Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 507, 508, 509, 510, 511, 512, 517, 518

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy53 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files53

Text of OCC-510_Final.pdf

Extracted from the file · 3 pages · 6,553 characters

Text of OCC-511_Final.pdf

Extracted from the file · 8 pages · 17,894 characters

Text of OCC-512_Final.pdf

Extracted from the file · 1 page · 992 characters

Text of OCC-517_Final.pdf

Extracted from the file · 1 page · 826 characters

Text of OCC-518_Final.pdf

Extracted from the file · 1 page · 601 characters

Text of OCC-512 Attachment 3 REDACTED.pdf

Extracted from the file · 33 pages · 5,436 characters

Text of OCC-512 Attachment 2 REDACTED.pdf

Extracted from the file · 33 pages · 5,436 characters

  1. Page 11 of 626

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 1, 2026 OCC-512, Attachment 1 Page 11 of 626 EVERSOURCE ENERGY Massachusetts ESMP: A Collaborative Approach Enabling the Clean Energy Future ESMP was submitted in full transparency bringing environmental justice, business, and consumer advocates to the table Electrification plans result in New England electric demand more than doubling by 2050 New England winter peak electric demand is expected to more than triple by 2050 New England electric demand growth has been relatively flat over the past decade 2023 • Sep: Draft ESMP filed with Grid Modernization Advisory Council • Nov: Stakeholder workshops 2024 • Jan: Final ESMP filed with DPU 2025 • Implement the ESMP • Aug: DPU decision • Nov: Finalize community engagement framework 10
  2. Page 12 of 626

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 1, 2026 OCC-512, Attachment 1 Page 12 of 626 EVERSOURCE ENERGY We Plan to Update 5-Year Regulated Cap Ex Plan Through 2028 During Year-End 2023 Earnings Call Provide annual updates for electric, gas and water distribution investments •Reliability, basic business/ safety, and peak load/ capacity/ substation projects are primary drivers of spend Transmission cap-ex plan to be updated for project completions, revisions of existing projects, and additional projects added to the plan •System reliability improvements •Electrification needs •Connect/ upgrade requirements for offshore wind and distributed energy resources (DER) Advancing Clean Energy programs: Grid Modernization, DER, EV and AMI •Reflects MA DPU’s decisions and expected approximately $2B of Eversource spend in the forecast period •PURA continuing to review AMI programs for CL&P Aquarion capital plan continues focus on main replacement programs as well as treatment and supply projects 11
  3. Page 13 of 626

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 1, 2026 OCC-512, Attachment 1 Page 13 of 626 EVERSOURCE ENERGY Status of State and Federal Regulatory Reviews Electric Transmission (Federal Energy Regulatory Commission) 41% of earnings Pending FERC decision on New England transmission ROEs dating back to 2011 in 4 open cases o Earnings currently reflect base ROE of 10.57% with a maximum ROE for any single project of 11.74% Electric Distribution (CT PURA, MA DPU, NHPUC) 40% of earnings CL&P: Settlement approved in October 2021 o Under Settlement terms, no PURA-initiated rate review can commence before at least October 1, 2025 o Certain reconciling mechanisms continue to operate such as revenue decoupling, electric system improvement, and energy efficiency o Authorized capital structure (53% common equity) and ROE (9.25%) remain in place NSTAR Electric: Rate review order issued in November 2022 o Annualized increase of $64 million effective January 1, 2023 o Annual performance-based rate adjustments approved for a 5-year term, with the first adjustment totaling $105M on January 1, 2024 o Authorized capital structure of 53.21% common equity and authorized ROE of 9.8% PSNH: Operating under rate settlement that took effect in January 2021 o The last of three step increases was effective November 2022 Natural Gas Distribution (CT PURA, MA DPU) 16% of earnings NSTAR Gas and Eversource Gas of MA operating under 10-year and 8-year rate plans, respectively o Most recent distribution increases were effective November 2023 o Certain reconciling mechanisms continue to operate, such as revenue decoupling and gas system improvement Yankee Gas prior rate case occurred in 2018 Aquarion CT: (CT PURA) 3% of earnings Permanent stay granted on rate decrease ordered by PURA; briefs and hearings scheduled through January 2024 12
  4. Page 14 of 626

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 1, 2026 OCC-512, Attachment 1 Page 14 of 626 EVERSOURCE ENERGY Massachusetts Has Constructive Regulatory Frameworks in Place to Enable the Clean Energy Transition MA Clean Energy Investments (2023-2027) Clean Energy Regulatory Support Mechanisms Advanced Metering Infrastructure Over $2 Billion Clean Energy Investment Plan Solar 24% Distributed Energy Resources 26% Solar Development Distributed Energy Resources Offshore Wind Transmission Interconnection & Electric Vehicles Grid Modernization Factor Advanced Metering Infrastructure 27% Offshore Wind Transmission & Grid Mod EV 13% 10% 13
  5. Page 15 of 626

