Interrogatory responses
Answers to questions 507, 508, 509, 510, 511, 512, 517, 518
Files53
OCC-507_Final.pdf
PDF · 195 KB · 6 pagesText searchable
Download OCC-507_Final.pdfRead the text of OCC-507_Final.pdf
OCC-508_Final.pdf
PDF · 81 KB · 1 pageText searchable
Download OCC-508_Final.pdfRead the text of OCC-508_Final.pdf
OCC-509_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download OCC-509_Final.pdfRead the text of OCC-509_Final.pdf
OCC-510_Final.pdf
PDF · 190 KB · 3 pagesText searchable
Download OCC-510_Final.pdfRead the text of OCC-510_Final.pdf
OCC-511_Final.pdf
PDF · 215 KB · 8 pagesText searchable
Download OCC-511_Final.pdfRead the text of OCC-511_Final.pdf
OCC-512_Final.pdf
PDF · 82 KB · 1 pageText searchable
Download OCC-512_Final.pdfRead the text of OCC-512_Final.pdf
OCC-517_Final.pdf
PDF · 131 KB · 1 pageText searchable
Download OCC-517_Final.pdfRead the text of OCC-517_Final.pdf
OCC-518_Final.pdf
PDF · 81 KB · 1 pageText searchable
Download OCC-518_Final.pdfRead the text of OCC-518_Final.pdf
OCC-512 Attachment 3 REDACTED.pdf
PDF · 5.2 MB · 33 pagesText searchable
Download OCC-512 Attachment 3 REDACTED.pdfRead the text of OCC-512 Attachment 3 REDACTED.pdf
OCC-512 Attachment 2 REDACTED.pdf
PDF · 6.8 MB · 33 pagesText searchable
Download OCC-512 Attachment 2 REDACTED.pdfRead the text of OCC-512 Attachment 2 REDACTED.pdf
OCC-512 Attachment 1.pdf
PDF · 23 MB · 626 pagesText searchable
Download OCC-512 Attachment 1.pdfRead the text of OCC-512 Attachment 1.pdf
OCC-507 Attachment 42.pdf
PDF · 1.7 MB · 3 pagesText searchable
Download OCC-507 Attachment 42.pdfRead the text of OCC-507 Attachment 42.pdf
OCC-507 Attachment 41.pdf
PDF · 1.8 MB · 9 pagesText searchable
Download OCC-507 Attachment 41.pdfRead the text of OCC-507 Attachment 41.pdf
OCC-507 Attachment 40.pdf
PDF · 2.2 MB · 5 pagesText searchable
Download OCC-507 Attachment 40.pdfRead the text of OCC-507 Attachment 40.pdf
OCC-507 Attachment 38.pdf
PDF · 4.6 MB · 19 pagesText searchable
Download OCC-507 Attachment 38.pdfRead the text of OCC-507 Attachment 38.pdf
OCC-507 Attachment 37.pdf
PDF · 2.9 MB · 49 pagesText searchable
Download OCC-507 Attachment 37.pdfRead the text of OCC-507 Attachment 37.pdf
OCC-507 Attachment 36.pdf
PDF · 2.9 MB · 59 pagesText searchable
Download OCC-507 Attachment 36.pdfRead the text of OCC-507 Attachment 36.pdf
OCC-507 Attachment 35.pdf
PDF · 4.3 MB · 38 pagesText searchable
Download OCC-507 Attachment 35.pdfRead the text of OCC-507 Attachment 35.pdf
OCC-507 Attachment 34.pdf
PDF · 2.1 MB · 5 pagesText searchable
Download OCC-507 Attachment 34.pdfRead the text of OCC-507 Attachment 34.pdf
OCC-507 Attachment 33.pdf
PDF · 2.9 MB · 13 pagesText searchable
Download OCC-507 Attachment 33.pdfRead the text of OCC-507 Attachment 33.pdf
OCC-507 Attachment 32.pdf
PDF · 1.6 MB · 5 pagesText searchable
Download OCC-507 Attachment 32.pdfRead the text of OCC-507 Attachment 32.pdf
OCC-507 Attachment 29.pdf
PDF · 1.8 MB · 8 pagesText searchable
Download OCC-507 Attachment 29.pdfRead the text of OCC-507 Attachment 29.pdf
OCC-507 Attachment 28.pdf
PDF · 2.5 MB · 18 pagesText searchable
Download OCC-507 Attachment 28.pdfRead the text of OCC-507 Attachment 28.pdf
OCC-507 Attachment 27.pdf
PDF · 3.0 MB · 35 pagesText searchable
Download OCC-507 Attachment 27.pdfRead the text of OCC-507 Attachment 27.pdf
OCC-507 Attachment 26.pdf
PDF · 5.0 MB · 19 pagesText searchable
Download OCC-507 Attachment 26.pdfRead the text of OCC-507 Attachment 26.pdf
OCC-507 Attachment 25.pdf
PDF · 2.0 MB · 12 pagesText searchable
Download OCC-507 Attachment 25.pdfRead the text of OCC-507 Attachment 25.pdf
OCC-507 Attachment 24.pdf
PDF · 1.5 MB · 2 pagesText searchable
Download OCC-507 Attachment 24.pdfRead the text of OCC-507 Attachment 24.pdf
OCC-507 Attachment 23.pdf
PDF · 21 MB · 268 pagesText searchable
Download OCC-507 Attachment 23.pdfRead the text of OCC-507 Attachment 23.pdf
OCC-507 Attachment 22.pdf
PDF · 25 MB · 178 pagesText searchable
Download OCC-507 Attachment 22.pdfRead the text of OCC-507 Attachment 22.pdf
OCC-507 Attachment 21.pdf
PDF · 38 MB · 296 pagesText searchable
Download OCC-507 Attachment 21.pdfRead the text of OCC-507 Attachment 21.pdf
OCC-507 Attachment 20.pdf
PDF · 22 MB · 167 pagesText searchable
Download OCC-507 Attachment 20.pdfRead the text of OCC-507 Attachment 20.pdf
OCC-507 Attachment 19.pdf
PDF · 9.1 MB · 137 pagesText searchable
Download OCC-507 Attachment 19.pdfRead the text of OCC-507 Attachment 19.pdf
OCC-507 Attachment 18.pdf
PDF · 17 MB · 247 pagesText searchable
Download OCC-507 Attachment 18.pdfRead the text of OCC-507 Attachment 18.pdf
OCC-507 Attachment 17.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download OCC-507 Attachment 17.pdfRead the text of OCC-507 Attachment 17.pdf
OCC-507 Attachment 16.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download OCC-507 Attachment 16.pdfRead the text of OCC-507 Attachment 16.pdf
OCC-507 Attachment 15.pdf
PDF · 32 MB · 202 pagesText searchable
Download OCC-507 Attachment 15.pdfRead the text of OCC-507 Attachment 15.pdf
OCC-507 Attachment 14.pdf
PDF · 2.6 MB · 6 pagesText searchable
Download OCC-507 Attachment 14.pdfRead the text of OCC-507 Attachment 14.pdf
OCC-507 Attachment 13.pdf
PDF · 4.8 MB · 19 pagesText searchable
Download OCC-507 Attachment 13.pdfRead the text of OCC-507 Attachment 13.pdf
OCC-507 Attachment 12.pdf
PDF · 4.6 MB · 19 pagesText searchable
Download OCC-507 Attachment 12.pdfRead the text of OCC-507 Attachment 12.pdf
OCC-507 Attachment 11.pdf
PDF · 4.9 MB · 7 pagesText searchable
Download OCC-507 Attachment 11.pdfRead the text of OCC-507 Attachment 11.pdf
OCC-507 Attachment 8.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download OCC-507 Attachment 8.pdfRead the text of OCC-507 Attachment 8.pdf
OCC-507 Attachment 4.pdf
PDF · 2.6 MB · 6 pagesText searchable
Download OCC-507 Attachment 4.pdfRead the text of OCC-507 Attachment 4.pdf
OCC-507 Attachment 2.pdf
PDF · 2.2 MB · 8 pagesText searchable
Download OCC-507 Attachment 2.pdfRead the text of OCC-507 Attachment 2.pdf
OCC-507 Attachment 1.pdf
