Interrogatory responses
Answers to questions 566, 569, 570, 575, 578
Files6
OCC-566_Final.pdf
PDF · 154 KB · 3 pagesText searchable
Download OCC-566_Final.pdfRead the text of OCC-566_Final.pdf
OCC-569_Final.pdf
PDF · 115 KB · 3 pagesText searchable
Download OCC-569_Final.pdfRead the text of OCC-569_Final.pdf
OCC-570_Final.pdf
PDF · 87 KB · 2 pagesText searchable
Download OCC-570_Final.pdfRead the text of OCC-570_Final.pdf
OCC-575_Final.pdf
PDF · 121 KB · 2 pagesText searchable
Download OCC-575_Final.pdfRead the text of OCC-575_Final.pdf
OCC-578_Final.pdf
PDF · 116 KB · 1 pageText searchable
Download OCC-578_Final.pdfRead the text of OCC-578_Final.pdf
OCC-578 Attachment 1.pdf
PDF · 1.5 MB · 46 pagesText searchable
Download OCC-578 Attachment 1.pdfRead the text of OCC-578 Attachment 1.pdf
Text of OCC-575_Final.pdf
Extracted from the file · 2 pages · 3,973 characters
Text of OCC-578_Final.pdf
Extracted from the file · 1 page · 1,564 characters
Page 11 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 11 of 46 98 B. FORECASTING AND PLANNING HORIZONS 99 100 To allow a technical and economic comparison on a level playing field, solutions are compared not simply with their initial capital need, but over longer time horizons to ensure that they 101 102 a. b. 103 As a result, the NWA Framework considers two-time frames, the System Forecast and the Financial Planning Horizon. 104 SYSTEM FORECAST HORIZON 105 106 107 108 109 110 The System Forecast Horizon describes the timeline over which the EDC can forecast load and generation growth on their system. The NWA Framework assumes a 10-year System Forecast Horizon. Within that 10-year horizon the utility can provide a load growth and DER adoption forecast which allows determination of the expected system peaks. Capacity deficits can only be determined within that 10-year forecasting horizon. As a result, traditional and DER investments can only be made within those ten years. The NWA Framework does not concern itself with the forecasting methodologies but takes a completed forecast as an input for each of the ten (10) years. 111 112 The System Forecast Horizon is set at the Base Year + 10 years. The Base Year describes the last year with a complete annual timeseries data set using 15-min interval data. 113 FINANCIAL PLANNING HORIZON 114 115 116 The Financial Planning Horizon defines the time horizon over which the NWA solution is assumed to be active. Within the Financial Planning Horizon, the tool will automatically track replacement of components, such as battery cells, as needed and O&M costs. The Financial Planning Horizon hereby needs to be larger than 117 FirstConstraintYear + DeferalYears − BaseYear 118 119 This is to ensure that the cost of the NWA is considered for the entire time span over which it needs to defer the traditional solution. 120 121 122 123 124 125 The NWA Framework suggests following approach to setting up the Financial Planning Horizon: Shortest Expected Lifespan. Using the shortest asset lifespan in addition to the year of construction yields the total financial planning horizon. E.g. with the inclusion of a battery storage system, the shortest expected lifespan is 12 years for the battery cells. The financial planning horizon can now be 12 to 22 years from the base year, depending on when the battery asset is constructed. E.g., the Battery Solution is to be constructed in year 8 of the System Forecast, as a result the Financial Planning Horizon is 8 + 12 = 20 years from the Base Year. 126 127 Note: The financial planning horizon needs to reach further at all times than the date to which the traditional solution is deferred. 