facilitate the Municipality’s application to attach Facilities to Poles. c. Municipality shall file applications for Attachment authorizations in blocks of 400 Poles or fewer. If multiple applications are filed at one time, Municipality shall designate a desired priority. d. Owner shall: (1) process applications, perform any required engineering and surveys and (2) perform any Make-Ready Work and any other required functions on a first come first serve basis. Owner shall be under no obligation to grant any authorization to attach Facilities, or if such an authorization has already been granted, may cancel any such authorization on sixty (60) days' written notice, if in Owner's judgment reasonably exercised the grant (i) would be or is in non-compliance with applicable Law or the requirements and specifications as denoted in Article IV, Section 2. e. Subject to the good faith dispute provision in Article VII(7)(c), Owner shall be under no obligation to grant or continue any authorization to attach Attachments or Facilities to Poles if Municipality has any outstanding and overdue payments owing to Owner under this Agreement or any other agreement with Owner for the provision of Pole Attachments and/or installation of other facilities. f. In accordance with the DPUC’s April 30, 2008 decision in Docket No. 07-02-13, Owner shall have 45 days from (i) Owner’s receipt of a completed pole attachment application and all required fees from Municipality and (ii) Municipality’s satisfaction of applicable provisions in this Agreement to prepare an estimate of the Make-Ready Work that is necessary to process Municipality’s Pole Attachment application. 2. Standards & Specifications for Attachments, Facilities and Overlashing. a. Technical Standards Governing Municipality’s Attachments, Overlashings and Facilities. Municipality's Attachments, Overlashings and Facilities shall be placed, maintained, relocated or removed in accordance with the requirements and specifications of applicable Law, the current editions of the Telcordia Blue Book - Manual of Construction Procedures SR-1421, the National Electrical Code (NEC), the National Electrical Safety Code (NESC), the rules and regulations of the Occupational Safety and Health Act (OSHA), the Environmental Protection Agency (EPA), PURA and the State Department of Environmental Protection (DEP), any town ordinances, and the rules and regulation of any other governing authority having jurisdiction. Municipality's activities and Municipality's Attachments, Overlashings and Facilities shall also comply with Owner’s standards, polices, practices and procedures governing pole attachments, including Owner’s safety, reliability, construction and engineering requirements, as may be updated from time to time which are included by reference herein. Where a difference in specification may exist, the more stringent shall apply. Municipality's Attachments, Overlashings and Facilities shall not physically, electronically, inductively, or otherwise interfere with the facilities of Owner, Other Owners and Other Licensees. Municipality shall always maintain a twelve (12) inch (30.48cm) separation from any existing communications facilities, except in the case of authorized Overlashing. b. Process To Be Used for Overlashing. Municipality shall be entitled to Overlash after providing at least 5 days prior written notice therof to Owner (the “Notice Period”) if it complies with the requirements herein, uses an Overlashing technique that is consistent with the Overlashing techniques shown in Exhibit F hereto and the resulting tension of any Overlashed bundles shall not exceed 60% of the usable heavy load in accord with NESC Rule 251 (“Approved Overlashing Techniques”), and Municipality’s existing cable and strands, as well as Municipality’s proposed Overlash, will not exceed the size and weight shown in Figures 1-4 in Exhibit F, subject to Owner’s and Muncipality’s compliance with the following additional procedures:
  5. Page 9 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 NECTA-084 Attachment 3 Page 9 of 34 Filed Jan. 14, 2011 in DPUC Docket No. 09-12-05, as amended to date Page 9 (i) Municipality shall perform (at Municipality’s expense) a visual inspection of all routes and poles where it proposes to Overlash new Cable to its existing licensed Attachment(s). Prior to any overlashing on up to forty (40) poles, Municipality shall provide at least five (5) working days electronic written notice thereof to Owner (the “Notice Period”). Each written notice from Municipality seeking to Overlash (the “Overlashing Notice”) shall identify (i.i) the specific Poles impacted by the proposed Overlashing, including the identification number that appears on each such Pole, (i.ii) a diagram or drawing of the Overlashing technique to be utilized, and (i.iii) submittal into Alden One, or its successor, of the request to Overlash with (i.iii.a) the weight and dimensions