Interrogatory responses

Answers to questions 507, 508, 509, 510, 511, 512, 517, 518

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy53 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files53

Text of OCC-510_Final.pdf

Extracted from the file · 3 pages · 6,553 characters

Text of OCC-511_Final.pdf

Extracted from the file · 8 pages · 17,894 characters

Text of OCC-512_Final.pdf

Extracted from the file · 1 page · 992 characters

Text of OCC-517_Final.pdf

Extracted from the file · 1 page · 826 characters

Text of OCC-518_Final.pdf

Extracted from the file · 1 page · 601 characters

Text of OCC-512 Attachment 3 REDACTED.pdf

Extracted from the file · 33 pages · 5,436 characters

Text of OCC-512 Attachment 2 REDACTED.pdf

Extracted from the file · 33 pages · 5,436 characters

Text of OCC-512 Attachment 1.pdf

Extracted from the file · 626 pages · 635,148 characters

Text of OCC-507 Attachment 42.pdf

Extracted from the file · 3 pages · 10,259 characters

Text of OCC-507 Attachment 41.pdf

Extracted from the file · 9 pages · 3,276 characters

Text of OCC-507 Attachment 40.pdf

Extracted from the file · 5 pages · 8,775 characters

Text of OCC-507 Attachment 38.pdf

Extracted from the file · 19 pages · 96,311 characters

Text of OCC-507 Attachment 37.pdf

Extracted from the file · 49 pages · 120,692 characters

Text of OCC-507 Attachment 36.pdf

Extracted from the file · 59 pages · 136,630 characters

Text of OCC-507 Attachment 35.pdf

Extracted from the file · 38 pages · 102,807 characters

Text of OCC-507 Attachment 34.pdf

Extracted from the file · 5 pages · 1,210 characters

Text of OCC-507 Attachment 33.pdf

Extracted from the file · 13 pages · 52,489 characters

Text of OCC-507 Attachment 32.pdf

Extracted from the file · 5 pages · 14,030 characters

Text of OCC-507 Attachment 29.pdf

Extracted from the file · 8 pages · 37,747 characters

Text of OCC-507 Attachment 28.pdf

Extracted from the file · 18 pages · 75,925 characters

Text of OCC-507 Attachment 27.pdf

Extracted from the file · 35 pages · 66,295 characters

Text of OCC-507 Attachment 26.pdf

Extracted from the file · 19 pages · 68,589 characters

Text of OCC-507 Attachment 25.pdf

Extracted from the file · 12 pages · 53,851 characters

Text of OCC-507 Attachment 24.pdf

Extracted from the file · 2 pages · 482 characters

Text of OCC-507 Attachment 23.pdf

Extracted from the file · 268 pages · 869,686 characters

Text of OCC-507 Attachment 22.pdf

Extracted from the file · 178 pages · 528,336 characters

Text of OCC-507 Attachment 21.pdf

Extracted from the file · 296 pages · 1,013,669 characters

Text of OCC-507 Attachment 20.pdf

Extracted from the file · 167 pages · 508,170 characters

  1. Page 18 of 137

    Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 18 of 137 OCC-507 CL&P Attachment 19 Page 18 of 137 Docket No. 16-06-04 6. Page 14 Capital Expenditures a. General UI’s proposed capital expenditures (Capital Program) disaggregated by category for the Rate Year is as follows: Proposed Capital Program for Rate Years 2017 – 2019 Categories Capacity Customer Reliability - Corrective Infrastructure Replacement - Substations Infrastructure Replacement - Distribution System Modernization and Operational Excellence System Resiliency System Operations Business Effectiveness Total 2017 2,312 37,272 5,052 18,882 24,920 (3,885) 6,032 10,525 4,416 $105,526 $ in thousands 2018 1,489 38,197 2,219 8,550 28,828 2,021 6,234 11,974 883 $100,394 2019 1,948 38,698 2,712 8,416 28,748 3,720 4,752 9,298 3,900 $102,191 Note: Amounts may not add due to rounding. Reed and Thomas PFT, p. 5. The Capital Program consisted of expenditures for programs that address the needs of customers and system reliability and strengthens the system against major storms. Every year, the Company develops a ten-year capital forecasting plan that assesses system needs and potential solutions to system issues. From this process, the Company determines the investments required to meet distribution business objectives. Id. The Company outlined the key objectives for the Capital Program, which includes supporting the day to day functions of installing new services, responding to customer requests about service changes, responding to emergencies and numerous other projects to construct, and repair and replace distribution facilities to maintain reliability 2016 2017 and meet customer needs. Id., p. 4. Capacity $ 159 $ 2,312 $ in thousands 2018 $ 1,489 2019 $ 1,948 The Capital Program is Customer separate from the UI Storm Resiliency Plan 33,199 (Resiliency37,272 38,197 38,698 Plan) which has been approved in the -Decision Reliability Correctivedated October 26, 2016 in Docket 5,693 No. 5,052 2,219 2,712 Infrastructure Replacement Substations 2016 Storm 7,070 8,550 8,416 16-07-11, PURA Review of The United Illuminating Company’s Resiliency18,882 Infrastructure Replacement - Distribution System to the 13,326 28,828 28,748 Plan (Resiliency Decision). The Resiliency Plan was filed pursuant merger24,920 and Operational Excellence 9, 2015 in Docket 10,316 No.