128 TERMINAL COST 129 130 131 132 With a varying Financial Planning Horizon all assets are considered with their entire lifetime revenue requirements impact. For this purpose, the Framework requires revenue requirements up to the financial planning horizon, which includes 1) new investments such as asset replacements as well as O&M, and 2) the terminal cost after the planning horizon which no longer includes O&M or new investments and simply sums the remaining cumulative net present value revenue requirements. Can meet future capacity needs in a reliable manner Can maintain economic feasibility over longer time spans 06.B.01 5Page 12 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 12 of 46 133 DEFERRING CAPACITY NEED 134 135 136 137 138 a. Deferral within the System Forecast Horizon: If an NWA solution defers the capacity only so much that the need arises again within the 10-year System Forecast Horizon, a simple value of deferral is calculated using the applicable inflation rate, technology cost reduction, and discount rate to create a change in NPV revenue requirements. Therefore, the NPV of the cost of the NWA solution plus the NPV of the cost of the deferred traditional solution must be less than the NPV of the cost of the traditional solution alone. This is shown in the equation below: 139 NWA(t)NPV + Traditional(t + n)NPV ≤ Traditional(t)NPV 140 141 142 143 144 145 146 147 148 where the traditional solution is depreciated over 40 years. 149 150 b. 06.B.02 Deferral past the System Forecast Horizon: With a ten (10) year forecasting horizon, it may happen that an NWA solution is capable of deferring the capacity need past the horizon. In this case, the capacity need is deferred to the first year after the forecast. With a 10-year forecast, the maximum possible deferral is ten (10) years. This limits the value an NWA can produce by deferring capital investments by no more than 10 years, as the assumption is that in year eleven (11) the capital project would be needed. • Situational: Based on the forecast trends and the chosen NWA solution, a decision can be made to declare the deferral to be ≥ 10 years. E.g. if forecasts show a decline Figure 1 illustrates an example of the application of different timelines in the financial planning model. Hereby, a capacity need at year five (5) is deferred by five (5) years. Flexible Financial Planning Horizon Terminal Value 10yrs – Forecasting Horizon Need Identified year 5 NWA Solution Depreciation NWA Solution O&M Applicable Replacements 40yrs – Traditional Solution Depreciation Deferred 40yrs – Traditional Solution Depreciation Flexible Deferral 5 years 50yrs Base Year 151 NWA Deployed 2025 Traditional Solution 2030 152 Figure 1: Financial Timelines in NWA Framework 153 C. NWA DISPATCH OPTIONS 154 155 156 157 158 NWA Decommission For EDCs to consider DERs as NWAs they need to provide the same level of availability as traditional solutions. While, in most cases, the EDC will be able to forecast high load conditions and the associated dispatch need, unforeseen conditions need to be taken into consideration as well. Such conditions can include storm impacts or other events of natural or human cause that interrupt or disable capacity carrying parts of the system. In such an event, much like the traditional solution counterpart, load might need to be transferred to the NWA on very short notice. 6Page 13 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 13 of 46 159 In conclusion, there are two dispatch options 160 161 162 163 164 165 a. 166 167 168 169 Note: Dispatch option b. is the more limiting for NWA technologies but cannot be excluded from the evaluation criteria, as without it, the EDC needs to provide a contingency for the unplanned dispatch, which would likely be the traditional solution upgrade that the NWA was aiming at deferring in the first place. As a result, several market participation options will not be considered by the Framework specifically because they do not meet this asset readiness standard. b. Planned Dispatch: up to 48-hours ahead, the EDC can determine peak load events and provide dispatch schedules for the NWA to mitigate such situations. This time frame allows the NWA to get “ready” for the dispatch if it is in non-ideal conditions. Unplanned Dispatch: the EDC calls upon an NWA within seconds of the actual dispatch due to an unforeseen event of natural or human origin. The NWA does not have time to get “ready” for its dispatch but still needs to provide the full service. 