Interrogatory responses
Answers to questions 499, 500, 502, 503, 506
Files8
OCC-499_Final.pdf
PDF · 99 KB · 1 pageText searchable
Download OCC-499_Final.pdfRead the text of OCC-499_Final.pdf
OCC-500_Final.pdf
PDF · 80 KB · 1 pageText searchable
Download OCC-500_Final.pdfRead the text of OCC-500_Final.pdf
OCC-502_Final.pdf
PDF · 135 KB · 2 pagesText searchable
Download OCC-502_Final.pdfRead the text of OCC-502_Final.pdf
OCC-503_Final.pdf
PDF · 81 KB · 1 pageText searchable
Download OCC-503_Final.pdfRead the text of OCC-503_Final.pdf
OCC-506_Final.pdf
PDF · 105 KB · 1 pageText searchable
Download OCC-506_Final.pdfRead the text of OCC-506_Final.pdf
OCC-500 Attachment 1 REDACTED.pdf
PDF · 1.6 MB · 7 pagesText searchable
Download OCC-500 Attachment 1 REDACTED.pdfRead the text of OCC-500 Attachment 1 REDACTED.pdf
OCC-499 Attachment 2 REDACTED.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download OCC-499 Attachment 2 REDACTED.pdfRead the text of OCC-499 Attachment 2 REDACTED.pdf
OCC-499 Attachment 1.pdf
PDF · 5.8 MB · 16 pagesText searchable
Download OCC-499 Attachment 1.pdfRead the text of OCC-499 Attachment 1.pdf
Text of OCC-503_Final.pdf
Extracted from the file
Text of OCC-506_Final.pdf
Extracted from the file
Text of OCC-500 Attachment 1 REDACTED.pdf
Extracted from the file · 7 pages · 11,044 characters
Page 1
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-499 Attachment 2 REDACTED Page 1 of 2 Connecticut Light and Power Field Visit AWC Operations Center (4/1/2026 @9am) • • • • • • • • Met with 23 and 13.8KV is primary for distribution They are moving their 27KV to 23KV o They started this due to one of their 27KV transformers failing and 27KV transformers are harder for them to get As they are standardizing their distribution they are able to buy transformers in bulk This building was originally built in 1930 o Major overhaul about 10 years ago Service all vehicles out of this building Grab as you go no signing out materials Several hundred people work out of this building daily Van Dyke 12 Substation (4/1/2026 @9:30am) • • • • • • • • • • • • Met With They rebuilt the switchgear in place 10-12 years ago High 2300 low 11KV 4 express feeders 4 transformers 100% network feeders All breakers are Moder Vacuum breakers 15-20 feeders underground Most network transformers were retro filled Used to direct bury but now put conduit on everything Added animal electrical fence around substation They are replacing the capacitor banks with ground mounted banks by 2027 at this sub Northwest Hartford 2N Substation (4/1/2026 @10:30am) • • • • • • • • • Met With 115 to 23 KV 2 overhead transmission lines and one pipe type cable that feed this sub 3 transformers Originally built in late 50s Has availability for future load growth Battery banks are all checked annually Electromechanical is used as a backup for the microprocessors at this sub Use vacuum breakers and SF6Page 2
REDACTED • • The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-499 Attachment 2 REDACTED Page 2 of 2 Use animal guards 1 of the 3 transformers in newer vintage 2000 Northeast Simsbury 43F Substation (4/1/2026 @11:30am) • • • • • • Met With Built 25 years ago Originally built with single transformer but added a second due to demand Uses noise barrier around transformer The original transformer is vintage 1965 and was moved from another substation o Last year had to regasket it due to leakage -> estimated $350K project 23KV substation Northfield Substation (4/1/2026 @12pm) • • • • • Met with Was 27.6KV then converted to 23KV when the transformer failed All microprocessor controls One of the transformers vintage 2023 o The other transformer is the sister transformer to the one that failed and is going to need to be replaced soon 4 total transformers on site
Text of OCC-499 Attachment 1.pdf
Extracted from the file · 16 pages · 5,098 characters
As listed on the current system
Question(s) Answered 499, 500, 502, 503, 506 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/14/2026