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 1, 2026 OCC-512, Attachment 1 Page 15 of 626 EVERSOURCE ENERGY Offshore Wind Project Summary South Fork Wind Revolution Wind Sunrise Wind 130 MW 704 MW 924 MW February 11, 2022 October 31, 2023 Anticipated in 1H 2024 Expected in service Early 2024 Late 2025 Late 2025 Construction status Onshore construction complete Turbine installation in progress Started limited onshore construction Pre-construction and site development activities on going ~ $160/MWH for 90 MW ~ $86/MWH for 40 MW (avg. annual escalator: 2%) $98.43/MWH RI for 400 MW (no escalator) $98.43/MWH CT for 200 MW (no escalator) $99.50/MWH CT for 104 MW (no escalator) $110.37/MWH (no escalator) 20 years 20 years 25 years Status of Contracts 130 MW for NY approved 400 MW for RI approved 304 MW for CT approved Contract signed with NYSERDA in October 2019 Contract is eligible for rebid in Q4 2023 NY RFP Interconnection East Hampton, NY (LI) Davisville, RI Brookhaven, NY (LI) Size Final Investment Decision Price as of first day of commercial operation Term 14
  6. Page 16 of 626

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 1, 2026 OCC-512, Attachment 1 Page 16 of 626 EVERSOURCE ENERGY 2023 Parent Debt and Equity Issuances and Maturities 2023 Debt Issuances through October 2023 Equity Issuances through October Company Size/Coupon Maturity New Shares Parent $750M @ 5.45% Mar 1, 2028 Parent $550M @ 5.45% Mar 1, 2028 Parent $450M @ 4.75% May 15, 2026 Parent $800M @ 5.125% May 15, 2033 $1.2 billion At-The-Market Program issued 2.17M shares at a weighted average price of $92.31 in 2022 with proceeds of approximately $200 million. No additional shares issued through October 2023 Treasury Shares 2023 Maturities Company Size/Coupon Maturity Parent $450M @ 2.80% May 1, 2023 Parent $350M @ SOFR + 25 bps. Aug 15, 2023 Parent $400M @ 3.80% Dec 1, 2023 Dividend reinvestment, employee equity programs continue with approximately 950,000 shares issued in 2022 Approximately 882,000 additional shares issued through October 2023 15
  7. Page 17 of 626

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 1, 2026 OCC-512, Attachment 1 Page 17 of 626 EVERSOURCE ENERGY Eversource Is Building On Our Commitment to Lower Emissions 2021 GHG Footprint In 2019, we announced an industry leading goal to reduce emissions from 5 key operational areas: o Line loss 7% 4% 8% 9% o Leaks from natural gas distribution 72% o Facilities o Vehicle fleet o Use of SF6, a potent greenhouse gas, in electrical equipment Line Loss Methane Facilities Fleet SF6 In 2022, we built on this strong foundation by committing to set a Science Based Target 16
  8. Page 18 of 626

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 1, 2026 OCC-512, Attachment 1 Page 18 of 626 EVERSOURCE ENERGY Industry-Leading Carbon Neutrality Goal Helps the New England Region Meet Its Targets Eversource Targets Regional Targets Carbon Neutral By 2030 80+% GHG Reductions By 2050 Reducing electric line loss Lowering methane emissions from gas distribution system Fleet – Adoption of hybrid vehicles and alternative fuel sources Industry-leading energy efficiency programs Utility-owned solar Offshore wind development Facility lighting and HVAC upgrades Reducing high dependence on high-emitting oil through ZEV infrastructure buildout, heating conversions Replacement of SF6 in substation equipment Enabling third-party renewable buildout 17
  9. Page 19 of 626

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 1, 2026 OCC-512, Attachment 1 Page 19 of 626 EVERSOURCE ENERGY Eversource’s Strong Sustainability Profile Continues to Attract ESG, Infrastructure Investors Number of ESG & Infrastructure Funds Holding ES Shares Very strong ratings among leading ESG raters One of the most diverse Boards in the utility industry 400 Nation’s leading energy efficiency programs 300 Strong focus on growing solar regulated solar portfolio Last of the ES fossil generating assets divested in January 2018 in New Hampshire Consolidation of Board oversight under Governance, Environmental and Social Responsibility Committee 95 200 100 0 43 45 95 108 2016 2017 48 66 91 68 143 163 182 201 2018 2019 2020 2021 ESG 73 256 2022 289 Q3 2023 Infrastructure 18
  10. Page 20 of 626

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 1, 2026 OCC-512, Attachment 1 Page 20 of 626 EVERSOURCE ENERGY A Value Proposition That Delivers Results for Investors Keys to Our Success: Results Delivered: 1. Exceed industry EPS and dividend growth Long-term average recurring EPS and dividend growth of about 6%, through 2022. Growth driven by robust regulated Cap Ex program and effective cost management 2. Control O&M spending Track record of strong cost discipline 3. Strong financial condition Solid credit ratings 4. Deliver top-tier service quality and reliability Reliability metrics top decile vs. peers 5. Manage a robust investment program focused on safety, reliability, customer service and clean energy Capital expenditures of $21.5 billion for 2023 -2027 for core businesses ensure a safe and reliable delivery system for our 4.4 million customers 6. Pursue clean energy solutions for the region Progress on offshore wind, energy efficiency, solar, storage, AMI installation, EV infrastructure 7. Address environmental, social and governance strengths Achieving top-tier industry ratings from key sustainability raters 19