(3,885) 2,021 3,720 settlement agreement approvedModernization in the Decision dated December System Resilency 6,170 6,032 6,234 4,752 15-07-38, Joint Application of Iberdrola, S.A, Iberdrola USA, Networks Inc., Green System Operations 20,667 10,525 11,974 9,298 Merger Sub, Inc. and UIL Holdings Corporation for Approval of a Change of Control Business Effectiveness 1,958 4,416 883 3,900 (2015 Iberdrola Change of Control Decision). The Resiliency Plan included programs $ 98,557 $ 105,526 $ 100,394 $ 102,191 costing an additional $50 million over four years. The programs are complimentary to the resiliency expenditures outlined above. The associated costs for the Resiliency Plan programs will be recovered through the non-bypassable Federally Mandated Congestion Charge (NBFMCC), which is outside of base distribution rates. Neither the OCC nor the AG opposed the Resiliency Plan. Resiliency Decision, p. 7.
  2. Page 19 of 137

    Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 19 of 137 OCC-507 CL&P Attachment 19 Page 19 of 137 Docket No. 16-06-04 Page 15 The OCC and the AG contended that the Company’s capital expenditures should be reduced by up to 20% of UI’s proposed budget. They specified concerns with the Company’s recent management of its capital budget and UI’s lack of addressing the Authority’s cost benefit analysis concerns outlined in the 2013 UI Rate Case Decision. The AG and OCC highlighted the variance in the Company’s capital budget and actual expenditures for the years 2013-2015. AG Brief, pp. 7-12; OCC Brief, pp. 5-11. The table below illustrates that UI’s actual capital expenditures from 2013 through 2015 were approximately 20% below that allowed by the 2013 UI Rate Case Decision.3 UI Allowed and Actual Capital Expenditures 2013-2015 Categories Capacity Customer Reliability - Corrective Infrastructure Replacement - Substations Infrastructure Replacement - Distribution System Modernization and Operational Excellence System Resiliency System Operations Business Effectiveness Total Actuals 31,302 102,389 6,260 36,528 50,442 23,763 20,548 48,049 862 $320,143 2013-2015 ($ in thousands) Allowed DN 13-01-19 Variance 45,439 (14,137) 102,702 (313) 10,328 (4,068) 59,391 (22,863) 50,019 423 45,874 (22,111) 20,329 219 55,178 (7,129) 9,847 (8,985) $399,108 $78,965 % Variance -31.11% -0.30% -39.39% -38.50% 0.85% -48.20% 1.08% -12.92% -91.25% 19.79% Note: Amounts may not add due to rounding. Response to Interrogatory OCC-257. The AG and the OCC also noted that as of the first two quarters of 2016, the Company underspent by 22% of its 2016 Capital Program budget. Late Filed Exhibit No. 23. The AG and OCC also argued that UI underspent by 16% from the years 2011-2015 in the resiliency category. Larkin PFT, p. 16; AG Brief, p. 7. Besides concerns with the 2013-2015 Allowed Company’s capital expenditure underspending, there are deeper concerns with UI’s Actuals DN 13-01-19 management that may be causing this trend. The OCC urged the Authority to place less Variance emphasis on the Company’s explanation for the project delays$ that contributed Capacity 31,302 $ 45,439 $ (14,137) Customer and instead focus on the distinct 102,389 pattern 102,702 (313) significantly to UI’s recent underspending of Reliability Corrective 6,260 10,328 (4,068) underspending and postponing projects. OCC Brief, p. 9. Infrastructure Replacement - Substations 36,528 59,391 (22,863) Infrastructure Replacement - Distribution System 50,442 50,019 Modernization and OEI 23,763 45,874 The OCC’s witness claimed that UIL had been facing financial pressure during System Resiliency 20,548 20,329 2014 and 2015 due to $60 million in costs of two attempted mergers. UI 48,049 acknowledged System Operations 55,178 that it was asked to reduce its budget to manage Specifically, Business Effectiveness the entire UIL portfolio. 862 9,847 UIL asked the Company to shift money from the UI capital budget to support the growth 320,143 $ 399,108 $ of UIL’s gas expansion program. UI stated that there have been$ times when the Company’s capital budget was increased at the expense of other areas of the UIL portfolio. Tr. 9/14/16, pp. 585, 586 and 708. Finally, the AG and the OCC argued that the Company’s lack of a cost-benefit analysis further supported their argument to reduce UI’s capital budget by 20%. AG 3 In the 2013 UI rate case, the Authority approved the Company’s capital plan for a two-year period beginning mid-2013 and ending mid-2015. Thomas Rebuttal Testimony, p. 6. Response to Interrogatory EN-41; Favuzza, Reed and 423 (22,112) 219 (7,129) (8,985) -31% 0% -39% -38% 1% -48% 1% -13% -91% (78,965) -20%
  3. Page 20 of 137

    Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 20 of 137 OCC-507 CL&P Attachment 19 Page 20 of 137 Docket No. 16-06-04 Page 16 Brief, p. 12; OCC Brief, p. 10. The AG cited the 2013 UI rate case where the Authority outlined the three characteristics (justification, affordability, and redefining the paradigm) that it considered when evaluating UI’s proposed capital plan. Brief, p. 8. The AG and the OCC argued that the Company’s Capital Program does not satisfy the cost-benefit characteristic outlined in the 2013 UI Rate Case Decision and that any capital program at the levels proposed by UI requires a more exhaustive cost-benefit analysis process. AG Brief, p. 10; OCC Brief, p. 10. The Company argued that the Authority should consider the years 2004 to 2015 to assess UI’s spending of its allowed budget where it has overspent by $37.77 million or 3.6%. Favuzza, Reed and Thomas Rebuttal Testimony, p. 5. The table below compares UI’s spending for these years. Allowed and Actual Capital Expenditures 2004-2015 2004-2015 ($ in thousands) Categories Capacity Customer Reliability - Corrective Infrastructure Replacement - Substations Infrastructure Replacement - Distribution System Modernization and Operational Excellence System Resiliency System Operations Business Effectiveness Total Actuals 100,385 353,146 33,506 68,123 244,994 28,045 27,810 168,211 63,239 $1,087,457 Allowed/Filed 122,834 260,371 23,216 97,415 207,051 46,030 26,613 173,748 92,402 $1,049,681 Variance (22,450) 92,775 10,290 (29,293) 37,943 (17,985) 1,197 (5,537) (29,163) $37,776 % Variance -18% 36% 44% -30% 18% -39% 4% -3% -32% 3.60% Note: Amounts may not add due to rounding. Response to Interrogatory EN-41. UI justified the underspending for each of the categories that contributed largely to the variance. In the capacity category, UI experienced a decrease in peak demand and forecasted only a modest load growth in the future. Specifically, substation load relief projects were 10% less than originally projected. . In the Reliability-Corrective Program, UI incurred $3 million less than originally projected since the need to rebalance feeders to address overloads did not materialize. Response to Interrogatory OCC-257. The Infrastructure Replacement - Substations category saw a $22 million reduction in spending due primarily to the reprioritization of substation rebuilds and removals. Most significantly, the Company began work to rebuild the Old Town substation as planned, when a new generator coming online required UI to shift work to rebuild the Baird substation to accommodate new generation into the system. This ultimately resulted in a shift of the Old Town substation rebuild to 2018. Tr. 9/14/16, pp. 466 and 467. The Authority notes that the above occurrences were largely outside of the Company’s control. Additionally, a reprioritization of low voltage substation removals ultimately resulted in two lower cost removals moving ahead of a higher cost one that was originally planned. Id., p. 467. Finally, in the Modernization and Operational Excellence and Business Effectiveness categories, a bulk of the underspending was the result of an accounting treatment whereby the Company shifted the capital expenditure to UIL since the scope of these projects involved its gas companies. Much of these funds would ultimately be allocated back to UI as an O&M expense. Response to Interrogatory OCC-257; Favuzza, Reed and Thomas Rebuttal Testimony, p. 7.
  4. Page 21 of 137

    Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 21 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 Page 21 of 137 Page 17 Regarding its lack of a traditional cost-benefit analysis, the Company countered the OCC and AG’s position stating that traditional cost-benefit analysis is not a primary means of justifying electric distribution system work and that the programs are necessary to maintain and improve service reliability levels and meet customer needs. UI further argued that it evaluates alternatives to determine the most cost-effective means to meet its obligations. While benefits may be difficult to quantify, the Company has presented adequate cost justification and shown the benefit of its programs. Id., pp. 8 and 9. The Authority finds merit in both a long-term and short-term evaluation of the Company’s historical spending. Capital spending is long-term in nature, as illustrated by the fact that UI forecasts its capital spending for ten years. A review of the Company’s Capital Program for the rate year relative to recent years is further illustrative. The table below compares UI’s approved capital plan in the 2013 UI rate case for the years 2013-2015 with its proposal for the rate years. UI Allowed and Proposed Capital Expenditures (2013 UI Rate Case Decision vs. Proposed Capital Program) Categories Capacity Customer Reliability - Corrective Infrastructure Replacement - Substations Infrastructure Replacement - Distribution System Modernization and Operational Excellence System Resiliency System Operations Business Effectiveness Total Allowed DN 13-01-19 45,439 102,702 10,328 59,391 50,019 45,874 20,329 55,178 9,847 $399,108 ($ in thousands) Proposed DN 16-06-04 Variance 5,749 (39,690) 114,167 11,465 9,983 (345) 35,848 (23,543) 82,496 32,477 1,856 (44,018) 17,018 (3,311) 31,797 (23,381) 9,199 (648) $308,111 ($90,997) % Variance -87.35% 11.16% -3.34% -39.64% 64.93% -95.95% -16.29% -42.37% -6.58% -22.80% Note: Amounts may not add due to rounding. Response to Interrogatory OCC-257; Reed and Thomas PFT, p. 5. UI’s Capital Program for the rate years is nearly 23% below what was allowed from the 2013 UI rate case. Furthermore, the Company’s proposal is 3.76% (1 - $308,111 / $320,143) less than UI’s actual expenditures from 2013 to 2015. Id. The Authority finds that the Company’s Capital Program has already accounted for the 20% reduction for which the AG and the OCC recommended. Consideration of the Company’s accurate long-term track record for preparing and fulfilling its capital plan commitment since 2004 further supports this determination. The Authority must also consider the 2015 Management Audit of The United Illuminating Company Final Report by Jacobs Consultancy dated November 9, 2015 (UI Management Audit Report). Relating to UI’s Capital Program, the UI Management Audit Report evaluated the Company’s use of the following: 1. 2. project management tools; construction methods;
  5. Page 22 of 137

    Connecticut Light and Power Company Docket No. 26-05-10 Docket No. 16-06-04 3. 4. 5. 6. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 22 of 137 OCC-507 CL&P Attachment 19 Page 22 of 137 Page 18 job scheduling; prioritization of work; workforce management techniques; and conformance with current industry, state and federal safety and work-related practices and standards. UI Management Audit Report, p. 81. The UI Management Audit Report concluded that the Company uses industry current practices in managing its projects and performs its construction activities in a consistent and controlled fashion that supports timely and quality construction program execution. Id., pp. 87 and 88. The shifting and reprioritization of projects and programs is a reality that is well-understood. The potential for large annual and multi-year variances in capital budgets and plans exists due to a variety of external and internal forces. UI routinely tests and evaluates its system to help make informed engineering and business judgments so that it operates its system to meet its obligations to its customers and the Authority. UI revisits its Capital Plan annually to reprioritize projects every summer. Tr. 9/14/16, pp. 459, 460 and 535-538. The Authority finds that it must be more informed about the yearly reprioritization and realignment of UI’s capital plans and will require annual filings as described below. These reporting requirements are identical to those that have been in place for The Connecticut Light and Power Company d/b/a Eversource Energy (CL&P) for many years. The Authority acknowledges that while a traditional cost-benefit analysis would be helpful, capital programs by nature often are ill-suited for such a treatment. The Authority agrees with the Company that it can be difficult to quantify the full benefits of providing reliable service to customers and a safe work environment to its employees. Nevertheless, UI has shown in this case benefits of past programs, including the positive effect its Overhead Paper Insulated Lead Cable Program had on reliability metrics. Reed and Thomas PFT, pp. 20 and 21. Ultimately, the Authority agrees with the Company in realizing that construction programs should be analyzed based on the needs the programs are intended to address and the reasonableness of the solutions to those needs. This approach is consistent with the Authority’s traditional methodology for analyzing electric utility construction programs. While the recent underspending raises concerns about the UI and UIL’s interaction (that is addressed below), based on the above analysis, the Authority determines that the Company has evaluated and adopted its Capital Program based on the current needs of the system. Accordingly, the Authority will not make any adjustments to the proposed capital spending level for the rate years based on the Company’s underspending or a lack of a cost benefit analysis. The Authority firmly supports the AG and the OCC premise that UI ratepayers should not subsidize UIL’s gas subsidiaries. UI customers must be assured that they receive the full benefit of the capital programs for which they have paid in rates. Below, the Authority addresses whether the Company’s ratepayers have received the full benefit for which they paid in rates since the 2013 UI Rate Case Decision.
  6. Page 23 of 137