of each cable sought to be Overlashed onto existing Attachments, (i.iii.b) such other technical information as Owner may reasonably request after Owner has received and reviewed Municipality’s notice of proposed Overlashing, and (i.iii.c) all of the additional information required by this Article IV. One (1) additional working day shall be added to the Notice Period for each additional fifteen (15 Poles) in excess of forty (40) poles. For example, if an Overlashing Notice encompasses 85 Poles, then eight (8) working days written notice would be required. (ii) No Overlashing can be installed over existing abandoned facilities not in use for two or more years when removal of the abandoned facilities would prevent a pole replacement.. Overlashing performed without prior notice to the Owner shall be considered an Unnoticed Overlash. Overlashing performed after the effective date of this Agreement without complying with the requirements of this Agreement shall be considered an Unauthorized Attachment and shall be subject to the Unauthorized Attachment/Unnoticed Overlashing Fee described in Article IV, Section 6. (iii) In the Overlashing Notice, Municipality shall inform Owner or the Local Exchange Company if, in Municipality’s reasonable engineering judgment, Municipality’s Overlashing Notice covers any Poles that are overloaded or are at risk from being overloaded due to the overlashing. Within the Notice Period, Owner or the Local Exchange Company, as may be applicable to the poles involved in the overlashing, shall review the data provided by Municipality to determine if an additional pole loading analysis is required. (iv) If the exercise of reasonable engineering judgment, as set forth in subsection (iii), discloses an existing safety violation, on the Poles covered by the Overlashing Notice, then Municipality shall ensure that the safety violation is remedied within fourteen (14) days at which time Municipality may proceed with the overlashing, so long as Owner confirms that the safety violation was remedied within that fourteen (14) day period. If the aforesaid review discloses a technical violation or other violation, which would not cause bodily harm, it may be corrected at a later date such as during the make-ready work or in the ordinary course of Owner’s operations in accordance with the requirements of PURA’s Final Decision in Docket No. 11-03-07RE01. During the overlash, if Municipality observes one or more technical violations on any of the Poles covered by the overlashing, Municipality shall notify Owner of each technical violation and the Pole it was observed on, and Owner shall record the technical violation so it is not forgotten. In the event that damage to the Poles or other existing attachments results from the Municipality’s overlashing, Municipality shall be responsible for any necessary repairs arising from such overlashing. (v) If review of the Overlashing Notice discloses that make-ready will be required and is caused by Municipality’s noticed overlashing of the Poles covered by an Overlashing Notice, then Owner may bill Municipality for the commercially reasonable cost of any aforesaid pole loading analysis as specified in Exhibit E, in addition to any make-ready costs it or the Local Exchange Company may incur. (vi) In the event that Owner, Local Exchange Company or Municipality identifies a safety, engineering, pole loading, make-ready or billing issue associated with an overlashing that cannot be resolved under the aforesaid procedures prior to or after completion of the overlashing by Municipality, then either Owner or Municipality may refer the dispute to the PURA Pole Mediation Team for resolution or resort to the dispute resolution process in Article V, Section 7 hereof, c. Additional Standards Governing Municipality’s Attachments, Facilities and Overlashings. (i) Municipality shall exercise all necessary precautions to avoid damage to facilities of Owner, Other Owners, Other Licensees and of others occupying space on said Poles, and hereby assumes all responsibility for any and all loss from damage caused by Municipality. The Municipality shall make an immediate report to Owner of the occurrence of any damage and, Municipality hereby agrees to reimburse Owner, Other Owners and/or Other
