Interrogatory responses
Answers to questions 507, 508, 509, 510, 511, 512, 517, 518
Files53
OCC-507_Final.pdf
PDF · 195 KB · 6 pagesText searchable
Download OCC-507_Final.pdfRead the text of OCC-507_Final.pdf
OCC-508_Final.pdf
PDF · 81 KB · 1 pageText searchable
Download OCC-508_Final.pdfRead the text of OCC-508_Final.pdf
OCC-509_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download OCC-509_Final.pdfRead the text of OCC-509_Final.pdf
OCC-510_Final.pdf
PDF · 190 KB · 3 pagesText searchable
Download OCC-510_Final.pdfRead the text of OCC-510_Final.pdf
OCC-511_Final.pdf
PDF · 215 KB · 8 pagesText searchable
Download OCC-511_Final.pdfRead the text of OCC-511_Final.pdf
OCC-512_Final.pdf
PDF · 82 KB · 1 pageText searchable
Download OCC-512_Final.pdfRead the text of OCC-512_Final.pdf
OCC-517_Final.pdf
PDF · 131 KB · 1 pageText searchable
Download OCC-517_Final.pdfRead the text of OCC-517_Final.pdf
OCC-518_Final.pdf
PDF · 81 KB · 1 pageText searchable
Download OCC-518_Final.pdfRead the text of OCC-518_Final.pdf
OCC-512 Attachment 3 REDACTED.pdf
PDF · 5.2 MB · 33 pagesText searchable
Download OCC-512 Attachment 3 REDACTED.pdfRead the text of OCC-512 Attachment 3 REDACTED.pdf
OCC-512 Attachment 2 REDACTED.pdf
PDF · 6.8 MB · 33 pagesText searchable
Download OCC-512 Attachment 2 REDACTED.pdfRead the text of OCC-512 Attachment 2 REDACTED.pdf
OCC-512 Attachment 1.pdf
PDF · 23 MB · 626 pagesText searchable
Download OCC-512 Attachment 1.pdfRead the text of OCC-512 Attachment 1.pdf
OCC-507 Attachment 42.pdf
PDF · 1.7 MB · 3 pagesText searchable
Download OCC-507 Attachment 42.pdfRead the text of OCC-507 Attachment 42.pdf
OCC-507 Attachment 41.pdf
PDF · 1.8 MB · 9 pagesText searchable
Download OCC-507 Attachment 41.pdfRead the text of OCC-507 Attachment 41.pdf
OCC-507 Attachment 40.pdf
PDF · 2.2 MB · 5 pagesText searchable
Download OCC-507 Attachment 40.pdfRead the text of OCC-507 Attachment 40.pdf
OCC-507 Attachment 38.pdf
PDF · 4.6 MB · 19 pagesText searchable
Download OCC-507 Attachment 38.pdfRead the text of OCC-507 Attachment 38.pdf
OCC-507 Attachment 37.pdf
PDF · 2.9 MB · 49 pagesText searchable
Download OCC-507 Attachment 37.pdfRead the text of OCC-507 Attachment 37.pdf
OCC-507 Attachment 36.pdf
PDF · 2.9 MB · 59 pagesText searchable
Download OCC-507 Attachment 36.pdfRead the text of OCC-507 Attachment 36.pdf
OCC-507 Attachment 35.pdf
PDF · 4.3 MB · 38 pagesText searchable
Download OCC-507 Attachment 35.pdfRead the text of OCC-507 Attachment 35.pdf
OCC-507 Attachment 34.pdf
PDF · 2.1 MB · 5 pagesText searchable
Download OCC-507 Attachment 34.pdfRead the text of OCC-507 Attachment 34.pdf
OCC-507 Attachment 33.pdf
PDF · 2.9 MB · 13 pagesText searchable
Download OCC-507 Attachment 33.pdfRead the text of OCC-507 Attachment 33.pdf
OCC-507 Attachment 32.pdf
PDF · 1.6 MB · 5 pagesText searchable
Download OCC-507 Attachment 32.pdfRead the text of OCC-507 Attachment 32.pdf
OCC-507 Attachment 29.pdf
PDF · 1.8 MB · 8 pagesText searchable
Download OCC-507 Attachment 29.pdfRead the text of OCC-507 Attachment 29.pdf
OCC-507 Attachment 28.pdf
PDF · 2.5 MB · 18 pagesText searchable
Download OCC-507 Attachment 28.pdfRead the text of OCC-507 Attachment 28.pdf
OCC-507 Attachment 27.pdf
PDF · 3.0 MB · 35 pagesText searchable
Download OCC-507 Attachment 27.pdfRead the text of OCC-507 Attachment 27.pdf
OCC-507 Attachment 26.pdf
PDF · 5.0 MB · 19 pagesText searchable
Download OCC-507 Attachment 26.pdfRead the text of OCC-507 Attachment 26.pdf
OCC-507 Attachment 25.pdf
PDF · 2.0 MB · 12 pagesText searchable
Download OCC-507 Attachment 25.pdfRead the text of OCC-507 Attachment 25.pdf
OCC-507 Attachment 24.pdf
PDF · 1.5 MB · 2 pagesText searchable
Download OCC-507 Attachment 24.pdfRead the text of OCC-507 Attachment 24.pdf
OCC-507 Attachment 23.pdf
PDF · 21 MB · 268 pagesText searchable
Download OCC-507 Attachment 23.pdfRead the text of OCC-507 Attachment 23.pdf
OCC-507 Attachment 22.pdf
PDF · 25 MB · 178 pagesText searchable
Download OCC-507 Attachment 22.pdfRead the text of OCC-507 Attachment 22.pdf
OCC-507 Attachment 21.pdf
PDF · 38 MB · 296 pagesText searchable
Download OCC-507 Attachment 21.pdfRead the text of OCC-507 Attachment 21.pdf
OCC-507 Attachment 20.pdf
PDF · 22 MB · 167 pagesText searchable
Download OCC-507 Attachment 20.pdfRead the text of OCC-507 Attachment 20.pdf
OCC-507 Attachment 19.pdf
PDF · 9.1 MB · 137 pagesText searchable
Download OCC-507 Attachment 19.pdfRead the text of OCC-507 Attachment 19.pdf
OCC-507 Attachment 18.pdf
PDF · 17 MB · 247 pagesText searchable
Download OCC-507 Attachment 18.pdfRead the text of OCC-507 Attachment 18.pdf
OCC-507 Attachment 17.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download OCC-507 Attachment 17.pdfRead the text of OCC-507 Attachment 17.pdf
OCC-507 Attachment 16.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download OCC-507 Attachment 16.pdfRead the text of OCC-507 Attachment 16.pdf
OCC-507 Attachment 15.pdf
PDF · 32 MB · 202 pagesText searchable
Download OCC-507 Attachment 15.pdfRead the text of OCC-507 Attachment 15.pdf
OCC-507 Attachment 14.pdf
PDF · 2.6 MB · 6 pagesText searchable
Download OCC-507 Attachment 14.pdfRead the text of OCC-507 Attachment 14.pdf
OCC-507 Attachment 13.pdf
PDF · 4.8 MB · 19 pagesText searchable
Download OCC-507 Attachment 13.pdfRead the text of OCC-507 Attachment 13.pdf
OCC-507 Attachment 12.pdf
PDF · 4.6 MB · 19 pagesText searchable
Download OCC-507 Attachment 12.pdfRead the text of OCC-507 Attachment 12.pdf
OCC-507 Attachment 11.pdf
PDF · 4.9 MB · 7 pagesText searchable
Download OCC-507 Attachment 11.pdfRead the text of OCC-507 Attachment 11.pdf
OCC-507 Attachment 8.pdf
PDF · 1.4 MB · 2 pagesText searchable
Download OCC-507 Attachment 8.pdfRead the text of OCC-507 Attachment 8.pdf