170 7Page 14 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 14 of 46 7. RELIABILITY MODEL 171 172 173 174 In order to assume availability of DERs that are used as an NWA, the company needs to ensure sufficient reserve margin, especially for assets that are controlled through utility owned programs. With NWA assets being part of the electric distribution grid’s supply capability, the same N-1 approaches apply as they would to transformers and other hardware. 175 This section describes the NWA Framework for reliability rules around DERs used for NWA purposes. 176 177 178 179 180 181 182 A. EXEMPTIONS FROM THE N-1 RELIABILITY DESIGN STANDARD a. b. 183 Energy Efficiency programs replace existing hardware with newer, more efficient hardware. Once replaced, the new hardware permanently consumes less energy than its predecessor. As a result, Energy Efficiency measures can be exempted from an N-1 design criterion. Conservation Voltage Reduction includes the installation of new voltage regulating equipment at the station and along feeder lines. This equipment is not typically designed to N-1 standards, and for the purpose of the NWA Framework, CVR will therefore not be part of any N-1 design criterion. B. RELIABILITY ASSUMPTIONS FOR CUSTOMER PROGRAMS 184 185 186 For residential customer sited DR, Battery Storage, and Solar assets which are controlled through customer programs an assumption on participation is made. The following equations are utilized to calculate the minimal customer behavior adjusted reliable capacity where the number of assets under contract is (n) 187 a. 188 PPVReliable_BTM = (∑ PPVInstalled_BTM ) ∗ εcapPV (1 − ) 189 b. 190 PDRReliable = (∑ PDRInstalled_BTM ) ∗ εcapDR (1 − ) 191 c. 192 PBESReliable = (∑ PBESInstalled_BTM ) ∗ εcapBES (1 − ) 193 194 d. 195 PDRComFirm = (∑ PDRComReliable ) − max(PDRComReliable ) 196 197 198 εcap represents the saturation limit of distributed DR and PV. For example, if εcap = 0.8 then no more than 80% of installed assets will ever be accounted for. The following values are used based on historic observations by the Eversource Energy Efficiency Group. 199 Table 2 shows the respective saturation factor for reliability calculations with Residential Solar 1 7.B.01 n Residential Demand Response 1 7.B.02 n BTM Battery Storage 1 7.B.03 n Commercial Demand Response is treated slightly differently and functions similar to a normal N-1 approach where the largest asset is removed from the overall observation. 7.B.04 8Page 15 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 15 of 46 PAvailable 200 ε = lim 201 Table 2: Saturated Reliability Factor for Utility Programs 7.B.05 n→∞ PInstalled 202 𝛆𝐜𝐚𝐩𝐏𝐕 𝛆𝐜𝐚𝐩𝐃𝐑 𝛆𝐜𝐚𝐩𝐁𝐄𝐒 0.95 0.80 0.80 C. RELIABILITY ASSUMPTIONS FOR GRID SCALE BATTERIES 203 204 Utility owned and operated grid-scale batteries are considered to be in the same N-1 reliability group as the station’s transformers. The resulting capacity which will be considered for grid scale-batteries is therefore calculated as follows 205 PBatFirm = 206 207 Note: It is therefore advisable that no single BESS exceeds the size of the largest station transformer as it would be entirely removed for the firm capacity calculation. 208 (∑ PBat ); (∑ PBat ) − max(PBat ) ; max(PBat ) ≤ max (PTransformer ) max(PBat ) > max (PTransformer ) 7.C.01 D. RELIABILITY ASSUMPTIONS FOR DG 209 210 All DG NWA solutions (Solar, Fuel Cell, CHP, Emergency Generators) are considered to be in a separate reliability group. The largest DG is excluded in the NWA Framework to calculate the Reliable DG Capacity PDGReliable analogous to the transformer + 211 large scale BESS group. 