Interrogatory responses

Answers to questions 190

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy8 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files8

Text of OCC-190 Attachment 2.pdf

Extracted from the file · 25 pages · 425,823 characters

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: 2023] Proposed Attacher (Company Name) | Date Proposed Attacher Sent Application | SPA Acknowledgement (Date) | Submission Complete Y or N | If Submission Not Complete Date Attacher Notified by SPA | Date Attacher Resubmits | Date SPA Acknowledges Submission for Completeness (Invoice is generated) | Time Taken To Review by SPA | # of Days Allowed for Completeness Review | Did SPA Meet Compliance for Completeness Review Y/N | Application Fee Received Y or N (Within Reporting Timeframe) | Application Fee Received Date | Conversation # | # of poles | Applicant Category <300, 300-3,000 or >3,000 | If >3,000, negotiated date for engineering phase | Is this a Pre-engineered submission? Y or N | Date SPA approved pre-engineered submission | Date SPA notifies Telco of receipt of pre-engineered submission | Telco Approved or Denied Pre-engineered submission | Telco Approved or Denied Pre-engineered submission Date | For Pre-engineered totals days taken for Pole Owners to approve or deny | Engineering Start Date (application fee received date) | Power Field Survey Complete Date | Telco Field Survey Complete Date | Date Power Requested Concurrence2 | Date Telco Requested Concurrence | Date Concurrence Agreed Upon | # of days for Engineering Phase and Application Review on Merits | Did Engineering Phase meet mandated timeframes (Y/N) | Power Design/Make-Ready Development Complete Date (includes information uploaded into Alden) | Telco Design/Make-Ready Complete Date(includes information uploaded into Alden) | # of days for Power Design/MR Development | # of days for Telco Design/MR Development NETSPEED LLC | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A FIBERTECH NETWORKS INC | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | YES NETSPEED LLC | Y | Y | Y | >3,000 | N | N/A | N/A | N/A | N/A | N/A MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A COX COMMUNICATIONS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | YES COMCAST - CT | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | N | N | N/A | N/A | N/A | N/A | N/A CHARTER COMMUNICATIONS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO CHARTER COMMUNICATIONS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled | YES CHARTER COMMUNICATIONS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | YES COMCAST - CT | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | YES COX COMMUNICATIONS | Y | Y | N | N | N/A | N/A | N/A | N/A | N/A MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | YES FIBERTECH NETWORKS INC | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled | YES COX COMMUNICATIONS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled | YES COMCAST - CT | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A COMCAST - CT | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled | Canceled | Canceled | Canceled | Canceled | Canceled | Canceled | Canceled TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A TOWN OF MANCHESTER | Y | Y | N | N | N/A | N/A | N/A | N/A | N/A COMCAST - CT | Y | Y | N | N | N/A | N/A | N/A | N/A | N/A CROWN CASTLE | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled CHARTER COMMUNICATIONS | Y | Y | N | N | N/A | N/A | N/A | N/A | N/A FIBERTECH NETWORKS INC | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled FIBERTECH NETWORKS INC | Y | Y | N | N | N/A | N/A | N/A | N/A | N/A MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | NO COMCAST - CT | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | NO COMCAST - CT | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | YES
  2. Part 2