OCC-507 Attachment 4.pdf
PDF · 2.6 MB · 6 pagesText searchable
Download OCC-507 Attachment 4.pdfRead the text of OCC-507 Attachment 4.pdf
OCC-507 Attachment 2.pdf
PDF · 2.2 MB · 8 pagesText searchable
Download OCC-507 Attachment 2.pdfRead the text of OCC-507 Attachment 2.pdf
OCC-507 Attachment 1.pdf
PDF · 3.5 MB · 32 pagesText searchable
Download OCC-507 Attachment 1.pdfRead the text of OCC-507 Attachment 1.pdf
OCC-507 Attachment 39.pdf
PDF · 1.5 MB · 22 pagesText searchable
Download OCC-507 Attachment 39.pdfRead the text of OCC-507 Attachment 39.pdf
OCC-507 Attachment 31.pdf
PDF · 1.8 MB · 8 pagesText searchable
Download OCC-507 Attachment 31.pdfRead the text of OCC-507 Attachment 31.pdf
OCC-507 Attachment 30.pdf
PDF · 1.9 MB · 5 pagesText searchable
Download OCC-507 Attachment 30.pdfRead the text of OCC-507 Attachment 30.pdf
OCC-507 Attachment 10.pdf
PDF · 1.6 MB · 3 pagesText searchable
Download OCC-507 Attachment 10.pdfRead the text of OCC-507 Attachment 10.pdf
OCC-507 Attachment 9.pdf
PDF · 6.2 MB · 10 pagesText searchable
Download OCC-507 Attachment 9.pdfRead the text of OCC-507 Attachment 9.pdf
OCC-507 Attachment 7.pdf
PDF · 1.5 MB · 3 pagesText searchable
Download OCC-507 Attachment 7.pdfRead the text of OCC-507 Attachment 7.pdf
OCC-507 Attachment 6.pdf
PDF · 1.5 MB · 4 pagesText searchable
Download OCC-507 Attachment 6.pdfRead the text of OCC-507 Attachment 6.pdf
OCC-507 Attachment 5.pdf
PDF · 1.5 MB · 4 pagesText searchable
Download OCC-507 Attachment 5.pdfRead the text of OCC-507 Attachment 5.pdf
OCC-507 Attachment 3.pdf
PDF · 5.4 MB · 65 pagesText searchable
Download OCC-507 Attachment 3.pdfRead the text of OCC-507 Attachment 3.pdf
Text of OCC-510_Final.pdf
Extracted from the file · 3 pages · 6,553 characters
Text of OCC-511_Final.pdf
Extracted from the file · 8 pages · 17,894 characters
Text of OCC-512_Final.pdf
Extracted from the file · 1 page · 992 characters
Text of OCC-517_Final.pdf
Extracted from the file · 1 page · 826 characters
Text of OCC-518_Final.pdf
Extracted from the file · 1 page · 601 characters
Text of OCC-512 Attachment 3 REDACTED.pdf
Extracted from the file · 33 pages · 5,436 characters
Text of OCC-512 Attachment 2 REDACTED.pdf
Extracted from the file · 33 pages · 5,436 characters
Text of OCC-512 Attachment 1.pdf
Extracted from the file · 626 pages · 635,148 characters
Text of OCC-507 Attachment 42.pdf
Extracted from the file · 3 pages · 10,259 characters
Text of OCC-507 Attachment 41.pdf
Extracted from the file · 9 pages · 3,276 characters
Text of OCC-507 Attachment 40.pdf
Extracted from the file · 5 pages · 8,775 characters
Text of OCC-507 Attachment 38.pdf
Extracted from the file · 19 pages · 96,311 characters
Text of OCC-507 Attachment 37.pdf
Extracted from the file · 49 pages · 120,692 characters
Text of OCC-507 Attachment 36.pdf
Extracted from the file · 59 pages · 136,630 characters
Text of OCC-507 Attachment 35.pdf
Extracted from the file · 38 pages · 102,807 characters
Text of OCC-507 Attachment 34.pdf
Extracted from the file · 5 pages · 1,210 characters
Text of OCC-507 Attachment 33.pdf
Extracted from the file · 13 pages · 52,489 characters
Text of OCC-507 Attachment 32.pdf
Extracted from the file · 5 pages · 14,030 characters
Text of OCC-507 Attachment 29.pdf
Extracted from the file · 8 pages · 37,747 characters
Text of OCC-507 Attachment 28.pdf
Extracted from the file · 18 pages · 75,925 characters
Text of OCC-507 Attachment 27.pdf
Extracted from the file · 35 pages · 66,295 characters
Text of OCC-507 Attachment 26.pdf
Extracted from the file · 19 pages · 68,589 characters
Text of OCC-507 Attachment 25.pdf
Extracted from the file · 12 pages · 53,851 characters
Text of OCC-507 Attachment 24.pdf
Extracted from the file · 2 pages · 482 characters
Text of OCC-507 Attachment 23.pdf
Extracted from the file · 268 pages · 869,686 characters
Text of OCC-507 Attachment 22.pdf
Extracted from the file · 178 pages · 528,336 characters
Text of OCC-507 Attachment 21.pdf
Extracted from the file · 296 pages · 1,013,669 characters
Text of OCC-507 Attachment 20.pdf
Extracted from the file · 167 pages · 508,170 characters
Page 21 of 137
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 21 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 Page 21 of 137 Page 17 Regarding its lack of a traditional cost-benefit analysis, the Company countered the OCC and AG’s position stating that traditional cost-benefit analysis is not a primary means of justifying electric distribution system work and that the programs are necessary to maintain and improve service reliability levels and meet customer needs. UI further argued that it evaluates alternatives to determine the most cost-effective means to meet its obligations. While benefits may be difficult to quantify, the Company has presented adequate cost justification and shown the benefit of its programs. Id., pp. 8 and 9. The Authority finds merit in both a long-term and short-term evaluation of the Company’s historical spending. Capital spending is long-term in nature, as illustrated by the fact that UI forecasts its capital spending for ten years. A review of the Company’s Capital Program for the rate year relative to recent years is further illustrative. The table below compares UI’s approved capital plan in the 2013 UI rate case for the years 2013-2015 with its proposal for the rate years. UI Allowed and Proposed Capital Expenditures (2013 UI Rate Case Decision vs. Proposed Capital Program) Categories Capacity Customer Reliability - Corrective Infrastructure Replacement - Substations Infrastructure Replacement - Distribution System Modernization and Operational Excellence System Resiliency System Operations Business Effectiveness Total Allowed DN 13-01-19 45,439 102,702 10,328 59,391 50,019 45,874 20,329 55,178 