  6. Page 10 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 NECTA-084 Attachment 3 Page 10 of 34 Filed Jan. 14, 2011 in DPUC Docket No. 09-12-05, as amended to date Page 10 Licensees within 60 days of Municipality’s receipt of a request for reimbursement, as applicable, for repairs to any damage caused by Municipality. (ii). Municipality shall not at any time make any additions to, or changes in, the location of its Attachments, Overlashings and/or Facilities covered by this Agreement without the prior written consent of Owner, except in cases of emergency after oral permission shall have been given by Owner or Owner's then-current representative who is responsible for overseeing Attachments, Overlashings and/or Facilities, such permission to be subsequently requested and confirmed in writing. (iii). Municipality shall place a label designating its ownership of any new Attachments, Overlashings and Facilities at each Pole, including any Overlashed Facilities. Such label must be recognizable by Owner from ground level. If Municipality had existing Attachments, Overlashings and Facilities pursuant to a former agreement with Owner and/or any Other Owner, Municipality shall label such existing Attachments, Overlashings and Facilities. For all Attachments, Overlashings and Facilities made or installed by Municipality after the Effective Date of this Agreement, the placement of such labels shall be made by Municipality at the time each such post-Effective Date attachment or installtion is made by Municipality; and with respect to those Attachments, Overlashings and Facilites made or installed by Municipality prior to the Effective Date of this Agreement, the placement of such labels shall be made by Municipality in the ordinary course of work by Municipality on Poles containing such pre-Effective Date installations. 3. Pre-Construction Surveys and Make-Ready Work. a. A Pre-Construction Survey will be required for each Pole for which Attachment is requested to determine the adequacy of the Pole to accommodate Municipality's Facilities, provided that a Pre Construction Survey is not required for Approved Overlashing Techniques. The field inspection will be performed by Owner or a representative of a Owner with optional participation by Other Owner(s), Other Licensees and the Municipality. b. In the event the Owner determines that a Pole to which Municipality desires to make Attachment(s), Overlashing(s) and/or attach Facility(ies) is inadequate or that a Pole needs rearrangement of the existing facilities thereon to accommodate Municipality's proposed Attachment(s), Overlashing(s) and/or Facility(ies), the Owner will inform Municipality in writing of the cost of the required Make-Ready Work. Charges for Make-Ready Work shall be as specified in Article VIII, Rates and Charges. Additionally, any costs directly related to the construction and installation of the new Pole, the removal and disposal of the prior Pole, and any other charges and costs incurred by the Other Owners, shall be considered additional Make-Ready Work charges. Notwithstanding the foregoing provisions, if a Pole replacement or Make-Ready work is necessary to accommodate Municipality’s proposed Attachment, Overlashing and/or Facilities to a Pole, then Municipality shall not be charged for the Make-Ready cost associated with such Pole replacement if, and only if, each of the following three conditions are satisfied: (i) Owner owns the Pole or is the designated custodian of said Pole per Owner’s agreement with an Other Owner, (ii) the Pole onto which Municipality wants to attach its Attachment, Overlashing or Facilities was installed by Owner after October 1, 1994 (which is the effective date of an amendment to Conn. Gen. Stat. Section 16-233 that provides Municipality with access to one 12-inch gain on a Pole) (iii) when such Pole was installed by Owner after October 1, 1994 one 12-inch gain space on the Pole was not reserved for the Municipality. c. Owner shall specify the point of attachment on each of the Poles to be occupied by Municipality's proposed Attachments and/or Facilities. Where multiple Attachments and Facilities are involved from the Municipality and other third parties seeking to attach to Poles, the Owner will attempt, to the extent practical, to designate the same relative position on each Pole for each of Municipality's Facilities. d. Municipality shall have forty-five (45) days from the receipt of written notification from the Owner of the costs of Make-Ready Work to accept and pay all Make-Ready Work costs; provided, however, that if the Owner receives a request from an Other Licensee for an authorization to attach to a Pole for which a written notification of Make-Ready Work costs has been sent to Municipality, then Municipality must accept the Make-Ready Work costs within fifteen (15) days after receipt of notification from the Owner of the other attachment request or by the end of the forty-five (45) day period, whichever period of time is shorter. e. In accordance with the DPUC’s April 30, 2008 decision in Docket No. 07-02-13, Owner