    Connecticut Light and Power Company Docket No. 26-05-10 Docket No. 16-06-04 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 23 of 137 OCC-507 CL&P Attachment 19 Page 23 of 137 Page 19 First, Item 36 of the merger settlement agreement approved by the Authority in the 2015 Iberdrola Change of Control Decision, Appendix 1, to which both the AG and OCC were parties, allows for UIL to have the authority and responsibility to provide input into the development of the UIL Utilities’ capital budgets and implement the approved budgets. Second, neither the AG nor the OCC have shown that UI customers did not receive full benefit of the amounts they paid in rates. To be clear, rates are established on rate base, not a comparison of budgeted and actual capital expenditures. The Company’s August 6, 2015 filing in compliance with Order No. 1 for the Decision dated February 10, 1977 in Docket No. 76-03-07, Investigation to Consider Rate Adjustment Procedures and Mechanisms Appropriate to Charge or Reimburse the Consumer for Changes in the Cost of Fossil Fuel, shows that UI’s actual average gross plant-in-service for the 12-month period ending June 30, 2015, was $1,481 million. When compared to the approved average plant-in-service of $1,457 million in the 2013 UI Rate Case Decision for the same 12-month period, it is clear that UI customers have not paid for assets that are not in service. 2013 UI Rate Case Decision, Appendix B. The Company has not violated any of the Authority’s statutes, regulations or orders by allocating capital away from these projects, but the fact that it has done so must be accounted for and made clear to the PURA. Ultimately, UI’s approved Capital Program budget should not be reduced based on the needs of UIL or its subsidiaries. In order to keep fully informed on UI’s Capital Program and its yearly reprioritization, the Authority will direct the Company to report on its capital spending as follows: by November 30 of 2017, 2018 and 2019, with a budget/forecast of spending by initiative or category for the following year; and by March 31 of each year 2018, 2019 and 2020 showing actual spending by initiative or category for the preceding year. The Authority recognizes that plans may change for good reason over the next three years. Accordingly, if the budgeted amount for any initiative or category changes by more than 10% from that represented in this proceeding and as modified by the Authority, the Company must provide an explanation in the annual budget report due each November 30. Further, if actual total spending varies from budgeted spending in any year, the Company must provide an explanation in the annual spending report due March 31 of each year. If the capital spending trend seen in recent years continues, the Authority will reopen the instant Decision and act accordingly. No party or intervenor opposed any specific capital expenditure or project to be added to plant-in-service. The AG however, questioned the Company’s wholesale replacement of specific types of equipment, particularly in UI’s infrastructure replacement program. The AG requested that the Authority require the Company to submit a more strategic and optimized plan for review and approval prior to implementation. AG Brief, p. 13. The Authority finds however, that the Company has provided a capital plan that specifically addresses the concerns noted by the PURA in the 2013 UI Rate Case Decision and those reiterated by the AG. The Company has satisfied Order No. 14 of the 2013 UI Rate Case Decision by providing a 20-year plan that forecasts long-term system needs while addressing potential rate impact of the forecasted spending. Regarding infrastructure replacement, the Company provided its completed, active and future replacement programs. In that document, UI provided ample justification for need, cost and long-term management while attempting to manage spending at a steady-state level. Reed and Thomas PFT, Exhibit RJR/JDT. To the Authority, this approach is strategic and optimized while attempting to keep costs down and maintain a steady-state
  7. Page 24 of 137

    Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 24 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 Page 24 of 137 Page 20 level of spending to avoid future spending bubbles. The Authority reviewed the Company’s proposed Capital Program and concludes that the expenditures are reasonable and necessary for safety, reliability and maintenance of the system. b. Grid Modernization The Grid Modernization Program includes expenditures related to modifying the electric distribution system to accommodate the proliferation of distributed energy resources (DER). The Company asserted that customers’ desire for choice has resulted in a rapidly growing incorporation of DER on the electric distribution system. This has created a driving need for the grid to evolve from a central station model, where power flows predominantly in one direction, to a more dynamic model that accommodates bidirectional power flows and the ability to manage intermittent resources. The Company stated that it expects that over time, it is likely that pockets of high penetration will create areas where the system needs to be controlled, monitored and operated in a new way to maintain current performance standards and reliability in a more distributed and complex operating model. Reed and Thomas PFT, p. 23. The Grid Modernization Program is comprised of three initiatives: Microgrid initiative, which consists of the costs and reimbursements from the Woodbridge Microgrid project. Distribution Management System (DMS) initiative, which will provide central monitoring and control functions and analytical capabilities for UI’s distribution system, and potentially for DER. This initiative is intended to enable the Company to operate the system to accommodate increasing levels of DER and enable a new dynamic, bidirectional electric distribution system. Grid Analytics initiative, which will provide UI with the capability to gather data on voltage and load performance to better model the electric distribution system in preparation for increased DER penetration. Id., pp. 23-25; Responses to Interrogatories EN-4 and EN-6. DER interconnections have a significant impact on the electric distribution system that must be taken into account in system design and operation. When the Authority first approved its generator interconnection standards in 2004, it acknowledged these concerns when it stated: “[s]mall generators connected to lower voltage electric systems are electrically “weak” and less robust than large generators connected to high voltage systems, and are not subject to coordinated dispatch by a system operator. Large numbers of small generators may therefore weaken the integrity of the electric system.” Decision dated April 24, 2004 in Docket No. 03-01-15, DPUC Investigation into the Need for Interconnection Standards for Distributed Generation (DG Decision), pp. 3 and 4. Furthermore, DER compromises the integrity of various protective devices and schemes in an electric distribution system if not properly accommodated, requiring further investment to accommodate the collateral impact of interconnections. DER does not benefit the reliability of the electric distribution system.
  8. Page 25 of 137

    Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 25 of 137 OCC-507 CL&P Attachment 19 Page 25 of 137 Docket No. 16-06-04 Page 21 Since the DG Decision, DER interconnections have grown rapidly, posing a challenge to the EDCs, primarily due to solar photovoltaic installations. UI provided data demonstrating that DER interconnections increased from 59 in 2011 to 2,530 in 2015. The Company stated that, while it currently has sufficient margin to accommodate DER at a system level, it will lose this margin beginning as early as 2019. The Distribution Management System and Grid Analytics initiatives will prepare the Company’s electric distribution system to safely manage and accommodate the influx of DER interconnections. Reed and Thomas PFT, pp. 24-26. The Operational Excellence Initiative (OEI) consists of measures to modernize UI’s Outage Management System, damage estimate capabilities, ability to more accurate estimate outage restoration times, and various other information technology (IT) projects and processes. The OEI will be fully implemented in 2016, and in years thereafter savings will accrue to the Company that are attributable to efficiency gains. Id., p. 22. The capital forecast for Grid Modernization and Operational Excellence is as follows: Modernization and OEI Capital Forecast ($000) Modernization: -Microgrid -DMS -Grid Analytics OEI Total 2016 2017 2018 2019 $2,087 $8,229 $10,316 $(2,670) ($1,215) ($3,885) $506 $3,540 ($2,025) $2,021 $5,745 ($2,025) $3,720 - Id., p. 24. No party or intervenor opposed the Grid Modernization or OEI Programs. The Bureau of Energy Technology and Policy (BETP) supported the Grid Modernization initiative. Specifically, it would improve data collection and analysis across the electric distribution system to prepare for the impact of DER on the system and improve planning for the considerable expansion of DER that is expected to occur. The BETP particularly endorsed deployment of the Grid Analytics and Distribution Management System initiatives, which form a foundation for grid-side system enhancement demonstration projects pursuant to Section 103 of Public Act 15-5, An Act Implementing Provisions of the State Budget for the Biennium ended June 13, 2017, Concerning General Government, Education, Health and Human Services and Bonds of the State. Finally, the BETP stated that it will require detailed information from the Company’s implementation of DMS and Grid Analytics to coordinate with its demonstration projects and requested that the Authority order detailed reporting requirements in this proceeding. BETP Brief, pp. 14-16. The Authority finds that the OEI will result in savings to ratepayers every year after 2016, and is therefore approved. The Grid Modernization initiatives have clearly been shown to be reasonable and necessary to accommodate the expanding DER penetration into areas of the electric distribution system, to prevent future negative effects from DER interconnections, more efficiently accommodate and operate DER in the system, and to thus facilitate energy policy, one of the goals of which is to promote the deployment of renewable resources. The Authority notes that some of the Grid
  9. Page 26 of 137

    Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 26 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 Page 26 of 137 Page 22 Modernization Initiatives are grid-side enhancement projects that are subject to both BETP and PURA approval per Section 103(b) of Public Act 15-5. Therefore, the Authority approves the Grid Modernization initiatives, subject to reporting requirements delineated in the Orders below, and any other modifications or reporting requirements that may result from final BETP or PURA approval of grid-side system enhancement projects under Public Act 15-5. Any reporting requirements established by BETP will also be utilized by the Authority in any reviews pursuant to this section. Finally, there is substantial uncertainty with regard to the schedule and quantification of the Grid Modernization initiatives, particularly since they are in the later years of the rate plan, as well as considerable variation in the expenditures. Consequently, the Authority will examine whether or not Grid Modernization capital expenditures should be included in the Electric Distribution Infrastructure Capital Tracking mechanism pursuant to Section II.B.6.c. Electric Distribution Infrastructure Capital Tracker. c. Electric Distribution Infrastructure Capital Tracker The OCC and the Company proposed that revenue requirements associated with infrastructure replacement and customer-related projects be removed from base rates and separately recovered through a tracking mechanism subject to adjustment either annually or semi-annually. The types of capital expenditures to be moved to such a charge would be those that are large, uncertain and are highly variable. The Company supports an annual mechanism whereby it would detail its actual capital expenditures from the previous year and allowed capital expenditure for the current year, to calculate a line item charge for customers. UI proposed that all capital expenditures in the Infrastructure Replacement category be included in this charge, which currently comprise approximately 41.5% of all capital expenditures. The Company also stated that capital expenditures in the customer category could be included, in which case the total capital expenditures to be moved to the new charge would comprise about 76.8% of all capital expenditures. The Company stated that its proposal is similar to the current Distribution Integrity Management Program (DIMP) tracker for Connecticut Natural Gas Corporation (CNG), which was approved by the Authority in its Decision dated January 22, 2014 in Docket No. 13-06-08, Application of Connecticut Natural Gas Corporation to Increase Its Rates and Charges (CNG 2013 Rate Case Decision). UI Response to Late Filed Exhibit No. 29. The OCC’s proposal is similar to UI’s, except that its mechanism would adjust revenue requirements semi-annually, similar to the Water Infrastructure and Conservation Adjustment (WICA) that is in place for the water utilities pursuant to Conn. Gen. Stat. §16-262w. The OCC also proposed that the mechanism be limited to no more than 5% of total distribution revenues annually and 10% between rate proceedings. Such a mechanism will result in significant consumer protection and regulatory oversight similar to WICA, which has been a “win-win” for the utilities and customers alike. The OCC further asserted that a semi-annual proceeding will reduce regulatory lag and allow the Company to re-prioritize projects more easily. Finally the Authority should hold a generic proceeding in 2017 to establish a WICA-like process going forward. OCC Response to Late Filed Exhibit No. 29; Brief, p 138. The AG supported a mechanism similar to the one proposed by the OCC for the same reasons. Brief, pp. 13-16.
  10. Page 27 of 137

    Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 27 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 Page 27 of 137 Page 23 The BETP also supported implementation of a capital tracking mechanism similar to WICA. The BETP asserted that a WICA-like mechanism is preferable to a DIMP-like mechanism as it is a more thoughtful, strategic approach to address infrastructure issues than the WICA. The BETP asserted that a WICA-like program will allow for expedited recovery of costs by the Company and be of great benefit to the system and the customers it serves. Brief, pp. 18-22. This issue has been raised too late in this proceeding to implement a capital tracking mechanism as part of the instant Decision. The parties in this proceeding have opposed other tracking mechanisms (for example, the DIMP), and it appears to the Authority that a more thoughtful, rational exploration of the topic is necessary given the shifting opinions on the matter. There are substantial differences in the parties’ opinions on which costs should be included in an electric distribution infrastructure capital tracker (EDICT). The OCC and the AG asserted that an EDICT should also apply to CL&P, yet CL&P has not been given an opportunity to weigh in on this matter. The parties related such a tracker to the WICA; however, the issues that led to the implementation of WICA (generally, reluctance of water utilities to deploy the capital to remediate obsolete piping) are not similar to those of electric utilities, where there has been no reluctance to remediate aging infrastructure (see Section II.B.6. Capital Expenditures). There are compelling—if somewhat different—reasons to consider establishing an EDICT, given the substantial costs associated with infrastructure replacement, which vary widely year to year; the value provided by greater transparency around the utility’s planning and prioritization of infrastructure projects and consideration of lower-cost alternatives thereto; as well as the fast-evolving need and technological options for grid modernization investments. As noted by the parties, although the Authority has no explicit statutory authorization to implement an EDICT, it has broad jurisdiction over the amount that public utility companies collect in rates and the manner in which those rates are collected, which provides ample authority to adopt and approve such a mechanism. See, Conn. Gen. Stat. §16-19 et seq. Therefore, the Authority intends to open a proceeding in 2017 to consider whether an EDICT should be implemented for UI and CL&P, and if so, which costs would be included in it and how future proceedings would be conducted. 7. Working Capital Allowance It is a customary regulatory practice to allow an adjustment to rate base in recognition of the timing difference between when revenues are received and when expenses are paid out. For larger utilities, the Authority typically prefers that a lead/lag study be conducted to determine the appropriate cash working capital (WC) allowance rather than using a rule of thumb approach or the utility’s balance sheet result. In this proceeding, UI conducted such a lead/lag study and requested that the results of that study be used for determining its WC requirement for the term of the rate plan. In developing its distribution WC requirement, the Company performed its lead/lag study utilizing its overall revenues and expenses. It then removed transmission and Generation Service Charge WC requirements to arrive at a distribution-only WC requirement. This is the same approach that was presented in the 2013 UI rate case

Text of OCC-507 Attachment 18.pdf

Extracted from the file · 247 pages · 763,200 characters

Text of OCC-507 Attachment 17.pdf

Extracted from the file · 2 pages · 6,387 characters

Text of OCC-507 Attachment 16.pdf

Extracted from the file · 2 pages · 484 characters

Text of OCC-507 Attachment 15.pdf

Extracted from the file · 202 pages · 895,816 characters

Text of OCC-507 Attachment 14.pdf

Extracted from the file · 6 pages · 8,947 characters

Text of OCC-507 Attachment 13.pdf

Extracted from the file · 19 pages · 93,122 characters

Text of OCC-507 Attachment 12.pdf

Extracted from the file · 19 pages · 95,631 characters

Text of OCC-507 Attachment 11.pdf

Extracted from the file · 7 pages · 10,667 characters

Text of OCC-507 Attachment 8.pdf

Extracted from the file · 2 pages · 3,673 characters

Text of OCC-507 Attachment 4.pdf

Extracted from the file · 6 pages · 8,272 characters

Text of OCC-507 Attachment 2.pdf

Extracted from the file · 8 pages · 30,345 characters

Text of OCC-507 Attachment 1.pdf

Extracted from the file · 32 pages · 164,962 characters

Text of OCC-507 Attachment 39.pdf

Extracted from the file · 22 pages · 32,510 characters

Text of OCC-507 Attachment 31.pdf

Extracted from the file · 8 pages · 37,747 characters

Text of OCC-507 Attachment 30.pdf

Extracted from the file · 5 pages · 22,063 characters

Text of OCC-507 Attachment 10.pdf

Extracted from the file · 3 pages · 4,485 characters

Text of OCC-507 Attachment 9.pdf

Extracted from the file · 10 pages · 15,175 characters

Text of OCC-507 Attachment 7.pdf

Extracted from the file · 3 pages · 5,747 characters

Text of OCC-507 Attachment 6.pdf

Extracted from the file · 4 pages · 6,545 characters

Text of OCC-507 Attachment 5.pdf

Extracted from the file · 4 pages · 5,724 characters

Text of OCC-507 Attachment 3.pdf

Extracted from the file · 65 pages · 195,008 characters

As listed on the current system

Question(s) Answered 507, 508, 509, 510, 511, 512, 517, 518 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/14/2026

This filing on the current system (opens in a new tab)