212 PDGReliable = (∑ PDG ) − max(PDG ) 213 DER assets included in PDG are 214 a. Solar DG: For solar DG, PDGSolar represents the installed capacity adjusted for minimal certain 215 216 b. Fuel Cells: weather adjusted output. See Solar Generation for details. PDGFC represents the nameplate installed capacity 217 218 c. d. CHP: Emergency Generators: PDGCHP represents the nameplate installed capacity PDGEG represents the nameplate installed capacity 7.D.01 219 9Page 16 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 16 of 46 8. 220 221 222 223 DISPATCH MODEL In order to determine their ability to solve technical issues, the dispatch, especially of flexible resources such as BESS, needs to be accurately modeled. The NWA Framework makes assumptions on DER dispatch modes and capabilities as outlined in the following Chapter 224 A. PRIORITIZATION OF DER DISPATCH 225 The NWA Framework assumes that in a multi-solution NWA portfolio, the dispatch priorities are as follows: 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 a. b. c. 250 Permanently Altering Assets: These technologies permanently alter the load of the system and are therefore always available and do not require an active dispatch to produce their benefit. The tool will use their contribution first to determine if any remaining dispatch is required. • Energy Efficiency Continuously Running Assets: Assets that are assumed to be continuously running are considered next. Given the nature of the resources, curtailment of their output would not make fiscal sense. Their contribution is set to nominal throughout the day which is observed. Any remaining capacity need is handled by dispatchable assets. • Solar: Has no variable cost and generates revenue when running • CHP: Installed through program funding with an assumed dispatch capability through DR system • Fuel Cell: Installed through program funding with an assumed dispatch capability through DR system Dispatchable Assets: Dispatchable assets can change their dispatch characteristics to the extent that their technical limitations allow them to. • CVR: Dispatch of tap changers at transformers, capacitors, and in-line voltage regulators with no marginal cost of dispatch • Utility Program Dispatch: Any utility program, such as DR management, fall under this category i. DR (Commercial and Residential DR), limited to one dispatch a day • Utility Owned Asset Optimization and Battery Programs: Remaining capacity need can be managed by storage. Storage is prioritized before emergency generation assets from an ecological standpoint. This includes the use of Battery Storage DR Programs. i. Utility Scale Battery Storage ii. BTM Storage Control Programs • Contracted Emergency Assets: As a last resort emergency generation asset can be dispatched to fill any remaining capacity gap. Their environmental impacts and associated costs make them the least desirable solution. i. Emergency Generator B. SOLAR GENERATION 251 252 253 254 For consideration of solar distributed generation as an NWA the technology’s technical capabilities are defined as follows by the NWA Framework (these apply to both utility scale and BTM installations, their different considerations by the NWA Framework on reliability can be reviewed in 7.D. Reliability Assumptions for DG; any values considered in this section are the result of those reliability assumptions). 255 256 a. Time Variant Output: Solar PV installations can only generate power during the hours when the sun is shining (typically daytime hours in the U.S.), therefore, any capacity deficits which occur outside those hours cannot be addressed through 10Page 17 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 17 of 46 257 258 259 solar. Solar generation potential is defined through clear sky irradiance profiles3. These clear sky irradiance profiles represent ideal weather conditions and change with the day of the year. The following simplified equation is used to determine the PDC panel output over time. 260 