  7. Page 11 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 NECTA-084 Attachment 3 Page 11 of 34 Filed Jan. 14, 2011 in DPUC Docket No. 09-12-05, as amended to date Page 11 shall have 45 days from (A) Owner's receipt of full payment of the charges for Make-Ready Work and (B) Municipality’s satisfaction of the applicable provisions in this Agreement to complete the Owner’s Make-Ready Work that is necessary to process Municipality’s Pole Attachment application; provided, however, that (X) if any Other Owner or any third party must perform make-ready work in order to accommodate Municipality’s proposed Pole Attachment and/or Facilities, then (i) Owner shall use commercially reasonable efforts to coordinate Owner’s MakeReady Work with the make-ready work of such other entities so that such other entities have sufficient time within said 45-day period to perform their respective make-ready work and (ii) Owner is not responsible for any delays in the performance of Owner’s Make-Ready Work if such delays are attributable to the failure of Other Owner(s) and/or any third party to timely perform shift or perform make-ready work on the facilities of such Other Owner(s)’ and/or third party(ies); (Y) the DPUC’s April 30, 2008 decision in Docket No. 07-02-13 extends such 45-day period by an additional 35 days if any Pole replacement is required to facilitate Municipality’s proposed Pole Attachment; and (Z) Page 19 of the DPUC’s April 30, 2008 decision in Docket No. 07-02-13 further extends such 45-day period (or 80-day period pursuant to subsection (Y) above) in the event “special situations . . . (e.g., inclement weather and emergency situations)” exist. f. If the Owner, or Other Owner, requires modifications to its facilities including, but not limited to, the replacement of a Pole, and if such modifications would not be necessary except for the Municipality's Attachment and/or Facilities, subject to Article IIII subsection 3b, such modifications shall be additional Make-Ready Work and the Municipality shall pay the costs for such additional Make-Ready Work in accordance with the provisions of Article VIII, Rates and Charges. Subject to Article IIII subsection 3b, additional Make-Ready Work necessitated by changes in the electric or communication utility needs of Owner or an Other Owner will be billable to Municipality when necessitated in addition to the presence of Municipality Facilities. g. Upon notice from the Owner of make-ready work that will not be performed by Owner which must be performed by the Municipality, Municipality shall promptly perform or cause Municipality’s agent or designee to perform (within the time period specified by Owner) any make-ready work necessary on Municipality's Attachments, Overlashings and/or Facilities to accommodate an Other Licensee's attachment to a Pole and each such Other Licensee shall pay all costs for such make-ready work, provided, however, that if Municipality performed such make-ready work then Municipality is responsible for invoicing each such Other Licensee and collecting fr om each such Other Licensee payment for the costs incurred by Municipality to perform said make-ready work. If Municipality fails to perform (or cause Municipality’s agent or designee to perform) such make-ready work within the time period specified by Owner, then the Owner shall have (i) the right to assess the Non-Conforming Construction/Shifting Fee set forth in Article VIII, Rates and Charges or (ii) the right, but not the obligation, to perform the make-ready work and charge Other Licensee the cost of performing such work. Notwithstanding the forgoing, the Municipality shall have the right to enter into separate agreements in which such Municipality may authorize the Other Owners, Owner, Other Licensees or third parties to perform the make-ready work on its behalf. h. Municipality shall reimburse Owner for all traffic control costs incurred by Owner to accommodate Municipality’s Facilities and/or Attachments to Poles. When traffic control is necessary for Municipality during the performance of Municipality’s make-ready work to accommodate attachments from Other Licensees to Poles, then such traffic control shall be arranged for by Municipality and Municipality shall be entitled to seek reimbursement for such traffic control expense from the appropriate Other Licensees . i. Municipality shall notify the Owner in writing before adding to, relocating, replacing, adjusting or otherwise modifying its Attachments, Overlashings and/or Facilities on a Pole. j. All tree trimming made necessary, in the sole opinion of Owner, by Municipality's proposed Attachments, Overlashings and/or Facilities shall be performed by Municipality or its contractors at the Municipality’s expense. All tree trimming done on a maintenance basis shall be the responsibility of Owner. k. All costs incurred by Owner to accommodate Municipality’s proposed Attachments, Overlashings and/or Facilities to Poles, subject to Article IV subsection 3b, shall be reimbursed by Municipality to Owner within 45 days of Owner’s request therefore. Such costs shall include, but are not limited to (i) costs directly related to the purchase, construction, removal and/or environmental disposal of Poles, and (ii) costs incurred in complying with applicable Law and/or town ordinances, decisions, directions, permitting requirements or ordinances of the EPA, DEP, PURA, DPUC or other governmental body having jurisdiction.