    CHARTER COMMUNICATIONS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | YES NETSPEED LLC | Y | Y | Y | >3,000 | N | N/A | N/A | N/A | N/A | N/A | YES COMCAST - CT | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | Canceled | YES NETSPEED LLC | Y | Y | Y | >3,000 | N | N/A | N/A | N/A | N/A | N/A | NO TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | NO TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | YES FIBERTECH NETWORKS INC | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO COMCAST - CT | N | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | NO COMCAST - CT | N | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | YES BREEZELINE - CT | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO COX COMMUNICATIONS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO COMCAST - CT | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled | YES BREEZELINE - CT | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | YES MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | YES TOWN OF SOUTH WINDSOR, CT | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | YES MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | Working solutions MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A | Canceled | YES TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO CABLEVISION | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | YES CABLEVISION | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO CABLEVISION | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled | YES TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A CROWN CASTLE | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO COMCAST - CT | Y | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A TOWN OF SOUTH WINDSOR, CT | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO COMCAST - CT | N | Y | Y | 300 - 3,000 | N | N/A | N/A | N/A | N/A | N/A NETSPEED LLC | Y | Y | Y | >3,000 | N | N/A | N/A | N/A | N/A | N/A | Canceled | Canceled | Canceled | Canceled NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled | Canceled | Canceled | Canceled VERIZON WIRELESS | Y | Y | N | N | N/A | N/A | N/A | N/A | N/A VERIZON WIRELESS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled | Canceled | Canceled | Canceled NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO VERIZON WIRELESS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | NO VERIZON WIRELESS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A VERIZON WIRELESS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | YES NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 | N | N/A | N/A | N/A | N/A | N/A | Canceled | YES [Sheet: 2024] Proposed Attacher (Company Name) | Date Proposed Attacher Sent Application | SPA Acknowledgement (Date) | Submission Complete Y or N | If Submission Not Complete Date Attacher Notified by SPA | Date Attacher Resubmits | Date SPA Acknowledges Submission for Completeness (Invoice is generated) | Time Taken To Review by SPA | # of Days Allowed for Completeness Review | Did SPA Meet Compliance for Completeness Review Y/N | Application Fee Received Y or N (Within Reporting Timeframe) | Application Fee Received Date | Conversation # | # of poles | Applicant Category <300, 300-3,000
  3. Part 3

    or >3,000 | If >3,000, negotiated date for engineering phase | Is this a Pre-engineered submission? Y or N | Date SPA approved pre-engineered submission | Date SPA notifies Telco of receipt of pre-engineered submission | Telco Approved or Denied Pre-engineered submission | Telco Approved or Denied Pre-engineered submission Date | For Pre-engineered totals days taken for Pole Owners to approve or deny | Engineering Start Date (application fee received date) | Power Field Survey Complete Date | Telco Field Survey Complete Date | Date Power Requested Concurrence | Date Telco Requested Concurrence | Date Concurrence Agreed Upon | # of days for Engineering Phase and Application Review on Merits | Did Engineering Phase meet mandated timeframes (Y/N) | Power Design/Make-Ready Development Complete Date (includes information uploaded into Alden) | Telco Design/Make-Ready Complete Date(includes information uploaded into Alden) | # of days for Power Design/MR Development | # of days for Telco Design/MR Development COX COMMUNICATIONS | Y | Y | Y | <300 | YES CHARTER COMMUNICATIONS | Y | Y | Y | <300 | NO TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | <300 | YES NETSPEED LLC | Y | Y | Y | >3,000 | NO CHARTER COMMUNICATIONS | Y | Y | Y | <300 | YES NETSPEED LLC | Y | Y | Y | >3,000 | N | N/A | N/A | N/A | N/A | N/A | NO COMCAST - CT | Y | Y | Y | <300 | YES TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | <300 | NO NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 | YES FIBERTECH NETWORKS INC | Y | Y | Y | <300 | YES NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | NO COMCAST - CT | Y | Y | Y | <300 | NO FIBERTECH NETWORKS INC | Y | Y | Y | <300 | NO COMCAST - CT | Y | Y | Y | 300 - 3,000 | NO COX COMMUNICATIONS | Y | Y | Y | <300 | NO COMCAST - CT | Y | Y | Y | 300 - 3,000 | YES NETSPEED LLC | Y | Y | Y | 300 - 3,000 | YES MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | YES BREEZELINE - CT | Y | Y | Y | <300 | YES COMCAST - CT | N | Y | Y | <300 | NO NETSPEED LLC | Y | Y | Y | 300 - 3,000 | NO NETSPEED LLC | Y | Y | Y | <300 | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300 - 3,000 | NO COX COMMUNICATIONS | Y | Y | Y | <300 | Conversation blank in alden | NO NETSPEED LLC | N | Y | Y | >3,000 | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300 - 3,000 | YES NETSPEED LLC | Y | Y | Y | >3,000 NETSPEED LLC | Y | Y | Y | <300 | YES MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | Canceled | NO TOWN OF POMFRET | Y | Y | Y | <300 | NO CABLEVISION | Y | Y | Y | <300 | NO TOWN OF WINDSOR - CT | N | Y | Y | <300 TOWN OF MANCHESTER | Y | Y | Y | <300 | NO TOWN OF MANCHESTER | N | Y | Y | <300 | NO TOWN OF VERNON | Y | Y | Y | <300 | NO COMCAST - CT | Y | Y | Y | >3,000 | NO VERIZON WIRELESS | Y | Y | Y | <300 MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 VERIZON WIRELESS | Y | Y | Y | <300 | NO COMCAST - CT | Y | Y | Y | 300 - 3,000 COMCAST - CT | Y | Y | Y | <300 COX COMMUNICATIONS | Y | Y | Y | <300 CHARTER COMMUNICATIONS | Y | Y | Y | <300 NETSPEED LLC | Y | Y | Y | 300 - 3,000 FIBERTECH NETWORKS INC | Y | Y | Y | 300 - 3,000 FIBERTECH NETWORKS INC | Y | Y | Y | 300 - 3,000 | NO FIBERTECH NETWORKS INC | Y | Y | Y | <300 TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | <300 NETSPEED LLC | N | Y | Y | >3,000 COMCAST - CT | N | Y | Y | >3,000 | NO COMCAST - CT | Y | Y | Y | >3,000 COMCAST - CT | Y | Y | Y | 300 - 3,000 | Canceled | NO COX COMMUNICATIONS | Y | Y | Y | <300 | Canceled | NO NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 | Canceled | Canceled | Canceled | Canceled | Canceled FIBERTECH NETWORKS INC | Y | Y | Y | 300 - 3,000 | Canceled | YES COMCAST - CT | Y | Y | Y | <300 | Canceled | Canceled | YES COMCAST - CT | Y | Y | Y | <300 | Canceled | YES FIBERTECH NETWORKS INC | Y | Y | Y | <300 | Canceled | YES COX COMMUNICATIONS | Y | Y | Y | <300 | Canceled | YES COMCAST - CT | Y | Y | Y | 300 - 3,000 | Canceled | YES
  4. Part 4