9,847 $399,108 ($ in thousands) Proposed DN 16-06-04 Variance 5,749 (39,690) 114,167 11,465 9,983 (345) 35,848 (23,543) 82,496 32,477 1,856 (44,018) 17,018 (3,311) 31,797 (23,381) 9,199 (648) $308,111 ($90,997) % Variance -87.35% 11.16% -3.34% -39.64% 64.93% -95.95% -16.29% -42.37% -6.58% -22.80% Note: Amounts may not add due to rounding. Response to Interrogatory OCC-257; Reed and Thomas PFT, p. 5. UI’s Capital Program for the rate years is nearly 23% below what was allowed from the 2013 UI rate case. Furthermore, the Company’s proposal is 3.76% (1 - $308,111 / $320,143) less than UI’s actual expenditures from 2013 to 2015. Id. The Authority finds that the Company’s Capital Program has already accounted for the 20% reduction for which the AG and the OCC recommended. Consideration of the Company’s accurate long-term track record for preparing and fulfilling its capital plan commitment since 2004 further supports this determination. The Authority must also consider the 2015 Management Audit of The United Illuminating Company Final Report by Jacobs Consultancy dated November 9, 2015 (UI Management Audit Report). Relating to UI’s Capital Program, the UI Management Audit Report evaluated the Company’s use of the following: 1. 2. project management tools; construction methods;Page 22 of 137
Connecticut Light and Power Company Docket No. 26-05-10 Docket No. 16-06-04 3. 4. 5. 6. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 22 of 137 OCC-507 CL&P Attachment 19 Page 22 of 137 Page 18 job scheduling; prioritization of work; workforce management techniques; and conformance with current industry, state and federal safety and work-related practices and standards. UI Management Audit Report, p. 81. The UI Management Audit Report concluded that the Company uses industry current practices in managing its projects and performs its construction activities in a consistent and controlled fashion that supports timely and quality construction program execution. Id., pp. 87 and 88. The shifting and reprioritization of projects and programs is a reality that is well-understood. The potential for large annual and multi-year variances in capital budgets and plans exists due to a variety of external and internal forces. UI routinely tests and evaluates its system to help make informed engineering and business judgments so that it operates its system to meet its obligations to its customers and the Authority. UI revisits its Capital Plan annually to reprioritize projects every summer. Tr. 9/14/16, pp. 459, 460 and 535-538. The Authority finds that it must be more informed about the yearly reprioritization and realignment of UI’s capital plans and will require annual filings as described below. These reporting requirements are identical to those that have been in place for The Connecticut Light and Power Company d/b/a Eversource Energy (CL&P) for many years. The Authority acknowledges that while a traditional cost-benefit analysis would be helpful, capital programs by nature often are ill-suited for such a treatment. The Authority agrees with the Company that it can be difficult to quantify the full benefits of providing reliable service to customers and a safe work environment to its employees. Nevertheless, UI has shown in this case benefits of past programs, including the positive effect its Overhead Paper Insulated Lead Cable Program had on reliability metrics. Reed and Thomas PFT, pp. 20 and 21. Ultimately, the Authority agrees with the Company in realizing that construction programs should be analyzed based on the needs the programs are intended to address and the reasonableness of the solutions to those needs. This approach is consistent with the Authority’s traditional methodology for analyzing electric utility construction programs. While the recent underspending raises concerns about the UI and UIL’s interaction (that is addressed below), based on the above analysis, the Authority determines that the Company has evaluated and adopted its Capital Program based on the current needs of the system. Accordingly, the Authority will not make any adjustments to the proposed capital spending level for the rate years based on the Company’s underspending or a lack of a cost benefit analysis. The Authority firmly supports the AG and the OCC premise that UI ratepayers should not subsidize UIL’s gas subsidiaries. UI customers must be assured that they receive the full benefit of the capital programs for which they have paid in rates. Below, the Authority addresses whether the Company’s ratepayers have received the full benefit for which they paid in rates since the 2013 UI Rate Case Decision.Page 23 of 137
Connecticut Light and Power Company Docket No. 26-05-10 Docket No. 16-06-04 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 23 of 137 OCC-507 CL&P Attachment 19 Page 23 of 137 Page 19 First, Item 36 of the merger settlement agreement approved by the Authority in the 2015 Iberdrola Change of Control Decision, Appendix 1, to which both the AG and OCC were parties, allows for UIL to have the authority and responsibility to provide input into the development of the UIL Utilities’ capital budgets and implement the approved budgets. Second, neither the AG nor the OCC have shown that UI customers did not receive full benefit of the amounts they paid in rates. To be clear, rates are established on rate base, not a comparison of budgeted and actual capital expenditures. The Company’s August 6, 2015 filing in compliance with Order No. 1 for the Decision dated February 10, 1977 in Docket No. 76-03-07, Investigation to Consider Rate Adjustment Procedures and Mechanisms Appropriate to Charge or Reimburse the Consumer for Changes in the Cost of Fossil Fuel, shows that UI’s actual average gross plant-in-service for the 12-month period ending June 30, 2015, was $1,481 million. When compared to the approved average plant-in-service of $1,457 million in the 2013 UI Rate Case Decision for the same 12-month period, it is clear that UI customers have not paid for assets that are not in service. 