PDF · 3.5 MB · 32 pagesText searchable
Download OCC-507 Attachment 1.pdfRead the text of OCC-507 Attachment 1.pdf
OCC-507 Attachment 39.pdf
PDF · 1.5 MB · 22 pagesText searchable
Download OCC-507 Attachment 39.pdfRead the text of OCC-507 Attachment 39.pdf
OCC-507 Attachment 31.pdf
PDF · 1.8 MB · 8 pagesText searchable
Download OCC-507 Attachment 31.pdfRead the text of OCC-507 Attachment 31.pdf
OCC-507 Attachment 30.pdf
PDF · 1.9 MB · 5 pagesText searchable
Download OCC-507 Attachment 30.pdfRead the text of OCC-507 Attachment 30.pdf
OCC-507 Attachment 10.pdf
PDF · 1.6 MB · 3 pagesText searchable
Download OCC-507 Attachment 10.pdfRead the text of OCC-507 Attachment 10.pdf
OCC-507 Attachment 9.pdf
PDF · 6.2 MB · 10 pagesText searchable
Download OCC-507 Attachment 9.pdfRead the text of OCC-507 Attachment 9.pdf
OCC-507 Attachment 7.pdf
PDF · 1.5 MB · 3 pagesText searchable
Download OCC-507 Attachment 7.pdfRead the text of OCC-507 Attachment 7.pdf
OCC-507 Attachment 6.pdf
PDF · 1.5 MB · 4 pagesText searchable
Download OCC-507 Attachment 6.pdfRead the text of OCC-507 Attachment 6.pdf
OCC-507 Attachment 5.pdf
PDF · 1.5 MB · 4 pagesText searchable
Download OCC-507 Attachment 5.pdfRead the text of OCC-507 Attachment 5.pdf
OCC-507 Attachment 3.pdf
PDF · 5.4 MB · 65 pagesText searchable
Download OCC-507 Attachment 3.pdfRead the text of OCC-507 Attachment 3.pdf
Text of OCC-510_Final.pdf
Extracted from the file · 3 pages · 6,553 characters
Text of OCC-511_Final.pdf
Extracted from the file · 8 pages · 17,894 characters
Text of OCC-512_Final.pdf
Extracted from the file · 1 page · 992 characters
Text of OCC-517_Final.pdf
Extracted from the file · 1 page · 826 characters
Text of OCC-518_Final.pdf
Extracted from the file · 1 page · 601 characters
Text of OCC-512 Attachment 3 REDACTED.pdf
Extracted from the file · 33 pages · 5,436 characters
Text of OCC-512 Attachment 2 REDACTED.pdf
Extracted from the file · 33 pages · 5,436 characters
Text of OCC-512 Attachment 1.pdf
Extracted from the file · 626 pages · 635,148 characters
Text of OCC-507 Attachment 42.pdf
Extracted from the file · 3 pages · 10,259 characters
Text of OCC-507 Attachment 41.pdf
Extracted from the file · 9 pages · 3,276 characters
Text of OCC-507 Attachment 40.pdf
Extracted from the file · 5 pages · 8,775 characters
Text of OCC-507 Attachment 38.pdf
Extracted from the file · 19 pages · 96,311 characters
Text of OCC-507 Attachment 37.pdf
Extracted from the file · 49 pages · 120,692 characters
Text of OCC-507 Attachment 36.pdf
Extracted from the file · 59 pages · 136,630 characters
Text of OCC-507 Attachment 35.pdf
Extracted from the file · 38 pages · 102,807 characters
Text of OCC-507 Attachment 34.pdf
Extracted from the file · 5 pages · 1,210 characters
Text of OCC-507 Attachment 33.pdf
Extracted from the file · 13 pages · 52,489 characters
Text of OCC-507 Attachment 32.pdf
Extracted from the file · 5 pages · 14,030 characters
Text of OCC-507 Attachment 29.pdf
Extracted from the file · 8 pages · 37,747 characters
Text of OCC-507 Attachment 28.pdf
Extracted from the file · 18 pages · 75,925 characters
Text of OCC-507 Attachment 27.pdf
Extracted from the file · 35 pages · 66,295 characters
Text of OCC-507 Attachment 26.pdf
Extracted from the file · 19 pages · 68,589 characters
Text of OCC-507 Attachment 25.pdf
Extracted from the file · 12 pages · 53,851 characters
Text of OCC-507 Attachment 24.pdf
Extracted from the file · 2 pages · 482 characters
Text of OCC-507 Attachment 23.pdf
Extracted from the file · 268 pages · 869,686 characters
Text of OCC-507 Attachment 22.pdf
Extracted from the file · 178 pages · 528,336 characters
Page 217 of 296
Connecticut Light and Power Company Docket No. 26-05-10 Docket No. 22-08-08 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 21 Page 217 of 296 OCC-507 CL&P Attachment 21 Page 217 of 296 Page 211 The Authority notes that it established the Innovative Energy Solutions (IES) Program in March 2022. Decision, March 30, 2022, Docket No. 17-12-03RE05, PURA Investigation into Distribution System Planning of the Electric Distribution Companies – Innovative Technology Application and Programs (Innovation Pilots) (IES Decision). The IES Program was established to allow companies and other stakeholders to develop innovative pilot projects and to receive initial funding support. IES Decision, p. 5; IES Decision, Att. B, p. 43. UI stated that staff were aware of the IES Program but nonetheless did not consider proposing the municipal curbside charging pilot in this year’s application cycle. Hr’g Tr. Mar. 8, 2023, 2743:15-20. The Authority also notes that it conducts an annual review of the LD EV Charging Program to make strategic and other adjustments to the program. This year’s annual review of the LD EV Charging Program is being conducted in Docket No. 23-08-06. While the Authority agrees that “garage orphans” in economically distressed areas must be addressed to ensure that the transition to electric transportation is achieved equitably, the Authority finds that the IES Program and/or Docket No. 23-08-06 are more appropriate proceedings through which to submit and develop such a pilot program and to seek amendments to the current LD EV Charging Program than the current rate case proceeding. As stated previously, the Authority operates with the presumption that interested stakeholders must be provided ample notice of proposed program developments in order to provide feedback. Therefore, a rate case proceeding, which incorporates a large variety of topics and is tied to a statutory timeline, does not allow potentially interested EV charging-related stakeholders to truly participate and to discuss such a proposal. In addition, the Authority established the IES Program with the intent of supporting pilot programs such as this one. Accordingly, the Authority denies UI’s requested proposal for a municipal curbside EV charging pilot and directs the Company to submit any future related proposals into the IES Program and future requests for modifications to the LD EV Charging program into the