  8. Page 12 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 NECTA-084 Attachment 3 Page 12 of 34 Filed Jan. 14, 2011 in DPUC Docket No. 09-12-05, as amended to date Page 12 4. Inspections of Municipality's Facilities a. Except for the use of Approved Overlashing Techniques performed following notice to Owner pursuant to Article IV, Section 2a, Municipality shall provide written notice to the Owner, at least twenty (20) days in advance of starting work, of the exact Pole locations where Municipality will be placing its Attachments and/or Facilities. Municipality shall also notify the Owner in writing within five (5) days of the date(s) of attachment of Municipality's Attachments and/or Facilities to Poles. b. The Owner and Municipality reserve the right to make Post-Construction Inspections (of any part or all) of Municipality's Attachments, Overlashings and/or Facilities attached to Poles. c. Intentionally deleted. d. The making of Post-Construction Inspections and/or or the failure to do so shall not operate to relieve Municipality of any responsibility, obligation or liability specified in this Agreement, e. The costs of inspection made during construction and/or the initial Post-Construction Inspection are included in the Make-Ready Work charges. The costs of any inspections found necessary due to the existence of substandard, non-conforming or unauthorized Attachments, Facilities and/or Overlashing (including the cost of any Periodic Inspection during which such substandard, non-conforming or unauthorized activity is uncovered) are the responsibility of the Municipality; and costs attributable to such inspections will be charged to the party responsible for the substandard construction, unauthorized Attachments, Facilities, Overlashing, or nonconforming condition (as the case may be) in addition to Unauthorized or Non-Conforming Charges; provided, however that if a Periodic Inspection does not uncover any substandard, non-conforming or unauthorized activity by the Municipality then the Municipality shall not be responsible for the cost of such Periodic Inspection. 5. Non-Conforming Conditions a. (i) Any Municipal Attachment, Overlashing or Facility that does not comply with the requirements of Article IV, Section 2(a) shall be deemed to be “non-conforming” and any Overlashing that does not meet the requirements of Article IV, Section 2(b) shall be deemed to be “non-conforming”. Subject to the good faith dispute provision in Article VII, Section 7(c), Municipality shall be obligated to correct any non-conforming condition which does not comply with the requirements of Article IV, Sections 2(a) and 2(b) within thirty (30) days of the date of the written notice from Owner and shall perform such correction itself or designate any Other Licensee or agent designated by the Municipality to perform such correction (but no such designation of an Other Licensee to perform such work shall relieve Municipality of its obligations hereunder); provided, however, that: (A) the Municipality shall remedy each such non-conforming condition within the accelerated time period specified by Owner if the Owner determines (in the Owner’s discretion) that the non-conforming condition (i) constitutes a material threat to the public safety or the safety of the Owner's employees, Other Owner's employees or Other Licensees, or (ii) interferes with the performance of the Owner's or Other Owner's service obligations, or (iii) poses an immediate threat to the physical integrity of the Pole plant or (iv) must be corrected sooner than 30 days per applicable Law, including the DPUC’s April 30, 2008 decision in Docket No. 07-02-13; and (B) if any non-conforming condition is deemed to be “immaterial” by the Owner (in its discretion), then Municipality shall have a total of 180 days to correct such non-conformance. (ii) Subject to the good faith dispute provision in Article VII, Section 7(c), if the Municipality fails to correct any such non-conforming condition which does not comply with the requirements of this Agreement within the applicable time period then: (A) the Municipality’s authorization to attach its Attachments, Overlashing and/or Facilities to the Poles in question shall be revoked forthwith, regardless of whether Municipality has activated the Attachments, Overlashings and/or Facilities attached to said Poles, and Municipality shall remove its Attachments, Overlashings and/or Facilities from said Poles in accordance with the provisions in Article VII, Revocation of Authorizations, and/or (B) Owner shall have the right, but not the obligation, to correct said conditions and Municipality shall pay to the Owner the cost of performing such work. b. When such non-conforming conditions pose a material threat to the public safety or the safety of the Owner's employees, Other Owner's employees or Other Licensees, interfere with the performance of the Owner's or Other Owner's service obligations, or pose an immediate threat to the physical integrity of the Pole plant, the Owner may perform such work and/or take such action that the Owner deems necessary upon notice when practicable to