2013 UI Rate Case Decision, Appendix B. The Company has not violated any of the Authority’s statutes, regulations or orders by allocating capital away from these projects, but the fact that it has done so must be accounted for and made clear to the PURA. Ultimately, UI’s approved Capital Program budget should not be reduced based on the needs of UIL or its subsidiaries. In order to keep fully informed on UI’s Capital Program and its yearly reprioritization, the Authority will direct the Company to report on its capital spending as follows: by November 30 of 2017, 2018 and 2019, with a budget/forecast of spending by initiative or category for the following year; and by March 31 of each year 2018, 2019 and 2020 showing actual spending by initiative or category for the preceding year. The Authority recognizes that plans may change for good reason over the next three years. Accordingly, if the budgeted amount for any initiative or category changes by more than 10% from that represented in this proceeding and as modified by the Authority, the Company must provide an explanation in the annual budget report due each November 30. Further, if actual total spending varies from budgeted spending in any year, the Company must provide an explanation in the annual spending report due March 31 of each year. If the capital spending trend seen in recent years continues, the Authority will reopen the instant Decision and act accordingly. No party or intervenor opposed any specific capital expenditure or project to be added to plant-in-service. The AG however, questioned the Company’s wholesale replacement of specific types of equipment, particularly in UI’s infrastructure replacement program. The AG requested that the Authority require the Company to submit a more strategic and optimized plan for review and approval prior to implementation. AG Brief, p. 13. The Authority finds however, that the Company has provided a capital plan that specifically addresses the concerns noted by the PURA in the 2013 UI Rate Case Decision and those reiterated by the AG. The Company has satisfied Order No. 14 of the 2013 UI Rate Case Decision by providing a 20-year plan that forecasts long-term system needs while addressing potential rate impact of the forecasted spending. Regarding infrastructure replacement, the Company provided its completed, active and future replacement programs. In that document, UI provided ample justification for need, cost and long-term management while attempting to manage spending at a steady-state level. Reed and Thomas PFT, Exhibit RJR/JDT. To the Authority, this approach is strategic and optimized while attempting to keep costs down and maintain a steady-statePage 24 of 137
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 24 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 Page 24 of 137 Page 20 level of spending to avoid future spending bubbles. The Authority reviewed the Company’s proposed Capital Program and concludes that the expenditures are reasonable and necessary for safety, reliability and maintenance of the system. b. Grid Modernization The Grid Modernization Program includes expenditures related to modifying the electric distribution system to accommodate the proliferation of distributed energy resources (DER). The Company asserted that customers’ desire for choice has resulted in a rapidly growing incorporation of DER on the electric distribution system. This has created a driving need for the grid to evolve from a central station model, where power flows predominantly in one direction, to a more dynamic model that accommodates bidirectional power flows and the ability to manage intermittent resources. The Company stated that it expects that over time, it is likely that pockets of high penetration will create areas where the system needs to be controlled, monitored and operated in a new way to maintain current performance standards and reliability in a more distributed and complex operating model. Reed and Thomas PFT, p. 23. The Grid Modernization Program is comprised of three initiatives: Microgrid initiative, which consists of the costs and reimbursements from the Woodbridge Microgrid project. Distribution Management System (DMS) initiative, which will provide central monitoring and control functions and analytical capabilities for UI’s distribution system, and potentially for DER. This initiative is intended to enable the Company to operate the system to accommodate increasing levels of DER and enable a new dynamic, bidirectional electric distribution system. Grid Analytics initiative, which will provide UI with the capability to gather data on voltage and load performance to better model the electric distribution system in preparation for increased DER penetration. Id., pp. 23-25; Responses to Interrogatories EN-4 and EN-6. DER interconnections have a significant impact on the electric distribution system that must be taken into account in system design and operation. When the Authority first approved its generator interconnection standards in 2004, it acknowledged these concerns when it stated: “[s]mall generators connected to lower voltage electric systems are electrically “weak” and less robust than large generators connected to high voltage systems, and are not subject to coordinated dispatch by a system operator. Large numbers of small generators may therefore weaken the integrity of the electric system.” Decision dated April 24, 2004 in Docket No. 03-01-15, DPUC Investigation into the Need for Interconnection Standards for Distributed Generation (DG Decision), pp. 3 and 4. Furthermore, DER compromises the integrity of various protective devices and schemes in an electric distribution system if not properly accommodated, requiring further investment to accommodate the collateral impact of interconnections. DER does not benefit the reliability of the electric distribution system.Page 25 of 137