appropriate annual review proceeding. C. EV CHARGING HUB UI proposed an EV Charging Hub project in its Application. King PFT, pp. 13:17 – 14:2. The Company stated that the project is meant to address the fast-charging needs of future scaled-up EV market adoption. Id., p. 14:20-23. Furthermore, according to UI, the current approach for EV fast-charging deployment will not accommodate the needs of MHD EVs, as these sites are not designed to host such vehicles. Id., pp. 14:23 – 15:1; UI Interrog. Resp. CAE-14, p. 2. Therefore, UI opined that it is important to apply funding to charging infrastructure that will scale with the market, rather than continue to invest in infrastructure that will soon be a stranded asset due to shifting EV needs. Id., p. 15:1-5. As proposed, the EV Charging Hub would offer DCFCs to serve corridor fast-charging needs for light-, medium-, and heavy-duty EVs in one large-scale charging area. King PFT, p. 13:18-19; Hr’g Tr. Mar. 8, 2023, 2830:5-105-10. The Company does not currently have a targeted location in mind for the EV Charging Hub. Hr’g Tr. Mar. 8, 2023, 2808:1922. However, the Company envisioned a charging hub that is close in proximity to a UI substation, due to the likely large amount of demand required by such a project. King PFT, 13:21-22. Specifically, the hub could serve a future load as high as 20 MW, and with an average charger power level of 250 kW, charge up to 80 vehicles simultaneously. Id., pp. 13:21 – 14:1.Page 218 of 296
Connecticut Light and Power Company Docket No. 26-05-10 Docket No. 22-08-08 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 21 Page 218 of 296 OCC-507 CL&P Attachment 21 Page 218 of 296 Page 212 In the proposal, UI suggested that the EV Charging Hub project would occur in four phases in partnership with third parties, who would ultimately own and operate the chargers and any driver amenities. King PFT, pp. 14:4, 13:19-21. The phases would include (1) site identification and evaluation, performed by both UI and third-party partners; (2) site acquisition, performed primarily by third-party partners; (3) design and engineering, where UI would perform electrical work and third-party partners would perform non-electrical work; and (4) construction, performed in a similar manner as phase 3. Id., p. 14:4-14. To support the project, UI proposed a capital budget of $31.2 million to be incurred over four years. King PFT, p. 15:7-9. The Company stated that project planning would occur in 2023, and project expenditures would begin in 2024 and continue through 2026. Id. UI further stated that project funds would be provided by existing incentives in the LD EV Charging Program and any applicable federal grants. Id., p. 15:9-10. If UI is successful in receiving federal grants for the program, the Company alleged that the proposed capital requirement would decrease. Id., p. 15:10-11. The Company is not aware of any existing large-scale fast-charging hubs meant to serve medium- and heavy-duty EVs. UI Interrog. Resp. CAE-14, p. 2. However, the Company did provide two examples of large-scale, light-duty fast-charging hubs. Id. Specifically, UI shared the Tesla Harris Ranch Supercharger, which offers 80 DCFC proprietary plugs to be used only by Tesla drivers, and the Revel superhub in Brooklyn, NY, which offers 25 DCFC universal access plugs. Id. DEEP expressed strong support for further consideration of the EV Charging Hub concept in a more focused proceeding, such as the ongoing Medium- and Heavy-Duty EV Charging proceeding in Docket No. 21-09-17, or a new proceeding. DEEP Brief, p. 12. Specifically, DEEP opined that reviewing this proposal in a focused proceeding “would allow for greater stakeholder input and an opportunity for UI to receive valuable feedback from PURA and stakeholders.” Id. Furthermore, DEEP expressed concern regarding the proposal’s completeness as well as some project components, such as the proposed limitation of including only DCFCs at the Hub. Id. Therefore, there are many benefits to receiving further stakeholder feedback regarding the EV Charging Hub concept in a focused proceeding. Id., pp. 12-13. The Authority notes the general lack of supporting evidence to establish the necessity of such a project’s development, especially at this time. As the Company notes, there are currently no existing large-scale DCFC hubs that can serve both LD and MHD EVs. Furthermore, there is no record evidence to suggest that the market penetration of MHD EVs will reach such a high level within the next four-five years so as to require the proposed project. Finally, the Authority reiterates that there is an ongoing proceeding investigating MHD EV charging in Docket No. 21-09-17. This proceeding has been ongoing since October 2021. Notice of Proceeding, Oct. 4, 2021, MHD Investigation. Given that a primary goal of the EV Charging Hub is to support MHD fast-charging, the Authority finds that the existing MHD Investigation is the appropriate arena through which to discuss a proposal such as the EV Charging Hub pilot program. Moreover, the in-state build-out of DCFCs should not be done in a vacuum. Indeed, both the current LD EV Charging Program and the Connecticut Department of Transportation's (DOT) work on the NEVI Formula Program already envision deploying DCFC infrastructure. Any futurePage 219 of 296