    BREEZELINE - CT | Y | Y | Y | <300 | Canceled | YES VERIZON WIRELESS | Y | Y | Y | <300 | Canceled | YES NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 | Canceled | YES CHARTER COMMUNICATIONS | Y | Y | Y | <300 | Canceled | YES COMCAST - CT | Y | Y | Y | >3,000 | Canceled | NO COMCAST - CT | N | Y | Y | <300 | Canceled | YES COMCAST - CT | Y | Y | Y | 300 - 3,000 | Canceled NETSPEED LLC | Y | Y | Y | 300 - 3,000 | N/A - TEL SO POLE | YES COMCAST - CT | N | Y | Y | 300 - 3,000 | Canceled | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | N MCIMETRO ACCESS TRANSMISSION SYSTEMS | N | Y | N COMCAST - CT | Y | Y | N BREEZELINE - CT | Y | Y | N FIBERTECH NETWORKS INC | Y | Y | Y | <300 | Canceled COMCAST - CT | N | Y | N CHARTER COMMUNICATIONS | Y | Y | N NETSPEED LLC | Y | Y | N FIBERTECH NETWORKS INC | Y | Y | N COX COMMUNICATIONS | Y | Y | N VERIZON WIRELESS | Y | Y | N [Sheet: 2025] Proposed Attacher (Company Name) | Date Proposed Attacher Sent Application | SPA Acknowledgement (Date) | Submission Complete Y or N | If Submission Not Complete Date Attacher Notified by SPA | Date Attacher Resubmits | Date SPA Acknowledges Submission for Completeness (Invoice is generated) | Time Taken To Review by SPA | # of Days Allowed for Completeness Review | Did SPA Meet Compliance for Completeness Review Y/N | Application Fee Received Y or N (Within Reporting Timeframe) | Application Fee Received Date | Conversation # | # of poles | Applicant Category <300, 300-3,000 or >3,000 | If >3,000, negotiated date for engineering phase | Is this a Pre-engineered submission? Y or N | Date SPA approved pre-engineered submission | Date SPA notifies Telco of receipt of pre-engineered submission | Telco Approved or Denied Pre-engineered submission | Telco Approved or Denied Pre-engineered submission Date | For Pre-engineered totals days taken for Pole Owners to approve or deny | Engineering Start Date (application fee received date) | Power Field Survey Complete Date | Telco Field Survey Complete Date | Date Power Requested Concurrence | Date Telco Requested Concurrence | Date Concurrence Agreed Upon | # of days for Engineering Phase and Application Review on Merits | Did Engineering Phase meet mandated timeframes (Y/N) | Power Design/Make-Ready Development Complete Date (includes information uploaded into Alden) | Telco Design/Make-Ready Complete Date(includes information uploaded into Alden) | # of days for Power Design/MR Development | # of days for Telco Design/MR Development COMCAST - CT | Y | Y | Y | >3000 | NO NETSPEED LLC | Y | Y | Y | >3000 | NO COMCAST - CT | Y | Y | Y | >3000 FIBERTECH NETWORKS INC | Y | Y | Y | <300 | NO NETSPEED LLC | Y | Y | Y | >3000 NETSPEED LLC | N | Y | Y | >3000 NETSPEED LLC | Y | Y | Y | 300-3000 | NO COMCAST - CT | Y | Y | Y | 300-3000 COMCAST - CT | Y | Y | Y | 300-3000 | NO CHARTER COMMUNICATIONS | Y | Y | Y | <300 NETSPEED LLC | Y | Y | Y | 300-3000 TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | <300 | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300-3000 CHARTER COMMUNICATIONS | Y | Y | Y | <300 | NO NETSPEED LLC | Y | Y | Y | 300-3000 | Canceled | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 COX COMMUNICATIONS | Y | Y | Y | <300 COX COMMUNICATIONS | Y | Y | Y | <300 | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | NO TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | <300 COMCAST - CT | Y | Y | Y | <300 COMCAST - CT | Y | Y | Y | <300 | NO NETSPEED LLC | Y | Y | Y | <300 | NO FIBERTECH NETWORKS INC | Y | Y | Y | <300 NETSPEED LLC | Y | Y | Y | <300 FIBERTECH NETWORKS INC | Y | Y | Y | <300 | Canceled | Canceled | Canceled | Canceled | Canceled TOWN OF SOUTH WINDSOR, CT | Y | Y | Y | <300 CITY OF BRISTOL, CT | Y | Y | Y | <300 | NO COX COMMUNICATIONS | Y | Y | Y | <300 | Canceled | Canceled | Canceled | Canceled | Canceled COMCAST - CT | Y | Y | Y | <300 | Canceled | Canceled | Canceled | Canceled | Canceled MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300-3000 | NO
  5. Part 5