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 25 of 137 OCC-507 CL&P Attachment 19 Page 25 of 137 Docket No. 16-06-04 Page 21 Since the DG Decision, DER interconnections have grown rapidly, posing a challenge to the EDCs, primarily due to solar photovoltaic installations. UI provided data demonstrating that DER interconnections increased from 59 in 2011 to 2,530 in 2015. The Company stated that, while it currently has sufficient margin to accommodate DER at a system level, it will lose this margin beginning as early as 2019. The Distribution Management System and Grid Analytics initiatives will prepare the Company’s electric distribution system to safely manage and accommodate the influx of DER interconnections. Reed and Thomas PFT, pp. 24-26. The Operational Excellence Initiative (OEI) consists of measures to modernize UI’s Outage Management System, damage estimate capabilities, ability to more accurate estimate outage restoration times, and various other information technology (IT) projects and processes. The OEI will be fully implemented in 2016, and in years thereafter savings will accrue to the Company that are attributable to efficiency gains. Id., p. 22. The capital forecast for Grid Modernization and Operational Excellence is as follows: Modernization and OEI Capital Forecast ($000) Modernization: -Microgrid -DMS -Grid Analytics OEI Total 2016 2017 2018 2019 $2,087 $8,229 $10,316 $(2,670) ($1,215) ($3,885) $506 $3,540 ($2,025) $2,021 $5,745 ($2,025) $3,720 - Id., p. 24. No party or intervenor opposed the Grid Modernization or OEI Programs. The Bureau of Energy Technology and Policy (BETP) supported the Grid Modernization initiative. Specifically, it would improve data collection and analysis across the electric distribution system to prepare for the impact of DER on the system and improve planning for the considerable expansion of DER that is expected to occur. The BETP particularly endorsed deployment of the Grid Analytics and Distribution Management System initiatives, which form a foundation for grid-side system enhancement demonstration projects pursuant to Section 103 of Public Act 15-5, An Act Implementing Provisions of the State Budget for the Biennium ended June 13, 2017, Concerning General Government, Education, Health and Human Services and Bonds of the State. Finally, the BETP stated that it will require detailed information from the Company’s implementation of DMS and Grid Analytics to coordinate with its demonstration projects and requested that the Authority order detailed reporting requirements in this proceeding. BETP Brief, pp. 14-16. The Authority finds that the OEI will result in savings to ratepayers every year after 2016, and is therefore approved. The Grid Modernization initiatives have clearly been shown to be reasonable and necessary to accommodate the expanding DER penetration into areas of the electric distribution system, to prevent future negative effects from DER interconnections, more efficiently accommodate and operate DER in the system, and to thus facilitate energy policy, one of the goals of which is to promote the deployment of renewable resources. The Authority notes that some of the GridPage 26 of 137
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 26 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 Page 26 of 137 Page 22 Modernization Initiatives are grid-side enhancement projects that are subject to both BETP and PURA approval per Section 103(b) of Public Act 15-5. Therefore, the Authority approves the Grid Modernization initiatives, subject to reporting requirements delineated in the Orders below, and any other modifications or reporting requirements that may result from final BETP or PURA approval of grid-side system enhancement projects under Public Act 15-5. Any reporting requirements established by BETP will also be utilized by the Authority in any reviews pursuant to this section. Finally, there is substantial uncertainty with regard to the schedule and quantification of the Grid Modernization initiatives, particularly since they are in the later years of the rate plan, as well as considerable variation in the expenditures. Consequently, the Authority will examine whether or not Grid Modernization capital expenditures should be included in the Electric Distribution Infrastructure Capital Tracking mechanism pursuant to Section II.B.6.c. Electric Distribution Infrastructure Capital Tracker. c. Electric Distribution Infrastructure Capital Tracker The OCC and the Company proposed that revenue requirements associated with infrastructure replacement and customer-related projects be removed from base rates and separately recovered through a tracking mechanism subject to adjustment either annually or semi-annually. The types of capital expenditures to be moved to such a charge would be those that are large, uncertain and are highly variable. The Company supports an annual mechanism whereby it would detail its actual capital expenditures from the previous year and allowed capital expenditure for the current year, to calculate a line item charge for customers. UI proposed that all capital expenditures in the Infrastructure Replacement category be included in this charge, which currently comprise approximately 41.5% of all capital expenditures. The Company also stated