Connecticut Light and Power Company Docket No. 26-05-10 Docket No. 22-08-08 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 21 Page 219 of 296 OCC-507 CL&P Attachment 21 Page 219 of 296 Page 213 EV Charging Hub would need to take into account such work and proactively coordinate with DOT to ensure optimal use of federal and state financial and other resources. Accordingly, the Authority denies UI’s proposal for an EV Charging Hub and directs the Company to submit any future related proposals in Docket No. 21-09-17, PURA Investigation into Medium and Heavy-Duty Electric Vehicle Charging, and to coordinate any future DCFC build out initiatives with the LD EV Charging Program and DOT’s NEVI work. D. ENERGY STORAGE PILOTS The Authority declines to approve the three energy storage pilots submitted by the Company in this proceeding but will review the projects for potential approval in Docket No. 22-06-05, PURA Implementation of Public Act 22-55. UI proposes three grid-scale front-of-the-meter energy storage pilots pursuant to Section 2 of Public Act 22-55, An Act Concerning Energy Storage Systems and Electric Distribution System Reliability, after engaging with Sound Grid Partners, LLC to perform a technical analysis to recommend an optimal portfolio of projects. Ex. UI-CETP-4, p. 2. Notably, each project includes “at least one critical facility or a municipally designated top-10 outage restoration priority facility and at least one source of renewable generation.” Id. Each project was sized to be capable of serving an islanded load for a four-hour outage based on the historical maximum net load conditions. Id., p. 4. The threshold of four hours was selected as between 58% and 82% of historical outages on the analyzed circuits had a duration less than or equal to this value. Id. As part of the analysis, 14 demonstration objectives were identified. Ex. UI-CETP-4, p. 12. Each project in the proposed portfolio demonstrates either eight or nine of the objectives, and across the three proposed projects all 14 are demonstrated. Id. UI notes that the three proposed projects define a strong portfolio that will provide learnings for future program design while providing reliability benefits at a reasonable cost. Id. Additionally, the utility cost test (UCT) values for all three projects when comparing against a generator alternative range between 1.002 and 1.179, and the UCT values when comparing against a resiliency poles and wires alternative range between 1.107 and 1.490. Interrog. Resp. CAE-52, Att. 1, p. 1. Further, total resource cost tests were also completed for each of the three proposed projects comparing them to a generator alternative and a resiliency poles and wires alternative, where the total resource cost test (TRC) “includes all energy and non-energy benefits, such as water savings, non-embedded emissions, environmental attributes, and non-energy impacts.” Id. The TRC value for each project when compared to a resiliency poles and wires alternative ranged from 1.084 to 1.468, while when compared to a generator alternative the TRC value ranged from 0.982 to 1.159. Id. Only one project, the North Haven project, had any cost test values below one, and it was the total resource cost test compared to a generator alternative, with a value of 0.982. Id. Lastly, each project avoids at least several million pounds of emissions for a single outage that utilizes the full battery storage solution capacity. Ex. UI-CETP-4, p. 11. The Authority appreciates the work the Company has completed to date in developing and proposing these three grid-scale front-of-the-meter energy storage pilots pursuant to Section 2 of Public Act 22-55. Nevertheless, recognizing that additional stakeholder engagement and technical meetings have been held in Docket No. 22-0605, the Authority declines to approve the three projects at this time but will continue to review the projects for potential approval in Docket No. 22-06-05.Page 220 of 296
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 21 Page 220 of 296 OCC-507 CL&P Attachment 21 Docket No. 22-08-08 Page 220 of 296 Page 214 E. INTEGRATED DISTRIBUTION SYSTEM PLAN & GRID MODERNIZATION ROADMAP The Company has included two Integrated Distribution System Planning (IDSP) projects in the Application. The first is an advanced DER and load forecasting project ($335,000 of operating expense in Rate Year 3) and the second is a CYME Server project ($81,250 of capital expenditure in Rate Year 2023/2024). Ex. UI-CETP-1, pp. 30-31. UI Interrog. Resp. UPA-6. The Authority disallows the expenditures on both the advanced DER and load forecasting project and the CYME Server project. In its description of the projects, the Company refers to PURA’s October 2, 2019 Interim Decision in Docket No. 17-12-03, PURA Investigation into Distribution System Planning of the Electric Distribution Companies, as the basis for developing its IDSP; however, no direction was given to the EDCs in that Interim Decision regarding the specific IDSP characteristics or the planning process necessary to implement an IDSP. Interim Decision, Oct. 2, 2019, Docket No. 17-12-03; Ex. UI-CETP-1, p. 30. Therefore, no guidance or orders governing an IDSP in Connecticut have been established on which to evaluate whether the Company’s proposed IDSP projects are necessary or prudent. Instead, the Authority recently initiated Docket No. 21-05-15RE03, PURA Investigation into The Establishment of Integrated Distribution System Planning Within A PerformanceBased Regulation Framework, which will establish the IDSP plan features and planning process necessary to evaluate such expenditures in the future. Until such decision has been issued, the Authority declines to approve cost recovery of IDSP-specific expenditures. F. PLEASURE BEACH ISLAND The Authority finds the Pleasure Beach Island (PBI) solar plus storage project to be a cost-effective solution to providing electricity to customers in a hard-to-reach area of UI’s service territory, and consequently approves the proposed project subject to the conditions below. UI proposes a solar plus storage system to serve two customers on PBI, a small “island/peninsula” located in the City of Bridgeport. Ex. UI-CETP-1, p. 22. PBI has two customers, a pavilion owned by the City of Bridgeport and two, 300-foot-tall radio transmission towers owned by WICC radio station. Id., p. 23. The customers on PBI are provided electric service via a “2,400-volt, three conductor, No. 1, rubber insulated, 6.9 kV submarine cable that was installed in 1940.” Ex. UI-CETP-5, p. 2. UI states that while the useful life of the cable is difficult to predict, typical cable life is approximately 40 years, and consequently the longer a cable is in service after 40 years, the more likely the cable will fail. Hr’g Tr. Mar. 8, 2023, 2733:18-2734:6. Further, the cable, which is approximately 80 years old, has been damaged previously in 1984 and 2003. Ex. UI-CETP-5, p. 2. In those two instances, the failures were in locations where cable was accessible for repair, but UI notes that if failure occurred under the harbor, it is unlikely that UI will be able to make the necessary repair due to environmental and logistical considerations. Hr’g Tr. Mar. 7, 2023, 2703:8-2705:7, Clean Energy Transformation Panel Prefiled Test., Jan. 6, 2023, p. 10. Specifically, UI notes it is challenging to get permits for work in the area of the cable due to “a host of different oyster beds ... that are very environmentally sensitive,” a nesting ground for birds, and other environmentally sensitive flora and fauna. Hr’g Tr. Mar. 7, 2023, 2704:14-2705:7.Page 221 of 296
