Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 256, 267, 268

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 11, 2026 OCC-256 Attachment 2 Page 1 of 1 THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR DELIVERY SERVICE PAGE 21 OF 21 APPENDIX A SERVICE CHARGES General Services Returned Payment Charge $20.00 per returned payment Late Payment Charge 1.0% applied to delinquent balance Sales Tax Abatement Charge $68.00 Reconnection at Meter (for non-payment or seasonal reconnection) $36.00 Same Day Reconnect at Meter (After Hours) Charge $110.00 Reconnection at Pole (for non-payment) a. Straight Time – Residential $571.23148.92 b. Straight Time – Non-Residential $557.11151.69 c. Over Time – Residential $797.25205.43 d. Over Time – Non-Residential $777.55209.24 Meter Diversion Charge $250.00 Restructuring Related or Supplier Requested Meter Test (Per Meter)* a. Company Residential Meter $81.49 b. Company Non-Residential Meter $83.01 c. Non-Company meter tested at customer’s location To be quoted Off-Cycle and Manual Meter Read Request (Per Meter or Per Request)** a. Residential $31.17 b. Non-Residential $39.85 Interval Data Services (Per Service Account) a. One time static view-monthly interval data $50.00 b. 12-month fluid view-monthly interval data $300.00 c. Special Request Mutual Agreement Meter Communications Equipment Installation Only (see Extended Metering Options) Load Pulse Outputs Installation Only (see Extended Metering Options) Special Request Mutual Agreement Extended Metering Options (Per Meter Costs) 1. 2. 3. a. Pulse output (Below 200 kW) $770.23 b. Pulse output (Above 200 kW) $713.12 a. Interval Recording AMR without pulses (Below 200 kW) $852.74 b. Interval Recording AMR without pulses (Above 200 kW) $230.51 a. Interval Recording AMR with pulse output (Below 200 kW) $1,335.35 b. Interval Recording AMR with pulse output (Above 200 kW) $713.12 *For all meters removed from location for testing **Limit 2 requests per supplier per week. NOTE: Above charges do not include sales tax. Supersedes Terms and Conditions for Delivery Service Effective May 1, 2018 By Decision dated April 18, 2018 Docket No. 17-10-46 Effective July 1, 2027 By Motion Ruling No. Docket No. 26-05-10 Terms & Conditions for Delivery Service - 07-01-27_OCC-256_REDLINED

Text of OCC-256 Attachment 3.pdf

Extracted from the file · 1 page · 2,539 characters

Text of OCC-256 Attachment 4.pdf

Extracted from the file · 1 page · 2,340 characters

Text of OCC-267_final.pdf

Extracted from the file · 1 page · 783 characters

Text of OCC-267 Attachment 1.pdf

Extracted from the file · 1 page · 1,257 characters

Text of OCC-268_final.pdf

Extracted from the file · 1 page · 2,120 characters

Text of OCC-268 Attachment 1.pdf

Extracted from the file · 1 page · 495 characters

Text of OCC-268 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 256, 267, 268 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/25/2026

This filing on the current system (opens in a new tab)