    COMCAST - CT | Y | Y | Y | 300-3000 | Canceled | Canceled | Canceled | Canceled | Canceled LEVEL 3 COMMUNICATIONS | Y | Y | Y | 300-3000 LEVEL 3 COMMUNICATIONS | Y | Y | Y | <300 COMCAST - CT | N | Y | Y | >3000 COMCAST - CT | N | Y | Y | 300-3000 TOWN OF SOUTH WINDSOR, CT | Y | Y | Y | <300 | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | N | Y | Y | <300 VERIZON WIRELESS | Y | Y | Y | <300 | NO NEW CINGULAR WIRELESS PCS | N | Y | Y | <300 | Canceled | Canceled | Canceled | Canceled | Canceled NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 | YES NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 | NO NEW CINGULAR WIRELESS PCS | Y | Y | Y | <300 | Canceled | Canceled | Canceled | Canceled | Canceled | Canceled VERIZON WIRELESS | Y | Y | Y | <300 | YES [Sheet: 2026] Proposed Attacher (Company Name) | Date Proposed Attacher Sent Application | SPA Acknowledgement (Date) | Submission Complete Y or N | If Submission Not Complete Date Attacher Notified by SPA | Date Attacher Resubmits | Date SPA Acknowledges Submission for Completeness (Invoice is generated) | Time Taken To Review by SPA | # of Days Allowed for Completeness Review | Did SPA Meet Compliance for Completeness Review Y/N | Application Fee Received Y or N (Within Reporting Timeframe) | Application Fee Received Date | Conversation # | # of poles | Applicant Category <300, 300-3,000 or >3,000 | If >3,000, negotiated date for engineering phase | Is this a Pre-engineered submission? Y or N | Date SPA approved pre-engineered submission | Date SPA notifies Telco of receipt of pre-engineered submission | Telco Approved or Denied Pre-engineered submission | Telco Approved or Denied Pre-engineered submission Date | For Pre-engineered totals days taken for Pole Owners to approve or deny | Engineering Start Date (application fee received date) | Power Field Survey Complete Date | Telco Field Survey Complete Date | Date Power Requested Concurrence | Date Telco Requested Concurrence | Date Concurrence Agreed Upon | # of days for Engineering Phase and Application Review on Merits | Did Engineering Phase meet mandated timeframes (Y/N) | Power Design/Make-Ready Development Complete Date (includes information uploaded into Alden) | Telco Design/Make-Ready Complete Date(includes information uploaded into Alden) | # of days for Power Design/MR Development | # of days for Telco Design/MR Development FIBER TECHNOLOGIES NETWORKS, L.L.C. | Y | Y | Y | <300 | N FIBER TECHNOLOGIES NETWORKS, L.L.C. | Y | Y | Y | <300 | N | NO COMCAST - CT | Y | Y | Y | <300 | N | NO CHARTER COMMUNICATIONS | Y | Y | Y | <300 | N | NO NetSpeed LLC | Y | Y | Y | 300-3,000 | N | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | N | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | N TELEPORT COMMUNICATIONS AMERICA, LLC | Y | Y | Y | <300 | N | NO COX COMMUNICATIONS | Y | Y | Y | <300 | N MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300-3,000 | N | NO NetSpeed LLC | Y | Y | Y | <300 | N | YES NetSpeed LLC | Y | Y | Y | <300 | N | NO COX COMMUNICATIONS | Y | Y | Y | <300 | N | YES Town of South Windsor, CT | Y | Y | Y | <300 | N | NO COMCAST - CT | Y | Y | Y | <300 | N | YES MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | 300-3,000 | N CROWN CASTLE | Y | Y | Y | <300 | N | NO FIBER TECHNOLOGIES NETWORKS, L.L.C. | Y | Y | Y | <300 | N | N/A | Cancel | N/A COX COMMUNICATIONS | Y | Y | Y | <300 | N | N/A | Cancel | N/A MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | N | Cancel | NO COMCAST - CT | Y | Y | Y | <300 | N | N/A | Cancel | N/A TOWN OF GLASTONBURY | Y | Y | Y | <300 | N | NO COX COMMUNICATIONS | Y | Y | Y | <300 | N | NO NetSpeed LLC | Y | Y | Y | <300 | N Town of Plainville | Y | Y | Y | <300 | N | YES FIBER TECHNOLOGIES NETWORKS, L.L.C. | Y | Y | Y | <300 | N | YES COX COMMUNICATIONS | Y | Y | <300 | N | Canceled | Canceled TOWN OF GLASTONBURY | Y | Y | Y | <300 | N | YES
  6. Part 6

    MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | N | N/A | Cancel | N/A VERIZON WIRELESS | Y | Y | Y | <300 | N | NO VERIZON WIRELESS | Y | Y | Y | <300 | N | YES New Cingular Wireless PCS | Y | Y | Y | <300 | N | N/A | Cancel | N/A CITY OF HARTFORD - CT | Y | Y | Y | <300 | N | NO MCIMETRO ACCESS TRANSMISSION SYSTEMS | Y | Y | Y | <300 | N | YES NetSpeed LLC | Y | Y | Y | <300 | N | Cancel | YES New Cingular Wireless PCS | Y | Y | Y | <300 | N | NO New Cingular Wireless PCS | Y | Y | Y | <300 | N | YES VERIZON WIRELESS | Y | Y | Y | <300 | N | N/A | Cancel | N/A VERIZON WIRELESS | Y | Y | Y | <300 | N | Cancel | Cancel | Cancel | Canceled | Canceled CHARTER COMMUNICATIONS | Y | Y | Y | <300 | N | N/A | Cancel | N/A VERIZON WIRELESS | Y | Y | Y | <300 | N | N/A | N/A NetSpeed LLC | Y | Y | Y | 300-3,000 | N COMCAST - CT | Y | Y | Y | <300 | N COMCAST - CT | Y | Y | Y | <300 | N | Cancel | Cancel | Cancel | Canceled | Canceled

Text of OCC-190 Attachment 3.pdf

Extracted from the file · 21 pages · 204,206 characters

Text of OCC-190 Attachment 4.pdf

Extracted from the file · 18 pages · 32,170 characters

Text of OCC-190 Attachment 5.pdf

Extracted from the file · 4 pages · 7,902 characters

As listed on the current system

Question(s) Answered 190 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/20/2026

This filing on the current system (opens in a new tab)