Connecticut Light and Power Company Docket No. 26-05-10 Docket No. 22-08-08 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 21 Page 221 of 296 OCC-507 CL&P Attachment 21 Page 221 of 296 Page 215 Notably, if the WICC radio transmission towers were to lose power, the lighting for flight path safety as required by the U.S. Department of Transportation Federal Aviation Administration would be affected. Ex. UI-CETP-5, p. 2. The current plan to keep power available to the radio towers during an electrical outage is to use a back-up generator, which UI notes is “non-sustainable for a long period of time.” Id. The generator, installed in 2017, is fueled by propane. Late Filed Ex. 125, p. 1. The current system configuration of keeping six to eight 100-pound bottles of propane on PBI would be able to fuel the generator for approximately four days, with replacement propane transported via ferry as a fire in 1996 destroyed part of the bridge between PBI and the mainland of Bridgeport, limiting access to the island. Id., Ex. UI-CETP-5, p. 2. Further, UI notes that sources estimate the useful life of a standby generator to be between 1,500 and 3,000 run hours and that a generator should be run a maximum of 500 hours continuously to maintain useful life. Late Filed Ex. 125, p. 1. Additionally, the operation manual for the generator on PBI recommends regular service every 250 hours. Id. Also, the generator only serves the WICC radio towers and not the other customer on PBI, the pavilion owned by the City of Bridgeport, which has no back-up power. Ex. UI-CETP-5, p. 2. Alternatively, if the cable were to be replaced to mitigate future electric service interruptions to PBI, the cost estimate ranges from $10 to $12 million dollars, in part because there is no available route for an overhead solution. Ex. UI-CETP-1, p. 25. The proposed solar and storage project, which UI asserts is “the most costeffective option,” is estimated to cost $1.052 million, with $19.5 thousand in O&M costs in 2025. Ex. UI-CETP-5, pp. 1-3. The proposed project is a 210 kilowatt (kW) photovoltaic (PV) solar system paired with 315 kilowatt-hours (kWh) of battery storage. Id. The system is designed to replace the existing cable and provide reliable power at all hours to the two customers on PBI, which combined average approximately 11,000 kWh annually. Id., p. 1. The system is also designed to withstand a Category 3 hurricane. Id. Notably, UI states that the system size is approximate, but expects the final design to be similar to the proposed system, as the proposed system was preliminarily sized through discussions with a few third-party developers who provided similar system size estimates. UI-CETP-5, p. 1; Hr’g Tr. Mar. 7, 2023, 2699:2-2700:11. Additionally, the O&M costs for the system were calculated as 1.8% of the capital expenditure costs, which is a typical practice of the Company. Hr’g Tr., 2707:15-2708:7. UI states that in the case of a storm where the system was not operating properly, personnel would be sent to maintain the system while the batteries provided interim power. Hr’g Tr., 2706:17-2707:14. Specifically, UI notes that the Company will not own the solar system but would have an agreement with the company who does own the solar system to ensure that the solar panels are maintained. Hr’g Tr., 2707:4-14. The Company also states that the PBI solar and storage project was not submitted as a project in Connecticut’s Energy Storage Solutions Program, or as a project pursuant to Public Act 22-55, An Act Concerning Energy Storage Systems and Electric Distribution System Reliability, as this system is “designed as an innovative project intended to replace existing, aged infrastructure past the end of its useful life to ensure reliable and safe 24 x 7 x 365 service to the customers on the island, not to provide back-up to customers nor reduce system peaks”, and consequently does not meet either program’s objectives. Interrog. Resp. CAE-17, p. 1. However, UI notes several benefits of the PBI project including: (1) that energy storage will be necessary to integrate renewable energyPage 222 of 296
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 21 Page 222 of 296 OCC-507 CL&P Attachment 21 Docket No. 22-08-08 Page 222 of 296 Page 216 sources to meet Connecticut’s clean energy goals and this project will allow UI to gain knowledge about how such systems can be operated; (2) that this project provides operational resilience to customers in a hard to serve area of the company’s territory; (3) that this project will help UI to assess opportunities to meet customer needs in unique ways and other potential locations and applications for battery storage; (4) that this project will provide greenhouse gas savings; and (5) that this project will assist Connecticut in reaching its goal of 650 MW of energy storage by 2027. Ex. UI-CETP-5, p. 2; Hr’g Tr. Mar. 7, 2023, 2708:8-2709:4. Lastly, the Company notes that the PBI project, and lessons learned from it, will benefit all UI customers due to the potential use of solar and storage projects in other locations, and consequently seeks to recover costs incurred for the PBI project through base distribution