Interrogatory responses
Answers to questions 101
Filed by The Connecticut Light and Power Company2 files
Part of docket 26-05-10Files2
OCC-101-SP01_Final.pdf
PDF · 114 KB · 2 pagesText searchable
Download OCC-101-SP01_Final.pdfRead the text of OCC-101-SP01_Final.pdf
OCC-101-SP01 Attachment 1 REDACTED.pdf
PDF · 327 KB · 1 pageText read by machine from a scan; may contain errors, especially in numbers
Download OCC-101-SP01 Attachment 1 REDACTED.pdfScanned pages and text of OCC-101-SP01 Attachment 1 REDACTED.pdf
Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-01 Date Issued September 16, 2026 OCC-101-SP01 Page 1 of 2 Date Filed: November 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (VMP/Budget) Page 12, lines 9-17, of Exhibit CLP-VMP-1, notes that the cost of the VMP is increasing, due to inflationary impacts on labor and equipment. a. Please provide current costs of labor associated w/ VMP and anticipated costs of labor for the VMP over next 5 years, as aligned with the Targeted system performance plan. b. Please provide current costs of equipment associated w/ VMP and anticipated costs of equipment VMP over next 5 years, as aligned with the Targeted system performance plan. c. Lines 14-17 note that another key driver of costs for the VMP is a PURA notification process. Please provide actual costs spent, indicating for each cost the docket number/required notification process. Supplemental Response: Please refer to OCC-101-SP01, Attachment 1 CONFIDENTIAL, for the standard equipment and labor rates for 2027-2030. The Company has determined that, in the event that PURA were to approve the Company’s request to notify customers in accordance with CT G.S. § 16-234, the cost of the proposed VMP could be reduced by $11.19M during the multi-year contract period from January 1, 2027 through December 31, 2030. Original Response: a. Please refer to OCC-101, Attachment 1 CONFIDENTIAL, for the Test Year (2025) and 2026 standard labor rates. In addition, the VMP includes unit price tree removals and unit price maintenance tree work. However, the labor rates are embedded in the unit price and not separated. The Company is currently under the final year of a four-year contract covering the term 2023-2026. In May 2026, the Company commenced the RFP process for the next multi-year contract for the term starting January 1, 2027, and has requested the itemization of unit prices, including labor, equipment, and documented notification costs. Vendors are currently preparing their bid submissions. The Company anticipates finalizing its VMP contract by November 2026.Page 2
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-01 Date Issued September 16, 2026 OCC-101-SP01 Page 2 of 2 b. Please refer to OCC-101, Attachment 1 CONFIDENTIAL, for the Test Year (2025) and 2026 standard equipment rates. In addition, the VMP includes unit price tree removals and unit price maintenance tree work. However, the equipment rates are embedded in the unit price and not separated. c. The Scheduled Maintenance Trimming is contracted by unit price per mile per Area Work Center per year and the documented notification costs are embedded within the unit price per mile and not separated. Please refer to Exhibit CLP-VMP-1, on page 45, at line 12-15, for the estimated documented notification costs associated with PURA’s order in Docket No. 12-01-10.
Scanned pages and machine-read text of OCC-101-SP01 Attachment 1 REDACTED.pdf
Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)

The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 16, 2026 OCC-101 SP01 Attachment 1 REDACTED Page 1 of 12027 2028 Staadard Labor Rate Lewis Lucas Asplundh Xylem Distinctive Stanley Tennett EAS N.G. Gilbert Green Velvet Lewis Lucas Asplundh Xylem Distinctive Stanley Tennett EAS N.G. Gilbert Green Velvet Foreperson [redacted] Groundperson [redacted] Flagger [redacted] General Foreperson (Storm only) [redacted] Climber [redacted] Permission Person [redacted] Crane Operator [redacted] 2027 2028 Staadard Equipment Rate Lewis Lucas Asplundh Xylem Distinctive Stanley Tennett EAS N.G. Gilbert Green Velvet Lewis Lucas Asplundh Xylem Distinctive Stanley Tennett EAS N.G. Gilbert Green Velvet Permission Vehicle [redacted] Bucket Truck 55-60' [redacted] Bucket Truck 55' Diesel [redacted] Bucket Truck 65-70' [redacted] Chipper Drum [redacted] Chipper Disk [redacted] Log Truck [redacted] Chip Truck [redacted] 1/2 or 3/4 Ton Pickup [redacted] Power Blower [redacted] Hydraulic Pruner [redacted] Stump Grinder [redacted] Chainsaw 12-18" [redacted] Chainsaw 19-24" [redacted] Chainsaw 25-36" [redacted] Brush Saw [redacted] Crane [redacted] Skidder [redacted] Mower [redacted] 2029 2030 Staadard Labor Rate Lewis Lucas Asplundh Xylem Distinctive Stanley Tennett EAS N.G. Gilbert Green Velvet Lewis Lucas Asplundh Xylem Distinctive Stanley Tennett EAS N.G. Gilbert Green Velvet Foreperson [redacted] Groundperson [redacted] Flagger [redacted] General Foreperson (Storm only) [redacted] Climber [redacted] Permission Person [redacted] Crane Operator [redacted] 2029 2030 Staadard Equipment Rate Lewis Lucas Asplundh Xylem Distinctive Stanley Tennett EAS N.G. Gilbert Green Velvet Lewis Lucas Asplundh Xylem Distinctive Stanley Tennett EAS N.G. Gilbert Green Velvet Permission Vehicle [redacted] Bucket Truck 55-60' [redacted] Bucket Truck 55' Diesel [redacted] Bucket Truck 65-70' [redacted] Chipper Drum [redacted] Chipper Disk [redacted] Log Truck [redacted] Chip Truck [redacted] 1/2 or 3/4 Ton Pickup [redacted] Power Blower [redacted] Hydraulic Pruner [redacted] Stump Grinder [redacted] Chainsaw 12-18" [redacted] Chainsaw 19-24" [redacted] Chainsaw 25-36" [redacted] Brush Saw [redacted] Crane [redacted] Skidder [redacted] Mower [redacted]
As listed on the current system
Question(s) Answered 101 (The Connecticut Light and Power Company)(Supplemental/Revision) Date Filed: 11/06/2026