Text of OCC-507 Attachment 42.pdf

Extracted from the file · 3 pages · 10,259 characters

Text of OCC-507 Attachment 41.pdf

Extracted from the file · 9 pages · 3,276 characters

Text of OCC-507 Attachment 40.pdf

Extracted from the file · 5 pages · 8,775 characters

Text of OCC-507 Attachment 38.pdf

Extracted from the file · 19 pages · 96,311 characters

Text of OCC-507 Attachment 37.pdf

Extracted from the file · 49 pages · 120,692 characters

Text of OCC-507 Attachment 36.pdf

Extracted from the file · 59 pages · 136,630 characters

Text of OCC-507 Attachment 35.pdf

Extracted from the file · 38 pages · 102,807 characters

Text of OCC-507 Attachment 34.pdf

Extracted from the file · 5 pages · 1,210 characters

Text of OCC-507 Attachment 33.pdf

Extracted from the file · 13 pages · 52,489 characters

Text of OCC-507 Attachment 32.pdf

Extracted from the file · 5 pages · 14,030 characters

Text of OCC-507 Attachment 29.pdf

Extracted from the file · 8 pages · 37,747 characters

Text of OCC-507 Attachment 28.pdf

Extracted from the file · 18 pages · 75,925 characters

Text of OCC-507 Attachment 27.pdf

Extracted from the file · 35 pages · 66,295 characters

Text of OCC-507 Attachment 26.pdf

Extracted from the file · 19 pages · 68,589 characters

Text of OCC-507 Attachment 25.pdf

Extracted from the file · 12 pages · 53,851 characters

Text of OCC-507 Attachment 24.pdf

Extracted from the file · 2 pages · 482 characters

Text of OCC-507 Attachment 23.pdf

Extracted from the file · 268 pages · 869,686 characters

Text of OCC-507 Attachment 22.pdf

Extracted from the file · 178 pages · 528,336 characters

Text of OCC-507 Attachment 21.pdf

Extracted from the file · 296 pages · 1,013,669 characters

Text of OCC-507 Attachment 20.pdf

Extracted from the file · 167 pages · 508,170 characters

Text of OCC-507 Attachment 19.pdf

Extracted from the file · 137 pages · 450,996 characters

Text of OCC-507 Attachment 18.pdf

Extracted from the file · 247 pages · 763,200 characters

Text of OCC-507 Attachment 17.pdf

Extracted from the file · 2 pages · 6,387 characters

Text of OCC-507 Attachment 16.pdf

Extracted from the file · 2 pages · 484 characters

Text of OCC-507 Attachment 15.pdf

Extracted from the file · 202 pages · 895,816 characters

Text of OCC-507 Attachment 14.pdf

Extracted from the file · 6 pages · 8,947 characters

Text of OCC-507 Attachment 13.pdf

Extracted from the file · 19 pages · 93,122 characters

Text of OCC-507 Attachment 12.pdf

Extracted from the file · 19 pages · 95,631 characters

Text of OCC-507 Attachment 11.pdf

Extracted from the file · 7 pages · 10,667 characters

Text of OCC-507 Attachment 8.pdf

Extracted from the file · 2 pages · 3,673 characters

Text of OCC-507 Attachment 4.pdf

Extracted from the file · 6 pages · 8,272 characters

Text of OCC-507 Attachment 2.pdf

Extracted from the file · 8 pages · 30,345 characters

Text of OCC-507 Attachment 1.pdf

Extracted from the file · 32 pages · 164,962 characters

Text of OCC-507 Attachment 39.pdf

Extracted from the file · 22 pages · 32,510 characters

Text of OCC-507 Attachment 31.pdf

Extracted from the file · 8 pages · 37,747 characters

Text of OCC-507 Attachment 30.pdf

Extracted from the file · 5 pages · 22,063 characters

Text of OCC-507 Attachment 10.pdf

Extracted from the file · 3 pages · 4,485 characters

Text of OCC-507 Attachment 9.pdf

Extracted from the file · 10 pages · 15,175 characters

Text of OCC-507 Attachment 7.pdf

Extracted from the file · 3 pages · 5,747 characters

Text of OCC-507 Attachment 6.pdf

Extracted from the file · 4 pages · 6,545 characters

Text of OCC-507 Attachment 5.pdf

Extracted from the file · 4 pages · 5,724 characters

Text of OCC-507 Attachment 3.pdf

Extracted from the file · 65 pages · 195,008 characters

As listed on the current system

Question(s) Answered 507, 508, 509, 510, 511, 512, 517, 518 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/14/2026

This filing on the current system (opens in a new tab)