rates. Ex. UI-CETP-1, p. 24. The Authority acknowledges the logistical and environmental difficulties in replacing the cable currently servicing PBI, as well as the substantially larger cost estimate to replace the cable relative to implementing a solar plus storage solution. Further, the Authority notes that using the generator back-up as a long-term solution is not feasible due to the required frequency of refueling and machine maintenance. The Authority finds the proposed project to likely be the most cost-effective available solution and one that provides broader benefits to the Company and ratepayers of Connecticut. Accordingly, the Authority approves the proposed PBI solar plus storage project, subject to the below conditions. First, the Authority clarifies that UI is not currently statutorily authorized to be the owner of the solar system and directs UI to select a third-party with which to execute a PPA via a competitive RFP. Accordingly, the Company will be directed to file with the Authority the results of the RFP including the details of all bids, including the winning bid, with the Authority as compliance. Second, the Authority notes that it has not identified where in base distribution rates that the PBI solar and storage project has been accounted for in the Company’s Application. To the extent that the PBI project costs have been included in the Application, the Authority disallows cost recovery through the base distribution rates at this time as (1) insufficient evidence was provided to demonstrate that the final costs are prudent and (2) the project is not used and useful at this time, the former of which is required to allow for the recovery of expenses and both of which are required for rate base treatment as discussed in Section IV., Rate Base. Accordingly, any such costs should be removed from the approved revenue requirement.152 The Authority does, however, authorize deferred accounting to allow the Company to track the costs of the PBI solar plus storage project. The tracked costs will be reviewed for the prudence and reasonableness of any incurred costs during the Company’s next rate case proceeding. The Company may also request inclusion of any annual expenses related to O&M in the same rate case proceeding. The Authority will review such O&M costs for prudence and reasonableness at that time. Lastly, as directed in the July 12, 2021 Ruling to Motion No. 14 in Docket No. 1010-12, Petition Filed by Cumulus Media, Inc. for an Investigation Pursuant to § 16-20 of 152 The Authority did not identify any costs related to the PBI solar plus storage solution in the requested Rate Year 2023/2024 revenue requirement.Page 223 of 296
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 21 Page 223 of 296 OCC-507 CL&P Attachment 21 Docket No. 22-08-08 Page 223 of 296 Page 217 the General Statutes of Connecticut, the Company must file for the Authority’s review and approval in the instant proceeding option(s) for a rate structure for the customers on the island pursuant to Conn. Gen. Stat. § 16-19e(a)(4) in order to allocate the cost of such service (Proposals) prior to the PBI solar plus storage project taking service. Such Proposals should be consistent with the Company’s current terms and conditions, including the guarantee of a minimum annual payment for a term of years. The Proposals shall include a timeline of requested approvals, all partnerships and other contractual agreements that the Company has and plans to enter into for the project, and any other documents and legal parameters necessary to execute the Proposal. Any rate structure options considered and presented may take into account the non-energy benefits that this project may provide to the Company and its ratepayers as a whole, including environmental and societal benefits. G. ELECTRIC POWER RESEARCH INSTITUTE EXPANDED MEMBERSHIP The Company proposes to expand its membership to the Electric Power Research Institute (EPRI) to “facilitate research and industry collaboration around clean energy,” including “program sets” related to energy storage, distributed generation, DER integration, electric transportation, and electrification. Ex. UI-CETP-1, p. 31. The Authority declines UI’s request because there is insufficient evidence in the record explaining how the expanded membership will specifically benefit ratepayers. Additionally, there is conflicting and confusing testimony in the record regarding the actual costs for the expanded EPRI membership. According to an interrogatory response, the Company requests that it recover a total of $565,900 over four years. Interrog. Resp. OCC-246. However, in a subsequent interrogatory response, the Company stated that its annual EPRI dues from 2017 through 2022 averaged $310,269. Interrog. Resp. OCC-387. Further, the Company testified at the hearing that it sought to increase its membership expense by “a little over $36,000” on an annual basis. Hr’g Tr. Mar. 8, 2023, 2805: 12-14. Finally, a schedule submitted by the Company indicated only a $17,00 increase in its membership expense. Sch. WP C3.03. Therefore, the actual cost of the extended membership is unclear to the Authority. Additionally, when asked about the program sets, the Company testified that it already belonged to two program sets it represented it wanted to join in the Application. Hr’g Tr. Mar. 8, 2023, 2806:1-4. Moreover, the Company only provided general and speculative remarks about potential benefits to its expanded membership and did not describe any quantifiable benefits to ratepayers. See Hr’g Tr. Mar. 8, 2023, 2806:1-25, 2807: 1-8. Therefore, the record is unclear as to how much the expanded membership would cost, what program sets the Company belongs to, what the benefits of expanded membership in those program sets are, and how specifically the expanded membership would benefit ratepayers. Finally, P.A. 23-102 § 3 (a), effective from passage on June 6, 2023, and before Rate Year 2023/2024 commences on September 1, 2023, expressly prohibits a public service company such as UI from recovering through rates any direct or indirect costs associated with “membership, dues, sponsorships or contributions to a business or industry trade association or group or related entity incorporated under Section 501 of the Internal Revenue Code of 1986, or any subsequent corresponding internal revenue code of the United States, as amended from time to time.” As such, thePage 224 of 296
