Interrogatory responses

Answers to questions 213, 220, 223, 225, 226, 227

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy7 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files7

Text of OCC-223 Attachment 1.pdf

Extracted from the file · 1 page · 263 characters

Text of OCC-225_final.pdf

Extracted from the file · 1 page · 971 characters

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-03 Date Issued August 07, 2026 OCC-226 Page 1 of 1 Date Filed: August 21, 2026 Witness: Ned W. Allis Request from: Office of Consumer Counsel Question: (Land Rights) Referring to Exhibit CLP Depreciation-4, page 1. FERC Accounts 360.20 and 389.20. Why are land rights considered depreciable plant and nondepreciable plant? Response: Land rights have a finite life and limited residual value at the end of their useful lives, which contrasts with land that typically has a value (which normally appreciates rather than depreciates) and an indefinite life. As a result, the costs of land rights are consumed during the course of utility operations and should be allocated over their expected useful lives (net of any salvage) through depreciation expense.

Text of OCC-227_final.pdf

Extracted from the file · 1 page · 547 characters

As listed on the current system

Question(s) Answered 213, 220, 223, 225, 226, 227 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/21/2026