PDC (t) = 261 262 263 264 265 266 267 268 269 270 271 272 The Framework does not consider losses or orientation of the solar array and rather assumes ideal conditions for both. b. IClearSky (t) W 1000 2 m ∗ PDCRated 8.B.01 Minimal Weather Adjusted Output (MWAC): In order to account for weather conditions and the chance of non-ideal conditions for solar generation, a Minimal Weather Adjusted Relative Irradiance εIrrMWAC has been evaluated through data analytics on historic irradiance data sets. A Minimal Weather Adjusted Relative Irradiance shall be used for all three seasons using the 10th percentile on the event distribution. • Summer: Jun, Jul, Aug 16.6% • Transition: Mar, Apr, May, Sept, Oct, Nov 18.1% • Winter: Dec, Jan, Feb 24.1% The resulting Minimal Weather Adjusted Clear Sky Irradiance Profile can therefore be determined by IClearSkyMWAC (t) = IClearSky (t) ∗ εIrrMWAC 8.B.02 273 274 Resulting in a Minimal Weather Adjusted DC Capacity of 275 PDCMWAC (t) = 276 277 278 No conversion losses are modeled for solar distributed generation, and the PDCMWAC (t) results can be directly converted to the resulting PACMWAC (t) values as follows. If PDCMWAC > PACRated , PACMWAC is capped at PACRated . 279 PACMWAC (t) = max PDCMWAC (t) IClearSky MWAC W 1000 2 m PAC (t) ∗ PDCRated 8.B.03 8.B.04 Rated 280 281 282 c. 283 Note: The NWA Framework defaults the PDC to PAC ration as 1.2.4 284 285 286 287 288 289 290 291 292 293 Degradation: The NWA Framework does not account for panel degradation over time but assumes a replacement of panels every 20 years. Figure 2 shows an application of solar distributed generation to reduce a capacity deficit. Using the evaluation framework for solar distributed generation, this capacity curve was calculated as follows: a. The plan calls for four (4) systems at PACRated = 2 MW each; no other DERs are considered b. The systems are defined as having an c. d. PDC PAC Rated = 1.5 ratio Rated The reliability framework accounts for only three (3) of the four (4) systems at 2 MW each, assuming the loss of the largest asset The clear sky irradiance profile is converted to the Minimal Weather Adjusted clear sky irradiance profile and applied to PDCMWAC to calculate PDCMWAC (t) using summer profiles 3 The NWA Framework bases its Clear Sky Irradiance data off Clean Power Research’s SolarAnywhere® Datasets 4 Data based on historic trend analysis of large-scale solar system installations in CT 11Page 18 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 18 of 46 294 e. In no instance does PDCMWAC (t) exceed PACRated , therefore there is no capping of the expected output 295 f. The resulting Minimal Weather Adjusted capacity curve peaks at 3.15 MW, or 39.3% of PACRated , or 26.3% of PDCRated 296 g. Due to the time of peak, very little contribution is made by solar to the capacity deficit shown in the example below. 297 1.00 5.00 0.90 0.00 0.80 -10.00 0.60 -15.00 0.50 -20.00 0.40 -25.00 0.30 -30.00 0.20 -35.00 0.10 -40.00 298 299 0.70 MWH BATTERY CHARGE MW -5.00 12:00:00 AM 12:30:00 AM 1:00:00 AM 1:30:00 AM 2:00:00 AM 2:30:00 AM 3:00:00 AM 3:30:00 AM 4:00:00 AM 4:30:00 AM 5:00:00 AM 5:30:00 AM 6:00:00 AM 6:30:00 AM 7:00:00 AM 7:30:00 AM 8:00:00 AM 8:30:00 AM 9:00:00 AM 9:30:00 AM 10:00:00 AM 10:30:00 AM 11:00:00 AM 11:30:00 AM 12:00:00 PM 12:30:00 PM 1:00:00 PM 1:30:00 PM 2:00:00 PM 2:30:00 PM 3:00:00 PM 3:30:00 PM 4:00:00 PM 4:30:00 PM 5:00:00 PM 5:30:00 PM 6:00:00 PM 6:30:00 PM 7:00:00 PM 7:30:00 PM 8:00:00 PM 8:30:00 PM 9:00:00 PM 9:30:00 PM 10:00:00 PM 10:30:00 PM 11:00:00 PM 11:30:00 PM 10.00 0.00 Fuel Cell CHP Solar EE CVR Battery Total Emergancy Gen Capacity Delta Headroom Battery Charge DR Total Figure 2: Application of Minimal Weather Adjusted Solar Generation Capacity to a Capacity Deficit 300 C. ENERGY EFFICIENCY 301 302 303 304 305 Energy Efficiency is modeled as a permanent dispatch from the year of installation. This means, that the Energy Efficiency impacts will be