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 21 Page 224 of 296 OCC-507 CL&P Attachment 21 Docket No. 22-08-08 Page 224 of 296 Page 218 Authority denies UI’s request to recover its proposed expanded EPRI membership costs from ratepayers. VIII. APPROVED REVENUE REQUIREMENT The table below summarizes the various components of the Company’s approved revenue requirement, as adjusted by the Authority, and provides the total approved revenue requirement for the rate year. Table 80: Approved Revenue Requirement Section IV.A. V.A. VI.A. VI.B. VI.C. VI.D. VI.D. VI.D. VI.D. VI.D. VI.D. VI.D. Revenue Component Rate Base Weighted Cost of Capital Allowed Cost of Capital Allowed Expenses: Operations & Maintenance Depreciation Amortization Payroll Taxes Gross Earnings Tax Municipal Property Taxes State Income Tax Federal Income Tax Provision for Deferred Taxes CT ITC Total Allowed Revenue Requirement Amounts ($000) 1,105,196 6.475% 71,561 150,860 72,536 6,605 5,419 26,156 35,053 1,325 10,885 2,703 1,762 384,865 IX. REVENUE ADJUSTMENT MECHANISMS A. EARNINGS SHARING MECHANISM (ESM) 1. Summary The Company proposed that its earnings sharing mechanism (ESM) continue as it is currently structured, with earnings above the allowed ROE measured on a calendar year basis shared 50/50 with customers. The Company is proposing to modify the structure so that the customers’ 50% share, if any, would be first utilized to amortize and accelerate the recovery of UI’s storm regulatory asset, if applicable, before being utilized as a cash credit. Application, Ex. UI-RRP-1, p. 9; Interrog. Resp. RRU 24. The Company indicated the mechanism returned approximately $15.66 million to customers, inclusive of carrying charges, due to earnings above the allowed ROE in 2017, 2018, and 2019. UI Interrog. Resp. RRU-26. In 2020, the customers’ 50% share of earnings sharing was utilized to offset deferred major storm expenses. Id.Page 225 of 296
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 21 Page 225 of 296 OCC-507 CL&P Attachment 21 Docket No. 22-08-08 Page 225 of 296 Page 219 As shown in RRU-16, Attachment 1, the Company’s calculation of its earned ROE for purposes of the ESM reflects its actual capital structure. Interrog. Resp. EOE-181. UI has utilized its actual capital structure when calculating earnings sharing for the last two decades. Id. 2. Positions of the Parties EOE recommends that the Authority provide guidance to the Company requiring all future ESM reporting to calculate the ROE using the lesser of the (1) authorized or (2) carried equity position, and to apply ESM carrying costs as of January 1 of the subsequent year. Additionally, EOE asserts that the Company should be required to separately identify and exclude all disallowed costs from the ESM reporting going forward and provide an affirmation of the accuracy of their disallowed expenses. This guidance would still allow for the Company to achieve its authorized ROE based on its authorized capital structure and would then share excess earnings in accordance with the rate case decision. This approach would also ensure that customers are not negatively impacted in situations where the Company deviates from directives and orders outlined in a rate case decision. EOE Brief, p. 51. EOE further argues that while deviations from a regulated entity’s authorized capital structure would not result in changes to rates charged to customers (ratepayers), such deviations would, however, impact an entity’s actual calculated ROE and WACC. When the actual equity percentage increases within the capital structure, the WACC would increase as there would be less debt charged at the lower cost. The inverse also holds true. Specific to ROE, a larger percentage of equity results in a lower calculated ROE as the utility income would be diluted within the calculation. This ultimately means that a regulated utility that exceeds its authorized equity percentage would derive a lower actual ROE, while still receiving the same amount of income (pre-ESM). Specific to the ESM, this means that a regulated utility could increase its carried equity percentages to derive a lower calculated ROE, which would negatively impact the customer’s portion of the earnings sharing resulting in less money being returned to ratepayers or used to offset the Storm Regulatory Asset. EOE Brief, p. 51. EOE highlighted how this would have benefited the ratepayers in past situations where the ESM was triggered. EOE indicated that the common equity level in the Company’s capital structure has grown from 54.44% in 2017, to 59.15% in 2021, despite being set at 50% for ratemaking purposes. EOE Brief, p. 50. In 2017-2019, UI exceeded its allowed ROE and shared $16.46 million of overearnings, based upon the equity ratio shown in UI’s actual capital structure. Interrog. Resp. EOE-181. However, had earnings been calculated using the 50% equity ratio allowed for ratemaking purposes, rather than the Company’s actual capital structure, ratepayers would have seen an additional earnings sharing bill credit in 2020 of $2.07 million, as well as $5.83 million greater ESM payments over the 2017–2019 rate plan period. EOE Brief, p. 51. Similarly, the OCC indicated that allowing UI to calculate earnings for ESM purposes using its actual capital structure defeats the rationale of the original rate case decision that set the authorized ROE, allowed ratemaking capital structure, and resulting weighted cost of capital. If a 50/50 capital structure was utilized for setting revenue requirements, an identical capital structure should be utilized to determine the level of earnings sharing in a given rate year. OCC Reply Brief, p. 22.Page 226 of 296