  9. Page 13 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 NECTA-084 Attachment 3 Page 13 of 34 Filed Jan. 14, 2011 in DPUC Docket No. 09-12-05, as amended to date Page 13 Municipality and without any liability to Municipality or its customers. If prior notice is not practicable, Owner shall notify Municipality as soon as reasonably practicable after taking any such action. The cost of said work and/or actions shall be borne by Municipality. c. Subject to the good faith dispute provision in Article VII, Section 7(c), Municipality shall be liable to Owner, subject to Article IIII subsection 3b, for the Non-Conforming Construction/Shifting Fee set forth in Article VIII, Rates and Charges, for each Attachment, Facility and Overlashing, for each day beyond the applicable time period described in Article IV, Section 5(a) above that the non-conforming condition remains uncorrected. 6. Unauthorized Attachments and Unnoticed Overlashings a. Municipality must receive prior written authorization from Owner for any of the following: (i) attachment of any Appurtenances, Attachments and/or Facilities to Poles; and (ii) Assignment of authorization as provided in Article IX, Section 5. (iii) With respect to Overlashing, Municipality must provide prior written notice to Owner, as more particularly described in Article IV, Section 2(a) hereof and other applicable provisions of this Agreement. Absent such written authorization the Owner may charge an Unauthorized Attachment /Unnoticed Overlashing Fee per Pole for each unauthorized Attachment, Facility and/or Overlash, as specified in Article VIII, Rates and Charges, without prejudice to its other rights or remedies under this Agreement. Further, the Owner will require the Municipality to submit, in writing, an application for all unauthorized Attachments, Overlashings and/or Facilities. If such application is not received by the Owner within forty five (45) days after Municipality’s receipt of written notice by the Owner of the unauthorized condition, then Owner shall be entitled to remove each such unauthorized Attachment, Overlashing and/or Facility unless such removal by Owner shall cause an immediate and bona fide risk to public safety. b. No act or failure to act by the Owner with regard to any unauthorized Attachment, Overlashing or Facility shall be deemed as the authorization of such unauthorized Attachment, Facility and/or Overlashing; and, if any authorization should be subsequently issued, said authorization shall not operate retroactively or constitute a waiver by the Owner of any of its rights or privileges or obligations under this Agreement, or otherwise, provided, however, that Municipality shall be subject to all liabilities, obligations and responsibilities of this Agreement in regard to said unauthorized Attachment, Overlashing or Facility. 7. Rearrangements and Shifting a. (i) The Owner may perform all rearrangements and shifting of Municipality's Attachments, Overlashings and/or Facilities as required in emergency or storm restoration conditions, vehicular accidents, threat to general public, public work projects and/or in order to comply with applicable Law, to accommodate Owner, Other Owners, or Other Licensees, and during normal Pole moves, maintenance, and replacement, provided, however, that with respect to any damage to Municipality’s Attachments, Overlashings and/or Facilities caused by Owner during or arising out of an emergency or storm restoration conditions, vehicular accidents, or threat to general public, Owner shall not be liable therefore unless such damage was caused by Owner’s gross negligence. (ii) In the event or circumstances beyond the control of either Party, including but not limited to emergencies, storms, vehicular accidents, threat to general public, acts of God or any other similar event, which cause damage to Municipality's Attachments, Overlashings and/or Facilities, then Municipality shall be responsible for removing and/or reattaching its Attachments, Overlashings and Facilities to the Pole(s). b. Subject to the good faith dispute provision in Article VII, Section 7(c), Owner may rearrange and reattach Municipality's Attachments, Overlashings and/or Facilities as needed under emergency conditions, but is under no obligation to do so. If Owner is unable to perform the rearrangement or shifting at its sole determination, in non-emergency conditions, for reasons including but not limited to technical concerns or risk of damage or interference