modeled as continuously on, regardless of whether there is a capacity deficit or not. Energy Efficiency is modeled for four (4) distinct applications as well as a generic application, each with different profiles. Energy Efficiency is calculated as follows over the course of a day, with εType (t) the Energy Efficiency specific profile type. The Energy Efficiency profiles listed below are based on internal experience of the EE-Team. 306 PEE = ∑Type (PEEType ∗ εType (t)) 307 308 309 310 a. 8.C.01 Lighting: Lighting Energy Efficiency is assumed to mostly target commercial and industrial lighting, as a result, Energy Efficiency savings will manifest themselves during working hours. Commercial and industrial lighting-based Energy Efficiency will take effect starting at 7am and stop at after 6pm. No seasonal dependency is assumed for Lighting Energy Efficiency measures. 12Page 19 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 19 of 46 Commercial Lighting EE Profile 120% EE Profile 100% 80% 60% 40% 20% 0:00 0:45 1:30 2:15 3:00 3:45 4:30 5:15 6:00 6:45 7:30 8:15 9:00 9:45 10:30 11:15 12:00 12:45 13:30 14:15 15:00 15:45 16:30 17:15 18:00 18:45 19:30 20:15 21:00 21:45 22:30 23:15 0% 311 312 Figure 3: Daily Lighting EE Profile 313 314 315 316 317 318 b. c. 319 320 321 322 Residential Lighting: Residential Lighting is assumed to provide the most impact in the evening hours after 7pm. HVAC Commercial: Commercial HVAC is assumed to mostly be active during the day, with minimal activity at night. It is also dependent on the time of year. The underlying assumption is that HVAC load will be the highest during summer months, the lowest during spring and fall, with a minor peak during winter. To determine the day of year dependency of potential commercial HVAC savings, the following equation applied in the NWA Framework: εHVACCommYearly (t) = 1 + cos ( 15 min Interval of the Year Total number of15 min Intervals per Year 1 15 min Interval of the Year 3 Total number of15 min Intervals per Year ∗ 4π) + sin ( ∗ π) 8.C.02 which results in the annual curve for HVAC below. 323 324 Figure 4: Annual Commercial HVAC EE Profile 325 For daily profile of commercial HVAC Energy Efficiency, 326 εHVACCommDaily (t) = (1 + sin (π ∗ 1 15 min Interal of the Day−10 2 Total number of15 min Intervals per Day 327 328 329 330 13 )) ∗ εHVACCommYearly (t) 8.C.03Page 20 of 46
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 08, 2026 OCC-578 Attachment 1 Page 20 of 46 331 332 Figure 5: Daily Profile for Commercial HVAC EE 333 334 335 d. HVAC Residential: The HVAC residential follows the same yearly distribution as the HVAC commercial application, see above Equation 8.C.02. εHVACResYearly (t) = εHVACComYearly (t) 8.C.04 336 337 338 339 However, given that residential HVAC applications typically have a higher yield in the evening hours and at night as opposed to the commercial HVAC which typically operates during the day, the profile has been adjusted. For the daily profile of residential HVAC, the following profile function is applied. 340 εHVACResDaily (t) = (0.7 + 3 10 sin (2π ∗ 15 min Interval of the Day+30 otal number of15 min Intervals per Day )) ∗ εHVACResYearly (t) 8.C.05 341 342 343 Figure 6: HVAC Residential HVAC EE Profile 344 D. DEMAND RESPONSE 345 346 Demand Response (DR) is classified into two types, commercial and residential DR. Both types of DR will dispatch automatically if there is a modeled capacity delta. The dispatch is modeled as a binary function, activating all of the resources or none. 347 348 DR contracts provide for a 3-hour dispatch minimum window. Longer dispatch windows can be simulated, but an adjustment to the overall DR volume needs to be made, as the EDC would then stagger the DR resources to achieve such an effect. 349 SNAP BACK AND PRE-CONDITIONING 14
As listed on the current system
Question(s) Answered 566, 569, 570, 575, 578 (The Connecticut Light and Power Company) Date Filed: 09/22/2026