Connecticut Light and Power Company Docket No. 26-05-10 Docket No. 22-08-08 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 21 Page 226 of 296 OCC-507 CL&P Attachment 21 Page 226 of 296 Page 220 In addition to supporting EOE’s recommended calculation of the ESM, OCC also proposed a modification to the ESM. Specifically, while the OCC does not necessarily oppose using ESM proceeds to pay off deferred storm costs, the OCC contends that the application of ESM funds to storm costs should be limited to storm costs that have been the subject of a review in a rate case or storm review case by PURA. As a result, only storm costs found to be prudent would be eligible to be funded by ESM proceeds. New storm costs should not automatically be charged against ESM until they are approved for recovery by PURA following a comprehensive and collaborative review in which the Company must meet its burden to demonstrate that incurred costs were necessary and prudent. OCC Brief, p. 249. The OCC noted that if PURA does accept this modification, that the Authority should consider a sharing of one-quarter to storm deferred costs, one-quarter to shareholders, and one-half to ratepayers as a bill credit. The pay-down of deferred storm costs improves the financial matrix of the Company by reducing the level of deferred assets on the Company’s balance sheet. Under the Company’s proposal, OCC argues that shareholders would enjoy the full 50% benefit of the ESM mechanism, in addition to the benefit of this reduction in risk, while ratepayers would contribute their entire share of overearnings. Dividing overearnings between shareholders, ratepayers, and deferred costs would better reflect the balance intended in the ESM mechanism’s design. Id., p. 250. The OCC also petitioned the Authority to consider the reporting of the actual earned ROE. The OCC argues that UI accounted for costs that were not included in the revenue requirement as operating expenses, affecting the measurement of the Company’s actual earned ROE. OCC Brief, p. 250. Specifically, the OCC states that UI has a long history of paying incentive compensation levels that exceed the amount allowed in rates and charging the excess amount above the line, thus reducing their earned ROE. Id. These actions cause the Company to earn below its allowed rate of return and experience a reduction in overearnings in years in which they in fact over earn. Id. The OCC requests that the Authority order UI to report its earned return based on a level of allowed expenses that does not include costs that were excluded for ratemaking purposes. Id. 3. Authority Analysis The Authority orders UI to continue the ESM with a 50/50 split from the first dollar of over-earning above the allowed ROE calculated on a calendar year basis. In addition, the Authority agrees with the arguments presented by EOE and the OCC that the measurement of the ROE should use the lesser of the authorized or actual equity position when tabulating the ROE, as utilizing the Company’s actual capital structure subverts the function of imbuing a capital structure for ratemaking purposes. The Authority also agrees with the OCC that the ESM revenue should only be applied to the storm regulatory asset after a prudence review by the Authority for two reasons: (1) consistent with the treatment of regulatory assets in this Decision and past PURA precedent, see Section IV.E.1., General, carrying charges do not accrue on regulatory assets prior to a prudence review; thus, there are no carrying cost benefits associated with applying ratepayers’ share of the ESM to a storm regulatory asset prior to the prudence review; and (2) applying ratepayers’ share of the ESM to a storm regulatory asset before a full review by the Authority introduces the risk that such costs are used to offset imprudent costs. The Authority will
Text of OCC-507 Attachment 20.pdf
Extracted from the file · 167 pages · 508,170 characters
Text of OCC-507 Attachment 19.pdf
Extracted from the file · 137 pages · 450,996 characters
Text of OCC-507 Attachment 18.pdf
Extracted from the file · 247 pages · 763,200 characters
Text of OCC-507 Attachment 17.pdf
Extracted from the file · 2 pages · 6,387 characters
Text of OCC-507 Attachment 16.pdf
Extracted from the file · 2 pages · 484 characters
Text of OCC-507 Attachment 15.pdf
Extracted from the file · 202 pages · 895,816 characters
Text of OCC-507 Attachment 14.pdf
Extracted from the file · 6 pages · 8,947 characters
Text of OCC-507 Attachment 13.pdf
Extracted from the file · 19 pages · 93,122 characters
Text of OCC-507 Attachment 12.pdf
Extracted from the file · 19 pages · 95,631 characters
Text of OCC-507 Attachment 11.pdf
Extracted from the file · 7 pages · 10,667 characters
Text of OCC-507 Attachment 8.pdf
Extracted from the file · 2 pages · 3,673 characters
Text of OCC-507 Attachment 4.pdf
Extracted from the file · 6 pages · 8,272 characters
Text of OCC-507 Attachment 2.pdf
Extracted from the file · 8 pages · 30,345 characters
Text of OCC-507 Attachment 1.pdf
Extracted from the file · 32 pages · 164,962 characters
Text of OCC-507 Attachment 39.pdf
Extracted from the file · 22 pages · 32,510 characters
Text of OCC-507 Attachment 31.pdf
Extracted from the file · 8 pages · 37,747 characters
Text of OCC-507 Attachment 30.pdf
Extracted from the file · 5 pages · 22,063 characters
Text of OCC-507 Attachment 10.pdf
Extracted from the file · 3 pages · 4,485 characters
Text of OCC-507 Attachment 9.pdf
Extracted from the file · 10 pages · 15,175 characters
Text of OCC-507 Attachment 7.pdf
Extracted from the file · 3 pages · 5,747 characters
Text of OCC-507 Attachment 6.pdf
Extracted from the file · 4 pages · 6,545 characters
Text of OCC-507 Attachment 5.pdf
Extracted from the file · 4 pages · 5,724 characters
Text of OCC-507 Attachment 3.pdf
Extracted from the file · 65 pages · 195,008 characters
As listed on the current system
Question(s) Answered 507, 508, 509, 510, 511, 512, 517, 518 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/14/2026