that capital expenditures in the customer category could be included, in which case the total capital expenditures to be moved to the new charge would comprise about 76.8% of all capital expenditures. The Company stated that its proposal is similar to the current Distribution Integrity Management Program (DIMP) tracker for Connecticut Natural Gas Corporation (CNG), which was approved by the Authority in its Decision dated January 22, 2014 in Docket No. 13-06-08, Application of Connecticut Natural Gas Corporation to Increase Its Rates and Charges (CNG 2013 Rate Case Decision). UI Response to Late Filed Exhibit No. 29. The OCC’s proposal is similar to UI’s, except that its mechanism would adjust revenue requirements semi-annually, similar to the Water Infrastructure and Conservation Adjustment (WICA) that is in place for the water utilities pursuant to Conn. Gen. Stat. §16-262w. The OCC also proposed that the mechanism be limited to no more than 5% of total distribution revenues annually and 10% between rate proceedings. Such a mechanism will result in significant consumer protection and regulatory oversight similar to WICA, which has been a “win-win” for the utilities and customers alike. The OCC further asserted that a semi-annual proceeding will reduce regulatory lag and allow the Company to re-prioritize projects more easily. Finally the Authority should hold a generic proceeding in 2017 to establish a WICA-like process going forward. OCC Response to Late Filed Exhibit No. 29; Brief, p 138. The AG supported a mechanism similar to the one proposed by the OCC for the same reasons. Brief, pp. 13-16.Page 27 of 137
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 27 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 Page 27 of 137 Page 23 The BETP also supported implementation of a capital tracking mechanism similar to WICA. The BETP asserted that a WICA-like mechanism is preferable to a DIMP-like mechanism as it is a more thoughtful, strategic approach to address infrastructure issues than the WICA. The BETP asserted that a WICA-like program will allow for expedited recovery of costs by the Company and be of great benefit to the system and the customers it serves. Brief, pp. 18-22. This issue has been raised too late in this proceeding to implement a capital tracking mechanism as part of the instant Decision. The parties in this proceeding have opposed other tracking mechanisms (for example, the DIMP), and it appears to the Authority that a more thoughtful, rational exploration of the topic is necessary given the shifting opinions on the matter. There are substantial differences in the parties’ opinions on which costs should be included in an electric distribution infrastructure capital tracker (EDICT). The OCC and the AG asserted that an EDICT should also apply to CL&P, yet CL&P has not been given an opportunity to weigh in on this matter. The parties related such a tracker to the WICA; however, the issues that led to the implementation of WICA (generally, reluctance of water utilities to deploy the capital to remediate obsolete piping) are not similar to those of electric utilities, where there has been no reluctance to remediate aging infrastructure (see Section II.B.6. Capital Expenditures). There are compelling—if somewhat different—reasons to consider establishing an EDICT, given the substantial costs associated with infrastructure replacement, which vary widely year to year; the value provided by greater transparency around the utility’s planning and prioritization of infrastructure projects and consideration of lower-cost alternatives thereto; as well as the fast-evolving need and technological options for grid modernization investments. As noted by the parties, although the Authority has no explicit statutory authorization to implement an EDICT, it has broad jurisdiction over the amount that public utility companies collect in rates and the manner in which those rates are collected, which provides ample authority to adopt and approve such a mechanism. See, Conn. Gen. Stat. §16-19 et seq. Therefore, the Authority intends to open a proceeding in 2017 to consider whether an EDICT should be implemented for UI and CL&P, and if so, which costs would be included in it and how future proceedings would be conducted. 7. Working Capital Allowance It is a customary regulatory practice to allow an adjustment to rate base in recognition of the timing difference between when revenues are received and when expenses are paid out. For larger utilities, the Authority typically prefers that a lead/lag study be conducted to determine the appropriate cash working capital (WC) allowance rather than using a rule of thumb approach or the utility’s balance sheet result. In this proceeding, UI conducted such a lead/lag study and requested that the results of that study be used for determining its WC requirement for the term of the rate plan. In developing its distribution WC requirement, the Company performed its lead/lag study utilizing its overall revenues and expenses. It then removed transmission and Generation Service Charge WC requirements to arrive at a distribution-only WC requirement. This is the same approach that was presented in the 2013 UI rate casePage 28 of 137