  10. Page 14 of 34

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 9, 2026 NECTA-084 Attachment 3 Page 14 of 34 Filed Jan. 14, 2011 in DPUC Docket No. 09-12-05, as amended to date Page 14 with Municipality's Attachments, Overlashings and/or Facilities, then Owner shall contact Municipality and Municipality shall (A) perform any such rearrangement or shifting within the time period specified by Owner thereafter and provide notice to Owner of completion of such rearrangement or shifting or (B) authorize any Other Licensee or agent designated by the Municipality to perform such rearrangement or shifting (but no such designation of an Other Licensee to perform such work shall relieve Municipality of its obligations hereunder). If Municipality fails to perform such rearrangement or shifting and provide notice to Owner of completion within the time period specified by Owner , the Non-Conforming Construction/Shifting Fee as set forth in Article VIII, Rates and Charges, will apply on a daily basis per rearrangement or shift location until notification from the Municipality that the work has been completed. c. Subject to Article IV, Section 3b, the costs of rearrangements and shifting, including the cost of traffic control, performed by Owner on behalf of the Municipality will be borne by the Municipality as set forth in Article VIII, Rates and Charges. d. Municipality shall arrange and pay the cost of any rearrangement or shifting, including traffic control, during rearrangements or shifting for which Municipality is responsible. 8. Removal of Municipality’s Facilities Upon forty five (45) days advance written notice from Owner, Municipality will remove any abandoned facilities not in use for two or more years when their removal would prevent a pole replacement; provided, however, that Municipality shall not be required to remove such facilities if Municipality demonstrates that the facilities were in service during the prior two years. Owner will remove any of its abandoned facilities where removal would prevent a pole replacement ARTICLE V OTHER OBLIGATIONS OF MUNICIPALITY 1. Insurance a. Municipality shall carry insurance policies issued by an insurance carrier licensed to operate in the State of Connecticut or an interlocal risk management agency, from and against any and all claims, demands, actions, judgments, costs, and/or expenses, including attorney's fees, and liabilities which may arise or result, directly or indirectly, from or by reason of such loss, injury or damage for the amounts specified as follows: b. The amounts of such insurance: (i) against liability due to injury or to death of persons shall be not less than $1,000,000 as to any one person and $1,000,000 as to any one occurrence, and (ii) against liability due to damage to property shall be not less than $1,000,000 as to any one occurrence. c. In each application the Municipality submits to the Owner hereunder for permission to attach Attachments and/or Facilities to Poles, the Municipality shall also carry such insurance as will protect Municipality from all claims under any Worker's Compensation Law in effect that may be applicable. Owner-The Connecticut Light and Power Company, its corporate parent and each of their respective trustees, officers, directors, employees and attorneys shall be named as additional insureds on such policy(ies) of insurance, except for Workmen’s Compensation insurance coverage. Provided, however, notwithstanding the foregoing requirements, the Municipality shall be excused from compliance with the above-mentioned requirement to provide proof of insurance coverage in each application the Municipality submits to the Owner hereunder if the Municipality has already timely provided Owner with written proof of the insurance coverage required under this Article V at the same time that Municipality has timely sent its payment to Owner for the most recent semi-annual rental

Text of NECTA-084 Attachment 4.pdf

Extracted from the file · 31 pages · 92,142 characters

As listed on the current system

Question(s) Answered 82, 83, 84 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026

This filing on the current system (opens in a new tab)