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 28 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 Page 28 of 137 Page 24 and accepted by the Authority. In reviewing the current lead/lag study, it became apparent that performing the total Company WC requirement and then making reductions required additional steps to verify a distribution-only WC requirement. This was further complicated by virtue of the fact that the transmission WC requirement, which is calculated differently by the FERC, required calculation of a separate factor to determine the transmission WC offset. Additionally, the accounts of the lead/lag study did not correspond to the applicable schedules of the Application itself (WP C-3.0 A, B and C) necessitating the need for an interrogatory to reconcile Application exhibits with the lead/lag study exhibits. Response to Interrogatory FI-137. The Company provided a distribution-only WC exhibit in response to Late Filed Exhibit No. 31, providing a much more streamlined review. Providing this updated study during the hearing process did however have some shortcomings in that the original lead/lag study analyzed payments for total company expenses and did not acknowledge a distribution-only payment process. Timing prevented such a distribution-only study to be performed. Additionally, other programs such as Conservation and Load Management, Renewable Energy Investment Charge, System Benefits Charge and the NBFMCC are reflected in the total company but not distribution-only lead/lag studies. Response to Late Filed Exhibit No. 31. The Authority will accept the total Company approach as proposed in this rate case. However, going forward and starting with its next rate case, the Company should file its WC request based on a distribution company-only basis with a lead/lag study that references the same specific accounts that are presented in the Company’s rate application. The Company made a reduction of $1,617,000 for prepaid insurance acknowledging that this was an item properly removed from the WC calculation. Late Filed Exhibit No. 3, Attachment 1, p. 17. The OCC acknowledged the Company’s reduction of prepaid insurance from the lead/lag study and stated that this reduction should be from rate base. The OCC cited a previous precedent for this treatment by the Authority in the Decision dated July 17, 2009 in Docket No. 08-12-07, Application of The Southern Connecticut Gas Company for a Rate Increase (2008 SCG Rate Case Decision). Brief, p. 19. The Authority finds that the adjustment made by the Company in Late Filed Exhibit No. 3 is for the full rate base reduction amount and accepts the Company prepaid insurance adjustment. The adjustments made to expenses or income for ratemaking purposes are detailed throughout this Decision and impact the working capital the Company needs. The Authority adjusted the expense and income levels used to calculate the working capital needs of the Company to mirror the expense and income adjustments made by this Decision. Based on these adjustments, the Authority calculated a WC requirement for the Company of $29,592,000 for rate year 1, $24,638,000 for rate year 2 and $20,185,000 for rate year 3. 8. Rate Base Summary As shown in Section V. Rate Model, the rate base approved in this Decision is $981 million for 2017, $997.026 million for 2018 and $1,014.144 million for 2019.Page 29 of 137
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 29 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 C. Page 29 of 137 Page 25 OPERATIONS AND MAINTENANCE EXPENSES UI originally proposed total O&M expenses of $158.231 million for 2017, $163.139 million for 2018 and $166.691 million for 2019. Including depreciation, amortization and taxes other than income tax expenses, the Company proposed total operating expenses of $281.557 million for 2017, $299.899 million for 2018 and $310.488 million for 2019. Application, Schedules WP C-3.0 A, WP C-3.0 B and WP C-3.0 C. The Company updated its requested total O&M expenses by increasing the 2017 amount by $0.547 million and decreasing the amounts in 2018 by $0.171 million and 2019 by $0.610 million. Late Filed Exhibit No. 3, Attachment 1, p. 1. 1. Amortization Expense UI initially proposed a total amortization expense of $6.082 million for 2017, $16.041 million for 2018 and $18.502 million for 2019. Each year’s total consists of rate case amortization expense of $0.417 million and UPZ regulatory asset amortization expense of $5.619 million for 2017, $15.578 million for 2018 and $18.040 million for 2019. Application, Schedule WP C-3.30 A-C. The Company subsequently updated its total amortization expense by reducing the proposed rate case amortization expense for each rate year by $0.066 million. Revised Late Filed Exhibit No. 3, Attachment 1, p. 1. Thus, UI’s final proposed amortization expense is $6.016 million ($6.082 - $0.066) for 2017, $15.975 million ($16.041- $0.066) for 2018 and $18.436 million ($18.502- $0.066) for 2019. The difference is the result of the Company reducing the proposed rate case expense from $1.388 million to $1.190 million, which resulted in an annual rate case amortization expense of $0.397 million ($1.190 / 3). The approximately $198,000 decrease included reductions of $120,000 to legal costs, $95,000 to postage expense, $15,000 for costs associated with the return on equity (ROE) witness, and $10,000 for overtime and payroll overheads and an increase of $45,000 for the lead/lag study. Id., p. 11. a. Utility Protection Zone Expense Based on the Authority’s determination, as described in Section II.B.2. Utility Protection Zone, directing the Company to expense UPZ expenditures for periods after 2016 and not treat them as regulatory asset, the PURA removes the related UPZ amortization expenses from the allowed amounts for the rate years. The allowed UPZ amortization expenses are $2.099 million for 2017, $7.537 million for 2018 and $5.469 million for 2019. Thus, the Authority disallows UPZ amortization expenses of $3.520 million ($5.619 - $2.099) in 2017, $8.041 million ($15.578 - $7.537) in 2018 and $12.571 million ($18.040 - $5.469) in 2019. b. Rate Case Expense The Company proposed outside legal expense of $500,000. The OCC argued that it should be reduced by 50% to $250,000. The OCC stated that the Company has in-house counsel and that outside legal expense invoiced through June 30, 2016, was only $18,301. Similarly, the OCC insisted that the Authority disallow overtime and payroll overheads of $30,000 from the rate case expense. According to the OCC, this would be consistent with the determination in the 2013 UI Rate Case Decision where thePage 30 of 137
Connecticut Light and Power Company Docket No. 26-05-10 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued August 31, 2026 OCC-507 Attachment 19 Page 30 of 137 OCC-507 CL&P Attachment 19 Docket No. 16-06-04 Page 30 of 137 Page 26 Authority indicated that the overtime and payroll overheads should be accounted for in the Company's payroll expense. These recommended adjustments would reduce rate case amortization expense by $93,000 in each rate year. Schultz III/Defever PFT, pp. 71-73; Brief, pp. 44 and 45. The Authority finds that the outside legal expense of $380,000 included in the total rate case expense is reasonable. Regarding the overtime and payroll overheads included in the total rate case expense, concurrent with the ruling in the 2013 UI Rate Case Decision, the Authority disallows the remaining $20,000 that UI included as a rate case expense as cited in Revised Late Filed Exhibit No. 3, Attachment 1, p. 11. Therefore, the Authority disallows $6,667 ($20,000 / 3) of the proposed rate case expense in each rate year. Consequently, for each rate year, the allowed rate case amortization expense is $0.390 million ($0.397 - $0.007). 2. Membership Dues Expense UI proposed membership dues expense of $513,000 for 2017, $526,000 for 2018 and $541,000 for 2019. Application, Schedule WP C-3.3 A-C. The OCC stated that UI included Plug-in Hybrid Electric Vehicle (PHEV) and Customer Contact Council as memberships in the rate years but not in the test year. The Company previously had memberships with both groups but had stopped paying dues. In the 2013 UI rate case, UI described costs related to these memberships as discretionary items that may be reduced to meet earnings goals. The OCC stated that ratepayers should not be responsible for these discretionary costs that UI has previously deemed non-essential. Also, the OCC indicated that Public Act 16-135, An Act Concerning Electric and Fuel Cell Electric Vehicles, did not require UI’s membership in PHEV. Furthermore, the OCC stated that the Authority found in the 2013 UI Rate Case Decision that memberships in organizations are often for the benefit of shareholders and not ratepayers and that they are less important to the Company between rate cases. Thus, the OCC recommended reductions of $103,000 in 2017, $106,000 in 2018 and $107,000 in 2019 to remove the costs associated with these memberships. Schultz III/Defever PFT, pp. 33-36. Consistent with the Authority’s determination in the 2013 UI Rate Case Decision, UI’s membership in certain groups is optional. The Company has the flexibility to eliminate the related costs to achieve earnings goals in the interim periods between rate cases. Thus, the Authority finds that the reductions in membership dues expense by $103,000 in 2017, $106,000 in 2018 and $107,000 in 2019, as recommended by the OCC, to be reasonable. 3. Uncollectible Expense UI originally proposed uncollectible expenses of approximately $5.090 million for 2017, $5.051 million for 2018 and $5.044 million for 2019 based on its revenues at present rates. UI calculated a total debt factor of 3.93% for 2015 by averaging the four quarter factors for the year. Application, Schedule WP C-3.20 A-C. Additionally, UI’s proposed revenue requirement increases included uncollectible expenses of approximately $0.669 million for 2017, $0.884 million 2018 and $1.021 million 2019.
Text of OCC-507 Attachment 18.pdf
Extracted from the file · 247 pages · 763,200 characters
Text of OCC-507 Attachment 17.pdf
Extracted from the file · 2 pages · 6,387 characters
Text of OCC-507 Attachment 16.pdf
Extracted from the file · 2 pages · 484 characters
Text of OCC-507 Attachment 15.pdf
Extracted from the file · 202 pages · 895,816 characters
Text of OCC-507 Attachment 14.pdf
Extracted from the file · 6 pages · 8,947 characters
Text of OCC-507 Attachment 13.pdf
Extracted from the file · 19 pages · 93,122 characters
Text of OCC-507 Attachment 12.pdf
Extracted from the file · 19 pages · 95,631 characters
Text of OCC-507 Attachment 11.pdf
Extracted from the file · 7 pages · 10,667 characters
Text of OCC-507 Attachment 8.pdf
Extracted from the file · 2 pages · 3,673 characters
Text of OCC-507 Attachment 4.pdf
Extracted from the file · 6 pages · 8,272 characters
Text of OCC-507 Attachment 2.pdf
Extracted from the file · 8 pages · 30,345 characters
Text of OCC-507 Attachment 1.pdf
Extracted from the file · 32 pages · 164,962 characters
Text of OCC-507 Attachment 39.pdf
Extracted from the file · 22 pages · 32,510 characters
Text of OCC-507 Attachment 31.pdf
Extracted from the file · 8 pages · 37,747 characters
Text of OCC-507 Attachment 30.pdf
Extracted from the file · 5 pages · 22,063 characters
Text of OCC-507 Attachment 10.pdf
Extracted from the file · 3 pages · 4,485 characters
Text of OCC-507 Attachment 9.pdf
Extracted from the file · 10 pages · 15,175 characters
Text of OCC-507 Attachment 7.pdf
Extracted from the file · 3 pages · 5,747 characters
Text of OCC-507 Attachment 6.pdf
Extracted from the file · 4 pages · 6,545 characters
Text of OCC-507 Attachment 5.pdf
Extracted from the file · 4 pages · 5,724 characters
Text of OCC-507 Attachment 3.pdf
Extracted from the file · 65 pages · 195,008 characters
As listed on the current system
Question(s) Answered 507, 508, 509, 510, 511, 512, 517, 518 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/14/2026